Search NASA⌕ Search

SEARCH · Search NASA

Results for “probabilistic analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 991 records · Page 55

Probabilistic Component Mode Synthesis of Nondeterministic Substructures

Standard methods of structural dynamic analysis assume that the structural characteristics are deterministic. Recognizing that these characteristics are actually statistical in nature researchers have recently developed a variety of methods that use this information to determine probabilities of a desired response characteristic, such as natural frequency, without using expensive Monte Carlo simulations. One of the problems in these methods is correctly identifying the statistical properties of primitive variables such as geometry, stiffness, and mass. We present a method where the measured dynamic properties of substructures are used instead as the random variables. The residual flexibility method of component mode synthesis is combined with the probabilistic methods to determine the cumulative distribution function of the system eigenvalues. A simple cantilever beam test problem is presented that illustrates the theory.

Brown, Andrew M.↗

Analysis of Loss-of-Offsite-Power Events 1997-2015

Loss of offsite power (LOOP) can have a major negative impact on a power plant’s ability to achieve and maintain safe shutdown conditions. LOOP event frequencies and times required for subsequent restoration of offsite power are important inputs to plant probabilistic risk assessments. This report presents a statistical and engineering analysis of LOOP frequencies and durations at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience during calendar years 1997 through 2015. LOOP events during critical operation that do not result in a reactor trip, are not included. Frequencies and durations were determined for four event categories: plant-centered, switchyard-centered, grid-related, and weather-related. Emergency diesel generator reliability is also considered (failure to start, failure to load and run, and failure to run more than 1 hour). There is an adverse trend in LOOP durations. The previously reported adverse trend in LOOP frequency was not statistically significant for 2006-2015. Grid-related LOOPs happen predominantly in the summer. Switchyard-centered LOOPs happen predominantly in winter and spring. Plant-centered and weather-related LOOPs do not show statistically significant seasonality. The engineering analysis of LOOP data shows that human errors have been much less frequent since 1997 than in the 1986 -1996 time period.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Analysis of Loss-of-Offsite-Power Events: 1987-2016

Loss of offsite power (LOOP) can have a major negative impact on a power plant’s ability to achieve and maintain safe shutdown conditions. LOOP event frequencies and times required for subsequent restoration of offsite power are important inputs to plant probabilistic risk assessments. This report presents a statistical and engineering analysis of LOOP frequencies and durations at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience during calendar years 1987 through 2016. LOOP events during critical operation that do not result in a reactor trip are not included. Frequencies and durations were determined for four event categories: plant-centered, switchyard-centered, grid-related, and weather-related. Emergency diesel generator reliability is also considered (failure to start, failure to load and run, and failure to run more than 1 hour). An adverse trend in overall LOOP frequency is identified. An adverse trend in LOOP durations is identified. Plant-centered and weather-related LOOP events do not show statistically significant seasonality. The engineering analysis of LOOP data shows that human errors have been much less frequent since 1997 than in the 1986–1996 time period.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Analysis of Loss-of-Offsite-Power Events 1987-2018

Loss of offsite power (LOOP) can have a major negative impact on a power plant’s ability to achieve and maintain safe shutdown conditions. LOOP event frequencies and times required for subsequent restoration of offsite power are important inputs to plant probabilistic risk assessments. This report presents a statistical and engineering analysis of LOOP frequencies and durations at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience during calendar years 1987 through 2018. LOOP events during critical operation that do not result in a reactor trip are not included. Frequencies and durations were determined for four event categories: plant-centered, switchyard-centered, grid-related, and weather-related. No significant trends in critical operation LOOP frequencies over the most recent 10-year period are identified. Adverse trends in LOOP durations are identified for switchyard-centered and grid-related LOOPs, as well as overall LOOPs during critical operation and overall LOOPs during shutdown operation. Both grid-related and weather-related LOOP events are found to show statistically significant seasonality. The engineering analysis of LOOP data shows that human errors have been much less frequent since 1997 than in the 1987–1996 time period.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Analysis of Loss-of-Offsite-Power Events: Update

