Search NASA⌕ Search

SEARCH · Search NASA

Results for “DEMONSTRATION PROGRAMS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,009 records · Page 56

Transport Studies Enabling Efficiency Optimization of Cost-Competitive Fuel Cell Stacks (aka AURORA: Areal Use and Reactant Optimization at Rated Amperage)

Hydrogen fuel cells are recognized as one of the most viable solutions for mobility in the 21st century; however, there are technical challenges that must be addressed before the technology can become available for mass production. One of the most demanding aspects is the costs of present-day fuel cells which are prohibitively high for the majority of envisioned markets. The fuel cell community recognizes two major drivers to an effective cost reduction: (1) decreasing the noble metals content, and (2) increasing the power density in order to reduce the number of cells needed to achieve a specified power level. To date, the majority of development work aimed at increasing the value metric (i.e. W/mg-Pt) has focused on the reduction of precious metal loadings, and this important work continues. Efforts to increase power density have been limited by two main factors: (1) performance limitations associated with mass transport barriers, and (2) the historical prioritization of efficiency over cost. This program is driven by commercialization imperatives, and challenges both of these factors. The premise of this Program, supported by proprietary cost modeling by Nuvera, is that DOE 2015 cost targets can be met by simultaneously exceeding DOE 2015 targets for Platinum loadings (using materials with less than 0.2 mg-Pt/cm 2 ) and MEA power density (operating at higher than 1.0 Watt/cm 2 ). The approach of this program is to combine Nuvera’s stack technology, which has demonstrated the ability to operate stably at high current densities (> 1.5 A/cm 2 ), with low Platinum loading MEAs developed by Johnson Matthey in order to maximize Pt specific power density and reduce stack cost. A predictive performance model developed by PSU/UTK is central to the program allowing the team to study the physics and optimize materials/conditions specific to low Pt loading electrodes and ultra-high current density and operation.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

New Pathways for Equitable Solar Adoption in Texas

As part of the SEIN Round 3 program, a diverse group of energy stakeholders in Texas set out to develop and pilot new pathways to increase rooftop solar adoption at no upfront cost to lowincome households. One potentially promising pathway we identified involved combining funding from existing utility and federal programs promoting weatherization and energy efficiency. Our objective was to demonstrate pilot projects that equitably deployed rooftop solar to properties owned or rented by families in disadvantaged communities. Our goal was to create a clear path for lowincome households to achieve electricity bill relief and to access clean energy by leveraging existing utility energy efficiency programs with existing federal resources, such as the U.S. Department of Health and Human Services (HHS) Low-Income Home Energy Assistance Program (LIHEAP) and/or U.S. Department of Energy (DOE) Weatherization Assistance Program (WAP) funding in Texas. This has been attempted in a few other states with varying degrees of success, but not yet in Texas.

14 SOLAR ENERGY↗

Establishing Building-Level Energy Goals in Procurement Documents: Lessons Learned from Pilot Utility and Portfolio Projects: Preprint

Encouraging commercial building owners to set measurable energy goals before design begins can drive design and contractor teams to develop innovative energy efficiency solutions within conventional building budgets. A federal building owner piloted this technique and created a large-scale zero energy office building on a budget comparable to local market construction rates. The successes and lessons learned from this performance-based procurement project formed the basis of an expanded program using utilities as the outreach channel to replicate the approach. The utilities delivered incentive-based offerings to focus building owners on the whole building rather than on individual building components and systems. In addition, a ripple effect was evident, with individual building owners as well as owners of multiple-building portfolios adopting the techniques, sometimes with variations, but always maintaining the same core principles. The original performance-based procurement process and its successful implementation in a federal building project informed all these efforts. Those successes and lessons learned demonstrate that the approach can be adapted to utility programs with some variation and is a powerful tool for engaging building owners as they make critical design decisions that impact energy performance over the life of the building.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Establishing Building-Level Energy Goals in Procurement Documents: Lessons Learned from Pilot Utility and Portfolio Projects

