Search NASA⌕ Search

SEARCH · Search NASA

Results for “electric utility programs”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 991 records · Page 55

Paths Forward: Approaches to Achieve Plug and Process Load Efficiency and Control in Commercial Buildings: Preprint

To accomplish net-zero carbon in the built environment by 2050, we must equitably decarbonize commercial buildings, which includes reducing plug and process loads (PPLs). PPLs are plug-in or hardwired electric and gas loads that are not directly associated with major building end uses like lighting and heating, ventilating, and air conditioning. PPLs account for a growing portion of U.S. commercial building energy consumption. Although commercial building PPL strategies and technologies are available today, they have not been adopted at a level sufficient to achieve significant savings and load flexibility across the building stock. In our "Pathways to Plug and Process Load Efficiency and Control" study, we investigated why these technologies and strategies have not seen widespread adoption and identified five behavior and technology pathways to increase PPL reduction in commercial buildings. In this paper, we expand beyond identifying the pathways and discuss approaches for achieving them. We discuss the importance of collecting and sharing data and case studies on PPL energy consumption and savings from control technology implementation, including code-required measures, for increasing adoption. Centralizing case studies and data, engaging industry organizations, and promoting awareness of PPL efficiency benefits to relevant groups are also key approaches. Additionally, funding, incentives, and rebate programs play important roles in driving PPL efficiency and control adoption. Finally, we discuss integrating PPL efficiency into broader company goals, such as environmental, social and governance (ESG) strategies and green building certifications, to further drive adoption.

adoption pathways↗

IN2 Profile: Reducing Energy Prices for Commercial Buildings with NETenergy’s Black ICE Technology

To cool a commercial building properly and cost-effectively, the owners of NETenergy have created a thermal battery that works much like an electrical battery except instead of storing energy electrically, it stores energy thermally. Through the Wells Fargo Innovation Incubator (IN²) program, NETenergy will be able to advance modeling of their system and increase product development. The IN² program launched in October 2014 and is part of Wells Fargo’s 2020 Environmental Commitment to provide $100 million to environmentally-focused nonprofits and universities. The goal is to create an ecosystem that fosters and accelerates the commercialization of promising commercial buildings technologies that can provide scalable solutions to reduce the energy impact of buildings. According to the Department of Energy, nearly 40 percent of energy consumption in the U.S. today comes from buildings at an estimated cost of $413 billion.

25 ENERGY STORAGE↗

District EnErgy Planner (DEEP) v2

The District EnErgy Planner - DEEP is an Mixed Integer Linear Programming (MILP) optimization software tool to solve district energy system, technology configuration, operation strategies, and energy retail business schemes. DEEP takes user input energy demand on heating, cooling and electricity demand. Energy loss through pipeline is calculated for heating and cooling from central plants. The optimal system configuration to minimize the district energy system life cycle cost or minimize CO2 emission is calculated based on energy balance equations and various constraints. The recent update on DEEP include a feature of waste heat utilization energy balance based optimization to take into accounts of different temperature bands of heat into account to maximize system efficiency. Another feature is to optimize district energy retail by provide optimal pricing scheme for heating, cooling and electricity to end users to incorporate district to grid demand response.

Feng, Wei↗

Prototype Laboratory Concept

The prototype laboratory concept was developed to simplify the laboratory design process, and should be considered for use as a new laboratory design methodology. Many developing countries lack adequate public and animal health laboratories and typically do not have the economic means and the design and construction expertise to build a laboratory on their own. These countries rely on international sponsors to provide the funds necessary to design and construct a laboratory. However, these international sponsors are often located far away, making travel back and forth difficult, which leads to an increase in overall costs and delays for the project. The prototype laboratory concept and design methodology were developed to streamline the design process, saving time and money, while also minimizing the number of errors that typically arise using a traditional design process by providing well considered design decisions in advance of the project. By solving numerous detailed design issues early, this methodology will allow the time, attention and energies of the design team to be focused on addressing the specific needs of the end users, the unique design challenges related to a given site and scientific program, and the biosafety and biosecurity risks associated with the scientific activities planned to be conducted in the facility. While the concept could be expanded to cover other types of laboratories to date, it has primarily focused on supporting the implementation of good laboratory design best practices for infectious disease diagnostic and research laboratories for both the human and animal health sectors. This report presents the laboratory design concept and details associated with the modular layouts. It builds on the work previously provided in the interim prototype laboratory concept report delivered to the Cooperative Biological Engagement Program (CBEP) at the Defense Threat Reduction Agency (DTRA) in 2014. This report includes a number of revised and additional module layouts, more detailed information regarding laboratory finishes and equipment, engineering service information, electrical and lighting layouts, plumbing service information and two mechanical service options for each prototype module. Additionally, this report also includes a description of a cost estimating tool that will accompany this report and allow funding agencies to generate an approximate cost for the construction of a laboratory that utilizes the prototype laboratory concept modules. This report is intended to serve a complete document and includes all relevant information from the 2014 prototype laboratory concept report.

