LARC Wind Tunnel Test Capabilities Facilities 20230517 - AIAA Niagara Frontier Presentation
Explore the source record for details and available documents.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
The results are reported of research to provide thermal support in the design of the thermal protection system (TPS) of the space shuttles. Tasks discussed include: generation of temperature boundaries for space shuttle orbiter and booster during atmospheric reentry, leading edge and nose cap materials, TPS panel test facility support, thermal test facility support, and hot gas test facility support. A summary of thermal models generated for the space shuttle support is included.
Drop test facility for simulation of low gravity fluid mechanics
This report will serve to present results of a test of the pressure sensitive paint (PSP) technique on the Common Research Model (CRM). This test was conducted at the National Transonic Facility (NTF) at NASA Langley Research Center. PSP data was collected on several surfaces with the tunnel operating in both cryogenic mode and standard air mode. This report will also outline lessons learned from the test as well as possible approaches to challenges faced in the test that can be applied to later entries.
The aerospace industry is currently investigating the effect of installing mixer/ejector nozzles on the core flow exhaust of high-bypass-ratio turbofan engines. This effort includes both full-scale engine tests at sea level conditions and subscale tests in static test facilities. Subscale model tests are to be conducted prior to full-scale testing. With this approach, model results can be analyzed and compared with analytical predications. Problem areas can then be identified and design changes made and verified in subscale prior to committing to any final design configurations for engine ground tests. One of the subscale model test programs for the integrated mixer/ejector development was a joint test conducted by the NASA Lewis Research Center and Pratt & Whitney Aircraft. This test was conducted to study various mixer/ejector nozzle configurations installed on the core flow exhaust of advanced, high-bypass-ratio turbofan engines for subsonic, commercial applications. The mixer/ejector concept involves the introduction of largescale, low-loss, streamwise vortices that entrain large amounts of secondary air and rapidly mix it with the primary stream. This results in increased ejector pumping relative to conventional ejectors and in more complete mixing within the ejector shroud. The latter improves thrust performance through the efficient energy exchange between the primary and secondary streams. This experimental program was completed in April 1997 in Lewis' CE-22 static test facility. Variables tested included the nozzle area ratio (A9/A8), which ranged from 1.6 to 3.0. This ratio was varied by increasing or decreasing the nozzle throat area, A8. Primary nozzles tested included both lobed mixers and conical primaries. These configurations were tested with and without an outer shroud, and the shroud position was varied by inserting spacers in it. In addition, data were acquired with and without secondary flow.
Typical entry vehicle aeroshells are limited in size by the launch vehicle shroud. Inflatable aerodynamic decelerators allow larger aeroshell diameters for entry vehicles because they are not constrained to the launch vehicle shroud diameter. During launch, the hypersonic inflatable aerodynamic decelerator (HIAD) is packed in a stowed configuration. Prior to atmospheric entry, the HIAD is deployed to produce a drag device many times larger than the launch shroud diameter. The large surface area of the inflatable aeroshell provides deceleration of high-mass entry vehicles at relatively low ballistic coefficients. Even for these low ballistic coefficients there is still appreciable heating, requiring the HIAD to employ a thermal protection system (TPS). This TPS must be capable of surviving the heat pulse, and the rigors of fabrication handling, high density packing, deployment, and aerodynamic loading. This paper provides a comprehensive overview of flexible TPS tests and results, conducted over the last three years. This paper also includes an overview of each test facility, the general approach for testing flexible TPS, the thermal analysis methodology and results, and a comparison with 8-foot High Temperature Tunnel, Laser-Hardened Materials Evaluation Laboratory, and Panel Test Facility test data. Results are presented for a baseline TPS layup that can withstand a 20 W/cm2 heat flux, silicon carbide (SiC) based TPS layup, and polyimide insulator TPS layup. Recent work has focused on developing material layups expected to survive heat flux loads up to 50 W/cm2 (which is adequate for many potential applications), future work will consider concepts capable of withstanding more than 100 W/cm2 incident radiant heat flux. This paper provides an overview of the experimental setup, material layup configurations, facility conditions, and planned future flexible TPS activities.
Tests were conducted to determine the effects of variable enthalpy levels on CPR-488 foam performance and/or recession. Also to be determined was whether the BX-250 thickness indicator plugs (TIP) concept is feasible for measuring recession rates of CPR-488 foam during external tank flight. The tests determined that the TIP plug idea works. The accuracy of the indicated recession depth is approximately + or - 1.16 in. The BX-250 plugs with TiO2 work better than the regular BX-250 plugs. Also, there is an effect of enthalpy on CPR-488 foam performance.
