Search NASA⌕ Search

SEARCH · Search NASA

Results for “SPACE LOGISTICS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 991 records · Page 55

Expedition 3 Crew Interview: Vladimir Dezhurov

Expedition 3 Pilot Vladimir Dezhurov is seen being interviewed before leaving to become part of the third resident crew on the International Space Station (ISS). He answers questions about his inspiration to become an astronaut and his career path. He discusses his expectations for life on the ISS and the experiments he will be performing while on board. Dezhurov gives details on the spacewalks that will take place during the STS-105 mission (the mission carrying the Expedition 3 crew up to the ISS) and the unloading operations for the Multipurpose Logistics Module.

Source record↗

Using System Mass (SM), Equivalent Mass (EM), Equivalent System Mass (ESM) or Life Cycle Mass (LCM) in Advanced Life Support (ALS) Reporting

The Advanced Life Support (ALS) has used a single number, Equivalent System Mass (ESM), for both reporting progress and technology selection. ESM is the launch mass required to provide a space system. ESM indicates launch cost. ESM alone is inadequate for technology selection, which should include other metrics such as Technology Readiness Level (TRL) and Life Cycle Cost (LCC) and also consider perfom.arxe 2nd risk. ESM has proven difficult to implement as a reporting metric, partly because it includes non-mass technology selection factors. Since it will not be used exclusively for technology selection, a new reporting metric can be made easier to compute and explain. Systems design trades-off performance, cost, and risk, but a risk weighted cost/benefit metric would be too complex to report. Since life support has fixed requirements, different systems usually have roughly equal performance. Risk is important since failure can harm the crew, but it is difficult to treat simply. Cost is not easy to estimate, but preliminary space system cost estimates are usually based on mass, which is better estimated than cost. Amass-based cost estimate, similar to ESM, would be a good single reporting metric. The paper defines and compares four mass-based cost estimates, Equivalent Mass (EM), Equivalent System Mass (ESM), Life Cycle Mass (LCM), and System Mass (SM). EM is traditional in life support and includes mass, volume, power, cooling and logistics. ESM is the specifically defined ALS metric, which adds crew time and possibly other cost factors to EM. LCM is a new metric, a mass-based estimate of LCC measured in mass units. SM includes only the factors of EM that are originally measured in mass, the hardware and logistics mass. All four mass-based metrics usually give similar comparisons. SM is by far the simplest to compute and easiest to explain.

Jones, Harry↗

Converting information from paper to optical media

The technology of converting large amounts of paper into electronic form is described for use in information management systems based on optical disk storage. The space savings and photographic nature of microfiche are combined in these systems with the advantages of computerized data (fast and flexible retrieval of graphics and text, simultaneous instant access for multiple users, and easy manipulation of data). It is noted that electronic imaging systems offer a unique opportunity to dramatically increase the productivity and profitability of information systems. Particular attention is given to the CALS (Computer-aided Aquisition and Logistic Support) system.

Deaton, Timothy N.↗

Geometric Reasoning for Automated Planning

An important aspect of mission planning for NASA s operation of the International Space Station is the allocation and management of space for supplies and equipment. The Stowage, Configuration Analysis, and Operations Planning teams collaborate to perform the bulk of that planning. A Geometric Reasoning Engine is developed in a way that can be shared by the teams to optimize item placement in the context of crew planning. The ISS crew spends (at the time of this writing) a third or more of their time moving supplies and equipment around. Better logistical support and optimized packing could make a significant impact on operational efficiency of the ISS. Currently, computational geometry and motion planning do not focus specifically on the optimized orientation and placement of 3D objects based on multiple distance and containment preferences and constraints. The software performs reasoning about the manipulation of 3D solid models in order to maximize an objective function based on distance. It optimizes for 3D orientation and placement. Spatial placement optimization is a general problem and can be applied to object packing or asset relocation.

