Search NASA⌕ Search

SEARCH · Search NASA

Results for “CAPACITY PLANNING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,009 records · Page 56

An Optimization-Based Planning Tool for On-Demand Mobility Service Operations

Regions worldwide are adopting and exploring low-speed automated electric shuttle (AES) service as an on-demand shared mobility service in dense geofenced urban areas. Building on this concept, the National Renewable Energy Laboratory (NREL) recently developed the Automated Mobility District (AMD) toolkit. The AMD toolkit—comprising of a travel micro-simulation model and an energy estimation model—estimates the mobility and energy impacts of a given shuttle configuration within an AMD. Early-stage AMD deployments need to find optimal operational configurations that include: (a) passenger capacity of an AES, (b) time-dependent routes, and (c) fleet size (AES units) to satisfy the demand for the region. This research extends the AMD toolkit functionality by developing an optimization-based planning module that will assist in the operations of AES units. We developed a constrained mixed-integer program accounting for passenger waiting time, battery range, and passenger capacity of AES units. For scalability, we demonstrated the Tabu search-based solution technique for a real-world network—a proposed AMD deployment in Greenville, South Carolina, USA. Compared to rule-based operations, our developed solution yields higher travel time and energy savings for the network at different demand levels. The sensitivity analyses for waiting time thresholds indicate nonlinearity in the system performance, underscoring the need to meet shared-use mobility user-level expectations. The developed optimization framework can be adapted and extended to accommodate different categories of shared-use on-demand mobility services.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

Policies to Spur Energy Access. Executive Summary; Volume 1, Engaging the Private Sector in Expanding Access to Electricity; Volume 2, Case Studies to Public-Private Models to Finance Decentralized Electricity Access

Government policy is one of the most important factors in engaging the private sector in providing universal access to electricity. In particular, the private sector is well positioned to provide decentralized electricity products and services. While policy uncertainty and regulatory barriers can keep enterprises and investors from engaging in the market, targeted policies can create opportunities to leverage private investment and skills to expand electricity access. However, creating a sustainable market requires policies beyond traditional electricity regulation. The report reviews the range of policy issues that impact the development and expansion of a market for decentralized electricity services from establishing an enabling policy environment to catalyzing finance, building human capacity, and integrating energy access with development programs. The case studies in this report show that robust policy frameworks--addressing a wide range of market issues--can lead to rapid transformation in energy access. The report highlights examples of these policies in action Bangladesh, Ethiopia, Mali, Mexico, and Nepal.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Electrification Futures Study: Methodological Approaches for Assessing Long-Term Power System Impacts of End-Use Electrification

By its nature, electrification enhances the coupling between the electric sector and end-use sectors. Assessing the impacts of electrification requires both an examination of the complex interactions between sectors and a broader assessment of multiple parts of the energy system. The Electrification Futures Study (EFS) uses several complementary modeling and analysis tools to analyze the impacts of electrification on the U.S. energy system. In particular, the EFS relies on an overarching scenario analysis approach, but through the use of separate modeling approaches designed to assess various electricity demand- and supply-side futures. The primary model employed to generate the supply-side scenarios is the Regional Energy Deployment System (ReEDS) model, which is a capacity expansion model for the U.S. electricity system through 2050. Traditionally, the model has been primarily exercised in scenario analysis that implicitly assumed limited electrification. Because of this assumption, resulting future load profiles are approximated by historical ones, load growth is driven primarily by population and economic growth only, and changes in direct end-use natural gas consumption do not effect natural gas costs for electricity generation. In this report, we (1) reflect the potential for resource sharing between regions given these changes in demand, (2) represent how changes in natural gas consumption in end-use sectors could impact the economics of natural gas-fired generation, and (3) document a new model representation of demand-side flexibility used for the EFS. These improvements to ReEDS are employed for the EFS supply-wide analysis, which is summarized in a companion EFS report titled Electrification Futures Study: Scenarios of Power System Evolution and Infrastructure Development for the United States (Murphy et al. 2019). The data and methods documented in this report could also be adapted for other models with similar scope and limitations as ReEDS, and these data and methods could be used to assess future electric system scenarios.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Linac Coherent Light Source II (LCLS-II) Conceptual Design Report

