Search NASA⌕ Search

SEARCH · Search NASA

Results for “INTERCONNECTED POWER SYSTEMS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,009 records · Page 56

On-Board AC Charging Topology Integrated with Electric Vehicle Motor Drive System

On-board AC charging is a convenient and widely adopted method for recharging electric vehicles (EVs) directly from standard alternating current (AC) power sources. This paper presents a novel topology for AC charging of EVs that utilizes EV 3-phase electric machine windings as the input inductors, thus eliminating the requirement for bulky grid interfacing inductors and resulting in a compact and cost-effective integrated motor drive and charger system. The proposed approach leverages the motor windings and parallel operating half-bridge inverter during the charging process by interconnecting the inverter phases with the motor windings in a mechanically interleaved and electrically paralleled manner. The implementation of this unique and innovative idea, achieved through precise control and arrangement of the motor winding as a series inductor, successfully eliminates the possibility of unintended motion of the electric machine during the charging process.

ADVANCED PROPULSION SYSTEMS↗

DOE 10658 Project Sensitivity-Driven Wide Area Protection (SWAP) Coordination Tools for IBRs

Utilities have seen a rapid increase in solar, wind, and battery energy storage systems that interconnect to their electric system through inverters. Inverter-Based Resources (IBRs) have fault current characteristics that are unlike the fault current response of traditional rotating-machine-based generators, which is well-known and repeatable. IBR’s non-traditional fault current behavior is due to the IBR control scheme, which is configured to provide a clean AC output but also protects the inverter’s sensitive power electronics devices from damage from conditions such as overcurrent. This results in a low fault current magnitude, low or no negative sequence current injection, the variability of sequence component currents, the variability of voltage with respect to current angles, and the lack of inertia. The control scheme also results in a fault current response that can vary between manufacturers and between models of the same manufacturer. High penetration of IBRs can adversely affect the protection schemes applied in areas with high penetration of IBRs. With the proliferation of IBRs, utilities are finding out that conventional protection schemes are not adequately equipped to protect the electric systems. This is mainly because the existing protection elements and practices have been designed based on the fault current response of conventional rotating machines. In several cases, the available literature does not provide any clear solution for the issues when the protection scheme does not operate properly near IBRs. This report identifies various protection challenges due to IBRs that industry is facing, from the utility perspective. Instead of focusing on one issue, this report looks broadly at all the challenges that system protection has experienced with high penetration of IBRs. Based on the IBR response from various utilities during real fault events and gathering perspectives from different utility SMEs via questionnaire, the report summarizes the gathered data and internal experiences.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A transient FETI methodology for large-scale parallel implicit computations in structural mechanics, part 2

Explicit codes are often used to simulate the nonlinear dynamics of large-scale structural systems, even for low frequency response, because the storage and CPU requirements entailed by the repeated factorizations traditionally found in implicit codes rapidly overwhelm the available computing resources. With the advent of parallel processing, this trend is accelerating because explicit schemes are also easier to parallellize than implicit ones. However, the time step restriction imposed by the Courant stability condition on all explicit schemes cannot yet and perhaps will never be offset by the speed of parallel hardware. Therefore, it is essential to develop efficient and robust alternatives to direct methods that are also amenable to massively parallel processing because implicit codes using unconditionally stable time-integration algorithms are computationally more efficient than explicit codes when simulating low-frequency dynamics. Here we present a domain decomposition method for implicit schemes that requires significantly less storage than factorization algorithms, that is several times faster than other popular direct and iterative methods, that can be easily implemented on both shared and local memory parallel processors, and that is both computationally and communication-wise efficient. The proposed transient domain decomposition method is an extension of the method of Finite Element Tearing and Interconnecting (FETI) developed by Farhat and Roux for the solution of static problems. Serial and parallel performance results on the CRAY Y-MP/8 and the iPSC-860/128 systems are reported and analyzed for realistic structural dynamics problems. These results establish the superiority of the FETI method over both the serial/parallel conjugate gradient algorithm with diagonal scaling and the serial/parallel direct method, and contrast the computational power of the iPSC-860/128 parallel processor with that of the CRAY Y-MP/8 system.

