ANALYTICAL METHOD FOR MEASURING TOTAL PROTIUM AND TOTAL DEUTERIUM IN A GAS MIXTURE CONTAINING H2, D2, AND HD VIA GAS CHROMATOGRAPHY
Explore the source record for details and available documents.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
Abstract not provided.
Abstract not provided.
An electrocatalytically active ink composition is used with an additive manufacturing process, such as 3D printing, to produce electrodes having consistent, adaptable, and high surface area structures. The electrocatalytically active ink composition includes a mixed powdered precursor and a polymer matrix. The mixed powdered precursor includes a carbon source, a dopant source, and/or a metal-containing catalyst. The material and electrochemical properties of the ink composition may facilitate 3D printing of electrochemically active electrodes for energy conversion and storage devices, and may allow fine-tuning of macro- and microstructures to develop electrodes having improved activity and efficiency.
The effect of immobile pore-water on gas transport in fractured rock has implications for numerical modeling of soil vapor extraction, methane leakage, gaseous CO 2 leakage from sequestration operations, radionuclide transport from underground nuclear explosions, and nuclear waste disposal. While the ability for immobile pore-water storage to effect gas transport has been recognized in the past, the details and specific scenarios leading to enhanced, retarded, or unaffected gas transport have not been explored. In this paper, we performed numerical investigations into the enhancement and retardation of gas transport due to immobile pore-water storage in order to identify implications for gas transport applications. To do this, we developed a numerical approach to model gas transport with a single-phase flow solution coupled to the advection–dispersion equation modified to account for immobile pore-water storage. Other than the immobility of pore water, the formulation contains all other physics included in two-phase formulations (advective and diffusive gas transport in fractures and rock matrix and dissolution in immobile pore water). The assumption of immobile pore water is valid here since for many applications involving transport of soluble gases in fractured rock, the rate of aqueous transport is insignificant compared to gas transport. We verify our modeling approach with analytical solutions of: (1) 1D gas diffusion, (2) 1D gas advection, (3) barometric pumping of a fracture, and (4) gas transport with uniform fracture flow and diffusion into the matrix. We account for pore-water storage in our model by implementing a kinetic formulation of gas dissolution wherein the dissolved (aqueous) phase is considered an immobile constituent. Using this formulation, we model the effect of dissolution rate and saturation on the retardation of gas transport during pure diffusion and pure advection. We also demonstrate that although it is commonly believed that pore-water storage will always enhance gas transport in fractures during oscillatory flow (e.g., during reversing pressure gradients such as barometric pumping cycles), our simulations indicate that this may not always be the case. Our numerical investigations indicate that scenarios with lower effective diffusion coefficients ( ⪅<!-- <≈ --> 10 −<!-- - --> 5  m 2 / s ) and lower dissolution coefficients (i.e., the dissolution diffusion coefficient) ( ⪅<!-- <≈ --> 10 −<!-- - --> 11  m 2 / s ) will result in enhanced gas transport. Other combinations of gaseous diffusion and dissolution coefficients result in delayed gas transport or insignificant effect on gas transport. Based on these results, and given the fact that the free-air diffusion coefficients for many gases are slightly above 10 −<!-- - --> 5  m 2 / s (near the boundary of enhanced/non-enhanced gas transport), tortuosity would have to be significant for gas transport enhancement to occur. Similarly, if we consider the free-water diffusion coefficient of gases (around 10 −<!-- - --> 9  m 2 / s for many gases of interest) to be a maximum bound for the effective dissolution coefficients (i.e., the rate of diffusion into the water away from the air/water interface will limit the dissolution rate), the effective dissolution coefficient would have to be at least 2 orders of magnitude less for enhanced gas transport to occur. Otherwise, pore-water storage will delay or have negligible effect on the gas transport. The results also indicate that the assumption of instantaneous equilibrium, often invoked in numerical codes for dissolution processes (i.e., dissolution coefficient is effectively infinite), will fail to accurately capture important details of soluble gas transport. Finally, the implication of our results is that gas breakthrough times in fractured rock during oscillatory flow may be highly dependent on the effective gaseous diffusion and dissolution coefficients.