Encouraging commercial building owners to set measurable energy goals before design begins can drive design and contractor teams to develop innovative energy efficiency solutions within conventional building budgets. A federal building owner piloted this technique and created a large-scale zero energy office building on a budget comparable to local market construction rates. The successes and lessons learned from this performance-based procurement project formed the basis of an expanded program using utilities as the outreach channel to replicate the approach. The utilities delivered incentive-based offerings to focus building owners on the whole building rather than on individual building components and systems. In addition, a ripple effect was evident, with individual building owners as well as owners of multiple-building portfolios adopting the techniques, sometimes with variations, but always maintaining the same core principles. The original performance-based procurement process and its successful implementation in a federal building project informed all these efforts. Those successes and lessons learned demonstrate that the approach can be adapted to utility programs with some variation and is a powerful tool for engaging building owners as they make critical design decisions that impact energy performance over the life of the building.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Accelerating Spectrum Sharing Technologies

Spectrum sharing potentially holds the promise of solving the emerging spectrum crisis. However, technology innovators face the conundrum of developing spectrum sharing technologies without the ability to experiment and test with real incumbent systems. Interference with operational incumbents can prevent critical services, and the cost of deploying and operating an incumbent system can be prohibitive. Thus, the lack of incumbent systems and frequency authorization for technology incubation and demonstration has stymied spectrum sharing research. To this end, industry, academia, and regulators all require a test facility for validating hypotheses and demonstrating functionality without affecting operational incumbent systems. This article proposes a four-phase program supported by our spectrum accountability architecture. We propose that our comprehensive experimentation and testing approach for technology incubation and demonstration will accelerate the development of spectrum sharing technologies.

3550-3650 MHz↗

Using Advanced Modeling to Accelerate the Scale-Up of Carbon Capture Technologies

Carbon capture and storage (CCS) is one of many approaches that are critical for significantly reducing domestic and global CO2 emissions. The U.S. Department of Energy’s Clean Coal Technology Program Plan envisions 2nd generation CO2 capture technologies ready for demonstration-scale testing around 2020 with the goal of enabling commercial deployment by 2025 [1]. Third generation technologies have a similarly aggressive timeline. A major challenge is that the development and scale-up of new technologies in the energy sector historically takes up to 15 years to move from the laboratory to pre-deployment and another 20 to 30 years for widespread industrial scale deployment. In order to help meet the goals of the DOE carbon capture program, the Carbon Capture Simulation Initiative (CCSI) was launched in early 2011 to develop, demonstrate, and deploy advanced computational tools and validated multi-scale models to reduce the time required to develop and scale up new carbon capture technologies. The CCSI Toolset (1) enables promising concepts to be more quickly identified through rapid computational screening of processes and devices, (2) reduces the time to design and troubleshoot new devices and processes by using optimization techniques to focus development on the best overall process conditions and by using detailed device-scale models to better understand and improve the internal behavior of complex equipment, and (3) provides quantitative predictions of device and process performance during scale up based on rigorously validated smaller scale simulations that take into account model and parameter uncertainty[2]. This article focuses on essential elements related to the development and validation of multi-scale models in order to help minimize risk and maximize learning as new technologies progress from pilot to demonstration scale.

Miller, David↗

Preliminary NBSR Design-Demonstration Element Thermal-Hydraulics and Structural Analyses

1.1 OBJECTIVE The United State High Performance Research Reactor (USHPRR) program aims to eliminate more than 200kg of High Enriched Uranium (HEU) from commerce annually by converting five U.S. high-performance research reactors and one associated critical assembly to Low Enriched Uranium (LEU) fuel using a high-density alloy of uranium-10 wt% molybdenum (U-10Mo). The National Bureau of Standards Reactor (NBSR) is one of five research reactors selected for this program. The objective of this report is to provide preliminary thermal-hydraulic and mechanical analyses of the hydrodynamic effects in the NBSR Design Demonstration Element (DDE) under conservative approximations for the plate power distribution. This report provides details on the modeling approach and the simulation results obtained, including pressure, flow velocity, temperature, and oxide layer over the design demonstration experiment for the irradiation cycles in the Belgian Reactor (BR)-2.