42 ENGINEERING↗

Power management

The multihundred kW power system management and a distribution program aims to develop critical components, circuits, and subsystems required to manage the generation, storage, and distribution of energy in large, orbital space systems. To accomplish this objective, a reference system including subsystems for the generation and storage of energy and management of electrical and thermal energy was designed and is being used to assess at the system level the impact of changing various subsystem parameters. A power management subsystem will then be designed. The subsystem is autonomous and based on ground utility systems concepts to the maximum extent possible. An agency power system breadboard is under development for characterizing and verifying the various component and subsystem technology developments.

Graves, J.↗

Experience and Assessment of the DOE/NASA Mod-1 2000 Kw Wind Turbine Generator at Boone, North Carolina

The Mod 1 program objectives are defined. The Mod 1 wind turbine is described. In addition to the steel blade operated on the wind turbine, a composite blade was designed and manufactured. During the early phase of the manufacturing cycle of Mod 1A configuration was designed that identified concepts such as partial span control, a soft tower, and upwind teetered rotors that were incorporated in second and third generation industry designs. The Mod 1 electrical system performed as designed, with voltage flicker characteristics within acceptable utility limits.

Collins, J. L.↗

Data Analytics for Electrical Distribution Systems with Micro PMUs (GMLC 1.4.9 Technical Report)

This report describes how electrical utilities with residential, industrial, commercial and government customers make decisions using Data Analytics (DA) applications and discusses how OpenFMB was leveraged to share that data among disparate types of devices for DA. OpenFMB is a data standard developed by utilities for distributed communication and control of power system assets. Here we explored how OpenFMB can be used for sharing analytics and what those analytics could be for a set of representative grid devices. A review of DA applications performed by electrical utilities and customers is presented. An overview of how the testbed we used was built and configured is summarized. Several experiments which were carried out to explore the capabilities of OpenFMB alongside other data sharing mechanisms for gathering sensor measurements and sharing analytics is also discussed. And finally a comparison of OpenFMB and LBNL’s SPARK framework is summarized. Today’s electrical utilities focus on monitoring the real-time customer consumptions, offering new real-time tariff models based on customer usage habits (rewards and punishments), providing energy peak during peak load times (plan energy generation and distribution), improving the load management for transformers and power lines, and controlling the energy and grid resources efficiently. On the other hand, the DA applications for residential customers are based on modifying the customer electricity usage habit to save money, making accurate and timely decisions for electrical billing. However, the DA applications for industrial, commercial and government customers focus on creating efficient programs to improve the environmental condition (reducing CO₂ emission), developing better load forecasting for industrial and/or commercial activities. In this project, a testbed was built to explore how the OpenFMB framework can be used to distribute data among various types of representative grid edge devices. Micro PMUs (Phasor Measurement Unit) were used to collect and transmit data to an OpenPDC server alongside relays with a framework configured with a system using OpenFMB to collect and transmit data. The testbed was composed of a physical asset based on a 60 Hz AC radial power system constructed using SI-GRID components. The power system consisted of a 3-phase 14 volts line-to-ground (24 volts line-to-line) power source, three 3-phase line emulators, a programmable resistive load bank, two smart relays, two micro PMUs, and a (SCADA) and Phasor Data Concentrator (PDC) computer. This testbed configuration allowed us to perform breaker operation tests collecting data from the micro PMUs and from the relays’ sensors. During the micro PMU breaker operation tests we collected the measured and estimated fundamental voltages, currents, frequency as well as the total true, reactive and apparent power. The displacement power factor from two micro PMUs located in parallel power lines was also used. The software steps for the implementation of the Synchrophasor system are explained in detail in this report. The setting (1-2-3) and data collection (4-5) phases were performed with a free download open source software. In the setting phase, the micro PMUs were set (1), the data stream for each micro PMU was validated, and the connection and configuration files were created (2). The PDC computer was set using the connection and configuration files of the micro PMUs (3). In the data collection phase, the binary data from the micro PMUs was collected (4), and the binary data files of the micro PMUs was converted to analyze the test results (5). OpenFMB was configured to use protocol translators to read Modbus and transform the reading into the OpenFMB data model to be read for DA applications.Our experiments showed that by leveraging the OpenFMB data model and the micro PMUs together we could obtain better situational awareness of network faults, which in some cases could lead to failures in the system and would be less perceivable otherwise. For example, in one experiment the fundamental RMS current angle, and the fundamental displacement power factor (estimated by the ratio between the measured real and apparent total power) had a disturbance at the micro PMU connected to the beginning of the parallel power line because the breaker was opened without the operators or SCADA system’s knowledge, and no current was available. Based on the breaker state scenarios and micro PMU locations, the DA applications using the current angle and displacement power factor from the micro PMUs should be studied in detail to avoid a non-desired measurement that could affect the decision from the DA. Also, the sample rates for PMU, Relay and micro PMU devices were compared. The DA application improved the control and operation between the electrical utilities and their customers (residential, industrial, transportation, commercial and government). The higher the sample rate, the better the quality of the measurement for DA estimations.

