Search NASA⌕ Search

SEARCH · Search NASA

Results for “SPACE LOGISTICS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,009 records · Page 56

Recovery from Missed Thrust During Low Thrust Insertion of NASA's Gateway into a Near Rectilinear Halo Orbit

Various strategies are assessed by which the first two elements of Gateway could recover from missed thrust events during insertion into a Near Rectilinear Halo Orbit (NRHO). Recovery strategies are assessed in terms of their ability to maintain the desired NRHO insertion epoch ad well as their cost in terms of additional time and ∆v required to reach the NRHO. Strategies utilize a 50 kW Solar Electric Propulsion (SEP) system onboard the Power and Propulsion Element (PPE). Recovery solutions are found that, in the event of a missed thrust arc during the Insertion Phase of the Gateway Lunar Transit, deliver the space-craft into the NRHO within three additional revolutions (roughly 21 days) and 80 m/s ∆v.

low thrust↗

Lessons Learned from Astrobee Operations on the International Space Station

Since its launch in 2019, NASA has been operating three Astrobee free-flying robots providing an autonomous and adaptable research platform aboard the International Space Station (ISS). These robots have not only facilitated a myriad of national and international research endeavors in microgravity but have also served as a STEM outreach platform for student competitions aboard the ISS. Amidst its extensive operational tenure, spanning over five years and exceeding 1200 hours of cumulative free-flyer operation as of April 2024, the Astrobee robots have encountered software and hardware anomalies. Despite its inherent design for on-orbit repair or replacement, certain anomalies have proven to be complex, necessitating remote resolution via software and firmware updates or, in extreme cases, hardware replacements or the return of faulty units to NASA's ground facilities for repair. Such challenges underscore the delicate balance between the autonomous functionality of Astrobee and the occasional need for human intervention to maintain optimal performance. One recurring point of failure identified during Astrobee's operational lifespan has been the SD card, a critical component utilized by the different Astrobee processors and the Dock Station. The occurrence of SD card anomalies, both on orbit and within ground units, has provided invaluable insights into the improvement of Astrobee's systems and mitigation to future faults. This presentation will focus on four key areas: 1. Overview of Faults and Anomalies: A comprehensive examination of the diverse array of faults and anomalies encountered by Astrobee and its associated systems both in orbit and on the ground. From software glitches to hardware malfunctions, this section provides insights into the challenges faced during Astrobee's operational tenure. 2. Resolution Processes and Procedures: An in-depth discussion of the methodologies and procedures implemented to resolve the encountered anomalies. This includes remote troubleshooting, software patches, firmware updates, and, when necessary, the logistics involved in hardware replacements or down-massing for repair. 3. Implementation of Software Updates and Hardware Upgrades: A detailed exploration of the strategies employed to mitigate the risk of recurring anomalies through the implementation of software updates and hardware upgrades. This section highlights the iterative nature of Astrobee's development, emphasizing the continuous pursuit of robustness and reliability. 4. Lessons Learned and Future Directions: Reflecting on the insights gained from addressing anomalies, this section examines the lessons learned and outlines future directions for enhancing Astrobee's robustness and resilience. It underscores the iterative nature of space exploration and the importance of adaptability and continuous improvement in the pursuit of scientific discovery. Through a nuanced examination of Astrobee's operational challenges and the strategies employed to overcome them, this presentation sheds light on the complexities of operating autonomous robotic systems in the ISS environment. It underscores NASA's commitment to pushing the boundaries of exploration and innovation while navigating the inherent challenges of space exploration.

