Search NASA⌕ Search

SEARCH · Search NASA

Results for “Operations cost”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 991 records · Page 55

Microwave Plasma Flash Pyrolysis for Coal-to-Product Applications

Since 2010, the US coal industry has experienced a precipitous decline, with coal production volumes dropping by as much as 35% according to EIA. This decline is hardly surprising given that 90% of domestic coal use is allocated to electricity production: While coal generation supplied about 45% of the nation's power in 2010, its share is projected to fall to only 22% in 2020. Fortunately, alternative uses for coal as a feedstock rather than as energy source are available. Coal tar is an established feedstock for chemicals and high-value carbon products including carbon fiber and battery-grade graphites. At present, growth of these uses is constrained by the low availability, purity, and yields of currently available coal liquids, and high energy- and CO2-intensity of current methods of production (i.e. coking). Previously reported work conducted in a partnership with Pacific Northwest National Laboratory demonstrated technical and economic viability of flash pyrolysis of coal in a microwave plasma environment at bench scales targeting production of fuel feedstocks (synthetic oil). H Quest’s work since then indicated promise of microwave-derived coal liquids to be uniquely suited for the lower-cost production of carbon materials, including synthetic graphite, carbon fiber, and composites. Low bulk process temperatures, subsecond residence times, and ambient pressure operation enable small-scale deployment, reduce capital and operating costs, and suppress formation of impurities, including QI material, typical in conventional coal tars. With no inherent production of CO2 or water consumption, microwave plasma flash pyrolysis presents a viable route to the sustainable production of both platform chemicals and carbon-based materials. Most recently, H Quest developed a novel, ruggedized microwave plasma reactor, which departs from the proof-of-concept approach and addresses the problems typically encountered in scaling laboratory microwave plasma apparata (e.g. eliminating fragile quartz enclosures prone to coking and fouling). This reactor has been integrated with a 15kW microwave power supply, a pulverized coal injection system, and a product recovery system. A series of screening tests across a range of coals (including hv-, lv-bituminous and subbituminous PRB), entrainment gas flows and compositions and microwave energy inputs are performed to evaluate conversion rates within the novel, scaled-up system, confirm yields of liquid products, and to perform compositional (GC/MS and elemental) analyses of the products. Results of these tests will be presented and discussed.

Skoptsov, George↗

The civil tiltrotor aircraft's potential in developing economies

The civilian tiltrotor (CTR) is analyzed as a new transportation technology with the potential for changing one of the key economic factors linked to Third World economic development. It is contended that efficient, low-cost transport services are a necessary condition for the economic development of Third World countries and that the CTR's capabilities and operating costs can provide more efficient transport services than have heretofore been available to such countries. A case study of potential CTR use among the nations of the Carribean Basin region appears to offer both analytical and empirical support to these contentions. The analysis indicates that normal market mechanisms are adequate for development of air cargo services using the CTR's capabilities. It is suggested that implementation of this service may require new institutional arrangements, but overall it is concluded that tiltrotor technology could make an important contribution to the economic development of Third World countries.

Alton, Larry R.↗

In-can Melter for Fukushima Waste: From Laboratory Scale Tests to the Industrial Design Definition - 19021

The In-Can melter process is being developed and qualified to treat waste arising from decommissioning and dismantling operations. This robust, simple and versatile in situ vitrification process is designed for high or medium level waste and is compact enough to be implemented in a decommissioned cell or close to the waste to be treated. It is developed to treat liquid and solid waste, to produce a small amount of secondary waste and to minimize investment and operating costs. The In-Can vitrification process is also developed with a modular design in order to be adapted regarding to nuclear operators' needs and requirements. The close collaboration between the CEA and Orano constitutes a unique structure able to provide a full and integrated solution, from the scenarios studies and matrix design definitions to the industrial implementation. The evaluation of the In-Can process for Fukushima water treatment secondary waste is a project led by Orano, CEA and ANADEC. This paper presents the first results of this project from the scenarios and glass formulation studies to the feasibility evaluation to Fukushima Daiichi Nuclear Power Station implementation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FINAL REPORT - Development of High Pressure Hydrogen Storage Tank for Storage and Gaseous Truck Delivery