Loss-of-offsite power (LOOP) can have a negative impact on a nuclear power plant’s ability to achieve and maintain safe shutdown conditions. LOOP event frequencies and times required for subsequent restoration of offsite power are important inputs to plant probabilistic risk assessments. This report presents a statistical and engineering analysis of LOOP frequencies and durations at U.S. commercial nuclear power plants. The data used in this study were based on the operating experience during calendar years 1987–2020, while the most recent 15-year data (i.e., from 2006–2020) were used for most analyses in this report. LOOP events during critical operation that did not result in a reactor trip are not included. Frequencies and durations were determined for four LOOP event categories: plant-centered, switchyard-centered, grid-related, and weather related. Highly significant decreasing trends in the LOOP occurrence rates were identified for All-LOOPs during critical operation (p-value = 0.001) and switchyard-centered LOOPs during critical operation (p-value = 0.002) for the most recent 10-year period (2011–2020). Adverse trends in LOOP durations continue for switchyard-centered LOOPs (p-value = 0.005), All-LOOPs (p-value = 0.019), as well as All-LOOPs during shutdown operation (p-value = 0.003). Statistical tests show the LOOP counts are not uniformly distributed across the 12 months, and variation among the months exists for plant-centered LOOPs (p-value = 0.028), grid-related LOOPs (p-value = 0.021), All-LOOPs (p-value = 0.003), and All-LOOPs during critical operation (p-value = 0.008). The engineering analysis of LOOP data showed for the period of 2006–2020, the equipment failure events were dominated by failures of circuits and relay; human errors have been less frequent and occurred primarily in maintenance; and weather events were dominated by tornadoes and lightning.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

HUMAN FAILURE EVENT DEPENDENCE: WHAT ARE THE LIMITS

Abstract Objectives: This paper discusses the differences between classical human reliability analysis (HRA) dependence and the full spectrum of probabilistic dependence. Positive influence suggests an error increases the likelihood of subsequent errors or success increases the likelihood of subsequent success. Currently the typical method for dependence in HRA implements the Technique for Human Error Rate Prediction (THERP) positive dependence equations. This assumes that the dependence between two human failure events varies at discrete levels between zero and complete dependence (as defined by THERP). Dependence in THERP does not consistently span dependence values between 0 and 1. In contrast, probabilistic dependence employs Bayes Law, and addresses a continuous range of dependence. Methods: Using the laws of probability, complete dependence and maximum positive dependence do not always agree. Maximum dependence is when two events overlap to their fullest amount. Maximum negative dependence is the smallest amount that two events can overlap. When the minimum probability of two events overlapping is less than independence, negative dependence occurs. For example, negative dependence is when an operator fails to actuate Pump A, thereby increasing his or her chance of actuating Pump B. The initial error actually increases the chance of subsequent success. Results: Comparing THERP and probability theory yields different results in certain scenarios; with the latter addressing negative dependence. Given that most human failure events are rare, the minimum overlap is typically 0. And when the second event is smaller than the first event the max dependence is less than 1, as defined by Bayes Law. As such alternative dependence equations are provided along with a look-up table defining the maximum and maximum negative dependence given the probability of two events. Conclusions: THERP dependence has been used ubiquitously for decades, and has provided approximations of the dependencies between two events. Since its inception, computational abilities have increased exponentially, and alternative approaches that follow the laws of probability dependence need to be implemented. These new approaches need to consider negative dependence and identify when THERP output is not appropriate.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Analysis of Loss-of-Offsite-Power Events: 2021 Update