Astrobee↗

Lessons Learned from Astrobee Operations on the International Space Station

Since its launch in 2019, NASA has been operating three Astrobee free-flying robots providing an autonomous and adaptable research platform aboard the International Space Station (ISS). These robots have not only facilitated a myriad of national and international research endeavors in microgravity but have also served as a STEM outreach platform for student competitions aboard the ISS. Amidst its extensive operational tenure, spanning over five years and exceeding 1200 hours of cumulative free-flyer operation as of April 2024, the Astrobee robots have encountered software and hardware anomalies. Despite its inherent design for on-orbit repair or replacement, certain anomalies have proven to be complex, necessitating remote resolution via software and firmware updates or, in extreme cases, hardware replacements or the return of faulty units to NASA's ground facilities for repair. Such challenges underscore the delicate balance between the autonomous functionality of Astrobee and the occasional need for human intervention to maintain optimal performance. One recurring point of failure identified during Astrobee's operational lifespan has been the SD card, a critical component utilized by the different Astrobee processors and the Dock Station. The occurrence of SD card anomalies, both on orbit and within ground units, has provided invaluable insights into the improvement of Astrobee's systems and mitigation to future faults. This presentation will focus on four key areas: 1. Overview of Faults and Anomalies: A comprehensive examination of the diverse array of faults and anomalies encountered by Astrobee and its associated systems both in orbit and on the ground. From software glitches to hardware malfunctions, this section provides insights into the challenges faced during Astrobee's operational tenure. 2. Resolution Processes and Procedures: An in-depth discussion of the methodologies and procedures implemented to resolve the encountered anomalies. This includes remote troubleshooting, software patches, firmware updates, and, when necessary, the logistics involved in hardware replacements or down-massing for repair. 3. Implementation of Software Updates and Hardware Upgrades: A detailed exploration of the strategies employed to mitigate the risk of recurring anomalies through the implementation of software updates and hardware upgrades. This section highlights the iterative nature of Astrobee's development, emphasizing the continuous pursuit of robustness and reliability. 4. Lessons Learned and Future Directions: Reflecting on the insights gained from addressing anomalies, this section examines the lessons learned and outlines future directions for enhancing Astrobee's robustness and resilience. It underscores the iterative nature of space exploration and the importance of adaptability and continuous improvement in the pursuit of scientific discovery. Through a nuanced examination of Astrobee's operational challenges and the strategies employed to overcome them, this presentation sheds light on the complexities of operating autonomous robotic systems in the ISS environment. It underscores NASA's commitment to pushing the boundaries of exploration and innovation while navigating the inherent challenges of space exploration.

Astrobee↗

A Survey and Evaluation of High Energy Liquid Chemical Propulsion Systems: Propellant Selection Criteria for Space Missions - Part 1

This report presents the results of a study to develop a procedure for evaluating liquid propellants in order (a) to select the most appropriate propellant (from among those under development) for each of several applications on each of the various missions in the NASA program, or (b) to select new propellants (from among those being proposed) for initiation or continuation of research and development. The analysis begins with a consideration of requirements--either for the specific application or for the various classes of applications. The known characteristics of the propellant or propellants to be evaluated are then put into a convenient form for evaluation. The next step is to determine whether or not there are requirements that simply cannot be met by the propellant. If the propellant passes this test, an optimum vehicle configuration using the propellant (and meeting all requirements) is estimated. (The configuration should be optimized with respect to the total resource consumption for all aspects of the mission, including R&D, production, logistics, and operation.) The total resource consumption for this configuration is then compared with that for similar configurations using other propellants (and meeting all requirements equally well). If all factors have been properly taken into account, this comparison of resource consumption will complete the evaluation. Such an evaluation may be performed several times, in increasing detail and with correspondingly increasing accuracy, as an R&D program proceeds, and the accuracy of the data as well as the cost of the next step in the program increase. The procedure is superior to those in common use in that it minimizes both the amount of analytical work and the number of points at which subjective value judgments are made.