The “Development of High Pressure Hydrogen Storage Tanks for Storage and Gaseous Truck Delivery” project [DE-FG36-08GO18062] was initiated on 01 July 2008. Hexagon Lincoln (then Lincoln Composites) received grant funding from the U.S. Department of Energy to support the design and development of an improved bulk hauling and storage solution for hydrogen in terms of cost, safety, weight and volumetric efficiency. The development of this capability required parallel development and qualification of large all-composites pressure vessels, a custom ISO container to transport and store said tanks, and performance of trade studies to identify optimal operating pressure for the system. Qualification of the 250 bar TITAN® module was completed in 2009 with supervision from the American Bureau of Shipping [ABS], and the equipment has been used internationally for bulk transportation of fuel gases since 2010. Phase 1 of the project was successfully completed in 2012 with the issuance of USDOT SP 14951, the special permit authorizing the manufacture, marking, sale and use of TITAN® Mobile Pipeline® equipment in the United States. The introduction of tube trailers with light weight composite tankage has meant that 2 to 3 times as much gaseous fuel can be transported with each trip. This increased hauling efficiency offers dramatically reduced operating costs and has enabled a profitable business model for over-the-road compressed natural gas delivery. The economic drivers of this business opportunity vary from country to country and region to region, but in many places gas distribution companies have realized profitable operations. Additional testing was performed in 2015 to characterize hydrogen-specific operating protocols for use of TITAN® systems in CHG service at 250 bar. This program demonstrated that existing compression and decompression methodologies can efficiently and safely fill and unload lightweight bulk hauling systems. Hexagon Lincoln and U.S. DOE agreed to continue into Phase 2 of the project without pursuing the development of higher pressure capabilities as originally planned. At 250 bar, development of equipment for hydrogen transport is supported by strong activity in the adjacent natural gas transportation sector. Trade studies performed since 2011 indicate optimization of hauling efficiency and system cost for hydrogen transport at about 350 bar (5076 psi). However, due to reduced efficiency of compression of natural gas above 250 bar, 350 bar operation is not an attractive option for natural gas transportation. The CHG market is not developed at this time, and it is difficult to forecast the arrival of significant revenues. On the investment side, the cost to fully qualify a large tank module at 350 bar is estimated at $3MM to $5MM. There is insufficient CHG market definition to support a stand-alone business case for this investment without near term revenue in the adjacent CNG transportation market. Therefore development of a 350 bar TITAN® system was deferred and not pursued under this project. Hexagon Lincoln continues to support the development of tankage and equipment for operation at 350 bar and above; with 700 bar vehicle tanks and 950 bar tanks for ground storage applications. Phase 2 activities were focused on reducing system cost, increasing system capacity, increasing system safety and characterization of polymer material performance specific to hydrogen pressure vessel usage. With the successful launch of TITAN® modules and trailers in natural gas transportation, over 600 units have been produced through the end of 2016, resulting in improved purchasing power for raw materials and manufactured components. This has allowed Hexagon Lincoln to approach the current project goals for system cost. At $590/kg of compressed hydrogen delivered, the system cost of the baseline TITAN® module is below the project’s 2015 target of $730/kg H2 delivered, and very close to the project’s 2020 target of $575/kg H2 delivered. [Based on product pricing in 1Q2017.] Emphasis was placed on configuration of larger capacity systems within the vehicle weights and dimensions allowed on federal and state highways in the United States and other countries. These activities resulted in the design and development of integrated tube trailer systems that have increased delivery capacities by 45%. The hydrogen delivery capacity of our largest system is 845 kg, exceeding the project’s 2015 target of 700 kg H2 delivered. Emerging technologies offering improvement of the safety systems used on the equipment were investigated, with particular focus on improving the reliability and cost of the emergency venting system for fire protection. Finally, investment in our materials laboratory improved detection and characterization of hydrogen-induced damage in polymer materials, supporting the development of operational protocols to avoid damage to pressure vessel liners and valve components.

