Search NASA⌕ Search

SEARCH · Search NASA

Results for “Crew Module”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,009 records · Page 56

Lessons Learned from the Airborne Particulate Monitor ISS Payload

Particulate monitoring on spacecraft has not been undertaken for air quality purposes for the first twenty years of human habitation on the International Space Station (ISS). The Airborne Particulate Monitor (APM) is a reference-quality instrument technology demonstration that characterized the airborne particles in the ISS cabin in real-time. Onboard aerosols have been measured with this higher fidelity instrument, so future miniaturized low-power aerosol instruments can be reliably compared in future ISS experiments. Several issues were encountered during the payload operations that are a result of the unique environment on ISS, which could not have been anticipated or eliminated by ground testing. First, the ISS had very small amounts of particulate matter in the particle measurement size range of the APM, which was unexpected. Second, despite the measured ‘clean’ environment, larger debris such as lint accumulated regularly on the cleanable inlet screen, which required regular inspection and crew time. The third issue is that particle emissions measured on ISS depend only on the activities in the immediate vicinity of the particle instrument and total particle concentrations cannot be generalized for the entire module. Finally, the sampling efficiency of APM on ISS is unknown because aisle-deployed instruments attached to wall panels of ISS are in the boundary layer of the large-scale ventilation flow of the modules. These issues are discussed and potential solutions for future particulate monitors are presented.

aerosol↗

STS-108-Endeavour/ISS UF-1/Pre-Launch/Launch/On Orbit/Landing/Crew Egress

This video shows footage from throughout the STS-108 mission. The crew of Space Shuttle Enveavour (Commander Dominic Gorie, Pilot Mark Kelly, and Mission Specialists Linda Godwin and Daniel Tani) together with the International Space Station (ISS) Expedition 4 crew (Commander Yuri Onufrienko and Flight Engineers Carl Walz and Daniel Bursch) are shown at their pre-flight meal, putting on flight suits, and boarding Endeavour. A special segment shows maintainance performed on Endeavour prior to the orbiter reaching the launch pad. Endeavour is shown arriving at Kennedy Space Center mounted on a 747, and is prepared for launch in the Orbiter Processing Facility. The mating of the External Tank and the Solid Rocket Boosters in shown in the Vehicle Assembly Building (VAB). The Raffaello Multi-Purpose Logistics Module (MPLM) and the Starshine satellite are shown being loaded into Endeavour's payload bay. Launch views include: Beach Tracker, VAB, Pad-B, Tower-1, DLTR-3, Grandstand, DOAMS, Playalinda DOAMS (with a close-up of the Endeavour's main engine, and UCS-23. On-orbit tasks include: docking with the ISS, greetings and enthusiastic crew transfer with the Expedition 3 crew (Commander Frank Culbertson, Jr. and Flight Engineers Mikhail Turin and Vladimir Dezhurov), Mission Control and crew reflections upon the 9/11 attacks, Raffaello docking with and being removed from the ISS, and an extravehicular activity (EVA) by Godwin and Tani. Landing views include: VAB, Tower-1, Mid-Field, South End SLF, North End SLF, Tower-2, Playalinda DOAMS, and Pilot Point of View (PPOV). Each of the four Endeavour crew members gives a short speech after landing.

