Search NASA⌕ Search

SEARCH · Search NASA

Results for “Control system”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,009 records · Page 56

The Impact of Wall Control Performance on Connected Lighting Systems

Wall controls form the only touchpoint for individual room users and that room’s lighting control system. As such, these interfaces strongly influence user understanding and utilization of the system, as well as overall acceptance. The Next Generation Lighting Systems (NGLS) program began an evaluation of the wall controls in 14 connected lighting systems installed in various rooms of the NGLS Living Lab at Parsons School of Design in New York City. These systems demonstrate the wide range of approaches to wall control setup and functionality taken by manufacturers. Characterizing the 14 controls across six attributes, only four, or 29%, were identical. Requirements for wall control design were not specified explicitly by NGLS. Rather, wall controls were required to provide system performance according to three criteria: vacancy control (manual on/auto off) of two zones; manual continuous dimming of the same two zones; and an AV presentation mode in one of the two zones. This report examines the classification of entries, the assessment method used to evaluate the systems from installation through day-to-day use, and the system performance observed to date for each.

42 ENGINEERING↗

A comparison of WEC control strategies

The operation of Wave Energy Converter (WEC) devices can pose many challenging problems to the Water Power Community. A key research question is how to significantly improve the performance of these WEC devices through improving the control system design. This report summarizes an effort to analyze and improve the performance of WEC through the design and implementation of control systems. Controllers were selected to span the WEC control design space with the aim of building a more comprehensive understanding of different controller capabilities and requirements. To design and evaluate these control strategies, a model scale test-bed WEC was designed for both numerical and experimental testing (see Section 1.1). Seven control strategies have been developed and applied on a numerical model of the selected WEC. This model is capable of performing at a range of levels, spanning from a fully-linear realization to varying levels of nonlinearity. The details of this model and its ongoing development are described in Section 1.2.

30 DIRECT ENERGY CONVERSION↗

Creating an Energy Intelligent Campus: Data Integration Challenges and Solutions at a Large Research Campus

Rich, well-organized building performance and energy consumption data enable a host of analytic capabilities for building owners and operators, from basic energy benchmarking to detailed fault detection and system optimization. Unfortunately, data integration for building control systems is challenging and costly in any setting. Large portfolios of buildings--campuses, cities, and corporate portfolios--experience these integration challenges most acutely. These large portfolios often have a wide array of control systems, including multiple vendors and nonstandard communication protocols. They typically have complex information technology (IT) networks and cybersecurity requirements and may integrate distributed energy resources into their infrastructure. Although the challenges are significant, the integration of control system data has the potential to provide proportionally greater value for these organizations through portfolio-scale analytics, comprehensive demand management, and asset performance visibility. As a large research campus, the National Renewable Energy Laboratory (NREL) experiences significant data integration challenges. To meet them, NREL has developed an architecture for effective data collection, integration, and analysis, providing a comprehensive view of data integration based on functional layers. The architecture is being evaluated on the NREL campus through deployment of three pilot implementations.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Building Cyber-Physical Security

Cyber-attacks are becoming more common and brazen. You may already have been a victim of one of these attacks and only find out when your credit card company calls to asks about suspicious activity. Many of the attacks that are in the news are focused on obtaining “personal identifiable information” such as credit card numbers, bank accounts and social security numbers. But there is a whole other target for these cyber criminals, and that is the area of cyber-physical systems including industrial control systems, infrastructure controls such as the electrical grid, and even controls for building systems. While not as well publicized as financial and personal information attacks are both a very real risk and a clear and present danger.

Cyber Physical Security↗

CS-Studio Scan System Parallelization

For several years, the Control System Studio (CS-Studio) Scan System has successfully automated the operation of beam lines at the Oak Ridge National Laboratory (ORNL) High Flux Isotope Reactor (HFIR) and Spallation Neutron Source (SNS). As it is applied to additional beam lines, we need to support simultaneous adjustments of temperatures or motor positions. While this can be implemented via virtual motors or similar logic inside the Experimental Physics and Industrial Control System (EPICS) Input/Output Controllers (IOCs), doing so requires a priori knowledge of experimenters requirements. By adding support for the parallel control of multiple process variables (PVs) to the Scan System, we can better support ad hoc automation of experiments that benefit from such simultaneous PV adjustments.