08 HYDROGEN↗

Development of ITM Oxygen Technology for Integration in IGCC and Other Advanced Power Generation DECISION POINT 1 UNDER PHASE 3

Air Products and the DOE have partnered over a number of years in the development of ITM Oxygen technology in support of gasification technology. Throughout this process, studies of application of the technology to IGCC and oxy-coal combustion have shown significant reduction in capital and operating costs compared to similar systems using conventional cryogenic air separation. Phase 3, the current phase of the program, focuses on the design, construction and operation of a 30- to 100-TPD pilot facility, the Intermediate Scale Test Unit (ISTU). Execution of this phase to date has resulted in significant advances in a number of areas including ceramic membrane material development, module design and production, ceramic-to-metal seal design, process control strategies, and engineering development of process cycles. Phase 3 will be complete upon successful operation of the ISTU in a series of tests making oxygen from ceramic membrane modules and producing power from a hot gas expander. Phase 3 work has extended beyond the planned schedule due to a delay in delivery of equipment from vendors. Air Products is currently managing the equipment delay by close involvement with the vendor to redesign the problematic equipment and oversee its fabrication. The result of these unforeseen challenges is that the ISTU project completion date has been delayed. Tight cost controls have been implemented both by DOE program management and APCI to meet budget constraints despite increased costs due to budget delays. Total project costs have increased in several areas. Increased costs in the ISTU project include purchased equipment, instruments, construction, and contractor engineering. Increased costs for other tasks include additional work in support of module production by Ceramatec, Inc, and increased Air Products labor for component testing. Air Products plans to complete testing as outlined in the SOPO and successfully complete all project objectives by the end of FY14.

Anderson, Lori↗

Wood Pellet-Fired Biomass Boiler Project at the Ketchikan Federal Building

Biomass boiler systems have existed for many years, but the technology has advanced in recent decades and can now provide automated and efficient operation for a relatively modest investment. Key advances in system monitoring and control allow for lower operating costs, since the control systems run all aspects of the boiler, including feed, load reduction and even tube cleaning. These advances have made such systems economical on a small scale in situations where inexpensive fuels like natural gas are not available. This creates an opportunity for building operators in remote, cold-climate locations to reduce the use of expensive fuels for heating buildings. GSA Region 10 installed the system at the federal building in Ketchikan, Alaska and submitted the project to the Green Proving Ground (GPG) program. GSA's GPG program contracted with the National Renewable Energy Laboratory (NREL) to assess the installation and the technology. The system serves as a demonstration to assess actual system efficiencies, as well as operating characteristics and financial benefits. In addition to installation and operational issues, the project team/researchers examined other issues, including fuel transportation costs, building energy savings, and overall economics.

09 BIOMASS FUELS↗

Cost analysis of alternative large-scale high-temperature solid oxide electrolysis hydrogen production facilities

We extend our past cost analysis of gigawatt-scale solid oxide electrolysis (SOE) facilities that produce high purity hydrogen gas from water by estimating construction and operating costs for three new alternative design cases: (1) offsite feed steam generation; (2) near-atmospheric pressure (NAP) stack; and (3) onsite electric boiler feed steam generation. Pressure effects on hydrogen electrode-(cathode-)supported SOE cell (SOEC) stack performance are estimated for the same assumed cell and stack construction and used to determine facility-wide stack capital costs for achieving a fixed H2 production at different pressures. Modular balance of plant (BOP) process equipment capital costs are estimated for each new alternative design case using our past equipment sizing, design, and cost data and scaling relationships. Furthermore, we update BOP equipment sizing and design for the NAP case using Aspen®. Vendor quotes for electric boilers are used to estimate costs for the electric boiler design case. Factory and onsite assembly and installation costs for SOEC stacks and BOP equipment are calculated using our past simplified first-principles approach. First-of-a-kind (FOAK) and N th -of-a-kind (NOAK) production maturity cost estimates are included for all results. The case with NAP stacks offers the lowest facility total capital cost (TCC, ~23% lower than base) while use of small electric boilers requires the highest TCC (~3% higher than base). H 2 production prices decrease from the base of ~$\$2.17$ /kgH 2 to ~$\$1.92$/kgH 2 for 1 GW e DC SIP facilities utilizing NAP stacks supplied by offsites steam situated in large modules and blocks for $\$0.030$/kWh e and $0.009/kWh t prices for electricity and thermal energy, respectively. We report all costs in 2021 US dollars.

