Search NASA⌕ Search

SEARCH · Search NASA

Results for “System Administration”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 991 records · Page 55

Thermal Performance of ATLAS Laser Thermal Control System Demonstration Unit

The second Ice, Cloud, and Land Elevation Satellite mission currently planned by National Aeronautics and Space Administration will measure global ice topography and canopy height using the Advanced Topographic Laser Altimeter System {ATLAS). The ATLAS comprises two lasers; but only one will be used at a time. Each laser will generate between 125 watts and 250 watts of heat, and each laser has its own optimal operating temperature that must be maintained within plus or minus 1 degree Centigrade accuracy by the Laser Thermal Control System (LTCS) consisting of a constant conductance heat pipe (CCHP), a loop heat pipe (LHP) and a radiator. The heat generated by the laser is acquired by the CCHP and transferred to the LHP, which delivers the heat to the radiator for ultimate rejection. The radiator can be exposed to temperatures between minus 71 degrees Centigrade and minus 93 degrees Centigrade. The two lasers can have different operating temperatures varying between plus 15 degrees Centigrade and plus 30 degrees Centigrade, and their operating temperatures are not known while the LTCS is being designed and built. Major challenges of the LTCS include: 1) A single thermal control system must maintain the ATLAS at 15 degrees Centigrade with 250 watts heat load and minus 71 degrees Centigrade radiator sink temperature, and maintain the ATLAS at plus 30 degrees Centigrade with 125 watts heat load and minus 93 degrees Centigrade radiator sink temperature. Furthermore, the LTCS must be qualification tested to maintain the ATLAS between plus 10 degrees Centigrade and plus 35 degrees Centigrade. 2) The LTCS must be shut down to ensure that the ATLAS can be maintained above its lowest desirable temperature of minus 2 degrees Centigrade during the survival mode. No software control algorithm for LTCS can be activated during survival and only thermostats can be used. 3) The radiator must be kept above minus 65 degrees Centigrade to prevent ammonia from freezing using no more than 135 watts of heater power. 4) The LHP reservoir control heater power is limited to 15 watts with a 70 percent duty cycle. 5) The voltage of the power supply can vary between 26 volts direct current and 34 volts direct current during the spacecraft lifetime. A design analysis shows that a single LTCS can satisfy these requirements. However, shutdown of· the LHP is particularly challenging and the shutdown heater must be wired in series with two reservoir thermostats and two CCHP thermostats at different set points. An LTCS demonstration unit has been tested to verify these performance characteristics experimentally prior to proceeding to the final LTCS design and fabrication. Test results showed that the LHP shutdown scheme would be able to shut down the LHP as designed and the reservoir control heater can maintain the ATLAS mass simulator within the plus or minus 1 degrees Centigrade accuracy under various combinations of the heat load, sink temperature, and power supply voltage.

Ku, Jentung↗

Trends in the administration of COVID-19 vaccines with other vaccines in the United States reported to V-safe during December 14, 2020—May 19, 2023

Introduction COVID-19 vaccines may be administered with other vaccines during the same healthcare visit. COVID-19 monovalent (Fall 2021) and bivalent (Fall 2022) vaccine recommendations coincided with annual seasonal influenza vaccination. Data describing the frequency of the co-administration of COVID-19 vaccines with other vaccines are limited. Methods We used V-safe, a voluntary smartphone-based U.S. safety surveillance system established by the CDC, to describe trends in the administration of COVID-19 vaccines with other vaccines reported to V-safe during December 14, 2020 – May 19, 2023. Results Of the 21 million COVID-19 vaccinations reported to V-safe, 2.2% (459,817) were administered with at least 1 other vaccine. Co-administration most frequently occurred during the first week of October 2023 (27,092; 44.1%). Most reports of co-administration included influenza vaccine (393,003; 85.5%). Co-administration was most frequently reported for registrants aged 6 months-6 years (4,872; 4.4%). Conclusion Reports of co-administration to V-safe peaked during October 2023, when influenza vaccination most often occurs, possibly reflecting increased opportunities for multiple vaccinations and greater acceptability of the co-administration of COVID-19 vaccine with other vaccines, especially influenza vaccine.

