Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,009 records · Page 56

AmeriFlux FLUXNET-1F US-xYE NEON Yellowstone Northern Range (Frog Rock) (YELL)

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site US-xYE NEON Yellowstone Northern Range (Frog Rock) (YELL). This is the FLUXNET version of the carbon flux data for the site US-xYE NEON Yellowstone Northern Range (Frog Rock) (YELL) produced by applying the standard ONEFlux (1F) software. Site Description - Located 100 kilometers southeast of Bozeman, the YELL site is within the northern reaches of Yellowstone National Park. The terrain consists of rolling hills with small wetlands in the bottom of the depressions. The field site is a mosaic of pine-dominated forest mixed with open swaths of sage and grass. This site is also within one of the Park’s bear management areas which includes seasonal closure (early March to early June) to minimize bear-human interactions.

Network), NEON (National Ecological Observatory↗

MV Sea Change: Fuel Cell, Emissions, and Hydrogen Fueling Performance

The Sea Change Project, managed and financed by SWITCH Maritime, produced the first zero-emission 100% hydrogen fuel-cell powered commercial ferry in the world. The MV Sea Change is a 70-foot catamaran equipped with a 360-kW fuel cell powertrain and a 250-bar 246 kg capacity hydrogen storage system. The 75-passenger vessel began public passenger service in July 2024 as part of the San Francisco Bay Ferry system. Summarized here are aspects of the design of the vessel, its construction, and vessel bunkering with high-pressure hydrogen. Results from a fuel cell performance analysis are also presented, along with estimates of the greenhouse gas (GHG) and criterial pollutant emissions assuming different sourcings of hydrogen. Lessons learned from the project will be briefly reviewed.

08 HYDROGEN↗

AmeriFlux FLUXNET-1F US-Ne2 Mead - irrigated maize-soybean rotation site

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site US-Ne2 Mead - irrigated maize-soybean rotation site. This is the FLUXNET version of the carbon flux data for the site US-Ne2 Mead - irrigated maize-soybean rotation site produced by applying the standard ONEFlux (1F) software. Site Description - The study site is one of three fields (all located within 1.6 km of each other) at the University of Nebraska Eastern Nebraska Research, Extension and Education Center near Mead, Nebraska. This site is irrigated with a center pivot system. Prior to the initiation of the study, the irrigated site had a 10-yr history of maize-soybean rotation under no-till management. A tillage operation (disking) was done just prior to the 2001 planting to homogenize the top 0.1 m of soil, incorporate P and K fertilizers, as well as previously accumulated surface residues. Since this tillage operation, the site has been under no-till management in a maize-soybean rotation (maize odd years and soybean even years). There was a brief period due to an intercomparison study from 2010 to 2013 when fall conservation tillage was performed and maize (not soybean) was planted in 2010 and 2012. The management reverted to a strictly no-till maize-soybean crop rotation after 2014.