We investigate the relation between star formation rate (SFR) and gas surface densities in Galactic star-forming regions using a sample of young stellar objects (YSOs) and massive dense clumps. Our YSO sample consists of objects located in 20 large molecular clouds from the Spitzer cores to disks (c2d) and Gould's Belt (GB) surveys. These data allow us to probe the regime of low-mass star formation, essentially invisible to tracers of high-mass star formation used to establish extragalactic SFR-gas relations. We estimate the gas surface density ({Sigma}{sub gas}) from extinction (A{sub V}) maps and YSO SFR surface densities ({Sigma}{sub SFR}) from the number of YSOs, assuming a mean mass and lifetime. We also divide the clouds into evenly spaced contour levels of A{sub V} , counting only Class I and Flat spectral energy distribution YSOs, which have not yet migrated from their birthplace. For a sample of massive star-forming clumps, we derive SFRs from the total infrared luminosity and use HCN gas maps to estimate gas surface densities. We find that c2d and GB clouds lie above the extragalactic SFR-gas relations (e.g., Kennicutt-Schmidt law) by factors of up to 17. Cloud regions with high {Sigma}{sub gas} lie above extragalactic relations up to a factor of 54 and overlap with high-mass star-forming regions. We use {sup 12}CO and {sup 13}CO gas maps of the Perseus and Ophiuchus clouds from the COMPLETE survey to estimate gas surface densities and compare to measurements from A{sub V} maps. We find that {sup 13}CO, with the standard conversions to total gas, underestimates the A{sub V} -based mass by factors of {approx}4-5. {sup 12}CO may underestimate the total gas mass at {Sigma}{sub gas} {approx}> 200 M{sub sun} pc{sup -2} by {approx}>30%; however, this small difference in mass estimates does not explain the large discrepancy between Galactic and extragalactic relations. We find evidence for a threshold of star formation ({Sigma}{sub th}) at 129 {+-} 14 M{sub sun} pc{sup -2}. At {Sigma}{sub gas}>{Sigma}{sub th}, the Galactic SFR-gas relation is linear. A possible reason for the difference between Galactic and extragalactic relations is that much of {Sigma}{sub gas} is below {Sigma}{sub th} in extragalactic studies, which detect all the CO-emitting gas. If the Kennicutt-Schmidt relation ({Sigma}{sub SFR} {proportional_to} {Sigma}{sup 1.4}{sub gas}) and a linear relation between dense gas and star formation are assumed, the fraction of dense star-forming gas (f{sub dense}) increases as {approx}{Sigma}{sup 0.4}{sub gas}. When {Sigma}{sub gas} reaches {approx}300 {Sigma}{sub th}, the fraction of dense gas is {approx}1, creating a maximal starburst.
Highlights: • Explore feasibility of unsaturated clay as a gas barrier in landfill cover. • Gas breakthrough pressure increases with clay thickness and degree of saturation. • Gas emission rate decreases with clay thickness and degree of saturation. • A 0.6 m-thick clay layer may be sufficient to meet gas emission rate limit. - Abstract: Determination of gas transport parameters in compacted clay plays a vital role for evaluating the effectiveness of soil barriers. The gas breakthrough pressure has been widely studied for saturated swelling clay buffer commonly used in high-level radioactive waste disposal facility where the generated gas pressure is very high (in the order of MPa). However, compacted clay in landfill cover is usually unsaturated and the generated landfill gas pressure is normally low (typically less than 10 kPa). Furthermore, effects of clay thickness and degree of saturation on gas breakthrough and emission rate in the context of unsaturated landfill cover has not been quantitatively investigated in previous studies. The feasibility of using unsaturated compacted clay as gas barrier in landfill covers is thus worthwhile to be explored over a wide range of landfill gas pressures under various degrees of saturation and clay thicknesses. In this study, to evaluate the effectiveness of unsaturated compacted clay to minimize gas emission, one-dimensional soil column tests were carried out on unsaturated compacted clay to determine gas breakthrough pressures at ultimate limit state (high pressure range) and gas emission rates at serviceability limit state (low pressure range). Various degrees of saturation and thicknesses of unsaturated clay sample were considered. Moreover, numerical simulations were carried out using a coupled gas–water flow finite element program (CODE-BRIGHT) to better understand the experimental results by extending the clay thickness and varying the degree of saturation to a broader range that is typical at different climate conditions. The results of experimental study and numerical simulation reveal that as the degree of saturation and thickness of clay increase, the gas breakthrough pressure increases but the gas emission rate decreases significantly. Under a gas pressure of 10 kPa (the upper bound limit of typical landfill gas pressure), a 0.6 m or thicker compacted clay is able to prevent gas breakthrough at degree of saturation of 60% or above (in humid regions). Furthermore, to meet the limit of gas emission rate set by the Australian guideline, a 0.6 m-thick clay layer may be sufficient even at low degree of saturation (i.e., 10% like in arid regions)
Total in-place oil for the Bakken petroleum system (BPS) (which includes the Bakken and Three Forks Formations) has been estimated to be 600 billion barrels (bbl). However, BPS wells have decline rates as high as 85% over the first 3 years of their lives, and primary recovery factors typically range from 3% to 10% of original oil in place. Given the low initial recovery rates, even small incremental productivity improvements could dramatically increase technically recoverable oil in the BPS. One potential solution is enhanced oil recovery (EOR) using gas injection, such as carbon dioxide (CO2) or hydrocarbon (HC) gases. While commonly used in conventional reservoirs, CO2 EOR in unconventional tight oil reservoirs has been limited to pilot tests. EOR using rich gas (mixture of methane, ethane, and propane) has also been employed in numerous pilots in several unconventional plays and has recently been successfully applied in the Eagle Ford play. If successful, large-scale gas-based EOR in the BPS could dramatically increase oil productivity and recovery factors and extend the life of the play