42 ENGINEERING↗

Development of Metallic Fuels for Actinide Transmutation

Research and development activities on metallic fuels are focused on their potential use for actinide transmutation in future sodium fast reactors. As part of this application, there is also a need for a near zero-loss fabrication process and a desire to demonstrate a multifold increase in burnup potential. The incorporation of Am and Np into the traditional U-20Pu-10Zr metallic fuel alloy was demonstrated in the US during the Integral Fast Reactor Program of the 1980’s and early 1990’s. However, the conventional counter gravity injection casting method performed under vacuum, previously used to fabricate these metallic fuel alloys, was not optimized for mitigating loss of the volatile Am constituent in the casting charge; as a result, approximately 40% of the Am casting charge failed to be incorporated into the as-cast fuel alloys. Fabrication development efforts of the past few years have pursued an optimized bottom-pour casting method to increase utilization of the melted charge to near 100%, and a differential pressure casting approach, performed under an argon overpressure, has been demonstrated to result in essentially no loss of Am due to volatilization during fabrication. In short, a path toward zero-loss fabrication of metallic fuels including minor actinides has been shown to be feasible. Irradiation testing of advanced metallic fuel alloys in the Advanced Test Reactor (ATR) has been underway since 2003. Testing in the ATR is performed inside of cadmium-shrouded positions to remove >99% of the thermal flux incident on the test fuels, resulting in an epi-thermal driven fuel test that is free from gross flux depression and producing an essentially prototypic radial temperature profile inside the fuel rodlets. To date, three irradiation test series (AFC-1,2,3) have been completed. Over 20 different metallic fuel alloys have been tested to burnups as high as 30% with constituent compositions of Pu up to 30%, Am up to 12%, Np up to 10%, and Zr between 10 and 60%. In general, the performance of all of these substantially disparate metallic fuel alloys has been observed to be excellent, and their irradiation behaviors are generally consistent with historic norms for metallic fuels without minor actinide additions and having lower Pu or Zr contents. Future work is being undertaken with a view toward increasing the burnup potential of metallic fuels even more. Design innovations under investigation include: 1) lowering the fuel smear density in order to accommodate more swelling, 2) annular fuel geometry to eliminate the need for a sodium bond, 3) minor alloy additions to stabilize lanthanide fission products inside the fuel and prevent their transport to the cladding where they can participate in fuel-cladding chemical interaction (FCCI), and 4) coatings/liners on the cladding inner surface to mitigate FCCI and enable higher temperature operation. This paper will present the current state of development of metallic fuels for actinide transmutation in the US. Highlights will include recent results from metallic fuel casting experiments, experiments to identify alloy additions to immobilize lanthanide fission products, and postirradiation examinations of annular metallic fuels at low burnup.

actinide transmutation↗

DoE Phase II SBIR: Spectrally-Assisted Vehicle Tracking

The goal of this Phase II SBIR is to develop a prototype software package to demonstrate spectrally-aided vehicle tracking performance. The primary application is to demonstrate improved target vehicle tracking performance in complex environments where traditional spatial tracker systems may show reduced performance. Example scenarios in Figure 1 include a) the target vehicle obscured by a large structure for an extended period of time, or b), the target engaging in extreme maneuvers amongst other civilian vehicles. The target information derived from spatial processing is unable to differentiate between the green versus the red vehicle. Spectral signature exploitation enables comparison of new candidate targets with existing track signatures. The ambiguity in this confusing scenario is resolved by folding spectral analysis results into each target nomination and association processes. Figure 3 shows a number of example spectral signatures from a variety of natural and man-made materials. The work performed over the two-year effort was divided into three general areas: algorithm refinement, software prototype development, and prototype performance demonstration. The tasks performed under this Phase II to accomplish the program goals were as follows: 1. Acquire relevant vehicle target datasets to support prototype. 2. Refine algorithms for target spectral feature exploitation. 3. Implement a prototype multi-hypothesis target tracking software package. 4. Demonstrate and quantify tracking performance using relevant data.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

INFORMATION: Special Report on "Selected Department of Energy Program Efforts to Implement the American Recovery and Reinvestment Act"