Source record↗

Rapid Assessment of a Lunar Surface Laboratory Module

Johnson Space Center is piloting an innovation team known as the Forge to perform rapid turnaround, concurrent engineering studies. The Forge is intended to be able to pull together a team of strategically selected domain experts to innovatively solve a specified problem within a short period of time. The Forge’s inaugural project being the development of a Lunar Surface Laboratory Module concept. The lab module is intended as an option for the Artemis program’s Lunar Architecture Team. The lab module may allow for increased science productivity and return on investment than a surface architecture with only the habitat. This paper will discuss the configuration of the Lunar Laboratory module, including the pressure vessel, its placement relative to the Surface Habitat and Pressurized Rover, and internal architecture. In order to determine the suitability of such a design, a human factors evaluation is conducted. Historically, a human factors evaluation of a habitable volume could require a month or longer, including time needed to prepare a test plan, conduct the evaluation, compile the data, and produce a report. The entire Forge effort will only last for five weeks, forcing the creation of a rapid assessment process. This rapid assessment includes three evaluation studies, all conducted and processed in the space of a single day, to determine the acceptability of the resulting design. The first evaluation is a card sort evaluation of the laboratory instruments. A brief discussion of the card sort evaluation is provided. This card sort is focused on the relative positioning of the laboratory instruments, determining whether a given instrument should be adjacent to, or separated from, another. It will use human factors personnel and both life and physical scientists as subject matter experts. The second evaluation is a science productivity tabletop evaluation. This evaluation focuses on the selection of instruments and the number of instruments, attempting to assess the amount of work the crew will be able to use the facility to do. It uses life and physical science personnel as subject matter experts. The third evaluation is a CAD or Virtual Reality human factors walkthrough evaluation. This evaluation focuses on the layout of the lab module and its connectivity to the basecamp’s pressurized elements. If possible, astronauts will be used as subject matter experts. Each of these evaluations will focus primarily on objective data with limited subjective comments, reducing the time required for processing responses. The results of each evaluation and their implications will be discussed. Based on the evaluation data, an overall acceptability of the Lunar Surface Laboratory Module produced by the Forge study can be determined. Lessons learned and recommendations for future use of the human factors rapid assessment process in early design trades will also be provided.

Lunar Laboratory↗

STS-100 Crew Activity Report: Flight Day 7 Highlights

On this seventh day of the STS-100 mission, the crewmembers of Endeavour, Commander Kent Rominger, Pilot Jeffrey Ashby, and Mission Specialists Chris Hadfield, Scott Parazynski, John Phillips, Umberto Guidoni, and Yuri Valentinovich Lonchakov, are seen as they unload equipment from the Rafaello Logistics Module. Guidoni and Rominger answer questions from the Italian and European Space Agencies in an on-orbit press conference. The computer glitch that delayed tests on the Canadian Robotic Arm and another boost to the International Space Station (ISS) is described.

Source record↗

Modeling and control of flexible space stations (slew maneuvers)

Large orbiting space structures are expected to experience mechanical vibrations arising from several disturbing forces such as those induced by shuttle takeoff or docking and crew movements. The problem is considered of modeling and control of large space structures subject to these and other disturbing forces. The system consists of a (rigid) massive body, which may play the role of experimental modules located at the center of the space station and flexible configurations, consisting of several beams, forming the space structure. A complete dynamic model of the system was developed using Hamilton's principle. This model consists of radial equations describing the translational motion of the central body, rotational equations describing the attitude motions of the body and several beam equations governing the vibration of the flexible members (platform) including appropriate boundary conditions. In summary, the dynamics of the space structure is governed by a complex system of interconnected partial and ordinary differential equations. Using Lyapunov's approach the asymptotic stability of the space structure is investigated. For asymptotic stability of the rest state (nominal trajectory), feedback controls are suggested. In the investigation, stability of the slewing maneuvers is also considered. Several numerical results are presented for illustration of the impact of coupling and the effectiveness of the stabilizing controls. Some insight is provided into the complexity of modeling, analysis and stabilization of actual space structures.

Ahmed, N. U.↗

STS-76 Flight Day 3

On this third day of the STS-76 mission, the flight crew, Cmdr Kevin P. Chilton, Pilot Richard A. Searfoss, and Mission Specialists Shannon W. Lucid, Linda M. Godwin, and Ronald M. Sega, are shown performing the docking maneuvers for the Mir Space Station and the Atlantis in-orbit rendezvous. The Atlantis crew is shown greeting the Mir cosmonaut crew, Cmdr. Yuri Onufrienko and Flight Engineer Yuri Usachev. The docking procedure is shown from both outside and inside the Atlantis. An interview with Mission Control is shown from inside Mir with both crews present. There is footage of the Mir, both docked with Atlantis and free flying. Not shown is the EVA by Clifford and Godwin to attach several experimental packages to the exterior of the Mir docking module, although their packing preparation is shown.