Farhat, Charbel↗

A transient FETI methodology for large-scale parallel implicit computations in structural mechanics

Explicit codes are often used to simulate the nonlinear dynamics of large-scale structural systems, even for low frequency response, because the storage and CPU requirements entailed by the repeated factorizations traditionally found in implicit codes rapidly overwhelm the available computing resources. With the advent of parallel processing, this trend is accelerating because explicit schemes are also easier to parallelize than implicit ones. However, the time step restriction imposed by the Courant stability condition on all explicit schemes cannot yet -- and perhaps will never -- be offset by the speed of parallel hardware. Therefore, it is essential to develop efficient and robust alternatives to direct methods that are also amenable to massively parallel processing because implicit codes using unconditionally stable time-integration algorithms are computationally more efficient when simulating low-frequency dynamics. Here we present a domain decomposition method for implicit schemes that requires significantly less storage than factorization algorithms, that is several times faster than other popular direct and iterative methods, that can be easily implemented on both shared and local memory parallel processors, and that is both computationally and communication-wise efficient. The proposed transient domain decomposition method is an extension of the method of Finite Element Tearing and Interconnecting (FETI) developed by Farhat and Roux for the solution of static problems. Serial and parallel performance results on the CRAY Y-MP/8 and the iPSC-860/128 systems are reported and analyzed for realistic structural dynamics problems. These results establish the superiority of the FETI method over both the serial/parallel conjugate gradient algorithm with diagonal scaling and the serial/parallel direct method, and contrast the computational power of the iPSC-860/128 parallel processor with that of the CRAY Y-MP/8 system.

Farhat, Charbel↗

AMD Radeon e9173 Low Power PCIE GPU Single Event Effects Test Report

The AMD Radeon Embedded e9170 Graphics Processing Unit (GPU), notably the e9173 Peripheral Component Interconnect Express (PCIE) variant, is of interest to Artemis generation programs with requirements for graphics rendering, compute, artificial intelligence (Ai) with a constraints-requiring piece-part procurement and power consumption of less than 50W. In addition to collecting heavy ion data on this device, a secondary purpose of this test campaign was to validate video capture hardware and software workflows used with GPU, microprocessor and system-on-chip device testing. Five (5) test patterns from the NEPP Processor Enclave (NPE) test suite were used with the e9173. The test patterns covered the operating system’s (OS) idle contribution towards the cross section, matrix math using tensorflow-rocm, two artificial intelligence models developed at NASA GSFC, and an industry standard GPU benchmarking application called Mesa GLXGears.

NASA Technical Memorandum (TM) test report for pos↗

International Cybersecurity: Capabilities and Overview [Slides]

Innovations in clean energy technology are beginning to transform electric grids around the world. It is more important than ever to understand and improve the resiliency and security of the grid against natural and human disruptions as our energy systems become more distributed, intelligent, and interconnected. Through its advanced cybersecurity technical assistance portfolio, experts at the National Renewable Energy Laboratory (NREL) work with international governments to support secure and resilient deployment of renewable energy assets and address grid interconnection challenges. Cybersecurity technical assistance is tailored to the needs of our international partners.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Synchrophasor spoofing detection and remediation for wide-area damping control

Evolving cyber-attack threats put at risk automatic closed-loop systems to be incorporated in the smart grid. Wide-area control systems are particularly vulnerable to signal spoofing attacks due to sensor remoteness and dependence on satellite communication for time synchronization. A successful cyber-attack on a wide-area controller has the potential to reduce relative stability of the power system or worse, destabilize it. As such, detection algorithms must be deployed as defense against such attacks with the ability to autonomously correct for detected tampering or misoperation. The Spoof Catch and Restore Routine (SCR 2 ), a combination of three real-time spoof detectors, each requiring limited information about the plant, is reported here. Nonlinear simulations of a compromised wide-area control system deployed in the Western Interconnection show the effectiveness of SCR 2 in detecting both delay-type and counterfeit-type spoofing attacks on wide-area sensors.