Clement, Bradley J.↗

NASA's Nuclear Thermal Propulsion Project

Space fission power systems can provide a power rich environment anywhere in the solar system, independent of available sunlight. Space fission propulsion offers the potential for enabling rapid, affordable access to any point in the solar system. One type of space fission propulsion is Nuclear Thermal Propulsion (NTP). NTP systems operate by using a fission reactor to heat hydrogen to very high temperature (>2500 K) and expanding the hot hydrogen through a supersonic nozzle. First generation NTP systems are designed to have an Isp of approximately 900 s. The high Isp of NTP enables rapid crew transfer to destinations such as Mars, and can also help reduce mission cost, improve logistics (fewer launches), and provide other benefits. However, for NTP systems to be utilized they must be affordable and viable to develop. NASA's Advanced Exploration Systems (AES) NTP project is a technology development project that will help assess the affordability and viability of NTP. Early work has included fabrication of representative graphite composite fuel element segments, coating of representative graphite composite fuel element segments, fabrication of representative cermet fuel element segments, and testing of fuel element segments in the Compact Fuel Element Environmental Tester (CFEET). Near-term activities will include testing approximately 16" fuel element segments in the Nuclear Thermal Rocket Element Environmental Simulator (NTREES), and ongoing research into improving fuel microstructure and coatings. In addition to recapturing fuels technology, affordable development, qualification, and utilization strategies must be devised. Options such as using low-enriched uranium (LEU) instead of highly-enriched uranium (HEU) are being assessed, although that option requires development of a key technology before it can be applied to NTP in the thrust range of interest. Ground test facilities will be required, especially if NTP is to be used in conjunction with high value or crewed missions. There are potential options for either modifying existing facilities or constructing new ground test facilities. At least three potential options exist for reducing (or eliminating) the release of radioactivity into the environment during ground testing. These include fully containing the NTP exhaust during the ground test, scrubbing the exhaust, or utilizing an existing borehole at the Nevada National Security Site (NNSS) to filter the exhaust. Finally, the project is considering the potential for an early flight demonstration of an engine very similar to one that could be used to support human Mars or other ambitious missions. The flight demonstration could be an important step towards the eventual utilization of NTP.

Houts, Michael↗

Gateway Lunar Habitat Modules as the Basis for a Modular Mars Transit Habitat

This paper provides a summary of the results from a recent concept study of various configurations for a Mars Transit Habitat. The designs considered are composed of modules based on published contractor concepts proposed for the lunar Gateway through NASA’s NextSTEP program. Using these Gateway concepts as a starting point for the design of a Mars Transit Habitat has potential advantages. Both Gateway and Mars Transit Habitats will have similar requirements for long-term operations in deep space, autonomous and remote operations when the crew is not onboard, and similar requirements for transferring crew to and from a planetary surface—the Moon and Mars respectively. The contractor designs for Gateway were traded against a monolithic transit habitat previously proposed by NASA’s Mars Integration Group. In addition, these concepts were considered for a “shakedown” mission for the transit habitat hardware in cislunar space to build confidence in new systems, including the advanced environmental control and life support systems needed for Mars missions. The results presented include overall vehicle configurations, mass, and volume estimates for the selected design concepts. Two concepts using large expandable modules are identified as leading candidates for a Mars Transit Habitat and the remaining elements are identified as representative of the habitable pressure vessels needed for safe haven configurations, logistics modules, surface habitats, rovers, and descent and ascent crew cabins in the overall Mars Architecture.

Smitherman, David↗

Development of an SE(3)-based Rigid Body Pose Estimation Scheme for Unknown Moments of Inertia in a Spacecraft

In real-world applications, the consideration of state and parameter uncertainties is an important part of any navigation and control system. Uncertainties can arise because of the instruments, communication systems, or external disturbances. Parameter uncertainty can be due to uncertainties in the data or the calibration process used. The objective of this research is to develop a rigid body pose estimation scheme on nonlinear manifolds of rigid body motion groups for unknown mass properties moments of inertia with application in space launch. An unscented Kalman filter is developed on special Euclidean space and their tangent bundle to address uncertainties in the states and inertia properties. This estimator accounts for uncertainties, while considering rotational-translational coupling, and avoids singularity or non-uniqueness issues. Since this estimator is based on the nonlinear manifolds on which rigid body motion evolves, it is reliable and is expected to result in high level of accuracy. The estimators are validated on a generic model of Logistic Module (LM) and a cuboid spacecraft model. The algorithms can then be tested on Dragon XL, HTV-X, and possibly other spacecraft.