Suyker, Andy [University of Nebraska - Lincoln]↗

Final Report on Aerosol Pretreatment Technology Performance and Benchmarking

Solvent-based post-combustion CO 2 capture (PCC) technology remains one of the leading methods to combat global CO 2 emissions produced from large-scale coal-fired power production. Advanced solventbased PCC technology has made significant improvements in design and performance that reduce capital and operating costs to enable its commercial use. Key to low cost, manageable logistics, and environmentally safe operation of solvent-based PCC technology are minimal solvent losses from the process through the treated gas stream exiting PCC plant absorbers. High flue gas aerosol particle concentrations (>10 5 particles/cm 3 ) for particles in the range of 70-200 nm have been shown to cause significant amine solvent losses for solvent-based PCC processes through several mechanisms including absorption of solvent and water into growing aerosol particles. Flue gas aerosol pretreatment technology is the only realistic and economically attractive method to reduce very high aerosol particle concentrations (>10 7 particles/cm 3 ) to enable solvent-based PCC for existing power plants lacking sufficient particle removal systems, such as baghouses. The overall goal of this project was to design, construct, independently test, and evaluate three flue gas aerosol pretreatment technologies identified to significantly reduce high aerosol particle concentrations (>10 7 particles/cm 3 ) in the 70-200 nm particle size range: (1) a novel, high-velocity water injection spray concept developed by RWE and tested by Linde, (2) an innovative electrostatic precipitator (ESP) device with optimized operating conditions developed by Washington University in St. Louis (WUSTL), and (3) a non-regenerative sorbent-based filter technology developed by InnoSepra for SO x and NO x removal from coal-fired power plant flue gas. Each technology has been validated with tests on 500-1000 scfm of actual coal-fired flue gas and evaluated in terms of particle removal efficiency (%), cost competitiveness, and environmental impact. Aerosol measurements were performed upstream and downstream of each aerosol reduction unit during independent testing of each technology using advanced instrumentation and analytical methods provided by WUSTL. To perform aerosol measurements, isokinetic probes were inserted into flanged pipes attached to the flue gas piping, and a small suction pump was used to sample gas containing aerosol particles. Aerosol particle number concentrations (# particles/cm 3 ) and size distributions were then measured using a scanning mobility particle sizer (SMPS, TSI Inc.) for very fine particles (<1,000 nm) and a particle counter manufactured by GRIMM for particles larger than 1,000 nm. This report summarizes the aerosol removal performance results from pilot scale testing of each technology. Performance results have been benchmarked against pre-defined targets and other flue gas aerosol pretreatment technologies with documented performance. Linde Gas North America LLC has been the prime contractor to DOE responsible for overall project management and provided the design for the high-velocity water spray-based aerosol removal technology based on a design concept developed by the German utility company RWE.

20 FOSSIL-FUELED POWER PLANTS↗

Knowledge management information tool Web analytics - 15182

The Knowledge Management Information Tool (KM-IT) is a web-based [01] system developed to maintain and preserve the Department of Energy's (DOE's) D and D knowledge base. The system was developed by Florida International University's Applied Research Center (FIU-ARC) with the support of the D and D community including the DOE Office of Environmental Management, and with the active collaboration and support of the DOE's Energy Facility Contractors Group (EFCOG). The KM-IT system is a D and D community driven system tailored to serve the technical issues faced by the D and D workforce across the DOE Complex. The D and D KM-IT is an interactive web-based system operational and available for free access at www.dndkm.org. [02] The D and D KM-IT is currently composed of the following tailored D and D modules: Web Crawler, Hotline, Technology, Document Library (including Hanford's and Savannah River Sites' ALARA Center Reports), Specialist Directory, Lessons Learned, Best Practices, Video/Picture Library, Vendors, Collaboration Tools, Training, and Mobile Systems. The Web Crawler dynamically searches through the D and D KM-IT repository as well as the web and displays search results based on the search criteria. The Hotline allows registered users to post questions/problems related to D and D and to receive solutions from a subject-matter specialist. The Technology module serves as repository of D and D technologies and contains technology/ demonstration fact sheets and vendor information. D and D community members can add Lessons Learned, Best Practices, Documents, and Pictures/Videos to the D and D KM-IT repository, after a formal approval process. The Vendor module provides a directory of commercial vendors who provide D and D related technologies, supplies, and services. D and D KM-IT makes excellent use of the knowledge that exists within the D and D community by allowing D and D project managers around the DOE complex to collaborate by sharing innovative ideas, past experiences, and practices and by maintaining a directory of subject matter specialists. The mobile version of the KM-IT can be accessed from m.dndkm.org [03] and currently has six active modules: Vendor, Technology, Picture/Video Library, Hotline, Lessons Learned and Specialist Directory. Web analytics is a key tool being implemented by the D and D KM-IT project team in an effort to enhance the system to better meet users' needs. The D and D KM-IT project team incorporates web analytics as part of its operational elements to analyze information and key data points on how the system is being used. Web analytics is the measurement, collection, analysis and reporting of internet data for the purposes of understanding and optimizing web usage. The use of web analytics retains or attracts D and D community members to access and share knowledge through virtual collaboration on the KM-IT platform. D and D KM-IT web analytics measures details on the overall usage of the system without tracking personal information or specific user behavior: how many users visited the application, how many of those users were unique visitors, how visitors come to the system (i.e., by following a link to the system or by using the web site URL via bookmark or directly typing the address), what keywords were used to perform searches with the search engine, how long the average user stayed on a given screen or on the entire system and what links were clicked on. This information is used to identify which areas of the system are more popular than the others and provides information that can be used to streamline the application for a better user experience. (authors)