42 ENGINEERING↗

Intermediate power conditioners - Where are we now?

It has been recognized in the photovoltaic (PV) industry that even in the event of a dramatic reduction in the price of generating PV cells, the costs for the other components of the system represent still a major obstacle towards commercialization. A project was, therefore, initiated with the aim to develop baseline and conceptual power conditioner designs which would attempt to meet a specified set of cost and performance goals in the 30 to 200 kW (Intermediate) size. Resulting Intermediate Size Power Conditioner Studies led to a number of conclusions. There is a need for a set of guidelines or standards for utility interconnection. The advent of new devices with more power handling capability will change the desired topology.

Klein, J. W.↗

Cooperation in Transmission Expansion Planning: Enhancing Grid Reliability and Efficiency Under a Changing Climate

Electricity grids are challenged to maintain reliability during more intense and frequent extreme weather events due to climate change. This challenge is exacerbated by multi-sector electrification and power sector decarbonization through increased reliance on variable renewable energy, which necessitates the expansion of transmission infrastructure. However, transmission expansion planning is often complicated by intertwined planning authorities and jurisdictions, and allocation of large capital investment needs. These factors cause authorities to manage transmission investments individually (i.e., only/mostly intraregional planning), which can lead to suboptimal transmission networks. This study investigates the potential benefits of cooperative transmission expansion planning (i.e., both intraregional and interregional planning that optimizes transmission investments across the entire physical system). Using sectoral and economic optimization, and machine learning models, it analyzes the impact of different levels of cooperation among transmission planning regions within U.S. Western Interconnection in 2019 and 2059 via an iterative investment process. Furthermore, it examines the effects of future climate change on transmission cooperation by simulating historical heat waves from 2019 under conditions of 2059. The results indicate that cooperative transmission planning leads to lower wholesale electricity prices, decreased energy outages, and reduced greenhouse gas emissions. However, the advantages of collaboration diminish during widespread heat waves, despite remaining beneficial especially for regions like California Independent System Operator with substantial solar installations. The study underscores the importance of transmission cooperation in reducing costs and enhancing reliability, emphasizing the need for strategic investments in storage to address challenges posed by future extreme weather events with varying spatial scales.

Capacity Expansion Model↗

Utility-Scale Operational Consequences for Solar Grid Services

This report delves into the critical aspects of grid services provided by solar inverter-based resources (IBRs), with an emphasis on the evolving landscape of microgrids, virtual power plants (VPPs), aggregators, and distributed energy resource management systems (DERMS). As the energy sector undergoes a transformative shift towards more decentralized and resilient grid architectures, understanding the multifaceted risks associated with these technologies becomes paramount. The report categorizes these risks into organizational, technical, and procedural domains, providing a thorough risk assessment framework that stakeholders can utilize to anticipate and mitigate potential issues. In addressing the increasing complexity of grid interconnections, the report highlights the importance of Cyber-Informed Engineering (CIE). By embedding engineering controls and cybersecurity measures into the early stages of system design, this approach aims to fortify grid infrastructure against emerging cyber threats. The analysis includes an exploration of best practices and strategies for integrating CIE principles to enhance grid security and resilience. To provide practical insights, the report conducts a detailed consequence analysis of various grid services and cyber mitigations that can be applied through the interconnection process. This analysis evaluates the potential impacts of different failure modes and vulnerabilities, offering a clear understanding of the consequences that could arise from disruptions within the energy grid. The findings are further enriched by a series of case studies that illustrate real-world scenarios and lessons learned from past incidents. Through this comprehensive examination of grid services and their criticality, the report aims to prepare industry professionals with the knowledge and tools necessary to navigate the complexities of modern energy systems. By providing a comprehensive approach that includes risk assessment, cybersecurity, and consequence analysis, solar stakeholders can more effectively guarantee the reliability, efficiency, and security of the energy grid.