Moments of Inertia↗

Machine Learning for Predicting Team Functioning in HERA Missions

Team functioning is integral to success in future long term space exploration missions. Proactively detecting declines in team functioning can mitigate conflict and ensure mission success. This project developed a speech-based artificial intelligence (AI) system that unobtrusively predicts degradation in team functioning, including performance and cohesion, in the Human Exploration Research Analog (HERA) Campaigns 4 and 5. The AI system conducted automated analysis of the prosodic (tone of voice) and linguistic (language content) components of speech, modeling interpersonal dynamics at both the turn-taking and day-wide levels. We investigated team functioning via observing structured interactions (i.e., multi-mission space exploration vehicle-extra vehicular activity [MMSEV-EVA], team interaction battery [TIB]) and unstructured interactions before the MMSEV-EVA task. We developed machine learning models to predict team functioning (objective task accuracy, self reported team efficacy and self reported team cohesion) by analyzing OpenSmile acoustic features, linguistic descriptors extracted via the linguistic inquiry and word count (LIWC) dictionary, and semantic embeddings. In the TIB, static models using logistic regression and random forests were not able to predict task accuracy, but predicted team efficacy and cohesion during both the decision making and relational tasks to a moderate level (60-70%). Majority voting on the individual turns to predict day long team efficacy further increased accuracies (70-80%). Finally, long short-term memory (LSTM) models showed the best performance across all variables (80-91%), including task performance. In the MMSEV-EVA, static models achieved an accuracy of 60% with majority voting, which increased to 80% through the incorporation of mission day as a variable, accounting for the learning effect. A key finding across both tasks was the "team-dependent" nature of these interactions; models achieved much higher accuracy when trained on prior days of the same team's data rather than attempting to generalize across entirely different teams, with even 1-2 days of prior data per team achieving 5-15% improvement over team-independent models. In addition, the incorporation of pre-task data from the same team also improves model performance, e.g., incorporating data from the decision-making task of the TIB, which preceded the relational task, improved the prediction of team efficacy and cohesion during the latter. We compared model performance when trained on machine-generated data compared to data that had been further corrected by human annotators. Overall, models trained on human-corrected data exhibited a modest improvement in performance, particularly when acoustic features were used. We found no significant correlation between word error rate (WER) and model accuracy (r(55) = -0.08, p = 0.51), but model’s accuracy was significantly higher for medium/high quality transcription (0.74 (SD = 0.48)) compared to the low-quality group (0.64 (SD = 0.36)) (t(63)=2.82, p = 0.006). Based on these, several design recommendation emerge, that could inform Standards at NASA. Models predicting team functioning should incorporate at least one to two days of historical interaction data, include brief pre-task discussions, and explicitly model temporal learning effects, especially for longer operational tasks. Minimum quality standards for automated speech-processing pipelines are needed, given the performance gains observed with manually corrected acoustic data. Finally, systems should leverage both acoustic features and language embeddings in complementary ways, with modality choices and fusion strategies tailored to mission context, task demands, and data quality requirements.

Shrivatsa Mishra↗

Modular space station

The modular space station comprising small, shuttle-launched modules, and characterized by low initial cost and incremental manning, is described. The initial space station is designed to be delivered into orbit by three space shuttles and assembled in space. The three sections are the power/subsystems module, the crew/operations module, and the general purpose laboratory module. It provides for a crew of six. Subsequently duplicate/crew/operations and power/subsystems modules will be mated to the original modules, and provide for an additional six crewmen. A total of 17 research and applications modules is planned, three of which will be free-flying modules. Details are given on the program plan, modular characteristics, logistics, experiment support capability and requirements, operations analysis, design support analyses, and shuttle interfaces.

Source record↗

Manned space platforms, payloads and tending

A concept has been developed for providing for a permanent manned presence in space for science, applications, and technology plus growth potential to support major future operational missions. An initial crew of two to four is accommodated along with installations for interior, exterior and tended payloads. Tended payloads support includes servicing of remote free-flying spacecraft, basing of reusable orbital transfer vehicles and basing of teleoperator-mounted payloads for near-station excursions. Candidate payloads, plus configuration, flight operation, subsystem and ground logistics aspects are described, as are Shuttle interactions.

