Search NASA⌕ Search

SEARCH · Search NASA

Results for “Distribution System Planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,009 records · Page 56

SU-E-T-403: Evaluation of the Beam Performance of a Varian TrueBeam Linear Accelerator Under External Device-Based Gated Delivery Conditions

Purpose: To examine the beam performance of a Varian TrueBeam linear accelerator under external device-based gated delivery conditions. Methods: Six gating cycles were used to evaluate the gating performance of a standard production TrueBeam system that was not specially tuned in any way. The system was equipped with a factory installed external gating interface (EXGI). An in-house EXGI tester box was used to simulate the input gating signals. The gating cycles were selected based on long beam-on and short beam-off times, short beam-on and long beam-off times, or equal beam on and off times to check linac performance. The beam latencies were measured as the time difference between the logic high gating signal and the first or last target pulses with an oscilloscope. Tissue-Phantom Ratio, beam flatness, and dose distributions from 5 different plans were measured using the 6 different gating durations and the un-gated irradiation. A PTW 729 2-D array was used to compare 5 plans versus the un-gated delivery with a 1%/1mm gamma index passing criteria. Results: The beam latencies of the linac were based off of 20 samples for beam-on and beam-off, for each gating cycle. The average beam-on delays were measured to be between 57 and 66msec, with a maximum of 88 msec. The beam off latencies averaged between 19 and 26msec, with a maximum of 48 msec. TPR20,10 measurements showed beam energy stability within 0.5% of the un-gated delivery. Beam flatness was better than 2.5% for all gated cycles. All but two deliveries, the open field with 4 seconds on, 1 second off, and a five field IMRT plan with 0.5 seconds on, 2.5 seconds off, had >90% passing rate. Conclusion: TrueBeam demonstrates excellent beam stability with minimal beam latencies under external device-based gated operations. Dosimetric measurements show minimal variation in beam energy, flatness, and plan delivery. Authors are employees of Varian Medical Systems, Inc.

60 APPLIED LIFE SCIENCES↗

The application of connectionism to query planning/scheduling in intelligent user interfaces

In the mid nineties, the Earth Observing System (EOS) will generate an estimated 10 terabytes of data per day. This enormous amount of data will require the use of sophisticated technologies from real time distributed Artificial Intelligence (AI) and data management. Without regard to the overall problems in distributed AI, efficient models were developed for doing query planning and/or scheduling in intelligent user interfaces that reside in a network environment. Before intelligent query/planning can be done, a model for real time AI planning and/or scheduling must be developed. As Connectionist Models (CM) have shown promise in increasing run times, a connectionist approach to AI planning and/or scheduling is proposed. The solution involves merging a CM rule based system to a general spreading activation model for the generation and selection of plans. The system was implemented in the Rochester Connectionist Simulator and runs on a Sun 3/260.

Short, Nicholas, Jr.↗

SU-F-T-284: The Effect of Linear Accelerator Output Variation On the Quality of Patient Specific Rapid Arc Verification Plans

Purpose: The aim of the current study is to investigate the effect of machine output variation on the delivery of the RapidArc verification plans. Methods: Three verification plans were generated using Eclipse™ treatment planning system (V11.031) with plan normalization value 100.0%. These plans were delivered on the linear accelerators using ArcCHECK− device, with machine output 1.000 cGy/MU at calibration point. These planned and delivered dose distributions were used as reference plans. Additional plans were created in Eclipse− with normalization values ranging 92.80%–102% to mimic the machine output ranging 1.072cGy/MU-0.980cGy/MU, at the calibration point. These plans were compared against the reference plans using gamma indices (3%, 3mm) and (2%, 2mm). Calculated gammas were studied for its dependence on machine output. Plans were considered passed if 90% of the points satisfy the defined gamma criteria. Results: The gamma index (3%, 3mm) was insensitive to output fluctuation within the output tolerance level (2% of calibration), and showed failures, when the machine output exceeds ≥3%. Gamma (2%, 2mm) was found to be more sensitive to the output variation compared to the gamma (3%, 3mm), and showed failures, when output exceeds ≥1.7%. The variation of the gamma indices with output variability also showed dependence upon the plan parameters (e.g. MLC movement and gantry rotation). The variation of the percentage points passing gamma criteria with output variation followed a non-linear decrease beyond the output tolerance level. Conclusion: Data from the limited plans and output conditions showed that gamma (2%, 2mm) is more sensitive to the output fluctuations compared to Gamma (3%,3mm). Work under progress, including detail data from a large number of plans and a wide range of output conditions, may be able to conclude the quantitative dependence of gammas on machine output, and hence the effect on the quality of delivered rapid arc plans.