Balance of plant (BOP) process equipment↗

Optimal mass evacuation planning for electric vehicles before natural disasters

The electric vehicle (EV) market has significantly expanded because EVs have lower operational costs while leaving less environmental footprint than internal combustion engine vehicles. However, EVs also come with drawbacks, including long charging time and short operational ranges. With these drawbacks and limited charging facilities, efficient long-distance EV evacuation management is challenging and has not been properly addressed. Without an efficient evacuation plan, serious congestion could happen at charging facilities, the evacuation process would be excessively long, and thus human lives may be put at risk. This study is motivated to investigate the optimal mass evacuation planning for EVs considering limited charging facilities. A three-stage method is proposed to efficiently approach this problem. A case study of Florida hurricane evacuation is conducted. Here, the method's effectiveness is verified by comparing it with a benchmark. Management insights and policy indications are drawn through sensitivity analysis of key parameters.

33 ADVANCED PROPULSION SYSTEMS↗

High-Speed, High-Temperature Finger Seal Test Results

Finger seals have significantly lower leakage rates than conventional labyrinth seals used in gas turbine engines and are expected to decrease specific fuel consumption by over 1 percent and to decrease direct operating cost by over 0.5 percent. Their compliant design accommodates shaft growth and motion due to thermal and dynamic loads with minimal wear. The cost to fabricate these finger seals is estimated to be about half the cost to fabricate brush seals. A finger seal has been tested in NASA's High Temperature, High Speed Turbine Seal Test Rig at operating conditions up to 1200 F, 1200 ft/s, and 75 psid. Static, performance and endurance test results are presented. While seal leakage and wear performance are acceptable, further design improvements are needed to reduce the seal power loss.

Proctor, Margaret P.↗

Space Shuttle Upgrades: Long Life Alkaline Fuel Cell

NASA has utilized the alkaline fuel cell technology to provide electrical power for manned launch vehicles such as Gemini, Apollo, and the Space Shuttle. The current Shuttle alkaline fuel cells are procured from UTC Fuel Cells, a United Technologies Company. The alkaline fuel cells are very reliable but the operating life is limited to 2600 hours due to voltage degradation of the individual cells. The main limiting factor in the life of the cells is corrosion of the cell's fiberglass/epoxy frame by the aqueous potassium hydroxide electrolyte. To reduce operating costs, the orbiter program office approved the Long Life Alkaline Fuel Cell (LLAFC) program as a shuttle upgrade in 1999 to increase the operating life of the fuel cell powerplant to 5000 hours. The LLAFC program incorporates improving the cell by extending the length of the corrosion path, which reduces the cell frame corrosion. UTCFC performed analysis to understand the fundamental mechanisms that drive the cell frame corrosion. The analysis indicated that the corrosion path started along the bond line between the cathode and the cell frame. Analysis also showed that the oxygen available at the cathode, the catalyst on the electrode, and the electrode substrate all supported or intensified the corrosion. The new cell design essentially doubled the corrosion path to mitigate the problem. A 10-cell stack was tested for 5000 hours during the development phase of this program to verify improved cell performance. A complete 96-cell stack was then tested for 5000 hours during the full manned-space qualification phase of this program. Additional upgrades to the powerplant under this program are: replacing the aluminum body in the pressure regulator with stainless steel to reduce corrosion, improving stack insulator plate with improved resistance to stress failure and improved temperature capability, and replacing separator plate elastomer seals with a more durable material and improved seal retention.

Kerri McCurdy↗

An Impartial Perspective for Superconducting Nb$_3$Sn coated Copper RF Cavities for Future Linear Accelerators

This Snowmass21 Contributed Paper encourages the Particle Physics community in fostering R&D in Superconducting Nb3Sn coated Copper RF Cavities instead of costly bulk Niobium. It describes the pressing need to devote effort in this direction, which would deliver higher gradient and higher temperature of operation and reduce the overall capital and operational costs of any future collider. It is unlikely that an ILC will be built in the next ten years with Nb as one of the main cost drivers of SRFs. This paper provides strong arguments on the benefits of using this time for R&D on producing Nb3Sn on inexpensive and thermally efficient metals such as Cu or bronze, while pursuing in parallel the novel U.S. concept of parallel-feed RF accelerator structures. A technology that synergistically uses both of these advanced tools would make an ILC or equivalent machines more affordable and more likely to be built. Such a successful enterprise would readily apply to other HEP accelerators, for instance a Muon Collider, and to accelerators beyond HEP. We present and assess current efforts in the U.S. on the novel concept of parallel-feed RF accelerator structures, and in the U.S. and abroad in producing Nb3Sn films on either Cu or bronze despite minimal funding.