Loss-of-offsite power (LOOP) can have a negative impact on a nuclear power plant’s ability to achieve and maintain safe shutdown conditions. LOOP event frequencies and times required for subsequent restoration of offsite power are important inputs to plant probabilistic risk assessments. This report presents a statistical and engineering analysis of LOOP frequencies and durations at U.S. commercial nuclear power plants. The data used in this study were based on the operating experience during calendar years 1987–2021, while the most recent 15-year data (i.e., from 2007–2021) were used for most analyses in this report. LOOP events during critical operation that did not result in a reactor trip are not included. Frequencies and durations were determined for four LOOP event categories: plant-centered, switchyard-centered, grid-related, and weather-related. These categories (and the All-LOOPs group which contains all LOOPs without regarding of the four categories) could be further grouped by whether a LOOP event occurred during critical operation, during shutdown operation, or during all operations. The following decreasing trends in the LOOP occurrence rates were identified for the most recent 10-year period (2012–2021): All-LOOPs during critical operation, switchyard-centered LOOPs during critical operation, and grid-related LOOPs during critical operation. Adverse trends in LOOP durations continue for switchyard-centered LOOPs during all operations, All-LOOPs during all operations, and All-LOOPs during shutdown operation for the 1997–2021 period. Statistical tests show the LOOP counts for the period of 2007–2021 are not uniformly distributed across the 12 months, and variation among the months exists for grid-related LOOPs during all operations, All-LOOPs during all operations, and All-LOOPs during critical operation. The engineering analysis of LOOP data showed for the period of 2007–2021, the equipment failure events were dominated by failures of relay and other; human errors have been less frequent and occurred primarily in maintenance and switching; and weather were dominated by tornadoes then by lightning and hurricane. Weather was the cause for 45% of LOOPs for the last fifteen years (2007– 2021) but only for 20% of LOOPs for the previous 20 years (1987–2006) .

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Decision Analyses Related to Groundwater Remediation - 17051

Traditional decision analyses of groundwater remediation scenarios frequently fail because the probability of adverse, unanticipated events occurring is often high. This is driven by many factors including that (1) the models developed to represent the flow and transport in contaminated aquifers are typically simpler than reality and do not account for all the important governing processes, (2) probability distributions are assigned to critical performance parameters (such as model inputs or characteristics of the engineered remediation systems) even though some of these parameters might be unknown or not be very well constrained. However, there is a novel decision analysis methodology and a computational tool based on Bayesian Information-Gap Decision Theory (BIG-DT) that are designed to mitigate the shortcomings of the models and probabilistic decision analyses by leveraging a non-probabilistic decision theory -- information-gap decision theory. The new decision analysis methodology considers possible models that have not been explicitly enumerated and does not require us to commit to a particular probability distribution for model and remediation-design parameters. Both the set of possible models and the set of possible probability distributions grow as the degree of uncertainty increases. The fundamental question that BIG-DT asks is 'How large can these sets be before a particular decision results in an undesirable outcome?'. The decision that allows these sets to be the largest is considered to be the best option. In this way, BIG-DT enables robust decision-support for groundwater remediation problems. Here, we apply BIG-DT to a representative groundwater remediation scenario where different options for hydraulic containment and pump and treat are being considered. BIG-DT requires many model runs and high-performance computing resources are needed when complex models are used. We demonstrate the BIG-DT analyses on a series of synthetic problems that are designed to be consistent with real-world problems such as Los Alamos National Laboratory (LANL) contamination sites. We also discuss a general framework for how the BIG-DT analyses will be carried out at the chromium groundwater contamination site at LANL. BIG-DT is implemented in Julia (a high-level, high-performance dynamic programming language for technical computing) and is part of the MADS framework (http://mads.lanl.gov and http://madsjulia.github.io/Mads.jl). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Robust Design of Advanced Thermoelectric Conversion Systems: Probabilistic Design Impacts on Specific Power and Power Flux Optimization

Advanced, direct thermal energy conversion technologies are receiving increased research attention in order to recover waste thermal energy in advanced vehicles and industrial processes. Advanced thermoelectric (TE) systems necessarily require integrated system-level analyses to establish accurate optimum system designs. Past system-level design and analysis has relied on well-defined deterministic input parameters even though many critically important environmental and system design parameters in the above mentioned applications are often randomly variable, sometimes according to complex relationships, rather than discrete, well-known deterministic variables. This work describes new research and development creating techniques and capabilities for probabilistic design and analysis of advanced TE power generation systems to quantify the effects of randomly uncertain design inputs in determining more robust optimum TE system designs and expected outputs. Selected case studies involving stochastic TE .material properties demonstrate key stochastic material impacts on power, optimum TE area, specific power, and power flux in the TE design optimization process. Magnitudes and directions of these design modifications are quantified for selected TE system design analysis cases