Source record↗

STS-77 Mission Highlights Resource Tape

The flight crew of the STS-77 mission, Cmdr. John H. Casper, Pilot Curtis L. Brown, Jr., and Mission Specialists Andrew S.W. Thomas, Ph.D., Daniel W. Bursch, Mario Runco, Jr., and Marc Garneau, Ph.D., present a video mission over-view of their space flight. Images include: pre-launch activities such as eating the traditional breakfast, crew suit-up, and the ride out to the launch pad. Also, included are various panoramic views of the shuttle on the pad. The crew can be seen being readied in the white room' for their mission. After the closing of the hatch and arm retraction, launch activities are shown including countdown, engine ignition, launch, and the separation of the Solid Rocket Boosters. Following an on-time launch, the crew of Endeavor are shown setting up a variety of experiments that will operate for much of the mission. Also seen is the deployment and inflation of the Spartan Satellite, experiments being conducted in the Spacehab module, thruster firing to stabilized the shuttle, and the mission ending re-entry and landing of the shuttle Endeavor.

Source record↗

STS-103 Crew Training

The Hubble Space Telescope (HST) team is preparing for NASA's third scheduled service call to Hubble. This mission, STS-103, will launch from Kennedy Space Center aboard the Space Shuttle Discovery. The seven flight crew members are Commander Curtis L. Brown, Pilot Scott J. Kelly, European Space Agency (ESA) astronaut Jean-Francois Clervoy who will join space walkers Steven L. Smith, C. Michael Foale, John M. Grunsfeld, and ESA astronaut Claude Nicollier. The objectives of the HST Third Servicing Mission (SM3A) are to replace the telescope's six gyroscopes, a Fine-Guidance Sensor, an S-Band Single Access Transmitter, a spare solid-state recorder and a high-voltage/temperature kit for protecting the batteries from overheating. In addition, the crew plans to install an advanced computer that is 20 times faster and has six times the memory of the current Hubble Space Telescope computer. To prepare for these extravehicular activities (EVAs), the SM3A astronauts participated in Crew Familiarization sessions with the actual SM3A flight hardware. During these sessions the crew spent long hours rehearsing their space walks in the Guidance Navigation Simulator and NBL (Neutral Buoyancy Laboratory). Using space gloves, flight Space Support Equipment (SSE), and Crew Aids and Tools (CATs), the astronauts trained with and verified flight orbital replacement unit (ORU) hardware. The crew worked with a number of trainers and simulators, such as the High Fidelity Mechanical Simulator, Guidance Navigation Simulator, System Engineering Simulator, the Aft Shroud Door Trainer, the Forward Shell/Light Shield Simulator, and the Support Systems Module Bay Doors Simulator. They also trained and verified the flight Orbital Replacement Unit Carrier (ORUC) and its ancillary hardware. Discovery's planned 10-day flight is scheduled to end with a night landing at Kennedy.

Source record↗

Foundation for Heavy Lift - Early Developments in the Ares V Launch Vehicle

The Ares V Cargo Launch Vehicle (CaLV) is NASA's primary vessel for safe, reliable delivery of the Lunar Surface Access Module (LSAM) and other resources into Earth orbit, as articulated in the U.S. Vision for Space Exploration. The Ares V launch concept is shown. The foundation for this heavy-lift companion to the Ares I Crew Launch Vehicle (CLV) is taking shape within NASA and with its government and industry partners. This paper will address accomplishments in the Ares V Launch Vehicle during 2006 and 2007 and offer a preview of future activities.