The LCLS-II Project is designed to support the DOE Office of Science mission, as described in the 22 April 2010 Mission Need Statement. The scope of the Project was chosen to provide an increase in capabilities and capacity for the facility both at project completion in 2017 and in the subsequent decade. The Project is designed to address all points of the Mission Need Statement (MNS): (1) Expanded spectral reach; (2) Capability to provide x-ray beams with controllable polarization; (3) Capability to provide 'pump' pulses over a vastly extended range of photon energies to a sample, synchronized to LCLS-II x-ray probe pulses with controllable inter-pulse time delay; and (4) Increase of user access through parallel rather than serial x-ray beam use within the constraint of a $300M-$400M Total Project Cost (TPC) range. The LCLS-II Project will construct: (1) A hard x-ray undulator source (2-13 keV); (2) A soft x-ray undulator source (250-2,000 eV); (3) A dedicated, independent electron source for these new undulators, using sectors 10-20 of the SLAC linac; (4) Modifications to existing SLAC facilities for the injector and new shielded enclosures for the undulator sources, beam dumps and x-ray front ends; (5) A new experiment hall capable of accommodating four experiment stations; and (6) Relocation of the two soft x-ray instruments in the existing Near Experiment Hall (NEH) to the new experiment hall (Experiment Hall-II). A key objective of LCLS-II is to maintain near-term international leadership in the study of matter on the fundamental atomic length scale and the associated ultrafast time scales of atomic motion and electronic transformation. Clearly, such studies promise scientific breakthroughs in key areas of societal needs like energy, environment, health and technology, and they are uniquely enabled by forefront X-ray Free Electron Laser (X-FEL) facilities. While the implementation of LCLS-II extends to about 2017, it is important to realize that LCLS-II only constitutes a stepping stone to what we believe is needed over a longer time scale. At present, a practical time horizon for planning is about 15 years into the future, matching that of worldwide planning activities for competitive X-FEL facilities in Europe and Asia. We therefore envision LCLS-II as an important stage in development to what is required by about 2025, tentatively called LCLS-2025, for continued US leadership even as new facilities around the world are being completed. We envision LCLS primarily as a hard x-ray FEL facility with some soft x-ray capabilities. A survey of planned X-FEL facilities around the world suggests that US planning to 2025 needs to include an internationally competitive soft x-ray FEL facility which complements the LCLS plans outlined in this document.

43 PARTICLE ACCELERATORS↗

Effects of Climate Change on Capacity Expansion Decisions of an Electricity Generation Fleet in the Southeast U.S.

The electric power sector in the United States faces many challenges related to climate change. On the demand side, climate change could shift demand patterns due to increased air temperatures. On the supply side, climate change could lead to deratings of thermal units due to changes in air temperature, water temperature, and water availability. Past studies have typically analyzed these risks separately. Here, we developed an integrated, multimodel framework to analyze how compounding risks of climate-change impacts on demand and supply affect long-term planning decisions in the power system. In the southeast U.S., we found that compounding climate-change impacts could result in a 35% increase in installed capacity by 2050 relative to the reference case. Participation of renewables, particularly solar, in the fleet increased, driven mostly by the expected increase in summertime peak demand. Such capacity requirements would increase investment costs by approximately 31 billion (USD 2015) over the next 30 years, compared to the reference case. These changes in investment decisions align with carbon emission mitigation strategies, highlighting how adaptation and mitigation strategies can converge.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