60 APPLIED LIFE SCIENCES↗

Advanced Food Technology Workshop Report

The Advanced Human Support Technology (AHST) Program conducts research and technology development to provide new technologies and next-generation system that will enable humans to live and work safely and effectively in space. One program element within the AHST Program is Advanced Life Support (ALS). The goal of the ALS program element is to develop regenerative life support systems directed at supporting National Aeronautics and Space Administration's (NASA) future long-duration missions. Such missions could last from months to years and make resupply impractical, thereby necessitating self-sufficiency. Thus, subsystems must be developed to fully recycle air and water, recover resources from solid wastes grow plants, process raw plant products into nutritious and palatable foods, control the thermal environment, while reducing the overall system mass. ALS systems will be a combination of physico-chemical and biological components depending on the specific mission requirements. In the transit vehicle, the food system will primarily be a prepackaged food system with the possible addition of salad crops that can be picked and eaten with limited preparation. On the lunar or planetary evolved base, the food system will be a combination of the prepackaged menu item and ingredients that are processed from the grown crops. Food processing and food preparation will be part of this food system.

Michele Perchonok↗

Second Line of Defense Megaports Initiative Operational Testing and Evaluation Plan - Kingston Container Terminal, Port of Kingston, Jamaica

Operational Testing and Evaluation Plan - Kingston Container Terminal, Port of Kingston, Jamaica was written for the Second Line of Defense Megaports Initiative. The purpose of the Operational Testing and Evaluation (OT&E) phase of the project is to prepare for turnover of the Megaports system supplied by U.S. Department of Energy/National Nuclear Security Administration (DOE/NNSA) located at the Kingston Container Terminal (KCT) of the Port of Kingston, Jamaica to the Government of Jamaica (GOJ). Activities conducted during the OT&E phase must demonstrate that the Megaports system can be operated effectively in real time by Jamaica Customs and KCT personnel to the satisfaction of the DOE/NNSA. These activities will also determine if the Megaports system, as installed and accepted, is performing according to the Megaports Program objectives such that the system is capable of executing the mission of the Second Line of Defense Megaports Initiative. The OT&E phase of the project also provides an opportunity to consider potential improvements to the system and to take remedial action if performance deficiencies are identified during the course of evaluation. Changes to the system should be considered under an appropriate change-control process. DOE/NNSA will determine that OT&E is complete by examining whether the Megaports system is performing as intended and that the GOJ is fully capable of operating the system independently without continued onsite support from the U.S. team.

Deforest, Thomas J.↗

Engineering America's Future in Space: Systems Engineering Innovations for Sustainable Exploration

The National Aeronautics and Space Administration (NASA) delivers space transportation solutions for America's complex missions, ranging from scientific payloads that expand knowledge, such as the Hubble Space Telescope, to astronauts and lunar rovers destined for voyages to the Moon. Currently, the venerable Space Shuttle, which has been in service since 1981, provides U.S. capability for both crew and cargo to low-Earth orbit to construct the International Space Station, before the Shuttle is retired in 2010, as outlined in the 2006 NASA Strategic Plan. I In the next decade, NASA will replace this system with a duo of launch vehicles: the Ares I Crew Launch Vehicle/Orion Crew Exploration Vehicle and the Ares V Cargo Launch Vehicle/Altair Lunar Lander. The goals for this new system include increased safety and reliability, coupled with lower operations costs that promote sustainable space exploration over a multi-decade schedule. This paper will provide details of the in-house systems engineering and vehicle integration work now being performed for the Ares I and planned for the Ares V. It will give an overview of the Ares I system-level test activities, such as the ground vibration testing that will be conducted in the Marshall Center's Dynamic Test Stand to verify the integrated vehicle stack's structural integrity against predictions made by modern modeling and simulation analysis. It also will give information about the work in progress for the Ares I-X developmental test flight planned in 2009 to provide key data before the Ares I Critical Design Review. Activities such as these will help prove and refine mission concepts of operation, while supporting the spectrum of design and development tasks being performed by Marshall's Engineering Directorate, ranging from launch vehicles and lunar rovers to scientific spacecraft and associated experiments. Ultimately, the work performed will lead to the fielding of a robust space transportation solution that will carry international explorers and essential payloads for sustainable scientific discovery beyond planet Earth.