43 PARTICLE ACCELERATORS↗

Cyber Security and Resilient Systems

The Department of Energy (DOE) Idaho National Laboratory (INL) has become a center of excellence for critical infrastructure protection, particularly in the field of cyber security. It is one of only a few national laboratories that have enhanced the nation’s cyber security posture by performing industrial control system (ICS) vendor assessments as well as user on-site assessments. Not only are vulnerabilities discovered, but described actions for enhancing security are suggested – both on a system-specific basis and from a general perspective of identifying common weaknesses and their corresponding corrective actions. These cyber security programs have performed over 40 assessments to date which have led to more robust, secure, and resilient monitoring and control systems for the US electrical grid, oil and gas, chemical, transportation, and many other sectors. In addition to cyber assessments themselves, the INL has been engaged in outreach to the ICS community through vendor forums, technical conferences, vendor user groups, and other special engagements as requested. Training programs have been created to help educate all levels of management and worker alike with an emphasis towards real everyday cyber hacking methods and techniques including typical exploits that are used. The asset owner or end user has many products available for its use created from these programs. One outstanding product is the US Department of Homeland Security (DHS) Cyber Security Procurement Language for Control Systems document that provides insight to the user when specifying a new monitoring and control system, particularly concerning security requirements. Employing some of the top cyber researchers in the nation, the INL can leverage this talent towards many applications other than critical infrastructure. Monitoring and control systems are used throughout the world to perform simple tasks such as cooking in a microwave to complex ones such as the monitoring and control of the next generation fighter jets or nuclear material safeguards systems in complex nuclear fuel cycle facilities. It is the intent of this paper to describe the cyber security programs that are currently in place, the experiences and successes achieved in industry including outreach and training, and suggestions about how other sectors and organizations can leverage this national expertise to help their monitoring and control systems become more secure.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Electrically heated particulate filter restart strategy

A control system that controls regeneration of a particulate filter is provided. The system generally includes a propagation module that estimates a propagation status of combustion of particulate matter in the particulate filter. A regeneration module controls current to the particulate filter to re-initiate regeneration based on the propagation status.

47 OTHER INSTRUMENTATION↗

A Low Cost SIPM Evaluation and Control Prototyping System including accurate bias voltage generation, leakage current measurement, and temperature control using Peltier cooling

We describe an electronics system to operate SIPMs in the laboratory. The system is comprised of a single channel amplifier board (SIPM Amp) and a 4-channel control board to which up to 4 SIPM Amp boards can be connected. The control board supplies a common low voltage power for the amplifiers. All channels feature individually regulated bias and Peltier power voltages, along withPt10K RTD readout. A graphical user interface allows control of the bias voltages, amplifier voltage, Peltier voltages, and also provides for readback of leakage currents and other voltages. The GUI app has a feedback loop to measure the SIPM temperature (with the PT10K) and generate correction voltages to the Peltier to regulate the temperature. The temperatures, which can be achieved by Peltier cooling depend on the thermal design of the setup, the practical limit being about 50C below ambient. The SIPM Amp. board is a small (3x5cm) PCB that has a single SIPM readout channel. The SIPM scan be surface mounted on the pcb or connected to a 2-pin 0.100" socket. The area around the SIPM footprint is thermally isolated by perforations in the PCB. The RTD is located inside the thermal break. Onboard is BV and LV filtering. The 10X amplifier is based on MiniCircuits' GALI-S66+ integrated circuit, tweaked for a 6V power. The amplifier was selected for a combination of high bandwidth, low noise, and low power. An accoupled amplifier output is connected to an SMA connector. For best operation of this inverting amplifier the output signal should be in the range of 0 to -1V.The Amplifier board is connected to the Control board with a 10-conductor 0.025" pitch ribbon cable, carrying all the services. Peltier power for currents more than 1A should use a separate 2-contact connector.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Neutron Source Facility Training Simulator Based on EPICS

A plant operator training simulator is developed for training the plant operators as well as for design verification of plant control system (PCS) and plant protection system (PPS) for the Kharkov Institute of Physics and Technology Neutron Source Facility. The simulator provides the operator interface for the whole plant including the sub-critical assembly coolant loop, target coolant loop, secondary coolant loop, and other facility systems. The operator interface is implemented based on Experimental Physics and Industrial Control System (EPICS), which is a comprehensive software development platform for distributed control systems. Since its development at Argonne National Laboratory, it has been widely adopted in the experimental physics community, e.g. for control of accelerator facilities. This work is the first implementation for a nuclear facility. The main parts of the operator interface are the plant control panel and plant protection panel. The development involved implementation of process variable database, sequence logic, and graphical user interface (GUI) for the PCS and PPS utilizing EPICS and related software tools, e.g. sequencer for sequence logic, and control system studio (CSS-BOY) for graphical use interface. For functional verification of the PCS and PPS, a plant model is interfaced, which is a physics-based model of the facility coolant loops implemented as a numerical computer code. The training simulator is tested and demonstrated its effectiveness in various plant operation sequences, e.g. start-up, shut-down, maintenance, and refueling. It was also tested for verification of the plant protection system under various trip conditions.