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Decision Gate Process for Assessment of a Technology Development Portfolio

The NASA Dust Management Project (DMP) was established to provide technologies (to TRL 6 development level) required to address adverse effects of lunar dust to humans and to exploration systems and equipment, which will reduce life cycle cost and risk, and will increase the probability of sustainable and successful lunar missions. The technology portfolio of DMP consisted of different categories of technologies whose final product is either a technology solution in itself, or one that contributes toward a dust mitigation strategy for a particular application. A Decision Gate Process (DGP) was developed to assess and validate the achievement and priority of the dust mitigation technologies as the technologies progress through the development cycle. The DGP was part of continuous technology assessment and was a critical element of DMP risk management. At the core of the process were technology-specific criteria developed to measure the success of each DMP technology in attaining the technology readiness levels assigned to each decision gate. The DGP accounts for both categories of technologies and qualifies the technology progression from technology development tasks to application areas. The process provided opportunities to validate performance, as well as to identify non-performance in time to adjust resources and direction. This paper describes the overall philosophy of the DGP and the methodology for implementation for DMP, and describes the method for defining the technology evaluation criteria. The process is illustrated by example of an application to a specific DMP technology.

Kohli, Rajiv↗

Decision Gate Process for Assessment of a NASA Technology Development Portfolio

The NASA Dust Management Project (DMP) was established to provide technologies (to Technology Readiness Level (TRL) 6) required to address adverse effects of lunar dust to humans and to exploration systems and equipment, to reduce life cycle cost and risk, and to increase the probability of sustainable and successful lunar missions. The technology portfolio of DMP consisted of different categories of technologies whose final product was either a technology solution in itself, or one that contributes toward a dust mitigation strategy for a particular application. A Decision Gate Process (DGP) was developed to assess and validate the achievement and priority of the dust mitigation technologies as the technologies progress through the development cycle. The DGP was part of continuous technology assessment and was a critical element of DMP risk management. At the core of the process were technology-specific criteria developed to measure the success of each DMP technology in attaining the technology readiness levels assigned to each decision gate. The DGP accounts for both categories of technologies and qualifies the technology progression from technology development tasks to application areas. The process provided opportunities to validate performance, as well as to identify non-performance in time to adjust resources and direction. This paper describes the overall philosophy of the DGP and the methodology for implementation for DMP, and describes the method for defining the technology evaluation criteria. The process is illustrated by example of an application to a specific DMP technology.

Kohli, Rajiv↗

AmeriFlux FLUXNET-1F US-StJ St Jones Reserve

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site US-StJ St Jones Reserve. This is the FLUXNET version of the carbon flux data for the site US-StJ St Jones Reserve produced by applying the standard ONEFlux (1F) software. Site Description - This tower is located in St Jones, near Dover Delaware. This area is part of the National Estuarine Research Reserve. It was established in 1993, and estuarine ecosystems from the Mid-Atlantic region are represented here. This region has been influenced by agricultural fields along the watershed. The EC tower is located in a tidal marsh near the Dover headquarters, there is a board walk that goes along the marsh. Restoring natural vegetation is on the long term management plan.