Dumbacher, Daniel L.↗

Experiences with Testing the Largest Ground System NASA Has Ever Built

In the 1980s, the National Aeronautics and Space Administration (NASA) embarked upon a major Earth-focused program called Mission to Planet Earth. The Goddard Space Flight Center (GSFC) was selected to manage and develop a key component - the Earth Observing System (EOS). The EOS consisted of four major missions designed to monitor the Earth. The missions included 4 spacecraft. Terra (launched December 1999), Aqua (launched May 2002), ICESat (Ice, Cloud, and Land Elevation Satellite, launched January 2003), and Aura (scheduled for launch January 2004). The purpose of these missions was to provide support for NASA s long-term research effort for determining how human-induced and natural changes affect our global environment. The EOS Data and Information System (EOSDIS), a globally distributed, large-scale scientific system, was built to support EOS. Its primary function is to capture, collect, process, and distribute the most voluminous set of remotely sensed scientific data to date estimated to be 350 Gbytes per day. The EOSDIS is composed of a diverse set of elements with functional capabilities that require the implementation of a complex set of computers, high-speed networks, mission-unique equipment, and associated Information Technology (IT) software along with mission-specific software. All missions are constrained by schedule, budget, and staffing resources, and rigorous testing has been shown to be critical to the success of each mission. This paper addresses the challenges associated with the planning, test definition. resource scheduling, execution, and discrepancy reporting involved in the mission readiness testing of a ground system on the scale of EOSDIS. The size and complexity of the mission systems supporting the Aqua flight operations, for example, combined with the limited resources available, prompted the project to challenge the prevailing testing culture. The resulting success of the Aqua Mission Readiness Testing (MRT) program was due in no small measure to re-structuring the traditional programmatic and technical approach to a more efficient and robust program. Programmatically, it meant gaining the endorsement, commitment, and cooperation of the numerous subsystem element managers and other stakeholder organizations. Technically, it required an MRT program that was agile, could rapidly adapt to requirements changes, and was flexible in its overall approach. Furthermore, this paper addresses the following questions: 1. What are the key ingredients (e.g., test tools, organization) needed to conduct a successful MRT program? 2. What distinguishes EOS MRT from the traditional system testing approach? 3. Where should the focus of testing be since it is infeasible to test every element or subsystem? 4. How can MRT be applied effectively to other systems or missions? To provide answers to these questions, this paper relies heavily on real-life, hands-on experiences ("lessons learned") gained during mission readiness testing of the Terra ground system and, most recently, the Aqua and ICESat missions. Moreover, this paper explores how lessons learned were turned into lessons applied for the upcoming Aura mission. Although derived from the EOS missions, MRT techniques and strategies can be applied to enhance the testing of other missions.

Lehtonen, Ken↗

Constant Rate Production: DOE Approach to Meeting NASA Needs for Radioisotope Power Systems for Nuclear-Enabled Launches

