Vapor Extraction Well Performance and Recommendations for Future Soil Vapor Extraction Activities at the A-014 Outfall
The vadose zone near the A-014 Outfall contains residual volatile organic compounds that serve as a potential source for groundwater contamination. Since 1995 active soil vapor extraction has been an integral part of the corrective actions at this facility. Currently two separate soil vapor extraction systems are being used to remove contamination in the vapor phase from the subsurface. The 782-3M soil vapor extraction unit was deployed in April of 1995 and the A-014 Mobile #3 unit was deployed in January of 2009. The objective of this investigation is to evaluate the performance of individual wells associated with these systems and provide recommendations on possible optimizations to these systems. Options that are considered include continuation of active extraction, transition to a low-energy soil vapor extraction treatment, or abandon nonperforming wells. The scope of the investigation examined the eighteen (18) vadose zone wells that are associated with the ongoing Resource Conservation and Recovery Act corrective action program within A/M Area. During the evaluation process, individual wells were isolated and purged for a standard period using the existing soil vapor extraction system. Following the purge period, vapor samples were collected intermittently over the following 24–72-hour period. The objective of the sampling activity was to collect sufficient data to estimate the mass flow rate of contaminants from the individual extraction wells. Subsequent analysis then evaluated and ranked extraction performance to provide recommendations on the viability, operational scheme, and applicability of low energy soil vapor extraction.