McArthur, J. Craig↗

Foundation for Heavy Lift: Early Developments in the Ares V Cargo Launch Vehicle

The Ares V Cargo Launch Vehicle (CaLV) is NASA's primary vessel for safe, reliable delivery of the Lunar Surface Access Module (LSAM) and other resources into Earth orbit, as articulated in the U.S. Vision for Space Exploration.' The Ares V launch concept is shown. The foundation for this heavy-lift companion to the Ares I Crew Launch Vehicle (CLV) is taking shape within NASA and with its government and industry partners. This paper will address accomplishments in the Ares V Launch Vehicle during 2006 and 2007 and offer a preview of future activities.

Sumrall, John P.↗

Design and Performance of a 40W Uplink Laser Transmitter for NASA's O2O Laser Communications Mission

NASA’s Orion Artemis II Optical Communications System (O2O) will provide operational laser communications between the ground and lunar orbit for the Artemis II crewed mission. In this work we describe a 40W ground-based laser transmitter for the O2O system. The uplink transmitter operates in the optical C-band and uses an energy-efficient 32-PPM modulation format. Four spatial diversity channels are time-aligned and combined in the far field. Each channel produces up to 10 W of output power and contains both the communications signal and the 7kHz modulated beacon signal required for acquisition. The transmitter delivers data at 10 Mbits/s and 20 Mbits/s channel rates, corresponding to the 250 MHz and 500 MHz slot rates respectively.

free-space optical communications↗

WetLab-2: Providing Quantitative PCR Capabilities on ISS

The objective of NASA Ames Research Centers WetLab-2 Project is to place on the ISS a system capable of conducting gene expression analysis via quantitative real-time PCR (qRT-PCR) of biological specimens sampled or cultured on orbit. The WetLab-2 system is capable of processing sample types ranging from microbial cultures to animal tissues dissected on-orbit. The project has developed a RNA preparation module that can lyse cells and extract RNA of sufficient quality and quantity for use as templates in qRT-PCR reactions. Our protocol has the advantage that it uses non-toxic chemicals, alcohols or other organics. The resulting RNA is transferred into a pipette and then dispensed into reaction tubes that contain all lyophilized reagents needed to perform qRT-PCR reactions. These reaction tubes are mounted on rotors to centrifuge the liquid to the reaction window of the tube using a cordless drill. System operations require simple and limited crew actions including syringe pushes, valve turns and pipette dispenses. The resulting process takes less than 30 min to have tubes ready for loading into the qRT-PCR unit.The project has selected a Commercial-Off-The-Shelf (COTS) qRT-PCR unit, the Cepheid SmartCycler, that will fly in its COTS configuration. The SmartCycler has a number of advantages including modular design (16 independent PCR modules), low power consumption, rapid thermal ramp times and four-color detection. The ability to detect up to four fluorescent channels will enable multiplex assays that can be used to normalize for RNA concentration and integrity, and to study multiple genes of interest in each module. The WetLab-2 system will have the capability to downlink data from the ISS to the ground after a completed run and to uplink new programs. The ability to conduct qRT-PCR on-orbit eliminates the confounding effects on gene expression of reentry stresses and shock acting on live cells and organisms or the concern of RNA degradation of fixed samples. The system can be used to validate terrestrial analyses of samples returned from ISS by providing on-orbit gene expression benchmarking prior to sample return. The ability to get on-orbit data will provide investigators with the opportunity to adjust experimental parameters in real time for subsequent trials, without the need for sample return and re-flight to sample multigenerational changes. The system can also be used for analysis of air, surface, water, and clinical samples to monitor environmental contaminants and crew health. The verification flight of the instrument is scheduled to launch on SpaceX-7 in June 2015. The WetLab-2 Project is supported by NASAs ISS Program at JSC, Code OZ.