SDO Delta H Mode Design and Analysis

While on orbit, disturbance torques on a three axis stabilized spacecraft tend to increase the system momentum, which is stored in the reaction wheels. Upon reaching the predefined momentum capacity (or maximum wheel speed) of the reaction wheel, an external torque must be used to unload the momentum. The purpose of the Delta H mode is to manage the system momentum. This is accomplished by driving the reaction wheels to a target momentum state while the attitude thrusters, which provide an external torque, are used to maintain the attitude. The Delta H mode is designed to meet the mission requirements and implement the momentum management plan. Changes in the requirements or the momentum management plan can lead to design changes in the mode. The momentum management plan defines the expected momentum buildup trend, the desired momentum state and how often the system is driven to the desired momentum state (unloaded). The desired momentum state is chosen based on wheel capacity, wheel configuration, thruster layout and thruster sizing. For the Solar Dynamics Observatory mission, the predefined wheel momentum capacity is a function of the jitter requirements, power, and maximum momentum capacity. Changes in jitter requirements or power limits can lead to changes in the desired momentum state. These changes propagate into the changes in the momentum management plan and therefore the Delta H mode design. This paper presents the analysis and design performed for the Solar Dynamics Observatory Delta H mode. In particular, the mode logic and processing needed to meet requirements is described along with the momentum distribution formulation. The Delta H mode design is validated using the Solar Dynamics Observatory High Fidelity simulator. Finally, a summary of the design is provided along with concluding remarks.

Mason, Paul A.↗

Dry cooling retrofits at existing fossil fuel-fired power plants in a water-stressed region: Tradeoffs in water savings, cost, and capacity shortfalls

This study (completed by US Department of Energy, National Energy Technology Laboratory) investigates the performance, cost, and generating capacity impacts of switching from wet cooling towers to dry cooling systems to reduce consumptive water use at existing fossil fuel-fired power plants in a water-stressed region. Here, retrofit analysis of dry cooling is conducted on a unit-by-unit basis for both coal-fired and gas-fired power plants in several western U.S. states. Based on regional averages, retrofitting dry cooling systems in lieu of wet cooling towers decreases total annual plant water consumption at existing coal- and gas-fired power plants by 93% and 100%, respectively, while increasing the levelized cost of electricity generation by approximately 12% and 18%, respectively. Over the year, the change in monthly net regional generating capacity from dry cooling retrofits exhibits a seasonal pattern, with the largest shortfalls occurring in July. Dry cooling retrofits thus lead to tradeoffs in water savings, cost, and capacity shortfalls, which vary with power plant characteristics. The tradeoffs identified here can inform electric power industry water management plans and decision-making for alternative cooling options in water-stressed regions.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Money Matters: A Three-Step Process for Using Budget Data in Program Evaluation to Assess the Design and Management of a Novel Public Health Program

We applied a three-step process, abstracting and analyzing program budgets to examine how Colorectal Cancer Control Program (CRCCP) awardees are structuring their programs and to assess the fidelity of program design to the CRCCP public health model. We reviewed 23 state, one tribal organization, and six university awardee budgets. We assessed resource allocations, staffing structures, and contracted partners and their activities. Awardees allocated 83% of all funds to contracts and personnel. Program managers were the most budgeted personnel type across three measures: number of people, full-time equivalency, and personnel costs. Awardees not only contracted with health care systems and clinics (39% of all contracts) but also contracted other partner types. Contractors were mainly funded to implement evidence-based interventions (25%) and conduct evaluation (24%). Program design varied among awardees in the number of staff (0–22), number of full-time equivalencies (0–5.4), and the number of contracts (1–11) budgeted. State awardees budgeted more resources to contracts, compared with university awardees (57% vs. 31%), while universities budgeted more for total personnel costs (41% vs. 30%). We learned that awardees designed their programs with fidelity to the CRCCP model. Although implementation approaches varied, overall results suggest implementation requires a combination of internal capacities and contracted partners. Budgets provide opportunities to use already existing program data to evaluate program design, partnerships, and planned activities.