Park, Young Soo↗

System for controller area network payload decoding

A system for decoding an unknown automotive controller area network (“CAN”) message definitions. CAN data vehicle signal mappings are typically held in secret and varied by automotive model and year. Without knowledge of the mappings, the wealth of real-time vehicle data hidden in the automotive CAN packets is uninterpretable—impeding research, after-market tuning, efficiency and performance monitoring, fault diagnosis, and privacy-related technologies. This system can ascertain the CAN signals' boundaries (start bit and length), endianness (byte ordering), signedness (binary-to-integer encoding) from raw CAN data. This allows conversion of CAN data to time series. Interpreting the translated CAN data's physical meaning and finding a linear mapping to standard units (e.g., knowing the signal is speed and scaling values to represent units of miles per hour) can be achieved for many signals by leveraging diagnostic standards to obtain real-time measurements of in-vehicle systems. The system can be integrated into lightweight hardware enabling an OBD-II plugin for real-time in-vehicle CAN decoding or run on standard computers. The system can output a standard DBC file with the signal definition information.

Verma, Kiren E.↗

Validation and Verification of TEDS Facility HYBRID Modeling

The HYBRID modeling repository is an in-house developed library of models for selected integrated energy systems (IES) modelling. HYBRID models have been developed since 2015 to describe the physical operation of tightly coupled thermal systems including power generators, thermal transport systems, thermal storage, thermal-to-electric conversion systems, and other thermal applications. Here, validation and verification (V&V) capabilities are demonstrated using the Thermal Energy Distribution System (TEDS) at INL. Building upon prior work, the TEDS model has been updated and verified so that it better represents the installed system configuration and the operating control system. The model control system was changed to allow replication of actual experimental procedures. Experimental operations focusing primarily on thermocline tank performance were devised and performed. Several anomalies were found in the operation data of the experiment facility. V&V activities calibrating a selected input parameter are demonstrated on a single component as well as with a single parameter within the thermocline. Calibrating is then demonstrated on multiple components and a multi-parameter metric for the entire system. The validation methodology is successfully applied to validate the model with experimental data. It is also used to confirm a hypothesis behind one of the anomalies in experimental performance.

25 ENERGY STORAGE↗

Using an operator training simulator in the undergraduate chemical engineering curriculim

An operator training simulator (OTS) is to the chemical engineer what a flight simulator is to the aerospace engineer. The basis of an OTS is a high-fidelity dynamic model of a chemical process that allows an engineer to simulate start-up, shut-down, and normal operation. It can also be used to test the skill and ability of an engineer or operator to respond and control some unforeseen situation(s) through the use of programmed malfunctions. West Virginia University (WVU) is a member of the National Energy Technology Laboratory’s Regional University Alliance (NETL-RUA). Working through the NETL-RUA, the authors have spent the last four years collaborating on the development of a high-fidelity OTS for an Integrated Gasification Combined Cycle (IGCC) power plant with CO{sub 2} capture that is the cornerstone of the AVESTARTM (Advanced Virtual Energy Simulation Training And Research) Center with sister facilities at NETL and WVU in Morgantown, WV. This OTS is capable of real-time dynamic simulation of IGCC plant operation, including start-up, shut-down, and power demand load following. The dynamic simulator and its human machine interfaces (HMIs) are based on the DYNSIM and InTouch software, respectively, from Invensys Operations Management. The purpose of this presentation is to discuss the authors’ experiences in using this sophisticated dynamic simulation-based OTS as a hands-on teaching tool in the undergraduate chemical engineering curriculum. At present, the OTS has been used in two separate courses: a new process simulation course and a traditional process control course. In the process simulation course, concepts of steady-state and dynamic simulations were covered prior to exposing the students to the OTS. Moreover, digital logic and the concept of equipment requiring one or more permissive states to be enabled prior to successful operation were also covered. Students were briefed about start-up procedures and the importance of following a predetermined sequence of actions in order to start-up the plant successfully. Student experience with the dynamic simulator consisted of a six-hour training session in which the Claus sulfur capture unit of the IGCC plant was started up. The students were able to operate the simulator through the InTouch-based HMI displays and study and understand the underlying dynamic modeling approach used in the DYNSIM-based simulator. The concepts learned during the training sessions were further reinforced when students developed their own DYNSIM models for a chemical process and wrote a detailed start-up procedure. In the process control course, students learned how the plant responds dynamically to changes in the manipulated inputs, as well as how the control system impacts plant performance, stability, robustness and disturbance rejection characteristics. The OTS provided the opportunity to study the dynamics of complicated, “real-life” process plants consisting of hundreds of pieces of equipment. Students implemented ideal forcing functions, tracked the time-delay through the entire plant, studied the response of open-loop unstable systems, and learned “good practices” in control system design by taking into account the real-world events where significant deviations from the “ideal” or “expected” response can occur. The theory of closed-loop stability was reinforced by implementing limiting proportional gain for stability limits of real plants. Finally, students were divided into several groups where each group was tasked to control a section of the plant within a set of operating limits in the face of disturbances and simulated process faults. At the end of this test, they suggested ways to improve the control system performance based on the theory they learned in class and the hands-on experience they earned while working on the OTS.