30 DIRECT ENERGY CONVERSION↗

Issues in Benchmarking Human Reliability Analysis Methods: A Literature Review

There is a diversity of human reliability analysis (HRA) methods available for use in assessing human performance within probabilistic risk assessments (PRA). Due to the significant differences in the methods, including the scope, approach, and underlying models, there is a need for an empirical comparison investigating the validity and reliability of the methods. To accomplish this empirical comparison, a benchmarking study comparing and evaluating HRA methods in assessing operator performance in simulator experiments is currently underway. In order to account for as many effects as possible in the construction of this benchmarking study, a literature review was conducted, reviewing past benchmarking studies in the areas of psychology and risk assessment. A number of lessons learned through these studies are presented in order to aid in the design of future HRA benchmarking endeavors.

99 GENERAL AND MISCELLANEOUS↗

Disintegration of the Aged Open Cluster Berkeley 17

We present the analysis of the morphological shape of Berkeley 17, the oldest known open cluster (∼10 Gyr), using the probabilistic star counting of Pan-STARRS point sources, and confirm its core-tail shape, plus an antitail, previously detected with the 2MASS data. The stellar population, as diagnosed by the color–magnitude diagram and theoretical isochrones, shows many massive members in the clusters core, whereas there is a paucity of such members in both of the tails. This manifests mass segregation in this aged star cluster with the low-mass members being stripped away from the system. It has been claimed that Berkeley 17 is associated with an excessive number of blue straggler candidates. A comparison of nearby reference fields indicates that about half of these may be field contamination.

79 ASTRONOMY AND ASTROPHYSICS↗

Summary of the 5th IAEA technical meeting on fusion data processing, validation and analysis (FDPVA)

The purpose of the 5th International Atomic Energy Agency technical meeting on fusion data processing, validation and analysis (FDPVA) (Ghent University, Ghent, Belgium, 12–15 June 2023) was to provide a platform during which a set of topics relevant to FDPVA were discussed with the view of meeting the needs of next step fusion devices such as ITER. The validation and analysis of experimental data obtained from diagnostics used to characterize fusion plasmas are crucial for a knowledge-based understanding of the physical processes governing the dynamics of these plasmas. This paper presents the recent progress and achievements in the domain of plasma diagnostics data analysis and synthetic diagnostics reported at the meeting, including concept description of new devices; fusion databases; integrated data analysis; inverse problems; uncertainty propagation, verification and validation; probabilistic methods and machine learning. The relevant results underline trends observed in the current major fusion confinement devices.

fusion databases↗

Evaluation of Joint Cyber/Safety Risk in Nuclear Power Systems

This report presents an analysis of the Emergency Core Cooling System (ECCS) for a generic Boiling Water Reactor (BWR)-4 NPP. The Electric Power Research Institute (EPRI) developed Hazards and Consequences Analysis for Digital Systems (HAZCADS) process is applied to the ECCS and its subsystems to identify unsafe control actions (UCAs) which act as possible cyber events of concern. The analysis is performed for two design basis events: Small-break Loss of Coolant Accident (SLOCA) and general transients (TRANS), such as unintended reactor trip. In previous work, HAZCADS UCAs were combined with other cyber-attack analysis to develop a risk-informed approach; however, this was for a single system. This report explores advanced systems engineering modeling approaches to model the interactions between digital assets across multiple systems which may be targeted by cyber adversaries. The complex and interdependent design of digital systems has the potential to introduce emergent cyber properties that are generally not covered by hazard analyses nor formal nuclear Probabilistic Risk Assessment (PRA). The R&D and supporting analysis presented here explores approaches to predict and manage how interdependent system properties effect risk. To show the potential impact of a successful cyber-attack to formal PRA event tree probabilities, HAZCADS analysis was also used. HAZCADS was also used to model the automatic depressurization system (ADS) automatic actuation. This analysis extended to an integrated system analysis for common-cause failure (CCF). In this aspect, the HAZCADS analysis continued by analyzing plant design details for system connectivity in support of critical plant functions. A dependency matrix was developed to depict the integrated functionality of the interconnected systems. Areas of potential CCF are indicated. Future work could include adversary attack development to show how CCF could be caused, resulting in PRA events. Across the multiple systems that comprise the ECCS, the analysis shows that the change in such probabilities was very different between systems. This indicates that some systems have a larger potential risk impact from successful cyber-attack or digital failure, which indicates a need for these systems to have a higher priority for design and defensive measures. Furthermore, we were able to establish that a risk analysis using any arbitrary threat model establishes an ordering of components with regard to cyber-risk. This ordering can be used to influence the overall system design with an eye to lowering risk, or as a way to understand real-time risk to operational systems based on a current threat landscape. Expert knowledge of both the analysis process and the system being analyzed is required to perform a HAZCADS analysis. The need for a tiered risk analysis is demonstrated by the results of this report.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Stage-local partitioned two-step runge-kutta methods for large systems of ordinary differential equations