43 PARTICLE ACCELERATORS↗

Artificial Intelligence Thermostat to Detect Faults

Residential air conditioners and heat pumps often experience faults due to inadequate maintenance, which can severely reduce efficiency or even cause system failure. Common issues include dirty or clogged air filters and refrigerant leaks. These problems degrade performance and increase energy use and operating costs. This study presents a smart thermostat with embedded artificial intelligence to detect such faults and alert homeowners when maintenance is needed. The thermostat uses low-cost measurements—including return-air temperature, relative humidity, supply-air temperature, outdoor-air temperature, and condenser subcooling—to identify abnormal operations. Because different faults produce distinct response patterns, tailored algorithms are developed to recognize characteristic fault signatures. The investigation is built on a detailed co-simulation platform that couples EnergyPlus with the DOE/ORNL Heat Pump Design Model (HPDM). EnergyPlus represents the building’s dynamic environment, while HPDM is a high-fidelity, hardware-based model that can simulate fault-free performance as well as a wide range of faults, including gradual degradation such as minor refrigerant leakage. This platform provides a virtual training and testing environment that helps distinguish fault-induced behavior from normal operation and supports development of robust diagnostic algorithms. Using this framework, a Dynamic Bayesian Network was developed to identify two common faults—gradual refrigerant charge loss and indoor airflow blockage—and the AI-embedded thermostat was verified through annual building simulations.

Shen, Bo [ORNL] (ORCID:0000000336600393)↗

DSN Co-Observing Operations to Support Space VLBI Missions

Reliable radio astronomy support of Space Very-Long-Baseline- Interferometry missions by ground radio telescopes is mandatory in order to achieve high scientific return from missions, The 70m DSN antennas along with other ground radio telescopes will perform as the ground segment of the Earth-space interferometer. Improvements of radio astronomy VLBI operations at the DSN to achieve higher reliability, efficiency, flexibility, and lower operations costs is a major goal in preparing for radio astronomy support of SVLBI. To help realize this goal, a remote control and monitoring mode for radio astronomy operations at the DSN is being developed.

radio↗

Agent-Based Coordination Scheme for PV Integration (ABC4PV)

Renewables and especially photovoltaics (PV) have benefitted significantly from a host of incentives and policies targeted toward enhanced integration and adoption of specific energy technologies. However, with the push to move forward into a subsidy-free market framework, behind-the-meter residential PV applications have generally struggled to retain their value (unlike utility scale and commercial projects) [1]. This project focused on developing control-theoretic solutions aimed at improving the integration and interaction of behind-the-meter residential PV with other distribution system assets (controllable and non-controllable) to enhance the integrated value of residential PV. To this end, a suite of decentralized control methodologies have been developed to enable effective coordination and control of behind-the-meter residential load customers’ PV, battery storage systems (BSS), controllable loads and other similar assets within a distribution feeder. This interaction aims at procuring energy savings and, thus, energy bill savings. The main source of savings is drawn from reducing the effect of demand charge pricing and is realized at the feeder level, assuming community level interaction and management among the aforementioned assets. Optimal control of the assets is implemented with a distributed optimization methodology, leveraging consensus-based algorithms. The results gathered from the optimal control simulations demonstrates that the savings can be duly achieved and the algorithm decision times (to dynamically control asset set points, for example) are fast. As for the overall efficiency of PV+BSS systems, to procure energy savings from curtailment of the demand charge pricing effects, the optimal control is set up so as to minimize the variance of the load for all customers, throughout a feeder and throughout time in a rolling horizon scheduling with model predictive control. The control takes into account inter-temporal electrochemical storage (battery) degradation costs: specifically, we have developed a long-term lifetime model for the BSS that weighs in the effect of the degradation factor in the dispatch formulations, thus, a considerable operating cost that affects energy decision making. The levelized cost of energy (LCOE – redefined for the purpose of quantifying asset integration effectiveness through the customers’ energy cost) is shown to be below the threshold set for the combined PV+BSS topology of $ 0.14/kWh for multiple cases of PV penetration all the way up to 50%, provided that a policy of shared ownership of and savings is in place. Further, the LCOE calculated for the case before the deployment PV+BSS systems is also achievable, i.e. the deployment of PV+BSS, if planned and scheduled optimally. will have no effect on customers’ energy costs. From the control methodology viewpoint, the developed consensus-based algorithms are shown to converge for a wide range of problem cases (spanning normal operating scenarios and contingencies), guaranteeing dispatch solutions under forecasting errors, communication break-downs and cyber-security attacks. The proposed control solutions are scalable and real-time implementable, with dispatch computations and device set-point updates converging in less than 2s in most practical instances of the above events.