Runge, F. C.↗

Predicting Crew Time Allocations for Lunar Orbital Missions Based on Historical ISS Operational Activities

As the National Aeronautics and Space Administration continues to define candidate architectures for the planned lunar “Gateway”, it will be necessary to have a detailed understanding of how the crew will inhabit, operate, and maintain the spacecraft. The nature of the Gateway vehicle systems configuration and operations will have a direct impact on the scope of work activities required of the crew. Crew work schedules are sensitive to variations in spacecraft architecture, visiting vehicle activities, and logistics operations – particularly within short duration missions as initially planned for the lunar Gateway. These system and operational configurations must be taken into account when planning for crew time availability to conduct science activities on Gateway missions. This paper presents a methodology that is used to predict crew time distributions for lunar Gateway missions, as applied in NASA’s Exploration Crew Time Model (ECTM). The process utilized for evaluating crew time distributions is based on the categorization of all crew activities into a standardized ontology. Historical ISS daily crew timeline data from July 20, 2011 (post STS retirement) to present day was captured via the Operational Planning Timeline Integration System (OPTimIS) database and characterized according to the standardized ontology. This process enabled correlation and statistical analysis of the ISS data according to common mission parameters such as crew size, ECLSS system design, vehicle traffic operations, and logistics delivery operations. The results of the statistical analysis are a set of crew time distributions for each activity category. These distributions are then utilized within the ECTM to examine crew time allocations based on mission parameter inputs, which serve to characterize the Gateway mission configurations. Results for predicted crew time allocations for representative short duration Gateway missions are presented. These results can be used to evaluate crew schedule availability for science and utilization activities. Variations in expected mission architectures and mission operations are accounted for to correct crew time predictions. The analysis is being leveraged to plan utilization capability objectives that are achievable on the Gateway missions, as well as inform the viability of various mission architecture options.

Stromgren, Chel↗

NASA Gateway Refueling Architecture and Concept of Operation

The Lunar Gateway is a deep space orbiting outpost being developed by NASA in partnership with ESA and other domestic and international partners. It is a critical component of NASA’s Artemis program supporting long-term human exploration of the moon and is designed to be refueled, requiring the on-orbit transfer of propellants. The first two modules of Gateway to be launched will be the Power and Propulsion Element (PPE) and the Habitation and Logistics Outpost (HALO). The PPE contains the bipropellant chemical and electrical propulsion systems that will provide attitude control and orbit raising capability for Gateway. The reaction control system (RCS) utilizes monomethylhydrazine (MMH) and mixed oxides of nitrogen-3 (MON-3) as the fuel and oxidizer, respectively. Helium is used as a pressurant. The Advanced Electric Propulsion Systems (AEPS) and Busek hall thrusters that comprise the solar electric propulsion (SEP) system use xenon as the propellent. The ESPRIT Refueling Module, provided by ESA, will supply the propellant refueling function to Gateway’s propulsion systems. On-orbit refueling is a complex, technically challenging operation that is key to enabling sustainable crewed Lunar and Martian exploration. Numerous systems may be involved in the refueling operation. Also numerous systems are required to enable the successful ability for Gateway to refuel such as, SEP, RCS, Structure & Mechanisms (S&M), Guidance, Navigation and Control (GNC), Thermal, Software, Vehicle System Manager (VSM), Flight Ops, Extra Vehicular Robotics (EVR), Communication and Tracking (C&T), Avionics, and more. This paper will detail the design architecture, concept of operations, and challenges associated with the Gateway refueling system. The methodologies used in Gateway will be compared to those implemented in OSAM-1 and the best practices documented by AIAA and CONFERS (Consortium For Execution Of Rendezvous And Servicing Operations).