ISS tools↗

Artemis Sustained Translational Acceleration Limits: Human Tolerance Evidence from Apollo to ISS

The designers of the next generation of lunar landers may adopt novel, crew-body orientations outside of our flight history or applied to flight durations and environments outside of our experience. Current sustained translational acceleration requirements in NASA-STD-3001 are applicable only to crewmembers in a seated posture and are thus inadequate to address human tolerance in non-seated configurations. Initial designs for the Apollo Lunar Module (LM) included seats for both commander and pilot; however, these were subsequently removed from the vehicle due to mass constraints and a willingness to accept the unknown risks for short-duration missions given the limited human physiologic data at the time. In the years since Apollo, our evidence base has grown immensely. Initial Artemis mission timelines under consideration will be longer than the longest Apollo mission, by a significant margin, with timeframes more analogous to longer Space Shuttle missions. Given the incidence of postflight orthostatic intolerance following shuttle missions, a significant risk may exist for lander design(s) pursuing a standing crew configuration similar to Apollo LM. New sustained translational acceleration limits developed to address this risk are presented herein. These limits were derived from evaluations of Apollo biomedical and flight profile data during lunar descent and ascent operations, Soyuz and Space Shuttle flight profile and post-landing biomedical data, and analogue bed rest post-exposure data on orthostatic intolerance.

James M. Pattarini↗

Smoke detection in low-G fires

Fires in spacecraft are considered a credible risk. To respond to this risk, NASA flew fire detectors on Skylab and the Space Shuttle (STS) and included them in the design for International Space Station Alpha (ISSA). In previous missions (Mercury, Gemini and Apollo), the crew quarters were so cramped that it was not considered credible that the astronauts could fail to observe a fire. The Skylab nodule included approximately 20 UV fire detectors. The space shuttle has 9 ionization detectors in the mid deck and flight deck and Spacelab has six additional ionization detectors. The planned detectors for ISSA are laser-diode, forward-scattering, smoke or particulate detectors. Current plans for the ISSA call for two detectors in the open area of the module and detectors in racks that have both cooling air flow and electrical power. Due to the complete absence of data concerning the nature of particulate and radiant emission from low-g fires, all three of these detector systems were designed based upon 1-g test data. As planned mission durations and complexity increase and the volume of spacecraft increases, the need for and importance of effective, crew independent, fire detection grows significantly. This requires more knowledge concerning low-gravity fires and how they might be detected. To date, no combustion-generated particulate samples have been collected for well-developed microgravity flames. All of the extant data come from drop tower tests and therefore only correspond to the early stages of a fire. The fuel sources were restricted to laminar gas-jet diffusion flames and rapidly overheated wire insulation. These gas-jet drop tower tests indicate, through thermophoretic sampling, that soot primaries and aggregates (groups of primary particles) in micro-g may be significantly larger than those in normal-g (ng). This raises new scientific questions about soot processes as well as practical issues for particulate detection/alarm threshold levels used in on-orbit smoke detectors. Furthermore, it is widely speculated but unverified that the aggregates will grow to very large scales in a microgravity fire of longer duration than available on the ground. Preliminary tests in the 2.2 second drop tower suggest that particulate generated by overheated wire insulation will also be larger in microgravity than in normal gravity. TEM grids downstream of the fire region in the WIF experiment as well as visual observation of long string-like aggregates, further confirm this suggestion. The combined impact of these limited results and theoretical predictions is that direct knowledge of low-g combustion particulate as opposed to extrapolation from 1-g data is needed for a more confident design of smoke detectors for spacecraft.

Urban, David L.↗

Space station functional relationships analysis

A systems engineering process is developed to assist Space Station designers to understand the underlying operational system of the facility so that it can be physically arranged and configured to support crew productivity. The study analyzes the operational system proposed for the Space Station in terms of mission functions, crew activities, and functional relationships in order to develop a quantitative model for evaluation of interior layouts, configuration, and traffic analysis for any Station configuration. Development of the model involved identification of crew functions, required support equipment, criteria of assessing functional relationships, and tools for analyzing functional relationship matrices, as well as analyses of crew transition frequency, sequential dependencies, support equipment requirements, potential for noise interference, need for privacy, and overall compatability of functions. The model can be used for analyzing crew functions for the Initial Operating Capability of the Station and for detecting relationships among these functions. Note: This process (FRA) was used during Phase B design studies to test optional layouts of the Space Station habitat module. The process is now being automated as a computer model for use in layout testing of the Space Station laboratory modules during Phase C.