LIQUID PROPELLANT↗

Silver Ion Biocide Delivery System for Water Disinfection

U.S. space exploration missions have long considered returning to the Moon and exploration of Mars that challenge life support systems. For these long duration missions, there is interest in replacing the iodine water treatment system with ionic silver, a proven biocide. For long duration exploration missions, it is imperative that an effective biocide be used that prevents microbial growth, biofilm formation, and microbially induced corrosion in the water storage and distribution systems while minimizing logistical supply requirements associated with the biocide delivery system. Two biocide delivery systems have been developed that electrochemically produce silver ions for disinfecting water throughout the water storage and distribution system. One system uses a newly developed hybrid micro-filtration and ion-exchange membrane to produce an abundance of silver ions at the 1000 ppb level upstream in the water distribution system to prevent biofilm growth. This is followed by a downstream collection module that electrochemically removes these silver ions before the water is discharged. Another approach uses a membraneless reactor to produce a 1000 ppb silver ion concentration level that also has a mechanically driven electrode cleaning mechanism that removes oxide films ensuring long life operation. By maintaining a sufficiently high level of silver ions throughout the water storage and distribution system, biofilm formation is suppressed. This approach overcomes present concerns where spurious silver deposition occurs on the container and flow line surfaces thus lowering the silver ion concentration to unsatisfactory disinfection levels.

Slote, Benjamin M.↗

Supply support of NASA tracking networks

The extent which supply support for Jet Propulsion Laboratory's Deep Space Network and Goddard Space Flight Center's Space Flight Tracking and Data Network should be consolidated is considered along with the Identification of opportunities for improvements in each of the supply systems without regard to consolidation. There is a considerable amount of commonality between the items in the stock catalogs at the two network depots, 58% for federal stock number items and 30% overall. The workload at the DSIF Supply Depot (DSD) is small (less than 20%) compared to the Network Logistics Depot (NLD). A number of important benefits in supply support would result from a consolidation of DSD into NLD. LMI found that a consolidation as is, without any changes in inventory management techniques, would reduce annual operating costs by from $208,000 to $358,000. However, if the consolidation were coupled with a change to use of economic order quantities, the annual operating cost reduction would range from $930,000 to $1,078,000.

Source record↗

Early Assessments of Crew Timelines for the Lunar Surface Habitat

As NASA progresses towards sustained crewed space missions, crew timelines will become increasingly important to achieving mission goals. While it is desirable to spend as much time as possible during crewed space missions on science activities and experiments, there are a large number of activities that crew members must perform each day in order to maintain both crew and vehicle health and safety. The time available for science activities in space is highly dependent on mandatory tasks required for crew and vehicle health and safety. The different crewed activities need to be planned accordingly long before the start of a mission in order to optimize crew time for science. To begin assessing the potential crew time for available for science, an understanding of the requirements to maintain crew and vehicle health and safety is needed. These additional activities may include sleep, exercise, vehicle maintenance, logistics handling, crew personal time, as well as many other tasks. The remaining time outside of these required tasks, within a reasonable crew work schedule, can be dedicated to science operations. This paper will detail a collaborative effort to analyzing crew times for sustained spaceflight missions and how the results of that analysis are applied to the crew timeline for the proposed Lunar Surface Habitat (SH).To determine the crew time for all of these required activities, an analysis was conducted utilizing defined agency requirements and historical crewed mission data. Predicted crew activity times were integrated into a daily schedule in order to optimize the crew’s time during the mission. This methodology was utilized to produce expected crew timelines for NASA’s proposed Artemis Base Camp (ABC) missions. The current plans for the ABC contain two different sustained habitats, the Pressurized Rover (PR) and the Surface Habitat (SH). While the crew are separated between the two habitats, the timelines for each element are dependent on the other element’s operations, so the two element timelines are formed in conjunction with one another. The results described in this paper, however, will focus solely on the crew timeline in the SH. This paper will explain the methodology behind predicting the required crew time spent in the SH for each activity, and the process of incorporating these predicted crew times into a coherent schedule.

Crew Time↗

Operations analysis (study 2.1). Program SEPSIM (solar electric propulsion stage simulation)

Program SEPSIM is a FORTRAN program which performs deployment, servicing, and retrieval missions to synchronous equatorial orbit using a space tug with a continuous low thrust upper stage known as a solar electric propulsion stage (SEPS). The SEPS ferries payloads back and forth between an intermediate orbit and synchronous orbit, and performs the necessary servicing maneuvers in synchronous orbit. The tug carries payloads between the orbiter and the intermediate orbit, deploys fully fueled SEPS vehicles, and retrieves exhausted SEPS vehicles when, and if, required. The program is presently contained in subroutine form in the Logistical On-orbit VEhicle Servicing (LOVES) Program, but can also be run independently with the addition of a simple driver program.