Brandie L. Rhodes↗

Some Aeronautical Communications Experiments

Classically there has existed an asymmetry between the computing and communicating sides of aerospace systems. Over the past few decades, this asymmetry has shifted to favoring communication link technologies, meaning that advancements in available central processing units (CPUs), storage devices, and internal data buses have stagnated. Indeed, the increased emphasis placed on refining subsystem performance such as with antenna bandwidth in phased arrays, amplifier power efficiency, software defined radio (SDR) flexibility and encoding for data compression and error correction has given rise to successful debuts of multi-gigabit-per-second data return from long space-link distances. These accomplishments are easily quantifiable through link budgets and illustrate what is possible, but also reveal the deficiencies in overall communications capabilities. In particular, the ever-accelerating presence of aerospace vehicles gives rise to newer and larger classes of challenges to address the needs of 21st century systems. Furthermore remote sensing and imaging capabilities have far outpaced our ability to transmit their products to the ground, so we are increasingly dependent on pre-processing and downselection to contend with the communications bottleneck. No longer may we depend upon the constrained logistics in delivering end-to-end data delivery through manual reconfigurations, static event scheduling and execution on a per-vehicle basis, for these methods do not scale and therefore must give way to dynamic, networked approaches with an overall systems view in mind. Emerging mission requirements exhibit a trend toward multiple smaller-scale vehicles working together to perform dissimilar observations. Such operations necessitate sensor fusion across a constellation, and where data processing may be distributed throughout a fairly disconnected network whose topology changes over time in non-deterministic manners. Individual communications link performance is still very relevant to deploying an effective communications system, but now must be embedded within a greater architecture of capability to optimally utilize the bandwidth available from each link to generate an ultimate end-to-end quality of service. The deleterious effects of timing uncertainty across the arrangement presents a challenge to measurement synchronization and delivery, so a successful deployed system needs to be tolerant to the delays inherent in time-of-light between elements and digital processing latencies existing at each node. In this presentation we share the flight test results from a high performance Gbps laser communications terminal evaluated with a suite of store and forward capabilities called High-rate Delay Tolerant Networking (HDTN). The communications payload is operated over Lake Erie across a range of configurations including several convergence layers, and is evaluated to determine recovery time after link disruptions, information loss, efficiency and speed. The effectiveness of utilizing a flying laboratory to increase the Technology Readiness Level (TRL) of an integrated system in relevant environments is discussed, as well as the value of conducting aeronautics experiments to retire risk for technology infusion into space missions. Upcoming flight campaigns will be presented, including opportunities to demonstrate secure command and control, data intensive hyperspectral imaging, quantum link characterization, 4k High Definition (HD) video streaming and internetworked space-ground-aero relay operations. These experiments will pave the way for future missions which will depend upon interoperability across disparate government and privately owned networks, involve contention with uncertain and dynamic timing, and require agility to autonomously configure optimal parameters across networks of ever-increasing size and complexity to ensure data delivery. https://www1.grc.nasa.gov/space/scan/acs/tech-studies/dtn/

Daniel Raible↗

STS-102/Expedition 2 Mission Overview

John Shannon, STS-102 Lead Flight Director, Bernestine Dickey, STS-102 Launch Package Manager, and Rick La Brode, International Space Station (ISS) Lead Flight Director, give an overview of the STS-102 mission during a prelaunch press conference. Mr. Shannon discusses how the mission came into being and its objectives, including information on the launch and a day-by-day account of mission activities. Ms. Dickey gives details on the payload of STS-102, describing the system racks, cargo elements, and crew supplies delivered via the Leonardo Multi-Purpose Logistics Module. Mr. La Brode describes the current configuration of the ISS and upcoming changes. He also discusses the activities of the Expedition 2 crew during the next four months. Computer simulations show the ISS' current and future (after the STS-102 mission) configurations, the installations of Leonardo, and the move of the Pressurized Mating Adapter from one port to another on the Destiny Laboratory. The panel then answers questions from the press.

Source record↗

STS-108 Mission Highlights Resource Tape

A continuation of 'STS-108 Mission Highlights Resource Tape, Part 1 of 3' (internal ID 2002049331) and 'STS-108 Mission Highlights Resource Tape, Part 2 of 3' (internal ID 2002049330), this video shows footage from flight days 9-12. The control of the International Space Station (ISS) is handed from the Expedition 3 crew (Commander Frank Culbertson, Jr. and Flight Engineers Mikhail Turin and Vladimir Dezhurov) to the Expedition 4 crew (Commander Yuri Onufrienko and Flight Engineers Carl Walz and Daniel Bursch) in an on-orbit ceremony. Both Expedition crews and the STS-108 crew (Commander Dominic Gorie, Pilot Mark Kelly, and Mission Specialists Linda Godwin and Daniel Tani) are seen reloading the Rafaello Multipurpose Logistics Module (MPLM). External shots show the MPLM demating from the ISS and returning to the payload bay of Endeavour. The three crews bid farewell to each other before closing the hatches between ISS and Endeavour. The orbiter undocks from ISS and performs its flyarounds. ISS is seen against a backdrop of stars as Endeavour flies away. On the return flight to Earth, the Starshine 2 satellite is deployed. The video ends with the orbiter's landing as seen from several viewpoints.