for decades. While CO2 may be a technically suitable working fluid for EOR in the BPS, supplies are limited and costs for using CO2 in EOR pilots are prohibitively high. Meanwhile, produced gas flaring has presented challenges for BPS operators in North Dakota. Analysis conducted by the North Dakota Pipeline Authority indicates that the current gas-gathering infrastructure in North Dakota is insufficient to accommodate all of the associated gas that is produced from the BPS. The geographically isolated location of North Dakota relative to large natural gas markets, combined with suppressed natural gas prices, has made it economically challenging for industry to invest capital in expanding gas-gathering infrastructure in the state. These circumstances led to a research program conducted by the Energy & Environmental Research Center (EERC) in partnership with Liberty Resources Management Company LLC (LR) to examine the potential to use rich gas injection for EOR and mitigate flaring. A rich gas EOR pilot test was designed and executed by LR at its Stomping Horse development area in Williams County, North Dakota. From July 2018 through May 2019, a total of 160 million standard cubic feet (MMscf) of rich produced gas was injected into the BPS using five different wells in a sequential injection strategy. LR’s Leon–Gohrick drill spacing unit (DSU) was used as the test site. Regulatory oversight was provided by the North Dakota Industrial Commission (NDIC). Technical support was provided by the EERC through a series of laboratory, modeling, and field-based activities, and additional post-pilot research activities incorporated learnings from the test, developed new laboratory data, improved fracture modeling methods, and developed machine learning and big data analytics. The results from the Stomping Horse rich gas EOR pilot activities indicate that developing an effective, economical EOR approach for the BPS will require more field tests. Another key lesson learned from the Stomping Horse tests is that detailed pre- and posttest data on reservoir conditions and fluids production are essential. Robust reservoir characterization provides information that is crucial to creating realistic geomodels and conducting valid dynamic simulations of potential EOR scenarios. A detailed understanding of the completions and production history of offset wells is also necessary for valid test result interpretations. This knowledge is essential to designing the operational parameters of injectivity tests and interpreting the results. A conformance control strategy is also essential to success. Laboratory-based examinations of rich gas interactions with reservoir fluids and rocks were conducted, with an emphasis on determining the ability to mobilize oil in the tight reservoir rocks and shales of the BPS. Injection fluid composition was shown to have a positive impact on reducing reservoir oil minimum miscibility pressure (MMP), reducing interfacial tension (IFT), and altering wettability. IFT and contact angle measurements demonstrated that wettability can be altered in the presence of rich gas, suggesting the potential to improve oil recovery. Iterative modeling of surface infrastructure and reservoir performance using data generated by the various project activities was conducted. A geologic model of the Stomping Horse area was built; history-matched oil, gas, and water production was used in simulations of various EOR scenarios. Early programmatic modeling results were used to support LR’s design and operation of the EOR pilot and to provide insight regarding optimization of future commercial-scale BPS EOR design and operations. Post-pilot modeling focused on alternative methods of understanding complex fracture networks and accelerating simulation time. These led to improved simulation run times and provide excellent history-matching results. Several of these iterative models were used as the bases for developing algorithms into machine learning and big data analytics. History matching in reservoir simulation is time-consuming and computer processing-intensive. Machine learning algorithms were created, and an automated history-matching tool was developed. A large set of synthetic reservoir simulations were created to generate well responses (oil, gas, and water production, well bottomhole pressure [BHP], and tracer or propane breakthrough) for a set of EOR operating parameters that included offset well status (open or closed), injectate (rich gas or propane), injection rate, and injection well BHP. A user interface was developed to provide real-time visualization. Machine learning-based models were developed to provide rapid forecasting of well performance given a set of user-defined EOR operating parameters. These predictive models allow the user to modify the offset well status, injection rate, and injection well BHP and rapidly forecast future production performance. The combination of real-time visualization tools with real-time forecasting tools provides a framework for real-time control—operational changes that the EOR site operator can enact (e.g., changing gas injection rates) to affect the observed performance and potentially improve the EOR outcome. There is great reason to be optimistic about the future of EOR in the Bakken. The results of the laboratory studies suggest significant potential for high rates of oil mobilization using produced field gas injection under the right conditions. The results of the lab studies, combined with rigorous statistical analysis of well production data and associated modeling efforts, confirm the notion that fluid mobility within the reservoir is controlled by fractures. As more knowledge is gained about the nature and distribution of fracture networks in the Bakken, the industry will be in a better position to predict and, ultimately, influence fluid mobility. New field tests are necessary to develop a more complete understanding of those conditions. Thoughtful and creatively engineered field tests within a well-characterized geologic setting will yield the fundamental knowledge needed to take Bakken oil production to the next level. This subtask was cofunded through the EERC–U.S. Department of Energy Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE-FE0024233. Nonfederal funding was provided by the North Dakota Industrial Commission’s Oil and Gas Research Program and Computer Modelling Group.