Tullis, Thomas S.↗

Space Station Furnace Facility Core. Requirements definition and conceptual design study. Volume 2: Technical report. Appendix 6: Technical summary reports

The Space Station Furnace Facility (SSFF) is a modular facility for materials research in the microgravity environment of the Space Station Freedom (SSF). The SSFF is designed for crystal growth and solidification research in the fields of electronic and photonic materials, metals and alloys, and glasses and ceramics and will allow for experimental determination of the role of gravitational forces in the solidification process. The facility will provide a capability for basic scientific research and will evaluate the commercial viability of low-gravity processing of selected technologically important materials. The facility is designed to support a complement of furnace modules as outlined in the Science Capabilities Requirements Document (SCRD). The SSFF is a three rack facility that provides the functions, interfaces, and equipment necessary for the processing of the furnaces and consists of two main parts: the SSFF Core Rack and the two Experiment Racks. The facility is designed to accommodate two experimenter-provided furnace modules housed within the two experiment racks, and is designed to operate these two furnace modules simultaneously. The SCRD specifies a wide range of furnace requirements and serves as the basis for the SSFF conceptual design. SSFF will support automated processing during the man-tended operations and is also designed for crew interface during the permanently manned configuration. The facility is modular in design and facilitates changes as required, so the SSFF is adept to modifications, maintenance, reconfiguration, and technology evolution.

Source record↗

Constellation Architecture Team-Lunar Scenario 12.0 Habitation Overview

This paper will describe an overview of the Constellation Architecture Team Lunar Scenario 12.0 (LS-12) surface habitation approach and concept performed during the study definition. The Lunar Scenario 12 architecture study focused on two primary habitation approaches: a horizontally-oriented habitation module (LS-12.0) and a vertically-oriented habitation module (LS-12.1). This paper will provide an overview of the 12.0 lunar surface campaign, the associated outpost architecture, habitation functionality, concept description, system integration strategy, mass and power resource estimates. The Scenario 12 architecture resulted from combining three previous scenario attributes from Scenario 4 "Optimized Exploration", Scenario 5 "Fission Surface Power System" and Scenario 8 "Initial Extensive Mobility" into Scenario 12 along with an added emphasis on defining the excursion ConOps while the crew is away from the outpost location. This paper will describe an overview of the CxAT-Lunar Scenario 12.0 habitation concepts and their functionality. The Crew Operations area includes basic crew accommodations such as sleeping, eating, hygiene and stowage. The EVA Operations area includes additional EVA capability beyond the suitlock function such as suit maintenance, spares stowage, and suit stowage. The Logistics Operations area includes the enhanced accommodations for 180 days such as enhanced life support systems hardware, consumable stowage, spares stowage, interconnection to the other habitation elements, a common interface mechanism for future growth, and mating to a pressurized rover or Pressurized Logistics Module (PLM). The Mission & Science Operations area includes enhanced outpost autonomy such as an IVA glove box, life support, medical operations, and exercise equipment.

Kennedy, Kriss J.↗

Lunar module alightment system

The lunar module (LM) landing phase is one of the most critical phases of the entire Apollo mission. Landing impact is of critical concern because at no other time during the LM mission is there less opportunity for vehicle control. To assure a successful landing, the alightment system must not only provide required shock attenuation for protection of crew and structure, but must also assure stability against overturning after touchdown. The paper discusses important design features of the alightment system, such as geometric arrangement, energy absorber characteristics, and deployment mechanisms. Performance characteristics of the vehicle at touchdown, as found analytically, are presented. Model and full-size testing of the landing system is briefly discussed.

LANDING SYSTEM↗