Lang, T. J.↗

Space station systems analysis study. Part 2, Volume 3: Appendixes, Book 1. Program requirements documentation

The objective elements representative of the kinds of space activities that will be supported by the space construction base (SCB) are discussed in (1) a brief mission overview including the primary purpose and general objectives; (2) descriptions of the processes involved (where applicable), the mission hardware, the principal activities to be undertaken, the test requirements, and the principal tests; and (3) the SCB requirements including such items as special devices (e.g., fabrication modules, assembly or construction fixtures, cranes, and airlocks), power, data management and communications, waste management, environmental control, safety, and logistics. Each program option is then described in terms of the objective elements it supports, its orbit, the general makeup of the SCB, the transportation approach, and the program schedule goals. The specific requirements that are imposed on the SCB in order to support program option L are given.

Source record↗

A continuation of base-line studies for environmentally monitoring space transportation systems at John F. Kennedy Space Center. Executive summary

Studies conducted in and around John F. Kennedy Space Center, Merrit Island, Florida were designed to establish baseline conditions for various attributes of the biotic and abiotic environment. Features were described and quantitatively measured. Certain condition were found to be appropriate for the detection and assessment of possible environmental perturbations caused by future NASA activities. These include plant communities, mammal populations, rainfall chemistry, fish populations, and the status of rare and endangered species. On the basis of statistical analysis of quantitative data and logistic considerations, it was possible to refine the kinds and amounts of measurements needed to evaluate perturbations in selected environmental components.

Stout, I. J.↗

Efforts to Reduce International Space Station Crew Maintenance Time in the Management of the Extravehicular Mobility Unit Transport Loop Water Quality

The EMU (Extravehicular Mobility Unit) contains a semi-closed-loop re-circulating water circuit (Transport Loop) to absorb heat into a LCVG (Liquid Coolant and Ventilation Garment) worn by the astronaut. A second, single-pass water circuit (Feed-water Loop) provides water to a cooling device (Sublimator) containing porous plates, and that water sublimates through the porous plates to space vacuum. The cooling effect from the sublimation of this water translates to a cooling of the LCVG water that circulates through the Sublimator. The quality of the EMU Transport Loop water is maintained through the use of a water processing kit (ALCLR - Airlock Cooling Loop Remediation) that is used to periodically clean and disinfect the water circuit. Opportunities to reduce crew time associated with ALCLR operations include a detailed review of the historical water quality data for evidence to support an extension to the implementation cycle. Furthermore, an EMU returned after 2-years of use on the ISS (International Space Station) is being used as a test bed to evaluate the results of extended and repeated ALCLR implementation cycles. Finally, design, use and on-orbit location enhancements to the ALCLR kit components are being considered to allow the implementation cycle to occur in parallel with other EMU maintenance and check-out activities, and to extend the life of the ALCLR kit components. These efforts are undertaken to reduce the crew-time and logistics burdens for the EMU, while ensuring the long-term health of the EMU water circuits for a post- Shuttle 6-year service life.

Etter,David↗

Efforts to Reduce International Space Station Crew Maintenance for the Management of the Extravehicular Mobility Unit Transport Loop Water Quality

The EMU (Extravehicular Mobility Unit) contains a semi-closed-loop re-circulating water circuit (Transport Loop) to absorb heat into a LCVG (Liquid Coolant and Ventilation Garment) worn by the astronaut. A second, single-pass water circuit (Feed-water Loop) provides water to a cooling device (Sublimator) containing porous plates, and that water sublimates through the porous plates to space vacuum. The cooling effect from the sublimation of this water translates to a cooling of the LCVG water that circulates through the Sublimator. The quality of the EMU Transport Loop water is maintained through the use of a water processing kit (ALCLR Airlock Cooling Loop Remediation) that is used to periodically clean and disinfect the water circuit. Opportunities to reduce crew time associated with on-orbit ALCLR operations include a detailed review of the historical water quality data for evidence to support an extension to the implementation cycle. Furthermore, an EMU returned after 2-years of use on the ISS (International Space Station) is being used as a test bed to evaluate the results of extended and repeated ALCLR implementation cycles. Finally, design, use and on-orbit location enhancements to the ALCLR kit components are being considered to allow the implementation cycle to occur in parallel with other EMU maintenance and check-out activities, and to extend the life of the ALCLR kit components. These efforts are undertaken to reduce the crew-time and logistics burdens for the EMU, while ensuring the long-term health of the EMU water circuits for a post-Shuttle 6-year service life.