A dilution apparatus for diluting a gas sample. The apparatus includes a sample gas conduit having a sample gas inlet end and a diluted sample gas outlet end, and a sample gas flow restricting orifice disposed proximate the sample gas inlet end connected with the sample gas conduit and providing fluid communication between the exterior and the interior of the sample gas conduit. A diluted sample gas conduit is provided within the sample gas conduit having a mixing end with a mixing space inlet opening disposed proximate the sample gas inlet end, thereby forming an annular space between the sample gas conduit and the diluted sample gas conduit. The mixing end of the diluted sample gas conduit is disposed at a distance from the sample gas flow restricting orifice. A dilution gas source connected with the sample gas inlet end of the sample gas conduit is provided for introducing a dilution gas into the annular space, and a filter is provided for filtering the sample gas. The apparatus is particularly suited for diluting heated sample gases containing one or more condensable components.
During phase-I, the project team led by Echogen Power Systems (EPS) had two primary objectives based on investigating the application of gas turbines with supercritical carbon dioxide (sCO 2 ) power cycles. The first objective was to improve the overall efficiency and performance of a hybrid gas turbine/sCO 2 power system through a joint optimization of the two subsystems (gas turbine and sCO 2 power cycle) using non-linear optimization techniques that simultaneously evaluate thermal performance of the combined cycle. The hybrid power system included several points of interaction, including (but not limited to) gas turbine exhaust, fuel heating, inlet chilling and turbine cooling. The second objective was to establish a baseline transient response model of the hybrid power system and a notional microgrid and begin steps to integrate the control systems of the three major elements (gas turbine, sCO 2 cycle and grid controller). The project team established a baseline performance for a combined cycle power plant using a production gas turbine and scaled sCO 2 power cycle only utilizing exhaust heat recovery. Echogen’s non-linear techno-economic optimization code was extended by adding gas turbine component models derived from a in-house developed gas turbine design code. With the two cycles coupled by the gas turbine exhaust, design parameters of both cycles were allowed to vary simultaneously to determine performance opportunity versus isolated designs. Returning to the baseline gas turbine/sCO 2 power cycle transient models: Echogen had in-house developed sCO 2 cycle transient model in GT-Suite system simulation software, and had partnered with Siemens Finspång for gas turbine transient model, and Siemens PTI group to provide micro-grid load profile as well as hybrid power cycle generated load (power and frequency) analysis. The transient model for the SGT-750 Siemens gas turbine was a “black-box” functional mock-up interface (FMI) model developed by Siemens Industrial Turbomachinery in Finspång, Sweden. The SGT-750 is a twin-shaft gas turbine that produces 40 MW electricity with an efficiency of about 40% at ISO conditions. At 100% gas turbine throttle (load), the SGT-750 has average exhaust conditions of 114.6 kg/s and 469.8°C. The transient model for sCO 2 power cycle was developed by Echogen in GT-SUITE 1D system simulation software platform. The basic CO 2 flow circuit has single-shaft turbomachinery with net 11.5 MW electrical power output at design conditions. The power turbine has a double-ended shaft with one end connected to synchronous generator through a fixed-ratio gearbox. The other end of power turbine is connected to the compressor through a continuously variable transmission. The major components of the sCO 2 power cycle modeled include air cooled condenser/cooler, CO 2 compressor, recuperator, two waste heat exchanger coils, power turbine, continuous variable transmission, gearbox and generator. Integration of SGT-750 transient model and sCO 2 power cycle transient model was done in Matlab Simulink. In the integrated model, the gas turbine and sCO 2 power cycle interacted at two points, first one being the gas turbine exhaust gas flow rate and temperature, which were inputs to sCO 2 power cycle model. The second point was the distribution of micro-grid load demand signal between the SGT-750 generator and sCO 2 cycle generator. For a given combined-cycle load demand, the gas turbine load demand was equal to the total demand minus the sCO 2 cycle power generated. In the present study the integrated model was simulated for two cases of grid load demand: (i) for a step change, both positive-step and negative-step, in grid load demand (ii) for a micro-grid load demand curve provided by Siemens PTI group. Finally, the time series plots representing load demand versus integrated system response were presented including the sCO 2 power cycle control system performance plots. The actual generated power and frequency of both the generators, gas turbine and sCO 2 power cycle, was supplied to Siemens PTI group for dynamic grid assessment, results of which are provided in appendices.