60 APPLIED LIFE SCIENCES↗

pnnl/DPVPROT

Distributed photovoltaics protection software toolkit The code package includes several important functions for design and analysis of new grid protection schemes, for scenarios of distributed photovoltaic (DPV) generation approaching 100% of the peak feeder load, i.e., high-penetration DPV. Convert distribution feeder models, used by planning engineers, to electromagnetic transient (EMT) models that produce waveforms for advanced relay algorithms. Visualize the results of protection scheme operation. Tools to determine distance relay settings on distribution systems. Tools to predict the performance of time-domain, incremental distance relay algorithms

McDermott, Tom↗

Staging For Wakefield Acceleration Experiment Hardware Development: Fast Kicker and High Power RF Delay Section

This project pursues demonstration of the complete staging of high gradient wakefield acceleration at Argonne Wakefield Accelerator (AWA) facility, which is well aligned with the core mission of AWA and the roadmap laid out for the dielectric wakefield accelerator technology toward future linear colliders. During the project, we have successfully demonstrated the feasibility of the staged short pulse TBA (C. Jing, et al, Nucl. Instrum. Meth. A., 898, 72-76, 2018). We have successfully performed the first over 100MW dielectric power extractor. As the last task, one of the key elements for the drive beam distribution system, the fast kicker, has been built and successfully demonstrated this year too. The staging technology demonstrated in this project is crucial for the 500MeV Demonstrator that is planned at AWA in the next five years. The plan is to use two staged meter long dielectric disk accelerators to achieve 500MeV energy gain within ~10 meter long experimental space. While this SBIR project is closed, we plan to continue to investigate the dielectric accelerator technologies under Euclid's general scientific and commercial interests.

43 PARTICLE ACCELERATORS↗

Open-Source High-Fidelity Aggregate Composite Load Models of Emerging Load Behaviors for Large-Sale Analysis

The goal of this project is to accurately model the dynamic loads for power system planning and operation and to address the challenges inherent in such modeling. Existing load models are inadequate to handle the increasing proliferation of residential air conditioner loads and distributed energy resources, the emerging trends of price-responsive demand, and the growing importance of protective devices in equipment and buildings. A need has emerged to develop a fundamentally new class of load models and next-generation data tools. This work proposes to develop a set of regional–level, scalable open source load models and tools, including large-scale aggregate load protection, concept of price responsive demand, advanced load composition data, next-generation load model data tools, and advanced composite load model calibration and validation frameworks to address new challenges in the representation of next-generation load models.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Regulatory Implications of Embedded Grid Energy Storage

Electricity is unique among commodities in that its supply chain was developed without a storage component. Every other resource commodity has the ability to store excess quantities built into its supply chain – in the form of granaries, warehouses, reservoirs, etc. This embedded storage creates a buffer for mismatches between supply and demand, stabilizing prices and protecting customers. Recent technological advances in cost-competitive energy storage technologies that are scalable and flexible have made the concept of embedded electrical storage feasible, but several regulatory questions remain. This paper summarizes energy regulatory structures in the U.S. and the implications that they would have for embedded storage on the electric grid. Regulatory challenges for embedded storage include the lack of underlying standards, inclusion in planning processes, ownership models, compensation, and metrics. Two possible pathways forward are explored: an incremental one including regulatory guidance regarding the evaluation of embedded storage in existing planning processes, and a complex one involving the revision of existing reliability standards or the development of a new standard specific to embedded storage.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The IRAS project organisation and mission operations

The project organisation of IRAS is described, showing the tasks assigned to each project group during post-launch operations. The satellite is described, emphasizing the detectors. In the task division, the role of the U.S. is to construct the telescope and survey instrument, launch the satellite, process final science data for the survey instrument, and provide certain standard satellite items. The Netherlands construct the spacecraft and three additional instruments, integrates and tests the overall satellite, and designs and participates in the development of the operational system. The U.K. provides the operational control center and primary tracking station, generates a system for preliminary science analysis of the survey data, provides housekeeping analysis software and science data distribution software, and staffs the control center operations. The teams involved in mission planning and operations, and their roles, are identified, and a block diagram of the operations organisation is presented.

Van Holtz, R. C.↗

Space station data system analysis/architecture study. Task 5: Program plan

Cost estimates for both the on-board and ground segments of the Space Station Data System (SSDS) are presented along with summary program schedules. Advanced technology development recommendations are provided in the areas of distributed data base management, end-to-end protocols, command/resource management, and flight qualified artificial intelligence machines.