Steele, John W.↗

Design guide: Designing and building high voltage power supplies, volume 2

This report contains an accumulation of publications and analyses aimed at developing guidelines for improving both high voltage and low voltage power supplies for the U.S. Air Force systems command. It is the intent of the report to supply good design and manufacturing techniques for the packaging and the building of high quality, reliable, long-life power supplies. These data are based on the wealth of engineering practices established by design and manufacturing engineers. The contents are: Fundamentals of Insulation: Gases, Liquid Dielectrics, Solid Insulation; Environment: Pressure, Particulates, Environmental Interactions with Space Power Systems, Surface Charging, System Design Criteria; Configuration and Design Data: Designs, Transients, Grounding and Bonding, Thermal Control; Materials and Processes: Insulation, Processes, Process Variables; Manufacturing: Yield, Government and Industrial Survey, Analysis, Problem Areas and Suggested Solutions, Designs That Have Worked in High Voltage Equipment, Manufacturing Summary; and Tests: Performance, Insulation Tests, Materials Testing, Component and Equipment Tests, Performance Testing, Facility and Environment, Accelerated Life Test; Maintenance and Repair: Maintenance, Test Sets, Pilots and Crewmen, Air Logistic Centers, Design Problem Recommendations.

W G Dunbar↗

Remote Observations of Reentering Spacecraft Including the Space Shuttle Orbiter

Flight measurement is a critical phase in development, validation and certification processes of technologies destined for future civilian and military operational capabilities. This paper focuses on several recent NASA-sponsored remote observations that have provided unique engineering and scientific insights of reentry vehicle flight phenomenology and performance that could not necessarily be obtained with more traditional instrumentation methods such as onboard discrete surface sensors. The missions highlighted include multiple spatially-resolved infrared observations of the NASA Space Shuttle Orbiter during hypersonic reentry from 2009 to 2011, and emission spectroscopy of comparatively small-sized sample return capsules returning from exploration missions. Emphasis has been placed upon identifying the challenges associated with these remote sensing missions with focus on end-to-end aspects that include the initial science objective, selection of the appropriate imaging platform and instrumentation suite, target flight path analysis and acquisition strategy, pre-mission simulations to optimize sensor configuration, logistics and communications during the actual observation. Explored are collaborative opportunities and technology investments required to develop a next-generation quantitative imaging system (i.e., an intelligent sensor and platform) with greater capability, which could more affordably support cross cutting civilian and military flight test needs.

Horvath, Thomas J.↗

Low-level gust gradient program and avialtion workshop effort

The Proceedings of the Workshop on Meteorological and Environmental Inputs to Aviation Systems, hosted by the University of Tennessee Space Institute, October 26-28, 1982, were prepared for publication. The Proceedings were submitted to FAA and will be distributed by August. Also, the proceedings of a one day workshop devoted specifically to wind shear and hosted during the same time frame were prepared and distributed. Plans for the 1983 workshop are proceeding extremely well. The workshop theme was established, the committee topics identified, and all ten committee chairmen contacted have agreed to accept their respective assignments. Additional logistics for the workshop are being carried out. The 1983 workshop is scheduled for October 26-28, 1983. Data gathered with the B-57B during the Joint Airport Weather Studies Project in Denver, Colorado, were analyzed. All runs for Flight 6 on July 16, 1982, were analyzed. Spectra, cross spectra and probability distributions were computed for each run. Also, Runs 10-14 of Flight 7 on July 15, 1982, were analyzed in similar detail.