A system for controlling the emission of associated gas produced from a reservoir. In an embodiment, the system comprises a gas compressor including a gas inlet in fluid communication with an associated gas source and a gas outlet. The gas compressor adjusts the pressure of the associated gas to produce a pressure-regulated associated gas. In addition, the system comprises a gas cleaner including a gas inlet in fluid communication with the outlet of the gas compressor, a fuel gas outlet, and a waste product outlet. The gas cleaner separates at least a portion of the sulfur and the water from the associated gas to produce a fuel gas. Further, the system comprises a gas turbine including a fuel gas inlet in fluid communication with the fuel gas outlet of the gas cleaner and an air inlet. Still further, the system comprises a choke in fluid communication with the air inlet.
Radioactive wastes from nuclear fuel processing are stored in large underground storage tanks at the Hanford Site. Solid wastes can be divided into salt-cake (mostly precipitated soluble sodium nitrate and nitrite salts with some interstitial liquid consisting of concentrated salt solutions) and sludge (mostly low solubility aluminum and iron compounds with relatively dilute interstitial liquid). Waste generates hydrogen through the radiolysis of water and organic compounds, radio-thermolytic decomposition of organic compounds, and corrosion of a tank's carbon steel walls. Nonflammable gases, such as nitrous oxide and nitrogen, are also produced. Additional flammable gases (e.g., ammonia and methane) are generated by chemical reactions between various degradation products of organic chemicals present in the tanks. Six double-shell tanks (DSTs) containing salt-cake wastes began showing signs of gas accumulation and buoyant instability in the form of periodic waste level drops in the 1980's. Studies in the 1990's indicated that gas would accumulate in the settled solids layer until its bulk density was lower than the supernatant liquid. The resultant gas release caused by this instability was termed a Buoyant Displacement Gas Release Event (BDGRE). Criteria were developed to prevent forming additional waste tanks that exhibited BDGREs. Significant gas accumulation and BDGREs were never observed in tanks containing predominantly sludge wastes. Literature reviews, data from Hanford Site waste tanks, and experiments with waste simulants have led to new conclusions on gas retention and release in sludge waste. The data show similar overall behavior where initially the settled solids volume increases as gas bubbles form. Gas fraction in the settled solids increases to a peak concentration after which additional generated gas escapes through connected cracks and there is a balance between gas generation and gas release with little change in gas fraction. Experiments showed that this behavior does not change as sludge waste depth increases. Sufficient data now exist to differentiate between gas retention and release behavior in Hanford Site sludge waste tanks and salt-cake waste tanks. The salt-cake criteria do not need to be applied to sludge waste tanks that exhibit certain gas retention and release behavior. Criteria for waste characteristics and process behavior have been defined that identify specific wastes and tanks that, based on previous operating experience, will have low gas retention and will not exhibit large, spontaneous releases. The first criterion defines what waste is considered sludge and what waste is considered salt-cake. If the mass ratio of soluble to insoluble constituents is below 2.5, then the waste is sludge. The second criterion is a density difference criterion that prevents tanks being operated in a region where sludge buoyancy might occur. For large gas releases to occur, the settled solids must accumulate sufficient gas to become less dense than the overlying supernatant (i.e., the settled solids would become buoyant). Based on previous operating experience, the ratio of liquid density to degassed settled solids bulk density (ρl/ρB) should be maintained at ≤ 0.84. This ensures that retained gas content in the sludge would need to exceed 16% by volume for the settled solids to become buoyant in the overlying supernatant. Tank waste that satisfies the mass ratio criterion, the liquid to bulk solids density criterion, and has process data supporting typical Hanford waste sludge behavior does not pose a significant risk for a large spontaneous gas release event. (authors)
Since 2000, natural gas has seen tremendous growth as a fuel source for electricity generation in the United States (U.S.) with annual installations exceeding 20 GW in all but four years. It also accounts for an increasingly significant share of the nation’s electricity generation, growing from around 15 percent in the early part of the 2000s to between 26 and 29 percent in the last three years. (1) Increasing reliance on natural gas has led to concerns that an extreme weather event – which may cause curtailments in gas delivery – or a natural gas infrastructure failure could lead to local or regional electric reliability issues. (2) These concerns stem from differences in delivery methods of natural gas to electric generating units (EGUs) contrasted with the fuel delivery and storage methods for traditional baseload power systems (i.e. coal and nuclear units).1 (3) Although it seems that there is an abundance of natural gas in a post-shale gas world, infrastructure limitations and differences in electric and natural gas markets persist that differentiate natural gas-fired generators from traditional baseload power generators. Such concerns can be partially mitigated by modifying natural gas EGUs for operation on secondary fuels and installing on-site fuel storage for the secondary fuel, thus ensuring continuity of operation in the case of a gas delivery problem.2 This report examines technical, regulatory, and market issues associated with operating power plants primarily fueled with natural gas, on a secondary fuel, such as fuel oil or liquefied natural gas (LNG). In addition, a regional case study was completed to identify the current and near-term potential for dual fuel operation in New England, along with a market impact analysis of potential cost savings during an extreme weather event. The New England Independent System Operator (ISO-NE) was selected as the study area based on a preponderance of natural gas-fired generators contributing to the regional generating capacity mix (nearly 50 percent natural gas), limited natural gas supply infrastructure, and the potential for natural gas delivery disruptions due to cold weather events, exacerbated by the lack of bulk natural gas storage in the region.