Vargas, Rodrigo↗

MAN-004 Design Standards Manual

At Sandia National Laboratories in New Mexico (SNL/NM), the design, construction, operation, and maintenance of facilities is guided by industry standards, a graded approach, and the systematic analysis of life cycle benefits received for costs incurred. The design of the physical plant must ensure that the facilities are "fit for use," and provide conditions that effectively, efficiently, and safely support current and future mission needs. In addition, SNL/NM applies sustainable design principles, using an integrated whole-building design approach, from site planning to facility design, construction, and operation to ensure building resource efficiency and the health and productivity of occupants. The safety and health of the workforce and the public, any possible effects on the environment, and compliance with building codes take precedence over project issues, such as performance, cost, and schedule. These design standards generally apply to all disciplines on all SNL/NM projects. Architectural and engineering design must be both functional and cost-effective. Facility design must be tailored to fit its intended function, while emphasizing low-maintenance, energy-efficient, and energy-conscious design. Design facilities that can be maintained easily, with readily accessible equipment areas, low maintenance, and quality systems. To promote an orderly and efficient appearance, architectural features of new facilities must complement and enhance the existing architecture at the site. As an Architectural and Engineering (A/E) professional, you must advise the Project Manager when this approach is prohibitively expensive. You are encouraged to use professional judgment and ingenuity to produce a coordinated interdisciplinary design that is cost-effective, easily contractible or buildable, high-performing, aesthetically pleasing, and compliant with applicable building codes. Close coordination and development of civil, landscape, structural, architectural, fire protection, mechanical, electrical, telecommunications, and security features is expected to ensure compatibility with planned functional equipment and to facilitate constructability. If portions of the design are subcontracted to specialists, delivery of the finished design documents must not be considered complete until the subcontracted portions are also submitted for review. You must, along with support consultants, perform functional analyses and programming in developing design solutions. These solutions must reflect coordination of the competing functional, budgetary, and physical requirements for the project. During design phases, meetings between you and the SNL/NM Project Team to discuss and resolve design issues are required. These meetings are a normal part of the design process. For specific design-review requirements, see the project-specific Design Criteria. In addition to the design requirements described in this manual, instructive information is provided to explain the sustainable building practice goals for design, construction, operation, and maintenance of SNL/NM facilities. Please notify SNL/NM personnel of design best practices not included in this manual, so they can be incorporated in future updates.

42 ENGINEERING↗

Model for Simulating a Spiral Software-Development Process

A discrete-event simulation model, and a computer program that implements the model, have been developed as means of analyzing a spiral software-development process. This model can be tailored to specific development environments for use by software project managers in making quantitative cases for deciding among different software-development processes, courses of action, and cost estimates. A spiral process can be contrasted with a waterfall process, which is a traditional process that consists of a sequence of activities that include analysis of requirements, design, coding, testing, and support. A spiral process is an iterative process that can be regarded as a repeating modified waterfall process. Each iteration includes assessment of risk, analysis of requirements, design, coding, testing, delivery, and evaluation. A key difference between a spiral and a waterfall process is that a spiral process can accommodate changes in requirements at each iteration, whereas in a waterfall process, requirements are considered to be fixed from the beginning and, therefore, a waterfall process is not flexible enough for some projects, especially those in which requirements are not known at the beginning or may change during development. For a given project, a spiral process may cost more and take more time than does a waterfall process, but may better satisfy a customer's expectations and needs. Models for simulating various waterfall processes have been developed previously, but until now, there have been no models for simulating spiral processes. The present spiral-process-simulating model and the software that implements it were developed by extending a discrete-event simulation process model of the IEEE 12207 Software Development Process, which was built using commercially available software known as the Process Analysis Tradeoff Tool (PATT). Typical inputs to PATT models include industry-average values of product size (expressed as number of lines of code), productivity (number of lines of code per hour), and number of defects per source line of code. The user provides the number of resources, the overall percent of effort that should be allocated to each process step, and the number of desired staff members for each step. The output of PATT includes the size of the product, a measure of effort, a measure of rework effort, the duration of the entire process, and the numbers of injected, detected, and corrected defects as well as a number of other interesting features. In the development of the present model, steps were added to the IEEE 12207 waterfall process, and this model and its implementing software were made to run repeatedly through the sequence of steps, each repetition representing an iteration in a spiral process. Because the IEEE 12207 model is founded on a waterfall paradigm, it enables direct comparison of spiral and waterfall processes. The model can be used throughout a software-development project to analyze the project as more information becomes available. For instance, data from early iterations can be used as inputs to the model, and the model can be used to estimate the time and cost of carrying the project to completion.