Frost, W.↗

Astrobee Guest Science Interface

At the end of 2018, Astrobee will launch three free-flying robots that will navigate the entire US segment of the ISS (International Space Station) and serve as a payload facility. The mechanical and electrical interfaces are now established and several payloads are being developed. Payload Interface: Astrobee is designed to host third party guest science program payloads (GSP payloads). Some GSP payloads may be software only, such as the Zero Robotics Finals Competition, which is currently hosted on SPHERES, and which will transition to Astrobee in 2019. Several GSP payloads with custom hardware, such as the Advanced Exploration Systems (AES) Logistics Reduction and Repurposing (LRR) Project RFID reader, are already under development. These payloads will attach in the Astrobee payload bay.

Barlow, J.↗

Evolution of the Baseline ISS ECLSS Technologies: The Next Logical Steps

The baseline Environmental Control and Life Support Systems which are currently deployed on the International Space Station or planned to be launched in Node 3 are based on technologies selected in the early 1990's. While they are generally meeting or exceeding requirements for supporting the ISS crew, lessons learned from years of on orbit and ground testing, new advances in technology state of the art, and requirements for future manned missions prompt consideration of the next logical step to enhance these systems to increase performance, robustness, reliability, and reduce on-orbit and logistical resource requirements. This paper discusses the current state of the art in ISS ECLSS technologies, and possible areas for enhancement/improvement. Potential utilization of the ISS as a testbed for on-orbit checkout of selected technology improvements is also addressed.

Carrasquillo, Robyn L.↗

Advanced Electric Propulsion System (AEPS) Enabling a Sustainable Return to the Lunar Surface through NASA Gateway

NASA continues to evolve a human exploration approach for beyond low-Earth orbit. The center of this approach is NASA’s Gateway that is envisioned to provide a maneuverable outpost in lunar orbit to extend human presence in deep space and expand on NASA exploration goals. The Gateway represents the initial step in NASA’s architecture for human cislunar operations, lunar surface access and missions to Mars. NASA announced at the May 2020 NASA Advisory Council’s Human Explorations and Operations Committee a new plan that calls for launching the first two elements of Gateway as a co-manifested mission in the late 2023 timeframe [2]. Launching the Power and Propulsion Element (PPE) and the Habitation and Logistics Outpost (HALO) together reduces mission risk, utilizes the PPE high-powered Electric Propulsion (EP) system to transport both elements to the lunar orbit, and reduces overall cost. NASA and Maxar Technologies have a commercial partnership to develop and demonstration a high-powered Solar Electric Propulsion (SEP) spacecraft [3, 4]. The PPE is baselined to include three 12.5-kW Advanced Electric Propulsion Systems (AEPS) and four 6-kW Hall thrusters, currently under development by Maxar, for a total beginning of life propulsion power of over 48-kW [5]. High-power solar electric propulsion is one of the key technologies that has been prioritized because of its significant exploration benefits, specifically, for missions beyond low Earth orbit. Spacecraft size and mass are currently dominated by onboard chemical propulsion systems and propellants that may constitute more than 50 percent of spacecraft mass. This impact can be substantially reduced through the utilization of SEP, due to its higher specific impulse and lower propellant load required to meet the equivalent mission delta-V. Studies performed for NASA’s HEOMD and Science Mission Directorate (SMD) have demonstrated that 40-kW-class SEP provides the necessary capabilities that would enable near term and future architectures, and science missions [6]. Accordingly, NASA has been developing a 12 kW Hall thruster electric propulsion thruster that can serve as the building block for a 40-kW-class SEP capability. The AEPS development, led by the NASA Glenn Research Center (GRC) and the Jet Propulsion Laboratory (JPL), began with the maturation of the high-power Hall thruster. The technology development work has transitioned to AR via a competitive procurement selection for the AEPS contract in May 2016. Management of the AEPS contract is being led by NASA GRC with funding from NASA’s Science Technology Mission Directorate (STMD) under the Technology Demonstration Missions (TDM) program. NASA continues to support the AEPS development leveraging in-house expertise, plasma modeling capability, and world-class test facilities.

AEPS↗