The U.S. power sector has become increasingly reliant on gas pipeline networks to deliver fuel to natural gas power plants. In addition to supplying relatively low-cost fuel, gas networks offer generators flexibility in their operations through the ability to deliver fuel when needed by using gas storage facilities or linepack if the gas network is at an operating point below its design capacity. However, disruptions or stress events on the gas network - like those occurring in the Northeast and Texas in recent years - can result in limitations on gas availability to generators at times when generation is in short supply. Here we examine a period of stress that occurred in the winter of 2022 in the Western United States. Using data on the region's natural gas pipeline network and electric generators, we build an integrated gas and electric model that closely replicates the actual dispatch of the period. We then evaluate the implications of removing flexibility employed by the gas network operator, which during that period curtailed scheduled gas deliveries to other parties to increase deliveries to natural gas power plants, which requested more gas than initially forecasted. We find that without the flexibility supplied by the gas network operator, there would have been curtailment of gas generation due to gas offtake constraints, requiring the power system operator to redispatch relying on more expensive generation or to potentially shed load. A sensitivity exploring a wind drought further exacerbates the strain, illustrating the potential challenge of managing gas and grid interactions as systems move to higher shares of variable renewable electricity. Based on this example, we discuss potential coordination strategies between the two system operators to ensure that the power system can successfully utilize and rely on the flexibility offered by natural gas networks.
Although prediction of future natural gas supply is complicated by uncertainty in such variables as demand, liquefied natural gas supply price and availability, coalbed methane and gas shale development rate, and pipeline availability, all U.S. Energy Information Administration gas supply estimates to date have predicted that Unconventional gas sources will be the dominant source of U.S. natural gas supply for at least the next two decades (Fig. 1.1; the period of estimation). Among the Unconventional gas supply sources, Tight Gas Sandstones (TGS) will represent 50-70% of the Unconventional gas supply in this time period (Fig. 1.2). Rocky Mountain TGS are estimated to be approximately 70% of the total TGS resource base (USEIA, 2005) and the Mesaverde Group (Mesaverde) sandstones represent the principal gas productive sandstone unit in the largest Western U.S. TGS basins including the basins that are the focus of this study (Washakie, Uinta, Piceance, northern Greater Green River, Wind River, Powder River). Industry assessment of the regional gas resource, projection of future gas supply, and exploration programs require an understanding of reservoir properties and accurate tools for formation evaluation. The goal of this study is to provide petrophysical formation evaluation tools related to relative permeability, capillary pressure, electrical properties and algorithms for wireline log analysis. Detailed and accurate moveable gas-in-place resource assessment is most critical in marginal gas plays and there is need for quantitative tools for definition of limits on gas producibility due to technology and rock physics and for defining water saturation. The results of this study address fundamental questions concerning: (1) gas storage; (2) gas flow; (3) capillary pressure; (4) electrical properties; (5) facies and upscaling issues; (6) wireline log interpretation algorithms; and (7) providing a web-accessible database of advanced rock properties. The following text briefly discusses the nature of these questions. Section I.2 briefly discusses the objective of the study with respect to the problems reviewed.