Uhd, Justin↗

Additional EIPC Study Analysis: Interim Report on High Priority Topics

Between 2010 and 2012 the Eastern Interconnection Planning Collaborative (EIPC) conducted a major long-term resource and transmission study of the Eastern Interconnection (EI). With guidance from a Stakeholder Steering Committee (SSC) that included representatives from the Eastern Interconnection States Planning Council (EISPC) among others, the project was conducted in two phases. Phase 1 involved a long-term capacity expansion analysis that involved creation of eight major futures plus 72 sensitivities. Three scenarios were selected for more extensive transmission- focused evaluation in Phase 2. Five power flow analyses, nine production cost model runs (including six sensitivities), and three capital cost estimations were developed during this second phase. The results from Phase 1 and 2 provided a wealth of data that could be examined further to address energy-related questions. A list of 13 topics was developed for further analysis; this paper discusses the first five.

Electricity Grid↗

NASA's advanced space transportation system launch vehicles

Some insight is provided into the advanced transportation planning and systems that will evolve to support long term mission requirements. The general requirements include: launch and lift capacity to low earth orbit (LEO); space based transfer systems for orbital operations between LEO and geosynchronous equatorial orbit (GEO), the Moon, and Mars; and Transfer vehicle systems for long duration deep space probes. These mission requirements are incorporated in the NASA Civil Needs Data Base. To accomplish these mission goals, adequate lift capacity to LEO must be available: to support science and application missions; to provide for construction of the Space Station Freedom; and to support resupply of personnel and supplies for its operations. Growth in lift capacity must be time phased to support an expanding mission model that includes Freedom Station, the Mission to Planet Earth, and an expanded robotic planetary program. The near term increase in cargo lift capacity associated with development of the Shuttle-C is addressed. The joint DOD/NASA Advanced Launch System studies are focused on a longer term new cargo capability that will significantly reduce costs of placing payloads in space.

Branscome, Darrell R.↗

Design and Operational Evaluation of the Traffic Management Advisor at the Ft. Worth Air Route Traffic Control Center

NASA and the FAA have designed and developed and an automation tool known as the Traffic Management Advisor (TMA). The system was operationally evaluated at the Ft. Worth Air Route Traffic Control Center (ARTCC). The TMA is a time-based strategic planning tool that provides Traffic Management Coordinators and En Route Air Traffic Controllers the ability to efficiently optimize the capacity of a demand impacted airport. The TMA consists of trajectory prediction, constraint-based runway scheduling, traffic flow visualization and controllers advisories. The TMA was used and operationally evaluated for forty-one rush traffic periods during a one month period in the Summer of 1996. The evaluations included all shifts of air traffic operations as well as periods of inclement weather. Performance data was collected for engineering and human factor analysis and compared with similar operations without the TMA. The engineering data indicates that the operations with the TMA show a one to two minute per aircraft delay reduction during rush periods. The human factor data indicate a perceived reduction in en route controller workload as well as an increase in job satisfaction. Upon completion of the evaluation, the TMA has become part of the normal operations at the Ft. Worth ARTCC.

Swenson, Harry N.↗

Decision-Theoretic Control of Planetary Rovers

Planetary rovers are small unmanned vehicles equipped with cameras and a variety of sensors used for scientific experiments. They must operate under tight constraints over such resources as operation time, power, storage capacity, and communication bandwidth. Moreover, the limited computational resources of the rover limit the complexity of on-line planning and scheduling. We describe two decision-theoretic approaches to maximize the productivity of planetary rovers: one based on adaptive planning and the other on hierarchical reinforcement learning. Both approaches map the problem into a Markov decision problem and attempt to solve a large part of the problem off-line, exploiting the structure of the plan and independence between plan components. We examine the advantages and limitations of these techniques and their scalability.