14 SOLAR ENERGY↗

Office of Legacy Management Decision Tree for Solar Photovoltaic Projects - 13317

To support consideration of renewable energy power development as a land reuse option, the DOE Office of Legacy Management (LM) and the National Renewable Energy Laboratory (NREL) established a partnership to conduct an assessment of wind and solar renewable energy resources on LM lands. From a solar capacity perspective, the larger sites in the western United States present opportunities for constructing solar photovoltaic (PV) projects. A detailed analysis and preliminary plan was developed for three large sites in New Mexico, assessing the costs, the conceptual layout of a PV system, and the electric utility interconnection process. As a result of the study, a 1,214-hectare (3,000-acre) site near Grants, New Mexico, was chosen for further study. The state incentives, utility connection process, and transmission line capacity were key factors in assessing the feasibility of the project. LM's Durango, Colorado, Disposal Site was also chosen for consideration because the uranium mill tailings disposal cell is on a hillside facing south, transmission lines cross the property, and the community was very supportive of the project. LM worked with the regulators to demonstrate that the disposal cell's long-term performance would not be impacted by the installation of a PV solar system. A number of LM-unique issues were resolved in making the site available for a private party to lease a portion of the site for a solar PV project. A lease was awarded in September 2012. Using a solar decision tree that was developed and launched by the EPA and NREL, LM has modified and expanded the decision tree structure to address the unique aspects and challenges faced by LM on its multiple sites. The LM solar decision tree covers factors such as land ownership, usable acreage, financial viability of the project, stakeholder involvement, and transmission line capacity. As additional sites are transferred to LM in the future, the decision tree will assist in determining whether a solar PV project is feasible on the new sites. (authors)

14 SOLAR ENERGY↗

Establishing Co‐Continuous Network of Conjugated Polymers and Elastomers for High‐Performance Polymer Solar Cells with Extreme Stretchability

High power conversion efficiency (PCE) and mechanical robustness are prerequisites for wearable applications of organic solar cells (OSCs). However, stretchability of present active systems (i.e., crack-onset strain (COS) < 30%) should be improved. While introducing elastomers into active systems is considered a simple method for improving stretchability, the inclusion of elastomers typically results in a decrease in PCE of the OSC with a limited enhancement in the stretchability due to lack of interconnected electrical and mechanical pathways. In this study, it is developed efficient and intrinsically stretchable (IS)-OSCs with exceptional mechanical robustness, by constructing co-continuous networks of conjugated polymers (D18) and elastomers (SEBS) within active layers. It is demonstrated that the blend film with a specific ratio (40:60 w/w) of D18:SEBS is crucial for forming co-continuous structures, establishing well-connected mechanical and electrical channels. Consequently, D18 0.4 :SEBS 0.6 /L8-BO OSCs achieve 16-times higher stretchability (COS = 126%) than the OSCs based on D18/L8-BO (COS = 8%), while achieving 4-times higher PCE (12.13%) compared to the OSCs based on SEBS-rich active layers (D18 0.2 :SEBS 0.8 /L8-BO, PCE = 3.15%). Furthermore, D18 0.4 :SEBS 0.6 -based IS-OSCs preserve 86 and 90% of original PCEs at 50% strain and after 200 stretching/releasing cycles with 15% strain, respectively, demonstrating the highest mechanical robustness among reported IS-OSCs.

14 SOLAR ENERGY↗

ARPA-E PERFORM datasets

Time-coincident load, wind, and solar data including actual and probabilistic forecast datasets at 5-min resolution for ERCOT, MISO, NYISO, and SPP. Wind and solar profiles are supplied for existing sites as well as planned sites based on interconnection queue projects as of 2021. For ERCOT actuals are provided for 2017 and 2018 and forecasts for 2018, and for the remaining ISOs actuals are provided for 2018 and 2019 and forecasts for 2019. There datasets were produced by NREL as part of the ARPA-E PERFORM project, an ARPA-E funded program that aim to use time-coincident power and load seeks to develop innovative management systems that represent the relative delivery risk of each asset and balance the collective risk of all assets across the grid. For more information on the datasets and methods used to generate them see https://github.com/PERFORM-Forecasts/documentation.