97 MATHEMATICS AND COMPUTING↗

Some Problems of Distributed and Boundary Control for Systems with Integral Aftereffect

We consider the problem of exact control for a system described by an equation with integral “memory.” It is shown that, under certain conditions, this system can be brought to rest in finite time by distributed control bounded in absolute value, and, in a special one-dimensional case, by control applied to an end-point of the interval. We consider different types of kernels in the integral term of the equation and describe some relationships between problems of controllability of some hyperbolic and parabolic systems.

97 MATHEMATICS AND COMPUTING↗

Fermilab's controls development with virtual accelerator

Control Systems development is often the last thing considered when designing and building new equipment, e.g. a new detector or superconducting RF LINAC; however when the new equipment is installed, it is the first thing desired to be operational for testing. Due to frequent delays in building new equipment and project deadlines, control system development and testing is often curtailed. A way to alleviate this problem is to simulate the control system, though this will be challenging for complex systems.The Fermilab PIP-II (proton improvement plan - II) project is being constructed at Fermilab to deliver $800\,MeV$ protons of $>1\,MW$ beam power to replace the present LINAC for the remainder of the existing accelerator complex. The new LINAC consists of a warm front end (WFE), 23 superconducting RF cryomodules (of 5 types), and a beam transfer line (BTL) to the existing complex.The accelerator physics group has a parallel project to create a digital twin (DT) of the PIP-II accelerator. We have coupled the EPICS controls to this DT and are developing both the DT and EPICS software in parallel. This will allow us to develop the EPICS software framework, the HMIs, sequences, high level physics applications, and other services for use in a fully functional control system.This presentation will detail the work that we have performed to date and show demonstrations of controlling and monitoring the status of the accelerator, as well as future plans for this work.

Hanlet, Pierrick [Fermilab]↗

Embedded EPICS server for PowerPMAC motion controllers

An embedded server layer of Experimental Physics and Industrial Control System (EPICS) for PowerPMAC motion controllers has been developed and deployed at two undulator beamlines of the National Institute of General Medical Sciences and the National Cancer Institute (GM/CA) Structural Biology Facility at the Advanced Photon Source (APS). This compact, open source solution makes the power and versatility of PowerPMAC motion controls directly accessible to distributed EPICS clients. At GM/CA the system controls about 200 servo and stepper motors — both encoded and unencoded — and multiple digital and analog I/O accessories. The server stack comprises two sublayers: a lower-level driver and database that communicates directly with PowerPMAC, and a facility-specific soft sublayer built on top. The paper describes installing EPICS on PowerPMAC, the implementation of both layers and client examples, including on-the-fly scanning.

EPICS↗

Designing Monte Carlo Simulation and an Optimal Machine Learning to Optimize and Model Space Missions

This paper investigates applying artificial intelligence (AI) algorithms to attitude control system of satellites to optimally tune the controller using high performance computing. This methodology is applied to the Virtual Telescope for X-ray Observation mission, which is a precise formation of two separate spacecraft observing multiple objects in the space in the X-ray domain. The mission is divided into phases based on the instrumentation and the mission goal. To reach an stable precise formation robust to stochastic slew and slew rate (i.e., Euler angles and angular velocities) in a minimal constrained time T , consumed energy of the attitude control system, denoted as E, and root-mean-square state error of attitude control system, denoted as e, are minimized. Monte-Carlo simulation is used for the sensitivity analysis of optimization and designing a controller. Deep neural networks (DNN), Gaussian processes (GP), and support vector regression (SVR) learn this optimization as a surrogate model, while their hyperparameters are optimized in a novel approach. THETA supercomputer at Argonne Leadership Computing Facility (ALCF) is used for optimizing the hyperparameters of DNN. The surrogate model meets the requirements of the mission, and it shows a better performance over the optimization and Monte-Carlo. The optimal DNN can satisfy the mission requirements e and T while reducing E for 90% compared to the other given methods.