Zilberstein, Shlomo↗

Self-Directed Cooperative Planetary Rovers

The project is concerned with the development of decision-theoretic techniques to optimize the scientific return of planetary rovers. Planetary rovers are small unmanned vehicles equipped with cameras and a variety of sensors used for scientific experiments. They must operate under tight constraints over such resources as operation time, power, storage capacity, and communication bandwidth. Moreover, the limited computational resources of the rover limit the complexity of on-line planning and scheduling. We have developed a comprehensive solution to this problem that involves high-level tools to describe a mission; a compiler that maps a mission description and additional probabilistic models of the components of the rover into a Markov decision problem; and algorithms for solving the rover control problem that are sensitive to the limited computational resources and high-level of uncertainty in this domain.

Zilberstein, Shlomo↗

Emerging Definition of Next-Generation of Aeronautical Communications

Aviation continues to experience rapid growth. In regions such as the United States and Europe air traffic congestion is constraining operations, leading to major new efforts to develop methodologies and infrastructures to enable continued aviation growth through transformational air traffic management systems. Such a transformation requires better communications linking airborne and ground-based elements. Technologies for next-generation communications, the required capacities, frequency spectrum of operation, network interconnectivity, and global interoperability are now receiving increased attention. A number of major planning and development efforts have taken place or are in process now to define the transformed airspace of the future. These activities include government and industry led efforts in the United States and Europe, and by international organizations. This paper will review the features, approaches, and activities of several representative planning and development efforts, and identify the emerging global consensus on requirements of next generation aeronautical communications systems for air traffic control.

Kerczewski, Robert J.↗

Science Missions Enabled by the Ares V

NASA's planned heavy-lift Ares V rocket is a centerpiece of U.S. Space Exploration Policy. With approximately 30% more capacity to Trans-Lunar Injection (TLI) than the Saturn V, Ares V could also enable additional science and exploration missions currently unachievable or extremely unworkable under current launch vehicle architectures. During the spring and summer of 2008, NASA held two workshops dedicated to the discussion of these new mission concepts for the Ares V rocket. The first workshop dealt with astronomy and astrophysics, and the second dealt primarily with planetary science and exploration, but did touch on Earth science and heliophysics. We present here the summary results and outcomes of these meetings, including a discussion of specific mission concepts and ideas, as well as suggestions on design for the Ares V fairing and flight configurations that improve science return.

Worden, Simon Peter↗

Generation Forecasting for Small Run-of-the-River Hydroelectric Systems Using Statistical Learning Models

With an increasing interest in constructing new run-of-the-river (ROR) hydroelectric generation over the more traditional reservoir-based hydroelectric systems, there is an increasing operational challenge due to the volatility of stream flow. The Snohomish County Public Utilities District (SnoPUD) has recently invested in the construction and operation of 3 new run-of-the-river projects in Northwestern Washington along Calligan Creek, Hancock Creek, and Youngs Creek. In order to effectively plan generation dispatch, SnoPUD has expressed interest in the development of an accurate forecasting tool to predict the generation capacity for these ROR systems. The following research project aims to use statistical learning models, namely Hidden Markov Models (HMMs), to predict day-ahead generation capacities for the aforementioned ROR systems. These models are constructed using 12 years of historical stream flow data collected at the intake sites and precipitation data recorded at the National Oceanic and Atmospheric Administration (NOAA) Alpine Meadows station. Four methods of constructing the models are studied for their forecast accuracies, and are compared with the persistence model. Despite using only one set of observable variables, the HMMs are shown to have slight improvements in accuracy over the persistence model approach, which shows great optimism for future work.