The overall objective of this project was to develop an efficient, reproducible and reliable process for the preparation of fluorine-18 labeled fluorine gas ([¹⁸F]F₂) from readily available cyclotron-produced [¹⁸F]fluoride ion. The two step process entailed the production of [¹⁸F]fluoromethane with subsequent conversion to [¹⁸F]F₂ by electric discharge of [¹⁸F]fluoromethane in the presence of carrier nonradioactive F₂ gas. The specific goals of this project were i) to optimize the preparation of [¹⁸F]fluoromethane from [¹⁸F]fluoride ion; ii) to develop a prototype automated system for the production of [¹⁸F]F₂ from [¹⁸F]fluoride ion and iii) develop a compact user friendly automated system for the preparation of [¹⁸F]F₂ with initial synthesis of fluorine-18 labeled radiotracers. Over the last decade there has been an increased interest in the production of "non-standard" positron-emitting isotopes for the preparation of new radiotracers for a variety of applications including medical imaging and therapy. The increased availability of these isotopes from small biomedical cyclotrons has prompted their use in labeling radiotracers. In much the same way the production of [¹⁸F]F₂ gas has been known for several decades. However, access to [¹⁸F]F₂ gas has been limited to those laboratories with the means (e.g. F₂ targetry for the cyclotron) and the project-based need to work with [¹⁸F]F₂ gas. Relatively few laboratories, compared to those that produce [¹⁸F]fluoride ion on a daily basis, possess the capability to produce and use [¹⁸F]F₂ gas. A simplified, reliable system employing [¹⁸F]fluoride ion from cyclotron targetry systems that are already in place coupled with on-demand production of the [¹⁸F]F₂ gas would greatly enhance its availability. This would improve the availability of [¹⁸F]F₂ gas and promote further work with a valuable precursor. The major goals of the project were accomplished over the funding period. The preparation of ¹⁸F]fluoromethane has been automated with reproducible yields greater than 90% conversion from [¹⁸F]fluoride ion. A trap and release system was established for the [¹⁸F]fluoride ion concentration and direct elution of the [¹⁸F]fluoride ion into the reaction vial with the appropriate base and precursor in DMSO. Other solvents were also investigated. The production time for [¹⁸F]fluoromethane is less than 10 minutes. An automated system for the [¹⁸F]F₂ gas production from the [18F]fluoromethane has been developed. The unit coupled to the [¹⁸F]fluoromethane system permits the on demand production of [¹⁸F]F₂ gas. In less than 30 minutes, mCi quantities of [¹⁸F]F₂ gas were produced. Several variables for the [¹⁸F]F₂ gas production were investigated and a set of parameters for reproducible operation were determined. These parameters included discharge chamber size, carrier gas (He, Ne, Ar), discharge time, discharge current, mass of F₂ gas added to the chamber. FDOPA and EF5 were used to test the reactivity of the [¹⁸F]F₂ gas. Both products were produced in low to modest yield. The ready availability of [¹⁸F]F₂ gas has potential impact to advance both DOE mission-driven initiatives and nuclear medicine initiatives through other federally funded agencies such as NIH and DoD. New reactions involving the use of [¹⁸F]F₂ gas will lead to direct labeling of new radiotracers and intermediates as well as new fluorine-18 labeled synthons that may be further reacted with other reagents to provide useful fluorine-18 labeled compounds. New tracers to understand and follow plant and microbial metabolism as well as new tracers for nuclear medicine applications, that have been either difficult to obtain or never produced due to the limited availability of [¹⁸F]F₂ gas, may be prepared using the techniques developed .
The relatively low generation costs associated with wind, solar photovoltaic (PV), and natural-gas power plants make it challenging for geothermal power plants to produce and sell the power that has the reliability and sustainability characteristics that are greatly needed in U.S. power markets. This is especially true for geothermal resources with low-to-medium temperatures, which results in relatively low-thermal efficiency and generation costs that are higher than those for wind, solar PV, and natural gas. This analysis evaluates solar thermal- and natural-gas combustion waste heat recovery-based topping cycle hybridization of geothermal binary power plants. This approach provides several benefits that may allow geothermal power plants to generate power at more competitive costs. First, the addition of solar thermal energy or natural-gas combustion waste heat input to a geothermal power plant provides additional heat input that can be converted to electrical power. Second, the temperature level of the heat obtained from concentrating solar collectors or natural-gas combustion exhaust is higher than that of geothermal heat, which provides opportunities for improving the efficiency of the conversion of thermal energy to electrical power. Third, the ease with which solar thermal systems integrate with energy storage and the flexibility of natural gas means power generation can occur during peak demand periods. The hybrid cycles are compared to equivalently sized, co-located, independent geothermal, concentrating solar, and/or natural-gas power plants. The hybrid cycle tends to produce slightly more power than the standalone plants combined. However, the hybrid plant Levelized Cost of Energy (LCOE) is slightly higher than the LCOE of the combined standalone power plants for each of the case study locations investigated. Using the steam-topping cycle, organic Rankine cycle (ORC)-bottoming cycle hybrid plant design to combine a solar thermal resource and low- temperature geothermal resource (<120 degrees C) leads to a hybrid plant with a lower LCOE than a standalone geothermal-only system. Thus, hybrid plants may enable the