The American Recovery and Reinvestment Act of 2009 (Recovery Act) was enacted on February 17, 2009, to jumpstart the economy by creating or saving millions of jobs, spurring technological advances in health and science, and investing in the Nation's energy future. The Department of Energy received over $32.7 billion in Recovery Act funding for various science, energy, and environmental programs and initiatives. As of November 2009, the Department had obligated $18.3 billion of the Recovery Act funding, but only $1.4 billion had been spent. The Department's Offices of Energy Efficiency and Renewable Energy, Fossil Energy, Environmental Management, Science, and Electricity Delivery and Energy Reliability received the majority of funding allocated to the Department, about $32.3 billion. Obligating these funds by the end of Fiscal Year 2010, as required by the Recovery Act, and overseeing their effective use in succeeding years, represents a massive workload increase for the Department's programs. The effort to date has strained existing resources. As has been widely acknowledged, any effort to disburse massive additional funding and to expeditiously initiate and complete projects increases the risk of fraud, waste and abuse. It is, therefore, important for the Department's program offices to assess and mitigate these risks to the maximum extent practicable. In this light, we initiated this review as an initial step in the Office of Inspector General's charge to determine whether the Department's major program offices had developed an effective approach for identifying and mitigating risks related to achieving the goals and objectives of the Recovery Act. The Department's program offices included in our review identified risks and planned mitigation strategies that, if successfully implemented and executed, should help achieve the goals and objectives of the Recovery Act. While each office identified risks unique to its respective areas of responsibility, there were a number of risks shared in common. These included the mechanical and substantive requirements related to the award and distribution of funds; program and project performance monitoring; and, program and project execution activities. In particular, the offices self-identified common risks such as: (1) The inability to award and distribute funds in a timely manner to achieve the goals of the Recovery Act; (2) The sufficiency of monitoring procedures and resources to, among other things, prevent and detect fraud, waste and abuse throughout the performance period of financial assistance awards and contracts; and (3) The inherent cost, schedule and performance risks associated with first-of-a-kind, innovative research and demonstration projects. Our review confirmed that the Department had begun to implement a number of strategies designed to mitigate these and other program-specific risks. Our testing, however, identified challenges to the effective implementation of these mitigation strategies that need to be addressed if the Department is to meet the goals and objectives established by the Recovery Act. At the time of our review: (1) Program staffing resources, critical to the success of all other mitigation strategies, remained inadequate both in numbers and qualifications (certifications and training) for positions in procurement and acquisition, project management, and monitoring and oversight functions; (2) Performance measures for achieving Recovery Act goals such as distributing funds in an expeditious manner had not always been established and included in performance plans, and, in financial assistance and contract documents; and (3) Programs had not consistently demonstrated that previously reported deficiencies, identified through audits, inspections, investigations and other oversight activities, had been considered in designing mitigation strategies for the Recovery Act related risks. As we noted in our Special Report on the American Recovery and Reinvestment Act at the Department of Energy (OAS-RA-09-01, March 2009) these sorts of deficiencies, which were described in the March 2009 report, had adversely impacted the success of earlier Departmental projects. We concluded that consideration of these previously encountered internal control weaknesses was essential if the Department was to avoid the same or similar problems in executing the Recovery Act programs/projects. During the course of our audit we identified other internal control weakness indicators. When brought to their attention by the Office of Inspector General audit staff, program officials acted promptly to address these problems by modifying or improving their risk mitigation strategies. For instance, we found that the Office of Energy Efficiency and Renewable Energy, responsible for $16.8 billion in Recovery Act program activities, took steps to strengthen its merit review process to avoid potential conflict of interest concerns.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Data-Driven Prediction and Optimization of Energy Use for Transit Fleets of Electric and ICE Vehicles

Due to the high upfront cost of electric vehicles, many public transit agencies can afford only mixed fleets of internal combustion and electric vehicles. Optimizing the operation of such mixed fleets is challenging because it requires accurate trip-level predictions of electricity and fuel use as well as efficient algorithms for assigning vehicles to transit routes. We present a novel framework for the data-driven prediction of trip-level energy use for mixed-vehicle transit fleets and for the optimization of vehicle assignments, which we evaluate using data collected from the bus fleet of CARTA, the public transit agency of Chattanooga, TN. We first introduce a data collection, storage, and processing framework for system-level and high-frequency vehicle-level transit data, including domain-specific data cleansing methods. We train and evaluate machine learning models for energy prediction, demonstrating that deep neural networks attain the highest accuracy. Based on these predictions, we formulate the problem of minimizing energy use through assigning vehicles to fixed-route transit trips. We propose an optimal integer program as well as efficient heuristic and meta-heuristic algorithms, demonstrating the scalability and performance of these algorithms numerically using the transit network of CARTA.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Fuel Flexible Combustion Systems for High-Efficiency Utilization of Opportunity Fuels in Gas Turbines