We introduce stage-local partitioned two-step Runge-Kutta methods are an extension of standard two-step Runge-Kutta methods, which are an alternative to the standard additive two-step Runge-Kutta methods currently existing in the literature. Furthermore, these new schemes are designed with an eye towards truly N-partitioned systems and leverage local stage approximations to make several computationally interesting approximations viable. Specifically, the focus on local stage approximations makes possible the construction of truly asynchronous schemes, in the parallel sense, possible. In addition, we show that an implicit-explicit approach to these schemes can lead to methods that require the inversion of only local nonlinear systems.

Applied Dynamical Systems↗

Composite Multilinearity, Epistemic Uncertainty and Risk Achievement Worth

Risk Achievement Worth is one of the most widely utilized importance measures. RAW is defined as the ratio of the risk metric value attained when a component has failed over the base case value of the risk metric. Traditionally, both the numerator and denominator are point estimates. Relevant literature has shown that inclusion of epistemic uncertainty i) induces notable variability in the point estimate ranking and ii) causes the expected value of the risk metric to differ from its nominal value. We obtain the conditions under which the equality holds between the nominal and expected values of a reliability risk metric. Among these conditions, separability and state-of-knowledge independence emerge. We then study how the presence of epistemic uncertainty aspects RAW and the associated ranking. We propose an extension of RAW (called ERAW) which allows one to obtain a ranking robust to epistemic uncertainty. We discuss the properties of ERAW and the conditions under which it coincides with RAW. We apply our findings to a probabilistic risk assessment model developed for the safety analysis of NASA lunar space missions.

97 MATHEMATICS AND COMPUTING↗

Ensemble models for circuit topology estimation, fault detection and classification in distribution systems

This paper presents a methodology for simultaneous fault detection, classification, and topology estimation for adaptive protection of distribution systems. The methodology estimates the probability of the occurrence of each one of these events by using a hybrid structure that combines three sub-systems, a convolutional neural network for topology estimation, a fault detection based on predictive residual analysis, and a standard support vector machine with probabilistic output for fault classification. The input to all these sub-systems is the local voltage and current measurements. A convolutional neural network uses these local measurements in the form of sequential data to extract features and estimate the topology conditions. The fault detector is constructed with a Bayesian stage (a multitask Gaussian process) that computes a predictive distribution (assumed to be Gaussian) of the residuals using the input. Since the distribution is known, these residuals can be transformed into a Standard distribution, whose values are then introduced into a one-class support vector machine. The structure allows using a one-class support vector machine without parameter cross-validation, so the fault detector is fully unsupervised. Finally, a support vector machine uses the input to perform the classification of the fault types. All three sub-systems can work in a parallel setup for both performance and computation efficiency. In conclusion, we test all three sub-systems included in the structure on a modified IEEE123 bus system, and we compare and evaluate the results with standard approaches.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Conclusive modification of the overlap between two quantum states

The task of changing the overlap between two quantum states cannot be performed by making use of unitary evolution only. However, by means of a unitary-reduction process, it could be modified. Here we study in detail the problem of mapping two known pure states onto two other states in such a way that the overlap between the outcome states is different from the one of the initial states. We show that the modulus of the overlap can be reduced only probabilistically, whereas it can be increased deterministically. Our analysis shows that the phases of the involved overlaps play an important role in the increase of the success probability of the desired process.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