14 SOLAR ENERGY↗

Lessons learned from the introduction of autonomous monitoring to the EUVE science operations center

The University of California at Berkeley's (UCB) Center for Extreme Ultraviolet Astrophysics (CEA), in conjunction with NASA's Ames Research Center (ARC), has implemented an autonomous monitoring system in the Extreme Ultraviolet Explorer (EUVE) science operations center (ESOC). The implementation was driven by a need to reduce operations costs and has allowed the ESOC to move from continuous, three-shift, human-tended monitoring of the science payload to a one-shift operation in which the off shifts are monitored by an autonomous anomaly detection system. This system includes Eworks, an artificial intelligence (AI) payload telemetry monitoring package based on RTworks, and Epage, an automatic paging system to notify ESOC personnel of detected anomalies. In this age of shrinking NASA budgets, the lessons learned on the EUVE project are useful to other NASA missions looking for ways to reduce their operations budgets. The process of knowledge capture, from the payload controllers for implementation in an expert system, is directly applicable to any mission considering a transition to autonomous monitoring in their control center. The collaboration with ARC demonstrates how a project with limited programming resources can expand the breadth of its goals without incurring the high cost of hiring additional, dedicated programmers. This dispersal of expertise across NASA centers allows future missions to easily access experts for collaborative efforts of their own. Even the criterion used to choose an expert system has widespread impacts on the implementation, including the completion time and the final cost. In this paper we discuss, from inception to completion, the areas where our experiences in moving from three shifts to one shift may offer insights for other NASA missions.

Lewis, M.↗

How Public Private Partnerships Enable NASA Future Space Communication Needs

The NASA Space Communications and Navigation (SCaN) Program is responsible for providing communication and navigation services to scientific and human space exploration missions. SCaN's current Space Network provides radio frequency (RF) relay services to near Earth space missions via Tracking and Data Relay Satellites (TDRS). SCaN plans to offer a new generation of relay services beginning in 2025, including the addition of optical communications capabilities and enhanced RF capabilities. The primary drivers behind the development of these next generation relay network services are to enhance communication and navigation services with significantly reduced development and operational costs. Several approaches being considered for implementation of these services are through government owned capabilities, through commercial service providers, or a combination of the two. One approach receiving a great deal of attention is the use of Public-Private Partnerships (PPP) to develop and provide capabilities or services. Utilizing Public-Private Partnerships allows NASA and commercial entities to share the investment, standards, and risks of developing and testing new or enhanced capabilities which can benefit both NASA and the commercial space communication industry. The capabilities developed under the PPP can then be used to support the growth of the commercial satellite communications industry while simultaneously being introduced into NASA operations to provide service to future NASA missions as part of the NASA Next Generation Architecture. Partnerships formed for this purpose can also serve as the basis for further NASA acquisition activities where government and industry can continue to share the cost, risk, and benefits of space communications capability development and operations. This objective is consistent with the 2010 National Space Policy stated principles: "The United States is committed to encouraging and facilitating the growth of a U.S. commercial space sector that supports U.S. needs, is globally competitive, and advances U.S. leadership in the generation of new markets and innovation-driven entrepreneurship." [1]NASA has conducted several internal studies as well as externally funded studies with industry to define the next generation space communication architecture. NASA has approached the commercial industry through a Request for Information (RFI) to define further the next generation architecture and has conducted numerous internal and external studies. The results are promising and are shaping the approach to utilize Public Private Partnership to achieve NASA's objectives while reducing costs. The commercial satellite industry has begun to deploy high performance, high throughput global satellite constellations which have the potential to provide communication services to NASA Missions. Commercial satellite manufacturers have advanced their processes to rapidly design, build, and deliver, reliable communication satellites using minimum government oversight. In this paper, we will 1) describe the NASA Next Generation Architecture, Concept of Operations (ConOps), and salient characteristics; 2) Discuss the rational of Public-Private Partnerships to achieve NASA’s next generation communication architecture; and 3) Summarize the preliminary analysis performed to date and describe the path forward.