Mizell, Carolyn↗

Environmental Management

Another key aspect of the NNSS mission is Environmental Management program, which addresses the environmental legacy from historic nuclear weapons related activities while also ensuring the health and safety of present day workers, the public, and the environment as current and future missions are completed. The Area 5 Radioactive Waste Management site receives low-level and mixed low-level waste from some 28 different generators from across the DOE complex in support of the legacy clean-up DOE Environmental Management project. Without this capability, the DOE would not be able to complete the clean up and proper disposition of these wastes. The program includes environmental protection, compliance, and monitoring of the air, water, plants, animals, and cultural resources at the NNSS. Investigation and implementation of appropriate corrective actions to address the contaminated ground water facilities and soils resulting from historic nuclear testing activities, the demolition of abandoned nuclear facilities, as well as installation of ground water wells to identify and monitor the extent of ground water contamination.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

History and Logic Model NASA Goddard Space Flight Center Instrument and Payload Systems Engineering Technical Performance Study

Historically, some NASA missions have exceeded schedule and cost commitments. Studies suggest technical performance is a contributor. The 1980 NASA Project Management Study concluded, "one of the most significant contributors to cost and schedule growth is inadequate definition of technical and management aspects of a program..." (as cited in GAO/NSIAD-93-97, p. 11). The 1991 NASA Roles and Missions Report identified a "need for increased emphasis on technological readiness and requirements on the front end of a program" (as cited in GAO/NSIAD-93-97, p. 11). The 1992 NASA Program Costs Report stated that NASA officials identified, among other things, "insufficient definition studies... [and] program redesigns and technical complexities" as reasons for cost and schedule overruns (GAO/NSAID-93-97, p. 11). The 2002 Task Force on Acquisition of National Security Space Programs found "requirements definition and control issues, unhealthy cost bias in proposal evaluation, widespread lack of budget reserves required to implement high risk programs on schedule, and an overall underappreciation of the importance of appropriately staffed and trained system engineering staff to manage the technologically demanding and unique aspects of space programs" (DoD, 2003, p.i.) In 2007, The NASA Office of the Chief Engineer chartered the NASA Instrument Capability Study (NICS) “to determine whether NASA instrument developers are facing challenges that impact the capability to design and build quality instruments or whether there are flaws in the acquisition strategy evidenced by schedule delays, cost overruns, and increased technical risk via design deficiencies. The... team was also chartered to determine if occurrences [are]... isolated cases or if there are generic issues... If the issues [are] found to be generic, the team [is] to offer solutions to recover such capability" (NICS Report, 2008, p. vi). The 2008 NICS Report, led by Goddard Space Flight Center (GSFC), identified challenges to instrument technical performance consistent with findings from previous reports. In 2017, the Instrument Project Division (IPD) Implementation Study was initiated to determine if there was a change in meeting schedule and cost commitments after implementing certain NICS recommendations. In 2018, the Instrument Technical Performance Study was initiated to determine the current state of Instrument Technical Performance in the GSFC Payload & Instrument Systems Engineering Branch. The purpose of the combined studies is to answer the question, "Is there a relationship between meeting NASA scientific instrument technical success and meeting schedule and cost commitments? If yes, what is the relationship?" References Department of Defense Office of the Under Secretary of Defense for Acquisition, Technology, and Logistics. (2003). The report of the defense science board/ air force scientific advisory board joint task force on acquisition of national security space programs. Washington DC. Government Accounting Office. (1992). NASA program costs: Space missions require substantially more funding than initially estimated. GAO/NSIAD-93-97. Washington DC. National Aeronautics and Space Administration, National Oceanic and Atmospheric Agency, Department of Defense. (2008). The NASA instrument capability study final report. NP-2008-11-058-GSFC. Washington DC.