Source record↗

Research in software allocation for advanced manned mission communications and tracking systems

An assessment of the planned processing hardware and software/firmware for the Communications and Tracking System of the Space Station Freedom (SSF) was performed. The intent of the assessment was to determine the optimum distribution of software/firmware in the processing hardware for maximum throughput with minimum required memory. As a product of the assessment process an assessment methodology was to be developed that could be used for similar assessments of future manned spacecraft system designs. The assessment process was hampered by changing requirements for the Space Station. As a result, the initial objective of determining the optimum software/firmware allocation was not fulfilled, but several useful conclusions and recommendations resulted from the assessment. It was concluded that the assessment process would not be completely successful for a system with changing requirements. It was also concluded that memory requirements and hardware requirements were being modified to fit as a consequence of the change process, and although throughput could not be quantitized, potential problem areas could be identified. Finally, inherent flexibility of the system design was essential for the success of a system design with changing requirements. Recommendations resulting from the assessment included development of common software for some embedded controller functions, reduction of embedded processor requirements by hardwiring some Orbital Replacement Units (ORUs) to make better use of processor capabilities, and improvement in communications between software development personnel to enhance the integration process. Lastly, a critical observation was made regarding the software integration tasks did not appear to be addressed in the design process to the degree necessary for successful satisfaction of the system requirements.

Warnagiris, Tom↗

Atmospheric aerosol and Doppler lidar studies

Experimental and theoretical studies were performed of atmospheric aerosol backscatter and atmospheric dynamics with Doppler lidar as a primary tool. Activities include field and laboratory measurement and analysis efforts. The primary focus of activities related to understanding aerosol backscatter is the GLObal Backscatter Experiment (GLOBE) program. GLOBE is a multi-element effort designed toward developing a global aerosol model to describe tropospheric clean background backscatter conditions that Laser Atmospheric Wind Sounder (LAWS) is likely to encounter. Two survey missions were designed and flown in the NASA DC-8 in November 1989 and May to June 1990 over the remote Pacific Ocean, a region where backscatter values are low and where LAWS wind measurements could make a major contribution. The instrument complement consisted of pulsed and continuous-wave (CW) CO2 gas and solid state lidars measuring aerosol backscatter, optical particle counters measuring aerosol concentration, size distribution, and chemical composition, a filter/impactor system collecting aerosol samples for subsequent analysis, and integrating nephelometers measuring visible scattering coefficients. The GLOBE instrument package and survey missions were carefully planned to achieve complementary measurements under clean background backscatter conditions.

Rothermel, Jeff↗

Advanced technologies in the ASI MLRO towards a new generation laser ranging system

Matera Laser Ranging Observatory (MLRO) is a high performance, highly automated optical and astronomical observatory currently under design and development by AlliedSignal for the Italian Space Agency (ASI). It is projected to become operational at the Centro Geodesia Spaziale in Matera, Italy, in 1997. MLRO, based on a 1.5-meter astronomical quality telescope, will perform ranging to spacecraft in earthbound orbits, lunar reflectors, and specially equipped deep space missions. The primary emphasis during design is to incorporate state-of-the-art technologies to produce an intelligent, automated, high accuracy ranging system that will mimic the characteristic features of a fifth generation laser ranging system. The telescope has multiple ports and foci to support future experiments in the areas of laser communications, lidar, astrometry, etc. The key features providing state-of-the-art ranging performance include: a diode-pumped picosecond (50 ps) laser, high speed (3-5 GHz) optoelectronic detection and signal processing, and a high accuracy (6 ps) high resolution (less than 2 ps) time measurement capability. The above combination of technologies is expected to yield millimeter laser ranging precision and accuracy on targets up to 300,000 km, surpassing the best operational instrument performance to date by a factor of five or more. Distributed processing and control using a state-of-the-art computing environment provides the framework for efficient operation, system optimization, and diagnostics. A computationally intelligent environment permits optimal planning, scheduling, tracking, and data processing. It also supports remote access, monitor, and control for joint experiments with other observatories.

Varghese, Thomas↗

Achieving Equilibrium for Dense, Integrated, Vehicle Navigation

Drone usage has proliferated in recent years with many applications that have market-changing potential. Applications that include parcel delivery, wildlife protection, precision farming, law enforcement, and industrial inspection, just to name a few. In this paper, the term drone is used to mean both Unmanned Aerial Vehicle and small Unmanned Aircraft System vehicles. Flight infrastructure can currently only support a few thousand aircraft flying over the United States National Airspace System (NAS) at any given time. A delay atone airport sends ripple effects through the system, causing more delays and missed connections. Once regulations and safety policies are put in place to allow for the widespread use of unmanned drones, the number of aircraft in the NAS is expected to skyrocket to millions, potentially congesting the airspace resulting in possible separation violations. In air traffic control, separation is the concept of keeping an “ownship” aircraft outside a minimum distance from “intruder” aircraft to reduce the risk of the aircraft colliding, as well as preventing accidents due to secondary factors, such as wake turbulence. Maintaining proper separation is a safety critical property for drones in the airspace. This paper addresses separation in time and in distance for high volume corridors (en-route) and lanes(on ground). The requirements and necessary conditions for maintaining proper separation and reaching maximum throughput for a given corridor/lane are addressed assuming unidirectional corridors/lanes where an aircraft arrives from one side and departs from the opposite side. Simulation results are presented that show the presented solution guarantees a set of drones to reach the equilibrium state by adjusting their speed based on their distance to the aircraft in front of them. The equilibrium state is defined as a state when a set of n aircraft moving at a relatively constant speed and uniform spacing from each other in a congested system. A congested system is defined as a state when the aircraft cannot move at their maximum allowed speed. Unlike existing centralized and pre-planned approaches, the proposed solution is fully distributed and enables autonomous aircraft to decide to adjust their speed and distance with respect to the preceding aircraft, dynamically. Simulation results are presented that assess the feasibility of the approach using a large number of drones and evaluate the scalability of the proposed solution.