Stegeman, James↗

Systems Engineering Approach to Technology Integration for NASA's 2nd Generation Reusable Launch Vehicle

The overall goal of the 2nd Generation RLV Program is to substantially reduce technical and business risks associated with developing a new class of reusable launch vehicles. NASA's specific goals are to improve the safety of a 2nd generation system by 2 orders of magnitude - equivalent to a crew risk of 1-in-10,000 missions - and decrease the cost tenfold, to approximately $1,000 per pound of payload launched. Architecture definition is being conducted in parallel with the maturating of key technologies specifically identified to improve safety and reliability, while reducing operational costs. An architecture broadly includes an Earth-to-orbit reusable launch vehicle, on-orbit transfer vehicles and upper stages, mission planning, ground and flight operations, and support infrastructure, both on the ground and in orbit. The systems engineering approach ensures that the technologies developed - such as lightweight structures, long-life rocket engines, reliable crew escape, and robust thermal protection systems - will synergistically integrate into the optimum vehicle. To best direct technology development decisions, analytical models are employed to accurately predict the benefits of each technology toward potential space transportation architectures as well as the risks associated with each technology. Rigorous systems analysis provides the foundation for assessing progress toward safety and cost goals. The systems engineering review process factors in comprehensive budget estimates, detailed project schedules, and business and performance plans, against the goals of safety, reliability, and cost, in addition to overall technical feasibility. This approach forms the basis for investment decisions in the 2nd Generation RLV Program's risk-reduction activities. Through this process, NASA will continually refine its specialized needs and identify where Defense and commercial requirements overlap those of civil missions.

Thomas, Dale↗

Systems Engineering Approach to Technology Integration for NASA's 2nd Generation Reusable Launch Vehicle

The overall goal of the 2nd Generation RLV Program is to substantially reduce technical and business risks associated with developing a new class of reusable launch vehicles. NASA's specific goals are to improve the safety of a 2nd-generation system by 2 orders of magnitude - equivalent to a crew risk of 1-in-10,000 missions - and decrease the cost tenfold, to approximately $1,000 per pound of payload launched. Architecture definition is being conducted in parallel with the maturating of key technologies specifically identified to improve safety and reliability, while reducing operational costs. An architecture broadly includes an Earth-to-orbit reusable launch vehicle, on-orbit transfer vehicles and upper stages, mission planning, ground and flight operations, and support infrastructure, both on the ground and in orbit. The systems engineering approach ensures that the technologies developed - such as lightweight structures, long-life rocket engines, reliable crew escape, and robust thermal protection systems - will synergistically integrate into the optimum vehicle. To best direct technology development decisions, analytical models are employed to accurately predict the benefits of each technology toward potential space transportation architectures as well as the risks associated with each technology. Rigorous systems analysis provides the foundation for assessing progress toward safety and cost goals. The systems engineering review process factors in comprehensive budget estimates, detailed project schedules, and business and performance plans, against the goals of safety, reliability, and cost, in addition to overall technical feasibility. This approach forms the basis for investment decisions in the 2nd Generation RLV Program's risk-reduction activities. Through this process, NASA will continually refine its specialized needs and identify where Defense and commercial requirements overlap those of civil missions.

Thomas, Dale↗