5-min data↗

Distributed Embedded Energy Converter Technologies (DEEC-Tec)

Distributed Embedded Energy Converter Technologies (also known as DEEC-Tec) is based upon the amalgamation and combining of numerous, relatively small, distributed embedded energy converters (DEECs) that, in aggregate, can form a larger overall energy harvesting-converting structure. Such DEEC-Tec based structures can be employed to harvest and convert marine renewable energy - e.g., ocean waves - into more desirable forms such as electricity. In this way, the DEEC-Tec hierarchy can be viewed via three different technology levels: (1) individual distributed embedded energy converters, (2) DEEC-Tec metamaterials (pseudo-materials made from the interconnection of many DEECs), and (3) DEEC-Tec-based marine energy converters built from DEEC-Tec metamaterials.

BFSF↗

Providencia Island White Papers: Hawaii, USA: A Grid Planning Case Study for Providencia Island, Colombia

Special considerations exist for island grids seeking to smoothly integrate distributed energy resources (DERs), such as rooftop photovoltaics (PV), with an existing fossil fuel-based grid without compromising system stability and reliability. Hawaii, having successfully integrated nonconventional renewable energy sources for a hybrid electricity grid, may serve as a guide for technical specifications and interconnection policy. Island grid planners may seek to follow Hawaii's example by standardizing technical specifications of generators, particularly for advanced inverter components.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Smart Contracts for Power Grid Applications Using the Advanced DLT Cyber Grid Guard Testbed

In this study is presented two power system applications with distributed ledger technology (DLT) and smart contracts (SC) that were assessed in a Cyber-Grid-Guard System (CGGS) advanced testbed, with protective relays, power meters, communication devices, DLT devices, synchronized time source, clock displays and real time simulator. This CGGS testbed was set in the Advanced Protection Lab, 252 lab space of the Grid Research Integration and Deployment Center (GRID- C), at Oak Ridge National Laboratory. In power grids, customer-owned distributed energy resources (DERs) are more frequent than in the past, and the numbers of points of interconnection (POI) with customer-owned DERs have increased. Disruptive operation from DERs presents a risk to grid operations, and protective relays located at the POI are used to isolate out-of-tolerance or poorly behaving of DERs. Ensuring the integrity of data from the relays at the POI, and DLT could enhance the security of the power grids. The first application is a SC to define and control the allowable total power factor (TPF) of the DER (wind farm) output, and the terms of the SC are implemented using DLT with a CGGS for a customer-owned DER. The TPF SC was implemented by the CGGS using DLT. The experimental model was performed with a real-time simulator using a CGGS and relay in-the-loop. The data collected from the CGGS were used to execute the TPF SC. The TPF limits were between +0.9 and +1.0, and the breakers’ operation in the POI was controlled by the relay using the SC. The events were collected from the real-time simulator, CGGS, and SEL 700GT relay to validate a successful application of the TPF SC using DLT. The second application is a SC to measure and control the allowable voltage service limits (VSL) by the CGGS using DLT. The tests were performed by using a real-time simulator, CGGS and relay in-the-loop. The data was collected from the CGGS that executed the SC. The main constraints were defined based on ANSI C84.1 service voltage limits, and the operation of the breakers in the POI. The events were collected from the CGGS, and SEL 700GT relay to assess a successful operation of the VSL SC using DLT.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Alternatives to the 15% Rule: Modeling and Hosting Capacity Analysis of 16 Feeders

This project is part of the third solicitation of the California Solar Initiative (CSI3) Research, Development, Demonstration, and Deployment Program created by the California Public Utilities Commission (CPUC) in 2006 to support solar research in California. The program focuses on research to improve the utility application review and approval process for interconnecting distributed energy resources such as solar to the distribution system. The CSI3 program is supporting EPRI, National Renewable Energy Laboratory (NREL), and Sandia National Laboratories (SNL) in their collaboration on the process with Pacific Gas and Electric (PG&E), Southern California Edison (SCE), and San Diego Gas and Electric (SDG&E). At present, the application review and approval process is the most time-consuming of any step on the path to generating power for delivery through the distribution system.

14 SOLAR ENERGY↗