Mahyar R. Malekpour↗

Highlights of IEEE Standard 1547-2018

This presentation contains highlights of technical requirements for DER integration prescribed in IEEE Standard 1547-2018.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Controlled-Environment Agriculture and the Geography of Food, Energy and Water Resilience in the United States

USDA guidelines call for an increase in fruit and vegetable consumption in U.S. households to promote healthier diets. Access to fresh fruits and vegetables are especially lacking in food deserts and food swamps (characterized by a prevalence of food that is highly processed and lacking in nutritional value). Adoption of the recommended healthy diet, which more than doubles the consumption of fruits and vegetables, would have a wide variety of health benefits and would reduce the land footprint of U.S diets. However, adopting a healthy diet would increase phosphate and nitrogen impacts associated with fertilizers and pesticides and would significantly increase freshwater consumption and energy use because of the resource intensity of field cultivation of fruits and vegetables. The majority of these crops are grown in just a few states, including California and Arizona, which are increasingly impacted by climate change. In addition, rural communities are rapidly becoming food deserts, while food produced in these areas is transported long distances to market. In recent years, highly intensified controlled environment (CE) agricultural systems, (i.e., vertical farming) have been developed to provide fresh food closer to consumers. Fruits and vegetables, many of which are amenable to CE culture, occupy a uniquely impactful segment of the food supply-chain, including their value in improving nutrition for vulnerable communities. The objective of this work is to elucidate the location dependency of the energy and water impacts of adoption of distributed CE farming for an important portion of the food system.

controlled environment agriculture↗

Employing Interacting Qubits for Distributed Microgrid Control

To empower flexible and scalable operations, distributed control of multi-inverter microgrids, based on classical communication networks among distributed energy resources, has attracted considerable attention as it can guarantee synchronization and provide suitable remedies to the problem of improper power sharing. Notwithstanding this, resilience of the current schemes on classical communication makes microgrids vulnerable to cyber attacks. Inspired by recent revolutionary breakthroughs in quantum communication, in this paper, we devise a novel synchronization mechanism. We extend the synchronization framework utilized in distributed control algorithms to networks of quantum systems by generating pinning terms and coupling mechanism for the new synchronization rule via exploiting proper quantum jump operators and observables, and show that the quantum system will converge to a time-variant target state. Our devised quantum distributed controller (QDC) gives rise to a novel quantum communication scheme for distributed control of microgrids and enables microgrids to exploit the state-of-the-art quantum communication frameworks as communication infrastructure. Finally, test results on two representative AC and DC networked microgrids validate the efficacy and universality of the quantum distributed control.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Impact of Open Communication Networks on Load Frequency Control with Plug-in Electric Vehicles by Cyber-Physical Dynamic Co-Simulation: Preprint

With the increasing electrification of the transportation sector, vehicle to grid (V2G) control technologies are promising to improving system frequency stability. However, these control technologies might require non-traditional communication supports. This paper investigates the impacts of electric vehicles (EVs) V2G on power system frequency regulation considering communication variations through transmission-distribution-communication (TDC) dynamic simulation. The simulation model is built based on our previously developed open-source transmission-and-distribution (T&D) dynamic co-simulation framework. Here, we add the communication variation functions (i.e. delay and packet loss) to complete the TDC simulation framework. In the case studies, practical communication variation scenarios are considered when the system experiencing an N-1 generation trip contingency. The considered scenarios include communication delay and packet loss using both homogeneous and heterogeneous assumptions. The delay and packet loss rate are the same in all communication channels in the homogeneous case but varies in the heterogeneous case. The results show the communication delay has an obvious impact on the frequency recovery compared to the communication packet drop. The impacts of the standard deviations of communication delay time and packet drop rate are not significant. The outcomes of this work can help improve the EV frequency regulation services and provide robust and effect supports to the grid.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