The use of radioisotope power systems (RPSs) for nuclear-enabled National Aeronautics and Space Administration (NASA) missions is made possible through a long-standing arrangement between the Department of Energy (DOE) and NASA. The requirements for the power system come from NASA, but DOE performs the procurement, fueling, testing, and delivery. A challenge has been interplay between the schedule for RPS availability from DOE versus the schedule for competitively selected missions. By mutual agreement, the actual operations to procure an RPS and prepare it for fueling have always been delayed until the final selection of a mission. The timeline for a New Frontiers–class mission leaves approximately 5 to 6 years from the time of final mission selection to the actual launch date. The number of RPSs used for a New Frontiers–class mission can be one to three units. If one or two units are needed, the timeline from the decision point to the launch date is a challenge, but it is achievable. The activities taking place include manufacturing the power system, producing the fuel, and performing the assembly/testing and delivery operations. If the mission selected requires three RPSs, the logistics of accomplishing all activities during the 5–6 years is problematic. The challenge involves obtaining the necessary resources for plutonium production, heat source production, and assembly/testing operations. Typically, the time between RPS-enabled missions requires staffing reduction down to 65%–75% of peak staffing levels to reduce costs. Coupling the ~2 year duration needed for hiring, training, and obtaining the appropriate security clearances for the required staff with the requirement for the RPS to arrive at Kennedy Space Center 6 months before the launch erodes much of the 5–6 years available to comfortably support the use of three RPSs. To provide better support for NASA RPS missions, a different approach for the production of heat sources was devised—constant rate production. This involves a higher level of base capability at DOE national laboratories to provide a stabilized workforce. This will enable 10–15 heat sources to be produced annually and placed into a stable intermediate form to enable storage for up to several years leading to quick production of general purpose heat source modules when a mission is selected. The upfront production of 238 Pu is maintained so material is constantly in the pipeline. Production of key specialized components is also maintained using this model.

42 ENGINEERING↗

Wake Vortex Tracking Using a 35 GHz Pulsed Doppler Radar

A 35 GHz, pulsed-Doppler radar system has been designed and assembled for wake vortex detection and tracking in low visibility conditions. Aircraft wake vortices continue to be an important factor in determining safe following distances or spacings for aircraft in the terminal area. Currently, under instrument meteorological conditions (IMC), aircraft adhere to conservative, fixed following-distance guidelines based primarily on aircraft weight classifications. When ambient conditions are such that vortices will either drift or dissipate, leaving the flight corridor clear, the prescribed spacings are unnecessarily long and result in decreased airport throughput. There is a potential for significant airport efficiency improvement, if a system can be employed to aid regulators and pilots in setting safe and efficient following distances based on airport conditions. The National Aeronautics and Space Administration (NASA), the Federal Aviation Agency, and Volpe National Transportation Systems Center have promoted and worked to develop systems that would increase airport capacity and provide for safe reductions in aircraft separation. The NASA Aircraft Vortex Spacing System (AVOSS), a wake vortex spacing system that can provide dynamic adjustment of spacings based on real-time airport weather conditions, has demonstrated that Lidar systems can be successfully used to detect and track vortices in clear air conditions. To fill the need for detection capability in low-visibility conditions, a 35 GHz, pulsed-Doppler radar system is being investigated for use as a complimentary, low-visibility sensor for wake vortices. The radar sensor provides spatial and temporal information similar to that provided by Lidar, but under weather conditions that a Lidar cannot penetrate. Currently, we are analyzing the radar design based upon the data and experience gained during the wake vortex Lidar deployment with AVOSS at Dallas/Fort Worth International Airport. As part of this study, two numerical models were utilized in system simulations. The results of this study improve our understanding of the method of detection, resolution requirements for range and azimuth, pulse compression, and performance prediction. Simulations applying pulse compression techniques show that detection is good in heavy fog to greater than 2000 m. Both compressed and uncompressed short pulses show the vortex structure. To explore operational challenges, siting and scanning strategies were also analyzed. Simulation results indicate that excellent wake vortex detection, tracking and classification is possible in drizzle (+15 dBZ) and heavy fog (- 13 dBZ) using short pulse techniques (<99ns) at ranges on the order of 900 m, with a modest power of 500 W output. At 1600 m, detection can be expected at reflectivities as low as -13 dBZ (heavy fog). The radar system, as designed and built, has the potential to support field studies of a wake vortex spacing system in low-visibility conditions ranging from heavy fog to rain, when sited within 2000m of the flight path.