42 ENGINEERING↗

Demonstration of Intelligent Control and Fan Improvements in Computer Room Air Handlers

This report documents a demonstration of the energy-efficiency improvement provided by a new control system for computer room air handling devices. It also analyzes measured and reported air handling device fan power associated with changing the fan type. A 135,000 square foot commercial data center was used for the demonstration. All air handling units were upgraded with improved efficiency fans, and a control system that automatically adjusts the fan speed for the air handling units was added. Power measurements were collected for a baseline and for a period with the fan speed control system active. Changing the fan type resulted in a savings of 47 percent of energy used by the air handling equipment and associated chiller plant energy needed to cool the air handlers themselves. The addition of the fan speed control resulted in an additional 37 percent savings in the same two categories. The combined savings for the two improvements for the same categories was 66 percent compared to the data center fitted with the original fans without a control system. The energy use reduction provided by the complete air handling device improvement program for the whole data center site is estimated to be 2.9 million kilowatt hours per year—an overall data center site savings of 8.0 percent. The reduced electrical energy use at the site provides a 1.9 million pound yearly reduction of carbon dioxide emissions. This demonstration showed that fan upgrades and a control system addition provide cost-effective improvements for data centers, with a payback reported to be under two years without utility incentives. In addition to the control system providing energy savings, the data collection and visual analysis capabilities provided immediate and long-term benefits. It is recommended that data center operators consider investing in fan upgrades and/or adding fan speed control for computer room air handlers.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Authentication Protocol for ICS without Encryption

Industrial control systems (ICS) describes the different types of control systems and associated instrumentation, which includes the devices, systems, networks, and controls used to operate and/or automate industrial processes. Depending on the industry, each ICS functions differently and are built to electronically manage tasks efficiently. Historically, industrial plants have included networking, and changes have been made over time without consideration for security. Many ICS devices currently have inadequate security features. Adding encryption in ICS is undesirable because many of the new detection method involves deep packet inspection. Therefore, we propose to develop a method of providing authentication between devices without encrypting the data. This testbed design will allow rapid development and experimentation with Cyber Physical Systems. Modbus connects to a supervisory computer with a Remote Terminal Unit (RTU) in Supervisory Control and Data Acquisition (SCADA) systems. Our project seeks to enhance security in the ICS environment by adding device authentication to the lower levels of the plant floor. This approach was selected as it allows verification of the sender of data from level 1/level 0 devices up to supervisory systems. This addition is desirable as it adds enhanced verification to the integrity of system data without obscuring (via encryption) the data being transmitted across the network. This is important because many ICS systems are real time critical (decryption adds to latency) and many other good security options require deep packet inspection (which encryption completely defeats). To accomplish this, a proof of concept of adding an authentication scheme was designed and will be tested with a common ICS protocol. The setup includes a single serial cable connecting the serial ports on two devices, a Master and a Minion. Authentication will occur in the following methods: - Data layer involving Transport Layer Security/Secure Socket Layer (TLS/SSL); - TCP/IP route implementation; - Key exchange algorithm; - Raspberry Pi programming for authentication. A portion of the setup includes adding Raspberry Pi into the system as the device is handling the authentication for the network traffic. Modbus is the chosen ICS protocol. It is used to transmit signals from instrumentation and control devices back to a main controller or data gathering system. Typically, the device identity is assumed but not verified. For verifying device identity, we constructed a digital signature architecture with TLS. A novel adaptation of this is to use only the digital signature that is provided and not the encryption capability. This allows ICS traffic to flow unobscured while still providing verification for the integrity of the data. Verification of this process will involve adding additional I/O level network devices with spoofed IP addresses and detecting the authenticated versus unauthenticated traffic. Our TLS implementation will have encryption disabled but should still allow for digital signing of data. This will enable our system to distinguish between real end devices and spoofed end devices. This experiment is presently building the test setup. It is focusing on a small setting to identify authenticated and unauthenticated devices on the network. This should allow for scaling to a larger network size after the initial proof of concept. One concern with this scheme is a certificate deployment has a large scale key management. Network size will thus increase the key management task for security. In addition, we believe that further research should be done on exploring the use of this method to defeat man-in-the-middle attacks.

42 ENGINEERING↗