13 HYDRO ENERGY↗

Nuclear Safeguards Infrastructure Development and Integration with Safety and Security

Faced with increasing global energy demands, many developing countries are considering building their first nuclear power plant. As a country embarks upon or expands its nuclear power program, it should consider how it will address the 19 issues laid out in the International Atomic Energy Agency (IAEA) document Milestones in Development of a National Infrastructure for Nuclear Power. One of those issues specifically addresses the international nonproliferation treaties and commitments and the implementation of safeguards to prevent diversion of nuclear material from peaceful purposes to nuclear weapons. Given the many legislative, economic, financial, environmental, operational, and other considerations preoccupying their planners, it is often difficult for countries to focus on developing the core strengths needed for effective safeguards implementation. Typically, these countries either have no nuclear experience or it is limited to the operation of research reactors used for radioisotope development and scientific research. As a result, their capacity to apply safeguards and manage fuel operations for a nuclear power program is limited. This paper argues that to address the safeguards issue effectively, a holistic approach must be taken to integrate safeguards with the other IAEA issues including safety and security - sometimes referred to as the '3S' concept. Taking a holistic approach means that a country must consider safeguards within the context of its entire nuclear power program, including operations best practices, safety, and security as well as integration with its larger nonproliferation commitments. The Department of Energy/National Nuclear Security Administration's International Nuclear Safeguards and Engagement Program (INSEP) has been involved in bilateral technical cooperation programs for over 20 years to promote nonproliferation and the peaceful uses of nuclear energy. INSEP is currently spearheading efforts to promote the development of nuclear safeguards infrastructure in countries with credible plans for nuclear energy as part of the Next Generation Safeguards Initiative. Developing an adequate safeguards infrastructure is critical to becoming a responsible 'owner' of nuclear power. The 3S concept is the optimal path forward to achieving this goal.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A Fast-Time Study of Aircraft Reordering in Arrival Sequencing and Scheduling

In order to ensure that the safe capacity of the terminal area is not exceeded, Air Traffic Management ATM often places restrictions on arriving flights transitioning from en route airspace to terminal airspace. This restriction of arrival traffic is commonly referred to as arrival flow management, and includes techniques such as metering, vectoring, fix-load balancing, and the imposition of miles-in-trail separations. These restrictions are enacted without regard for the relative priority which airlines may be placing on individual flights based on factors such as crew criticality, passenger connectivity, critical turn times, gate availability, on-time performance, fuel status, or runway preference. The development of new arrival flow management techniques which take into consideration priorities expressed by air carriers will likely reduce the economic impact of ATM restrictions on the airlines and lead to increased airline economic efficiency by allowing airlines to have greater control over their individual arrival banks of aircraft. NASA and the Federal Aviation Administration (FAA) have designed and developed a suite of software decision support tools (DSTs) collectively known as the Center TRACON Automation System (CTAS). One of these tools, the Traffic Management Advisor (TMA) is currently being used at the Fort Worth Air Route Traffic Control Center to perform arrival flow management of traffic into the Dallas/Fort Worth airport (DFW). The TMA is a time-based strategic planning tool that assists Traffic Management Coordinators (TMCs) and En Route Air Traffic Controllers in efficiently balancing arrival demand with airport capacity. The primary algorithm in the TMA is a real-time scheduler which generates efficient landing sequences and landing times for arrivals within about 200 no a. from touchdown. This scheduler will sequence aircraft so that they arrive in a first- come - first-served (FCFS) order. While FCFS sequencing establishes a fair order based on estimated times of arrival, it does not take into account individual airline priorities among incoming flights. NASA is exploring the possibility of allowing airlines to express relative arrival priorities to air traffic management through the development of new CTAS scheduling algorithms which take into consideration airline arrival preferences. The accommodation of airline priorities in arrival sequencing and scheduling would under most circumstances result in a deviation from a "natural" or FCFS arrival order. As a First step toward developing airline influenced sequencing algorithms, an investigation was conducted to determine the feasibility of reordering arrival traffic from a strict FCFS sequence. A fast-time simulation has been developed which allows statistical evaluation of sequencing and scheduling algorithms for arrival traffic at the Dallas/Fort Worth Airport. In contrast to real-time simulation or field tests, which would require on the order of ninety minutes to examine a single traffic rush period, the fast-time simulation allows examination of multiple rush periods in a matter of seconds.

Carr, Greg↗