Neece, Robert T.↗

Characteristics of Elastomer Seals Exposed to Space Environments

A universal docking and berthing system is being developed by the National Aeronautics and Space Administration (NASA) to support all future space exploration missions to low-Earth orbit (LEO), to the Moon, and to Mars. The Low Impact Docking System (LIDS) is being designed to operate using a seal-on-seal configuration in numerous space environments, each having unique exposures to temperature, solar radiation, reactive elements, debris, and mission duration. As the LIDS seal is likely to be manufactured from an elastomeric material, performance evaluation of elastomers after exposure to atomic oxygen (AO) and ultraviolet radiation (UV) was conducted, of which the work presented herein was a part. Each of the three candidate silicone elastomer compounds investigated, including Esterline ELA-SA-401, and Parker Hannifin S0383-70 and S0899-50, was characterized as a low outgassing compound, per ASTM E595, having percent total mass loss (TML) less than 1.0 percent and collected volatile condensable materials (CVCM) less than 0.1 percent. Each compound was compatible with the LIDS operating environment of -50 to 50 C. The seal characteristics presented include compression set, elastomer-to-elastomer adhesion, and o-ring leakage rate. The ELA-SA-401 compound had the lowest variation in compression set with temperature. The S0383-70 compound exhibited the lowest compression set after exposure to AO and UV. The adhesion for all of the compounds was significantly reduced after exposure to AO and was further decreased after exposure to AO and UV. The leakage rates of o-ring specimens showed modest increases after exposure to AO. The leakage rates after exposure to AO and UV were increased by factors of up to 600 when compared to specimens in the as-received condition.

Daniels, Christopher C.↗

Performance of Subscale Docking Seals Under Simulated Temperature Conditions

A universal docking system is being developed by the National Aeronautics and Space Administration (NASA) to support future space exploration missions to low Earth orbit (LEO), to the moon, and to Mars. The candidate docking seals for the system are a composite design consisting of elastomer seal bulbs molded into the front and rear sides of a metal ring. The test specimens were subscale seals with two different elastomer cross-sections and a 12-in. outside diameter. The seal assemblies were mated in elastomer seal-on-metal plate and elastomer seal-on-elastomer seal configurations. The seals were manufactured from S0383-70 silicone elastomer compound. Nominal and off-nominal joint configurations were examined. Both the compression load required to mate the seals and the leak rate observed were recorded while the assemblies were subjected to representative docking system operating temperatures of -58, 73, and 122 F (-50, 23, and 50 C). Both the loads required to fully compress the seals and their leak rates were directly proportional to the test temperature.

Smith, Ian M.↗

Concept of Operations for Integrating Commercial Supersonic Transport Aircraft into the National Airspace System

Several businesses and government agencies, including the National Aeronautics and Space Administration are currently working on solving key technological barriers that must be overcome in order to realize the vision of low-boom supersonic flights conducted over land. However, once these challenges are met, the manner in which this class of aircraft is integrated in the National Airspace System may become a potential constraint due to the significant environmental, efficiency, and economic repercussions that their integration may cause. This document was developed to create a path for research and development that exposes the benefits and barriers of seamlessly integrating a class of CSTs into the NAS, while also serving as a Concept of Operations (ConOps) which posits a mid- to far-term solution (2025-2035) concept for best integrating CST into the NAS. Background research regarding historic supersonic operations in the National Airspace System, assumptions about design aspects and equipage of commercial supersonic transport (CST) aircraft, assumptions concerning the operational environment are described in this document. Results of a simulation experiment to investigate the interactions between CST aircraft and modern-day air traffic are disseminated and are used to generate scenarios for CST operations. Finally, technology needs to realize these operational scenarios are discussed.