42 ENGINEERING↗

Demonstration Assessment of Light Emitting Diode (LED) Residential Downlights and Undercabinet Lights in the Lane County Tour of Homes, Eugene, Oregon

In August 2008 the Pacific Northwest National Laboratory (PNNL) conducted a light emitting diode (LED) residential lighting demonstration project for the U.S. Department of Energy (DOE), Office of Building Technologies, as part of DOE’s Solid State Lighting (SSL) Technology Demonstration Gateway Program. Two lighting technologies, an LED replacement for downlight lamps (bulbs) and an LED undercabinet lighting fixture, were tested in the demonstration which was conducted in two homes built for the 2008 Tour of Homes in Eugene, Oregon. The homes were built by the Lane County Home Builders Association (HBA), and Future B Homes. The Energy Trust of Oregon (ETO) also participated in the demonstration project. The LED downlight product, the LR6, made by Cree LED Lighting Solutions acts as a screw-in replacement for incandescent and halogen bulbs in recessed can downlights. The second product tested is Phillips/Color Kinetics’ eW® Profile Powercore undercabinet fixture designed to mount under kitchen cabinets to illuminate the countertop and backsplash surfaces. Quantitative and qualitative measurements of light performance and electrical power usage were taken at each site before and after initially installed halogen and incandescent lamps were replaced with the LED products. Energy savings and simple paybacks were also calculated and builders who toured the homes were surveyed for their responses to the LED products. The LED downlight product drew 12 Watts of power, cutting energy use by 82% compared to the 65W incandescent lamp and by 84% compared to the 75W halogen lamp. The LED undercabinet fixture drew 10 watts, cutting energy use by 83% to 90% compared to the halogen product, which was tested at two power settings: a low power 60W setting and a high power 105W setting. The LED downlight consistently provided more light than the halogen and incandescent lamps in horizontal measurements at counter height and floor level. It also outperformed in vertical illuminance measurements taken on the walls, indicating better lateral dispersion of the light. The undercabinet fixture’s light output was midway between the low and high power halogen undercabinet fixture light outputs (35.8 foot candle versus 13.4 fc and 53.4 fc) but it produced a more uniform light (max/min ratio of 7.0 versus 10.8). The color correlated temperature (CCT, the blue or yellowness) of the LED light correlated well with the halogen and incandescent lights (2675 K vs 2700 K). The color rendering of the LED downlight also correlated well at 92 CRI compared to 100 CRI for the halogen and incandescent lamps. The LED undercabinet fixture had measures of 2880 K CCT and 71 CRI compared to the 2700 K and 100 CRI scores for the halogen undercabinet fixture. Builders who toured the homes were surveyed; they gave the LED downlight high marks for brightness, said the undercabinet improved shadows and glare and said both products improved overall visibility, home appearance, and home value. Paybacks on the LED downlight ranged from 7.6 years (assuming electricity cost of 11 c/kWh) to 13.5 years (at 5C/kWh). Paybacks on the LED undercabinet fixture in a new home ranged from 4.4 years (11c/kWh electricity) to 7.6 years (5c/kWh) based on product costs of $95 per LED downlight and $140 per LED undercabinet fixture at 3 hrs per day of usage for the downlight and 2 hrs per day for the undercabinet lighting.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Ductless Heat Pump Program

The Verde Ductless Heat Pump (DHP) Program expanded access to high-efficiency electric heating and cooling technologies for households in priority communities within the Portland Metro area. Funded by the U.S. Department of Energy’s Building Technologies Office (DE-EE0010132), the program combined residential ductless heat pump deployment with community-based outreach, participant support, contractor partnerships, and system development to improve program delivery.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