Robbins, Geraldine↗

Up-skilling and Re-skilling for the Nuclear Industry - 17276

In the UK, nuclear skills and qualifications have been the subject of several studies in higher levels of Government, including one by UK Cabinet Office. The newly formed UK Nuclear Skills Strategy Group (NSSG) has been tasked with addressing the current skills and people gaps for the UK nuclear industry. The NSSG is working with several key organisations in the UK: The National Skills Academy for Nuclear, (NSAN), which covers skills interventions, training and workforce development and experience, and the newly forming National College for Nuclear (NCfN) which will become a nuclear qualifications awarding body, regulating educational qualifications and curriculum in the nuclear sector. The NSSG has published its own UK Nuclear Skills Strategy in December 2016, aligned to the UK Cabinet Office study. It is the intent that, in the near future, nuclear qualifications and experience will be directly transferable across different organisations and nuclear sites in the UK, enabling the maintenance of high standards of behaviours and improved mobility throughout the sector. The UK needs to maintain and grow a diverse workforce and nuclear Suitably Qualified and Experienced Personnel (SQEP) people. The 2015 UK Nuclear Labour Market Intelligence (LMI) report, produced by Cogent for the Nuclear Energy Skills Alliance (NESA), concluded that the total nuclear workforce demand for the UK Nuclear Civil and Defence sector needed to grow by 33,000 people in the next five years, which includes replacement and expansion demand. This involved all disciplines and grades, with for example, higher level skilled workers needing to increase by 2200 FTEs every year. The main discipline pinch points were in, for example, Mechanical; Electrical; Project Management; Safety Case Specialists; Commissioning Engineers. Of the overall workforce, around 10% is over 60 years old and around 38% is over 50 years old. Jacobs in the UK is widely involved in many aspects of skills and competence development, with active involvement in local and national training programmes, and driving new methodologies to accelerate our staff's journey to nuclear competence. As well as looking at the immediate future, there is a risk in the UK that, over the 120-year plus clean-up mission, there won't be enough people with the right skills. Jacobs is developing sustainable solutions to this in our skills and development strategy for the nuclear sector. Jacobs has developed a variety of approaches to help us maintain and grow our diverse workforce and nuclear 'SQEP' people. This includes: - Identifying and developing our employees' technical and personal skills and capabilities, particularly the requirements of our millennials in both technical and social aspects of their working lives. - Identifying and planning for our future skills needs to meet our projected business requirements. - Our programme to transfer skilled employees from other sectors into the nuclear industry. - Our extensive school student placement scheme, aligned to the UK's 'Industrial Cadet' scheme, which has helped to bring school-aged students into Jacobs on workplace experience. - Our collaboration with our customers to develop UK national level Trailblazer Apprentice programmes. - Our involvement at a UK national level in the work of the National Skills Academy for Nuclear (NSAN), the Nuclear Energy Skills Alliance (NESA) High Level Skills Committee and the newly forming UK National College for Nuclear (NCfN). - Our work to ensure diversity is valued in our workplace, for example in our involvement in 'Women in Nuclear'. (authors)