Underwood, Matthew C.↗

Assessment Environment for Complex Systems Software Guide

This Software Guide (SG) describes the software developed to test the Assessment Environment for Complex Systems (AECS) by the West Virginia High Technology Consortium (WVHTC) Foundation's Mission Systems Group (MSG) for the National Aeronautics and Space Administration (NASA) Aeronautics Research Mission Directorate (ARMD). This software is referred to as the AECS Test Project throughout the remainder of this document. AECS provides a framework for developing, simulating, testing, and analyzing modern avionics systems within an Integrated Modular Avionics (IMA) architecture. The purpose of the AECS Test Project is twofold. First, it provides a means to test the AECS hardware and system developed by MSG. Second, it provides an example project upon which future AECS research may be based. This Software Guide fully describes building, installing, and executing the AECS Test Project as well as its architecture and design. The design of the AECS hardware is described in the AECS Hardware Guide. Instructions on how to configure, build and use the AECS are described in the User's Guide. Sample AECS software, developed by the WVHTC Foundation, is presented in the AECS Software Guide. The AECS Hardware Guide, AECS User's Guide, and AECS Software Guide are authored by MSG. The requirements set forth for AECS are presented in the Statement of Work for the Assessment Environment for Complex Systems authored by NASA Dryden Flight Research Center (DFRC). The intended audience for this document includes software engineers, hardware engineers, project managers, and quality assurance personnel from WVHTC Foundation (the suppliers of the software), NASA (the customer), and future researchers (users of the software). Readers are assumed to have general knowledge in the field of real-time, embedded computer software development.

tests↗

A system study of the solar power satellite concept

The paper summarizes a system study of the solar power satellite (SPS) concept which was conducted in the 1977-1980 time period. The system study was sponsored by the U.S. Department of Energy and the National Aeronautics and Space Administration as part of an SPS Concept Development and Evaluation Program. A reference system, developed during the study is described. The reference system was subsequently used as a basis for environmental, economic, and societal assessments. The reference system was recognized as probably not being an optimized approach. A number of alternate approaches which were studied in less depth are also described. The paper concludes with a number of observations regarding the SPS concept, and the pertinence of ongoing space technology, development, and flight programs to various aspects of the concept.

Piland, R. O.↗

On the Mechanism of Serotonin-Induced Dipsogenesis in the Rat

Subcutaneous administration of 1-5-hydroxytryptophan (5-HTP), the precursor of serotonin, to female rats induces copious drinking accompanied by activation of the renin-angiotensin system. Neither a reduction in blood pressure nor body temperature accompanied administration of 5-HTP. The objective of the present study was to determine whether serotonin-induced dipsogenesis, like that of 5-HTP, is mediated via the renin-angiotensin system. Serotonin (2 mg/kg, SC)-induced drinking was inhibited by the dopaminergic antagonist, haloperidol (150 /micro g/kg, IP), which also inhibits angiotensin II-induced drinking, Both captopril (35 mg/kg, IP), an angiotensin converting enzyme inhibitor, and propranolol (6 micro g/kg, IP), a beta-adrenergic antagonist, blocked serotonin-induced dipsogenesis. The alpha(sub a),-adrenergic agonist, clonidine (6.25 micro g/kg, SC), which suppresses renin release from the kidney, attenuated serotonin-induced water intake. The dipsogenic responses to submaximal concentrations of both serotonin (1 mg/kg, SC) and isoproterenol (8 micro g/kg, SC) were additive rather than interactive suggesting that similar pathways mediate both responses. The serotonergic receptor antagonist, methysergide (3 mg/kg, IP), inhibited serotonin-induced drinking but had no effect on isoproterenol (25micro g/kg, SC)-induced dipsogenesis. However, neither serotonin (2 mg/kg, SC) nor isoproterenol (25 micro g/kg, SC)-induced drinking was inhibited by cinansefin (25 micro g/kg, IP). These data indicate that serotonin induces drinking in rats via the renin-angiotensin system. However, the results of the studies using methysergide suggest that scrotonin appears to act at a point prior to activation of beta-adrenoceptors in the pathway leading to release of renin from the kidneys.