2011 Residential Energy Efficiency Technical Update Meeting Summary Report: Denver, Colorado - August 9-11, 2011

This report provides an overview of the U.S. Department of Energy Building America program's Summer 2011 Residential Energy Efficiency Technical Update Meeting. This meeting was held on August 9-11, 2011, in Denver, Colorado, and brought together more than 290 professionals representing organizations with a vested interest in energy efficiency improvements in residential buildings.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Development of an Advanced Fine Coal Suspension Dewatering Process

With the advancement in fine coal cleaning technology, recovery of fine coal (minus 28 mesh) has become an attractive route for the U.S. coal industry. The clean coal recovered using the advanced flotation technology i.e. column flotation, contains on average 20% solids and 80% water, with an average particle size of 35 microns. Fine coal slurry is usually dewatered using a vacuum dewatering technique, providing a material with about 25 to 30 percent moisture. The process developed in this project will improve dewatering of fine (0.6mm) coal slurry to less than 20 percent moisture. Thus, thermal drying of dewatered wet coal will be eliminated. This will provide significant energy savings for the coal industry along with some environmental benefits. A 1% increase in recovery of coal and producing a filter cake material of less than 20 % moisture will amount to energy savings of 1900 trillion Btu/yr/unit. In terms of the amount of coal it will be about 0.8% of the total coal being used in the USA for electric power generation. It is difficult to dewater the fine clean coal slurry to about 20% moisture level using the conventional dewatering techniques. The finer the particle, the larger the surface area and thus, it retains large amounts of moisture on the surface. The coal industry has shown some reluctance in using the advanced coal recovery techniques, because of unavailability of an economical dewatering technique which can provide a product containing less than 20% moisture. The U.S.DOE and Industry has identified the dewatering of coal fines as a high priority problem. The goal of the proposed program is to develop and evaluate a novel two stage dewatering process developed at the University of Kentucky, which involves utilization of two forces, namely, vacuum and pressure for dewatering of fine coal slurries. It has been observed that a fine coal filter cake formed under vacuum has a porous structure with water trapped in the capillaries. When this porous cake is subjected to pressure for a short time, the free water present is released from the filter cake. Laboratory studies have shown that depending on the coal type a filter cake containing about 15% moisture could be obtained using the two-stage filtration technique. It was also noted that applying intermittent breaks in vacuum force during cake formation, which disturbed the cake structure, helped in removing moisture from the filter cakes. In this project a novel approach of cleaning coal using column flotation was also developed. With this approach the feed capacity of the column is increased significantly, and the column was also able to recover coarser size coal which usually gets lost in the process. The outcome of the research benefits the coal industry, utility industry, and indirectly the general public. The benefits can be counted in terms of clean energy, cleaner environment, and lower cost power.

01 COAL, LIGNITE, AND PEAT↗

Composite Power System Reliability with Renewables and Customer Flexibility

Composite Power System Reliability is defined as the computational procedure that quantifies the probability that the power system will perform the function of delivering electric power to customers adequately, on a continuous basis and with an acceptable quality. This definition leaves many details undefined and exemplifies the ambiguity in reliability analysis. The increasing deployment of wind and PV creates additional uncertainties that make reliability analysis a rather complex issue. Because of increased uncertainty the need for composite reliability analysis and utilization of results in power system planning is critical. New approaches are emerging for dealing with these problems from the operational point of view, including demand response programs, tapping on customer and distributed resource flexibility and new control approaches. The key question to be addressed is: how the new operational paradigms affect composite power system reliability. Here, this paper presents the ongoing work of the IEEE Composite System Reliability Task Force of the IEEE PES Reliability, Risk, Probability Application (RRPA) Subcommittee.

24 POWER TRANSMISSION AND DISTRIBUTION↗

High-Penetration PV Integration Handbook for Distribution Engineers

This handbook has been developed as part of a five-year research project which began in 2010. The National Renewable Energy Laboratory (NREL), Southern California Edison (SCE), Quanta Technology, Satcon Technology Corporation, Electrical Distribution Design (EDD), and Clean Power Research (CPR) teamed together to analyze the impacts of high-penetration levels of photovoltaic (PV) systems interconnected onto the SCE distribution system. This project was designed specifically to leverage the experience that SCE and the project team would gain during the significant installation of 500 MW of commercial scale PV systems (1-5 MW typically) starting in 2010 and completing in 2015 within SCE’s service territory through a program approved by the California Public Utility Commission (CPUC).