Source record↗

Habitat Demonstration Unit-Deep Space Habitat (HDU-DSH) Integration and Preparation for Desert RATS 2011

The Habitat Demonstration Unit, or HDU, is a multi-purpose test bed that allows NASA scientists and engineers to design, develop, and test new living quarters, laboratories, and workspaces for the next generation space mission. Previous testing and integration has occurred during 2010 at the annual Desert Research and Technology Studies (Desert RATS) field testing campaign in the Arizona desert. There the HDU team tests the configuration developed for the fiscal year, or FY configuration. For FY2011, the NASA mission calls for simulating a deep space condition. The HDU-DSH, or Deep Space Habitat, will be configured with new systems and modules that will outfit the test bed with new deep space capabilities. One such addition is the new X-HAB (eXploration Habitat) Inflatable Loft. With any deep space mission there is the need for safe, suitable living quarters. The current HDU configuration does not allow for any living space at all. In fact, Desert RATS 2010 saw the crew sleeping in the Space Exploration Vehicles (SEV) instead of the HDU. The X-HAB Challenge pitted three universities against each other: Oklahoma State University, University of Maryland, and the University of Wisconsin. The winning team will have their design implemented by NASA for field testing at DRATS 2011. This paper will highlight the primary objective of getting the X-HAB field ready which involves the implementation of an elevator/handrail system along with smaller logistical and integration tasks associated with getting the HDU-DSH ready for shipment to DRATS.

Barbeau, Zack↗

Lunar Surface Concept of Operations for the Global Exploration Roadmap Lunar Surface Exploration Scenario

The International Space Exploration Coordination Group (ISECG) is a voluntary, non-binding coordination forum of 26 space agencies. Building on the 2018 Global Exploration Roadmap (GER) and on growing global interest in space exploration, ISECG’s GER Supplement (Aug 2020) captures the latest developments in lunar exploration planning in an updated Lunar Surface Exploration Scenario. The updated Lunar Surface Exploration Scenario describes a phased approach to implementing infrastructure and exploration on the lunar surface to meet the goals and objectives defined by the ISECG. The updated scenario starts with Boots on the Moon, where space agencies focus on sending humans to the Moon beginning in 2024 and robotic exploration missions to support the 2024 goal and later phases. Next is Phase 2, Lunar Exploration—Expanding and Building, with an emphasis on completion of the proposed lunar surface objectives by exploring the lunar surface diversely and ultimately settling at the most beneficial site. Initial focus is on lunar surface exploration objectives pertaining to human landing and ascent, logistic cargo landers, and long-range traverses. The later focus is on lunar surface exploration objectives pertaining to long duration habitation, crew health and performance, and in-situ resource utilisation (ISRU). The third phase, Sustained Lunar Opportunities, envisages laying the foundation for a sustained and vibrant lunar presence in the coming decades through partnerships with international governments, academia and industry. During this phase, governments would shift their investment focus to further expand the frontier, including Mars exploration missions. This paper will describe the concept of operations by phase that supported the development of the updated scenario, along with refinements to those concepts of operations since the release of the updated scenario. By phase, the paper will describe the scenario, give an overview of the applicable architecture elements, identify functional requirements/needs of those elements, and include a discussion of nominal operations and contingency scenarios.

Markus Landgraf↗

Recovery from Missed Thrust During Low Thrust Insertion of NASA's Gateway into a Near Rectilinear Halo Orbit

Various strategies are assessed by which the first two elements of Gateway could recover from missed thrust events during insertion into a Near Rectilinear Halo Orbit (NRHO). Recovery strategies are assessed in terms of their ability to maintain the desired NRHO insertion epoch ad well as their cost in terms of additional time and ∆v required to reach the NRHO. Strategies utilize a 50 kW Solar Electric Propulsion (SEP) system onboard the Power and Propulsion Element (PPE). Recovery solutions are found that, in the event of a missed thrust arc during the Insertion Phase of the Gateway Lunar Transit, deliver the space-craft into the NRHO within three additional revolutions (roughly 21 days) and 80 m/s ∆v.

low thrust↗