The purpose of this program was to develop low-emissions, efficient fuel-flexible combustion technology which enables operation of a given gas turbine on a wider range of opportunity fuels that lie outside of current natural gas-centered fuel specifications. The program encompasses a selection of important, representative fuels of opportunity for gas turbines with widely varying fundamental properties of combustion. The research program covers conceptual and detailed combustor design, fabrication, and testing of retrofitable and/or novel fuel-flexible gas turbine combustor hardware, specifically advanced fuel nozzle technology, at full-scale gas turbine combustor conditions. This project was performed over the period of October 2008 through September 2011 under Cooperative Agreement DE-FC26-08NT05868 for the U.S. Department of Energy/National Energy Technology Laboratory (USDOE/NETL) entitled "Fuel Flexible Combustion Systems for High-Efficiency Utilization of Opportunity Fuels in Gas Turbines". The overall objective of this program was met with great success. GE was able to successfully demonstrate the operability of two fuel-flexible combustion nozzles over a wide range of opportunity fuels at heavy-duty gas turbine conditions while meeting emissions goals. The GE MS6000B ("6B") gas turbine engine was chosen as the target platform for new fuel-flexible premixer development. Comprehensive conceptual design and analysis of new fuel-flexible premixing nozzles were undertaken. Gas turbine cycle models and detailed flow network models of the combustor provide the premixer conditions (temperature, pressure, pressure drops, velocities, and air flow splits) and illustrate the impact of widely varying fuel flow rates on the combustor. Detailed chemical kinetic mechanisms were employed to compare some fundamental combustion characteristics of the target fuels, including flame speeds and lean blow-out behavior. Perfectly premixed combustion experiments were conducted to provide experimental combustion data of our target fuels at gas turbine conditions. Based on an initial assessment of premixer design requirements and challenges, the most promising sub-scale premixer concepts were evaluated both experimentally and computationally. After comprehensive screening tests, two best performing concepts were scaled up for further development. High pressure single nozzle tests were performed with the scaled premixer concepts at target gas turbine conditions with opportunity fuels. Single-digit NOx emissions were demonstrated for syngas fuels. Plasma-assisted pilot technology was demonstrated to enhance ignition capability and provide additional flame stability margin to a standard premixing fuel nozzle. However, the impact of plasma on NOx emissions was observed to be unacceptable given the goals of this program and difficult to avoid.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Cis-regulatory evolution shapes facial diversity in birds and mammals

Birds and mammals exhibit extraordinary facial diversity, reflecting adaptations to distinct ecological niches and feeding strategies. While core face-building developmental programs are conserved and orchestrated by interactions between ectodermal organizers and the underlying mesenchyme, mechanisms driving facial shape variation remain poorly understood. Here, we integrate single-cell transcriptomic and chromatin accessibility profiling of mouse and chicken developing face to construct a comparative regulatory map. Although both ectodermal and mesenchymal populations display distinct regulatory features in each species, the mesenchyme exhibits markedly greater divergence, pointing to its central role in shaping facial morphology. We further reveal unexpected molecular complexity in the main face-shaping organizer, including a mouse-specific Shh/Wnt5a expression domain. At key morphogen loci (Bmp4, Fgf8, and Wnt5a), conserved and lineage-specific enhancers exhibit spatially restricted activity patterns that mirror divergent signaling domains. These findings demonstrate how cis-regulatory evolution modulates conserved developmental programs to generate morphological novelty, providing a valuable resource for studying vertebrate facial evolution.

Kyomen, Stella [Max Planck Institute for Evolution↗

Report on the U.S. DOE Geothermal Technologies Program's 2009 Risk Analysis

NREL conducted an annual program risk analysis on behalf of the U.S. Department of Energy Geothermal Technologies Program (GTP). NREL implemented a probabilistic risk analysis of GTP-sponsored research, development, and demonstration (RD&D) work, primarily for enhanced geothermal systems (EGS). The analysis examined estimates of improvement potential derived from program RD&D work for two types of technology performance metric (TPM): EGS-enabling technologies potential and EGS cost improvement potential. Four risk teams (exploration, wells/pumps/tools, reservoir engineering, and power conversion) comprised of industry experts, DOE laboratory researchers, academic researchers, and laboratory subcontractors estimated the RD&D impacts and TPM-improvement probability distributions. The assessment employed a risk analysis spreadsheet add-in that uses Monte Carlo simulation to drive the Geothermal Electric Technology Evaluation Model (GETEM). The GETEM-based risk analysis used baseline data from the experts' discussion of multiple reports and data sources. Risk results are expressed in terms of each metric's units and/or the program's top-level metric: levelized costs of electricity (LCOE). Results--both qualitative comments and quantitative improvement potential--are thorough and cohesive in three of the four expert groups. This conference paper summarizes the industry's current thinking on various metrics and potential for research improvement in geothermal technologies.