14 SOLAR ENERGY↗

GRACE Final Technical Report

The GRACE project (Grid that is Risk-Aware for Clean Electricity) was a five-year research initiative funded by the U.S. Department of Energy's Advanced Research Projects Agency- Energy (ARPA-E) under the PERFORM program. Led by Duke University's Nicholas School of the Environment, with contributions from The Ohio State University, North Carolina State University, Dartmouth College, and Pacific Northwest National Laboratory, the project addressed a fundamental challenge in grid management: conventional software plans for a single most-likely outcome and relies on reserves as a buffer, leaving utilities poorly equipped for the growing variability introduced by renewable energy. GRACE demonstrated a better approach: explicitly representing thousands of plausible future scenarios and choosing operating schedules that perform well across all of them.

14 SOLAR ENERGY↗

Demand Response Spinning Reserve Demonstration -- Phase 2 Findings from the Summer of 2008

The Demand Response Spinning Reserve project is a pioneering demonstration showing that existing utility load-management assets can provide an important electricity system reliability resource known as spinning reserve. Using aggregated demand-side resources to provide spinning reserve as demonstrated in this project will give grid operators at the California Independent System Operator (CA ISO) and Southern California Edison (SCE) a powerful new tool to improve reliability, prevent rolling blackouts, and lower grid operating costs.In the first phase of this demonstration project, we target marketed SCE?s air-conditioning (AC) load-cycling program, called the Summer Discount Plan (SDP), to customers on a single SCE distribution feederand developed an external website with real-time telemetry for the aggregated loads on this feeder and conducted a large number of short-duration curtailments of participating customers? air-conditioning units to simulate provision of spinning reserve. In this second phase of the demonstration project, we explored four major elements that would be critical for this demonstration to make the transition to a commercial activity:1. We conducted load curtailments within four geographically distinct feeders to determine the transferability of target marketing approaches and better understand the performance of SCE?s load management dispatch system as well as variations in the AC use of SCE?s participating customers;2. We deployed specialized, near-real-time AC monitoring devices to improve our understanding of the aggregated load curtailments we observe on the feeders;3. We integrated information provided by the AC monitoring devices with information from SCE?s load management dispatch system to measure the time required for each step in the curtailment process; and4. We established connectivity with the CA ISO to explore the steps involved in responding to CA ISO-initiated requests for dispatch of spinning reserve.The major findings from the second phase of this demonstration are:1. Demand-response resources can provide full response significantly faster than required by NERC and WECC reliability rules.2. The aggregate impact of demand response from many small, individual sources can be estimated with varying degrees of reliability through analysis of distribution feeder loads.3. Monitoring individual AC units helps to evaluate the efficacy of the SCE load management dispatch system and better understand AC energy use by participating customers.4. Monitoring individual AC units provides an independent data source to corroborate the estimates of the magnitude of aggregate load curtailments and gives insight into results from estimation methods that rely solely on distribution feeder data.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Kennedy Space Center (KSC) Pad B Catenary Capability Analysis and Technical Exchange Meeting (TEM) Support

The existing lightning protection system at Pad 39B for the Space Shuttle is an outgrowth of a system that was put in place for the Apollo Program. Dr. Frank Fisher of Lightning Technologies was a key participant in the design and implementation of that system. He conveyed to the NESC team that the catenary wire provision was put in place quickly (as assurance against possible vehicle damage causing critical launch delays) rather than being implemented as a comprehensive system designed to provide a high degree of guaranteed protection. Also, the technology of lightning protection has evolved over time with considerable work being conducted by groups such as the electric utilities companies, aircraft manufacturers, universities, and others. Several accepted present-day methods for analysis of lightning protection were used by Drs. Medelius and Mata to study the expected lightning environment for the Pad 39B facility and to analyze the degree of protection against direct lightning attachment to the Space Shuttle. The specific physical configuration directly affects the vulnerability, so cases that were considered included the RSS next to and rolled back from the Space Shuttle, and the GOx Vent Arm both extended and withdrawn from the ET. Elements of the lightning protection system at Pad 39B are shown in Figure 6.0-1 and consist of an 80 foot insulating mast on top of the Fixed Support Structure (FSS), a catenary wire system that runs from the mast in a North/South direction to grounds 1000 feet away on each side of the mast, the RSS which can either be next to or away from the Space Shuttle, and a GOx vent that can either be extended or retracted from the top of the ET.

Wilson, Timmy R.↗