economic development of geothermal resources in locations with low geothermal resource temperatures. However, in areas with higher geothermal resource temperatures (>120 degrees C), the geothermal-only plant has a lower LCOE than the hybrid cycle and thus could be developed without the need for solar heat addition. iv A geothermal-natural-gas reciprocating engine hybrid plant was evaluated for an Elk Hills, California case study location. The Elk Hills case study analysis indicates that when the natural-gas engine operates for more than 12 hours per day the hybrid plant can produce power at an LCOE lower than a standalone geothermal plant, and comparable to that of the standalone natural-gas reciprocating engine, while also reducing the carbon intensity of the power generated relative to the standalone natural-gas engine. This may represent a scenario in which the hybrid plant provides an opportunity for the deployment of a low-temperature geothermal resource that otherwise may have an LCOE too high to develop and operate as a standalone resource, while also reducing the carbon intensity of natural-gas generation sources. A "triple-hybrid" plant that combines natural gas, solar thermal, thermal energy storage, and geothermal was also investigated. A natural-gas combustion turbine (NGCT) is added to the geothermal-solar hybrid such that the hot exhaust gas from the gas turbine provides an alternative source of heat to the steam turbine of the hybrid cycle. Analysis results suggest that the triple-hybrid plant has a significantly higher energy generation and revenue than a standalone NGCT or the original geothermal-solar hybrid. The triple-hybrid design benefits most from using a smaller solar field so that the solar energy can be dispatched at the most valuable times available. The triple-hybrid plant also has a lower LCOE than the standalone NGCT. The triple-hybrid plant was evaluated making simple assumptions about the dispatch profile of the gas cycle, and more nuanced and realistic dispatching schedules should be analyzed in future work.
Hydraulic fracturing is essential for producing gas and oil at an economic rate from low permeability sands. Most fracturing treatments use water and polymers with a gelling agent as a fracturing fluid. The water is held in the small pore spaces by capillary pressure and is not recovered when drawdown pressures are low. The un-recovered water leaves a water saturated zone around the fracture face that stops the flow of gas into the fracture. This is a particularly acute problem in low permeability formations where capillary pressures are high. Depletion (lower reservoir pressures) causes a limitation on the drawdown pressure that can be applied. A hydraulic fracturing process can be energized by the addition of a compressible, sometimes soluble, gas phase into the treatment fluid. When the well is produced, the energized fluid expands and gas comes out of solution. Energizing the fluid creates high gas saturation in the invaded zone, thereby facilitating gas flowback. A new compositional hydraulic fracturing model has been created (EFRAC). This is the first model to include changes in composition, temperature, and phase behavior of the fluid inside the fracture. An equation of state is used to evaluate the phase behavior of the fluid. These compositional effects are coupled with the fluid rheology, proppant transport, and mechanics of fracture growth to create a general model for fracture creation when energized fluids are used. In addition to the fracture propagation model, we have also introduced another new model for hydraulically fractured well productivity. This is the first and only model that takes into account both finite fracture conductivity and damage in the invaded zone in a simple analytical way. EFRAC was successfully used to simulate several fracture treatments in a gas field in South Texas. Based on production estimates, energized fluids may be required when drawdown pressures are smaller than the capillary forces in the formation. For this field, the minimum CO{sub 2} gas quality (volume % of gas) recommended is 30% for moderate differences between fracture and reservoir pressures (2900 psi reservoir, 5300 psi fracture). The minimum quality is reduced to 20% when the difference between pressures is larger, resulting in additional gas expansion in the invaded zone. Inlet fluid temperature, flow rate, and base viscosity did not have a large impact on fracture production. Finally, every stage of the fracturing treatment should be energized with a gas component to ensure high gas saturation in the invaded zone. A second, more general, sensitivity study was conducted. Simulations show that CO{sub 2} outperforms N{sub 2} as a fluid component because it has higher solubility in water at fracturing temperatures and pressures. In fact, all gas components with higher solubility in water will increase the fluid's ability to reduce damage in the invaded zone. Adding methanol to the fracturing solution can increase the solubility of CO{sub 2}. N{sub 2} should only be used if the gas leaks-off either during the creation of the fracture or during closure, resulting in gas going into the invaded zone. Experimental data is needed to determine if the gas phase leaks-off during the creation of the fracture. Simulations show that the bubbles in a fluid traveling across the face of a porous medium are not likely to attach to the surface of the rock, the filter cake, or penetrate far into the porous medium. In summary, this research has created the first compositional fracturing simulator, a useful tool to aid in energized fracture design. We have made several important and original conclusions about the best practices when using energized fluids in tight gas sands. The models and tools presented here may be used in the future to predict behavior of any multi-phase or multi-component fracturing fluid system.