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

An Integrated Approach to Exploration Launch Office Requirements Development

The proposed paper will focus on the Project Management and Systems Engineering approach utilized to develop a set of both integrated and cohesive requirements for the Exploration Launch Office, within the Constellation Program. A summary of the programmatic drivers which influenced the approach along with details of the resulting implementation will be discussed as well as metrics evaluating the efficiency and accuracy of the various requirements development activities. Requirements development activities will focus on the procedures utilized to ensure that technical content was valid and mature in preparation for the Crew Launch Vehicle and Constellation System s Requirements Reviews. This discussion will begin at initial requirements development during the Exploration Systems Architecture Study and progress through formal development of the program structure. Specific emphasis will be given to development and validation of the requirements. This discussion will focus on approaches to garner the appropriate requirement owners (or customers), project infrastructure utilized to emphasize proper integration, and finally the procedure to technically mature, verify and validate the requirements. Examples of requirements being implemented on the Launch Vehicle (systems, interfaces, test & verification) will be utilized to demonstrate the various processes and also provide a top level understanding of the launch vehicle(s) performance goals. Details may also be provided on the approaches for verification, which range from typical aerospace hardware development (qualification/acceptance) through flight certification (flight test, etc.). The primary intent of this paper is to provide a demonstrated procedure for the development of a mature, effective, integrated set of requirements on a complex system, which also has the added intricacies of both heritage and new hardware development integration. Ancillary focus of the paper will include discussion of Test and Verification approaches along with top level systems/elements performance capabilities.

Holladay, Jon B.↗

Improvements in Hanford TRU Program Utilizing Systems Modeling and Analyses

Hanford's Transuranic (TRU) Program is responsible for certifying contact-handled (CH) TRU waste and shipping the certified waste to the Waste Isolation Pilot Plant (WIPP). Hanford's CH TRU waste includes material that is in retrievable storage as well as above ground storage, and newly generated waste. Certifying a typical container entails retrieving and then characterizing it (Non-Destructive Examination [NDE], Non-Destructive Assay [NDA], and Head Space Gas Sampling [HSG]), validating records (data review and reconciliation), and designating the container for a payload. The certified payload is then shipped to WIPP. Systems modeling and analysis techniques were applied to Hanford's TRU Program to help streamline the certification process and increase shipping rates. The modeling and analysis yields several benefits: - Maintains visibility on system performance and predicts downstream consequences of production issues. - Predicts future system performance with higher confidence, based on tracking past performance. - Applies speculation analyses to determine the impact of proposed changes (e.g., apparent shortage of feed should not be used as basis to reassign personnel if more feed is coming in the queue). - Positively identifies the appropriate queue for all containers (e.g., discovered several containers that were not actively being worked because they were in the wrong 'physical' location - method used previously for queuing up containers). - Identifies anomalies with the various data systems used to track inventory (e.g., dimensional differences for Standard Waste Boxes). A model of the TRU Program certification process was created using custom queries of the multiple databases for managing waste containers. The model was developed using a simplified process chart based on the expected path for a typical container. The process chart was augmented with the remediation path for containers that do not meet acceptance criteria for WIPP. Containers are sorted into queues based on their current status in the process. A container can be in only one queue at any given time. Existing data systems are queried to establish the quantity of containers in each queue on any given day. This sets the amount of feed available that is then modeled to be processed according to the daily production plans. The daily production plans were created by identifying the equipment necessary and the staff that performs each process step, and determining the expected production rate for each step. Production performance is monitored on a weekly basis with Project senior staff to establish a total operating efficiency (TOE) for each step (comparing actual performance to production capacity). The unit operations were modeled to be constrained by each day's feed queue plus the performance of the preceding step. The TOE for each unit operation was applied to an integrated model to determine bottlenecks and identify areas for improvement. All of the steps were linked to predict future system performance based on available feed and integrated system-level TOE. It has been determined that at times sub-optimization of a particular unit operation is necessary to ensure the system remains balanced (e.g., having excess capacity in assay does no good if there is no feed available because the real-time radiography [RTR] is working at half capacity). Several recommendations have been provided to the Project management team resulting in improvements in the performance of TRU certification activities by Hanford's TRU Program. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Gandalf Staff: A Mobile Tool for Lunar Exploration (2nd year of development)