15 GEOTHERMAL ENERGY↗

Report on the U.S. DOE Geothermal Technologies Program's 2009 Risk Analysis

NREL conducted an annual program risk analysis on behalf of the U.S. Department of Energy Geothermal Technologies Program (GTP). NREL implemented a probabilistic risk analysis of GTP-sponsored research, development, and demonstration (RD&D) work, primarily for enhanced geothermal systems (EGS). The analysis examined estimates of improvement potential derived from program RD&D work for two types of technology performance metric (TPM): EGS-enabling technologies potential and EGS cost improvement potential. Four risk teams (exploration, wells/pumps/tools, reservoir engineering, and power conversion) comprised of industry experts, DOE laboratory researchers, academic researchers, and laboratory subcontractors estimated the RD&D impacts and TPM-improvement probability distributions. The assessment employed a risk analysis spreadsheet add-in that uses Monte Carlo simulation to drive the Geothermal Electric Technology Evaluation Model (GETEM). The GETEM-based risk analysis used baseline data from the experts' discussion of multiple reports and data sources. Risk results are expressed in terms of each metric's units and/or the program's top-level metric: levelized costs of electricity (LCOE). Results--both qualitative comments and quantitative improvement potential--are thorough and cohesive in three of the four expert groups. This conference paper summarizes the industry's current thinking on various metrics and potential for research improvement in geothermal technologies.

15 GEOTHERMAL ENERGY↗

SECA Coal-Based Systems - LGFCS

LGFCS is developing an integrated planar (IP) SOFC technology for mega-watt scale power generation including the potential for use in highly efficient, economically competitive central generation power plant facilities fuel by coal synthesis gas. This Department of Energy Solid-State Energy Conversion Alliance (SECA) program is aimed at achieving further cell and stack technical advancements and assessing the readiness of the LGFCS SOFC stack technology to be scaled to larger-scale demonstrations in subsequent phases. LGFCS is currently in Phase 2 of the program with the Phase 1 test carrying over for completion during Phase 2.

30 DIRECT ENERGY CONVERSION↗

Program Correctness, Verification and Testing for Exascale (Corvette)

The goal of this project is to provide tools to assess the correctness of parallel programs written using hybrid parallelism. There is a dire lack of both theoretical and engineering know-how in the area of finding bugs in hybrid or large scale parallel programs, which our research aims to change. In the project we have demonstrated novel approaches in several areas: 1. Low overhead automated and precise detection of concurrency bugs at scale. 2. Using low overhead bug detection tools to guide speculative program transformations for performance. 3. Techniques to reduce the concurrency required to reproduce a bug using partial program restart/replay. 4. Techniques to provide reproducible execution of floating point programs. 5. Techniques for tuning the floating point precision used in codes.

97 MATHEMATICS AND COMPUTING↗

On-Ramp Wireless: Program Final Report

The objective of the project was to develop and demonstrate a centrally managed, wide area wireless distribution grid sensor and faulted circuit indicator system capable of monitoring underground and other hard-to-reach distribution circuits while delivering the reliability, ease of installation, security, battery life and low cost structure required to be a commercially viable product for the electric utility industry. This integrated wireless grid monitoring system enables utilities across the United States to enhance the reliability of their distribution grids, improve performance metrics (i.e., SAIFI, CAIDI, SAIDI), support dynamic load management and predictive maintenance, and enable future remote monitoring applications necessary to achieve the goals of the Smart Grid. This project scope included: conceptual design; trade studies focused on maximizing ease of installation, sensing capabilities, power budget analysis to reduce maintenance costs and time to replace; sensor product development; and field technology demonstration. The trade studies included Radio Frequency (RF) propagation. The RF Trade Study was completed for the 2.4 GHz ISM-band and not extended to 1 GHz band due to availability of suitable radio solutions and associated impacts to overall commercial value of the solution. The technology demonstrations/field trials were performed in partnership with Southern California Edison and San Diego Gas and Electric. The sensing systems included fault indicator and wireless analog sensor devices from Schweitzer Engineering Labs (SEL) and smart transformer monitoring devices from Gridsense. Both SEL and Gridsense worked with ORW during this project to During the demonstration phase, sensors were deployed in multiple locations. Resulting data was analyzed for the following: RF performance, communication systems reliability, sensor system capabilities, and system level analytics relative to the commercial value to the smart grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