Kikta, Dianne C.↗

Development of a Multi-Stage Filter System for Cabin Ventilation Systems on the ISS and Future Deep Space Missions

The National Aeronautics and Space Administration's (NASA's) deep space exploration missions will be of significant duration requiring long-life and reliably performing spacecraft cabin ventilation filters. A particulate filter system is being developed at NASA Glenn Research Center (GRC) to meet the challenges of these remote and long duration missions. The capabilities and features of the filter system are expected to expand the life and reduce the maintenance requirements over that of the current ISS (International Space Station) filter by providing pre-filtration stages with novel self-cleaning and regenerable techniques. The filter provides two regenerable pre-filtration stages using a screen mesh media and an impactor collection system, and also provides intermediate stage filtration employing self-replacing filter media. The filter system is also designed to be compatible with the interfaces and performance requirements of the ISS distributed ventilation architecture in the US modules to facilitate testing on ISS type test or mock up platforms. Currently, a prototype of the filter system is undergoing tests in a custom configured filter test stand at the NASA GRC. The test stand provides the same range of flow rates produced on the ISS distributed architecture, and is equipped and instrumented to perform filter tests based on industrial test standards. The test stand has been used successfully to perform filter and flow performance test on returned ISS Bacterial Filter Elements. Similar test protocols were used to characterize the performance of the current filter system. Different performing grades of filter media will be installed and tested on the filter system, and different test particle standards will be used to simulate the range of particulate matter particles and debris the filter will see during a mission. This paper will present results and analysis of the test data to guide and provide input to the next generation filter system.

ISS↗

Parametric Analysis of Life Support Systems for Future Space Exploration Missions

The National Aeronautics and Space Administration is in a process of evaluating future targets for space exploration. In order to maintain the welfare of a crew during future missions, a suite of life support technology is responsible for oxygen and water generation, carbon dioxide control, the removal of trace concentrations of organic contaminants, processing and recovery of water, and the storage and reclamation of solid waste. For each particular life support subsystem, a variety competing technologies either exist or are under aggressive development efforts. Each individual technology has strengths and weaknesses with regard to launch mass, power and cooling requirements, volume of hardware and consumables, and crew time requirements for operation. However, from a system level perspective, the favorability of each life support architecture is better assessed when the sub-system technologies are analyzed in aggregate. In order to evaluate each specific life support system architecture, the measure of equivalent system mass (ESM) was employed to benchmark system favorability. Moreover, the results discussed herein will be from the context of loop-closure with respect to the air, water, and waste sub-systems. Specifically, closure relates to the amount of consumables mass that crosses the boundary of the vehicle over the lifetime of a mission. As will be demonstrated in this manuscript, the optimal level of loop closure is heavily dependent upon mission requirements such as duration and the level of extra-vehicular activity (EVA) performed. Sub-system level trades were also considered as a function of mission duration to assess when increased loop closure is practical. Although many additional factors will likely merit consideration in designing life support systems for future missions, the ESM results described herein provide a context for future architecture design decisions toward a flexible path program.

Swickrath, Michael J.↗

Load Component Database of Household Appliances and Small Office Equipment

This paper discusses the development of a load component database for household appliances and office equipment. To develop more accurate load models at both transmission and distribution level, a better understanding on the individual behaviors of home appliances and office equipment under power system voltage and frequency variations becomes more and more critical. Bonneville Power Administration (BPA) has begun a series of voltage and frequency tests against home appliances and office equipments since 2005. Since 2006, Researchers at Pacific Northwest National Laboratory has collaborated with BPA personnel and developed a load component database based on these appliance testing results to facilitate the load model validation work for the Western Electricity Coordinating Council (WECC). In this paper, the testing procedure and testing results are first presented. The load model parameters are then derived and grouped. Recommendations are given for aggregating the individual appliance models to feeder level, the models of which are used for distribution and transmission level studies.

24 POWER TRANSMISSION AND DISTRIBUTION↗