The Gandalf Staff is a mobile tool designed to be a flexible device supporting crewed and uncrewed operations on the lunar surface. The core of the device is a 24v battery with communications and data storage systems. Initial optional components supporting crewed Extra-Vehicular Activity (EVA) include a LiDAR and 360˚ camera. These provide 3D mapping of the traverse for documentation, and to aid future planning. The mapping also creates outreach opportunities for the public to “stand beside” the astronaut in Virtual Reality (VR). The staff provides external lighting for field site illumination in the south polar region low sun angle environment. Navigation instruments for crew position determination with Lunar Search and Rescue (LunaSAR) are also included. The staff itself can be used as a walking aid or as a splint for Incapacitated Crew Rescue (ICR). As a stand-alone device, the staff operates as a long duration untended science platform collecting environmental data and sending it to a lunar base station. The stand-alone mode requires connection to an auxiliary power source (e.g. solar array) and energy storage system (e.g. battery), so it could become an electrical recharging station. To make rapid progress in the 1st year, and also to demonstrate innovative project management techniques, NASA guided a private industry partner, T STAR, in leading Capstone Engineering student teams at Texas A&M University (TAMU) for proof-of-concept development and testing. These teams developed the power system and demonstrated successful integration of LiDAR, WiFi communications, and external lighting subsystems. Another industry team at Jacobs Technology prototyped a tripod to hold the staff upright. For the 2nd year (FY’22), NASA will again collaborate with partners to prototype enhanced power and lighting concepts. Year 2 will also add new capability for LunaSAR and geophysical science instrumentation using a heat probe. The heat probe is based upon Apollo heritage but modified to measure subsurface volatile ice regimes at the Artemis landing site. Components of the Gandalf Staff can be developed, tested, and deployed independently, or on the integrated staff, rovers, or utility trailers. The project supports crew safety, lunar sample curation, mission science, and public outreach goals of NASA. PLAIN TEST SUMMARY: Gandalf Staff is a 24v battery powered mobile tool for the lunar surface supporting crewed geologic field site exploration, or as a stand-alone science platform. As a tool assisting astronauts conducting field geology, the Gandalf Staff provides external lighting to illuminate shadowed regions on the surface. It also documents the process of collecting rocks and dust samples using a LiDAR (laser range instrument) and cameras. The staff provides a beacon for emergency location of astronauts and augments communications when the astronauts are blocked by large boulders. As a standalone science platform, the Gandalf Staff provides a power system for instruments and sensors to measure the lunar environment over long periods of time. The staff gathers data and sends the results to a lunar base station for analysis.

External Lighting↗

AmeriFlux FLUXNET-1F US-xDS NEON Disney Wilderness Preserve (DSNY)

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site US-xDS NEON Disney Wilderness Preserve (DSNY). This is the FLUXNET version of the carbon flux data for the site US-xDS NEON Disney Wilderness Preserve (DSNY) produced by applying the standard ONEFlux (1F) software. Site Description - The 12,000-acre Disney Wilderness Preserve straddles the headwaters of the Everglades ecosystem in south-central Florida. This site is seasonally wet and flooded. The Disney site was heavily logged and used as ranchland for decades. However, vegetation and site conditions have been restored to closely represent site condition records, documented by the area’s first Spanish missionaries. The large-scale wetland and upland restoration at Disney included the removal of non-native, invasive plants and grasses and the removal of agricultural ditches. The primary management activity is controlled burns.

Network), NEON (National Ecological Observatory↗

AmeriFlux FLUXNET-1F CA-MA2 Manitoba Agricultural Site 2

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site CA-MA2 Manitoba Agricultural Site 2. This is the FLUXNET version of the carbon flux data for the site CA-MA2 Manitoba Agricultural Site 2 produced by applying the standard ONEFlux (1F) software. Site Description - This field had been in perennial forages (grass with small amount of legume) for several decades. Field size = 60 ha. In 2009, the producer tilled the land so that part of the summer had perennial forage, and the remainder was fallow (see effect outlined by Fraser and Amiro 2013). In 2010, oats were planted. In 2011, the field was too wet to plant and remained fallow. Cattle were in the field for a brief period in June 2011to feed on weeds. See Table 2 in Taylor et al (2013) describing site management practices.

Amiro, Brian↗