Abstract. Convective cooling is a critical management strategy for maintaining an environment that promotes production efficiency, thermal comfort, and animal well-being in commercial broiler houses. Variations in house size, design, and equipment configuration contribute greatly to the air velocity distribution within the facility. This study assessed total airflow, air velocity distribution, and quantified the floor area in three facilities experiencing insufficient air velocity for maintenance of production efficiency, thermal comfort, and animal well-being. Test facility 1 was an 18.3 × 170.7 m solid side-wall broiler house, test facility 2 was a 15.24 × 144.8 m solid side-wall broiler house, and test facility 3 was a 12.19 × 121.9 m curtain side-wall broiler house. Total airflow of each facility, measured with a Fan Assessment and Numeration System, was 512,730, 389,495, and 329,270 m 3 h -1 for test facilities 1, 2, and 3, respectively. Air velocity distribution patterns were characterized in each house with a Scalable Environment Assessment System (SEAS) and spatial statistics. The air velocity distributions within the test facilities were variable, with notable maxima immediately downstream of the tunnel inlets, which serve as a well-defined vena contracta, and local minima near the leading end of the evaporative pads and the exhaust fans. Equipment within the facilities had an impact on the air velocity distribution by creating reduced cross-sectional areas that resulted in localized increases in air velocity. The percentage of total bird-level floor area in each facility experiencing air velocities below 1.5 m s -1 was 14.3%, 20.7%, and 10.0% for test facilities 1, 2, and 3, respectively. The effective design velocity (V ed ) was calculated from total airflow using the measured building cross-sectional area. The V ed measured 2.97, 2.45, and 2.34 m s -1 for test facilities 1, 2, and 3, respectively. Mean cross-sectional air velocity (V cs ) was calculated from SEAS data and normalized using each facility’s V ed to account for differences in building size for comparison. Test facility 1, the largest of the three houses, generated substantially higher V cs /V ed than test facilities 2 and 3. Test facilities 2 and 3 maintained a larger proportion of V cs above V ed than test facility 1. Test facility 1 showed 26.5% of the total house length below V ed , while test facilities 2 and 3 had only 20.8% and 17.5%, respectively, of the total house length below V ed . The lower-velocity regions were due to the length of the evaporative cooling pad inlet and the use of tunnel doors, and the exhaust fan placement on the side-walls in test facility 1 created an additional pronounced low-velocity area. Placement of tunnel ventilation fans on the end-wall of the facility, rather than the side-wall, eliminated the low-velocity region at the exhaust end of the facility. Modifications to current practices for broiler production facility construction and evaporative cooling pad inlet installation would be required to minimize the low-velocity region at the inlet end of these facilities. Consideration of house width and physical arrangement of the air inlets, tunnel fans, and internal equipment are critical for improving the uniformity of air velocity in commercial broiler houses. Keywords: Air velocity, Anemometer, Broiler house, FANS, Tunnel ventilation.
NASA has conducted a study to assess alternatives to refurbishing existing launch vehicle modal test facilities as opposed to developing new test facilities to meet the demands of a very fiscally constrained test and evaluation environment. The results of this study showed that Marshall Space Flight Center (MSFC) Test Stand (TS) 4550 could be made compliant, within reasonable cost and schedule impacts, if safety processes and operational limitations were put in place to meet the safety codes and concerns of the Fire Marshall. Trades were performed with key selection criteria to ensure that appropriate levels of occupant safety are incorporated into test facility design modifications. In preparation for the ground vibration tests that were to be performed on the Ares I launch vehicle, the Ares Flight and Integrated Test Office (FITO) organization evaluated the available test facility options, which included the existing mothballed structural dynamic TS4550 used by Apollo and Shuttle, alternative ground vibration test facilities at other locations, and construction of a new dynamic test stand. After an exhaustive assessment of the alternatives, the results favored modifying the TS4550 because it was the lowest cost option and presented the least schedule risk to the NASA Constellation Program for Ares Integrated Vehicle Ground Vibration Test (IVGVT). As the renovation design plans and drawings were being developed for TS4550, a safety concern was discovered the original design for the construction of the test stand, originally built for the Apollo Program and renovated for the Shuttle Program, was completed before NASA s adoption of the currently imposed safety and building codes per National Fire Protection Association Life Safety Code [NFPA 101] and International Building Codes. The initial FITO assessment of the design changes, required to make TS4550 compliant with current safety and building standards, identified a significant cost increase and schedule impact. An effort was launched to thoroughly evaluate the applicable life safety requirements, examine the context in which they were derived, and determine a means by which the TS4550 modifications could be made within budget and on schedule, while still providing the occupants with appropriate levels of safety.
Propulsion ground test facilities face the daily challenge of scheduling multiple customers into limited facility space and successfully completing their propulsion test projects. Over the last decade NASA s propulsion test facilities have performed hundreds of tests, collected thousands of seconds of test data, and exceeded the capabilities of numerous test facility and test article components. A logistic regression mathematical modeling technique has been developed to predict the probability of successfully completing a rocket propulsion test. A logistic regression model is a mathematical modeling approach that can be used to describe the relationship of several independent predictor variables X(sub 1), X(sub 2),.., X(sub k) to a binary or dichotomous dependent variable Y, where Y can only be one of two possible outcomes, in this case Success or Failure of accomplishing a full duration test. The use of logistic regression modeling is not new; however, modeling propulsion ground test facilities using logistic regression is both a new and unique application of the statistical technique. Results from this type of model provide project managers with insight and confidence into the effectiveness of rocket propulsion ground testing.
Space exploration programs and science - Surveyor project, Mariner program, Deep Space Instrumentation Facility, space flight operation facility, environment test facility, and physics
Reactivation of the Transient Reactor Test (TREAT) Facility Neutron Radiography Program The Transient Reactor Test (TREAT) Facility is a 19,000 MW reactor located at the Idaho National Laboratory designed to perform transient testing on nuclear fuel experiments and materials. A neutron radiography facility was installed with the first radiograph being produced in 1967 that utilized the indirect (or transfer) method of neutron radiography to examine irradiated nuclear fuels and experiment test loops. The TREAT neutron radiography facility performed approximately 5,000 radiographs by the spring of 1977. The original radiography facility was upgraded in 1974-1975 to correct previous deficiencies and to improve capabilities. In 1986, an upgraded aperture was installed to increase the resolution of images followed by a major reactor upgrade completed in 1988. Overall, the existing neutron radiography system was in good working order. Originally built in 1958, the TREAT Facility was in operation until it was placed in a shutdown status in 1994. Following the Fukishima disaster and seeing a need for enhanced accident tolerant fuels, the United Stated Department of Energy decided to restart the TREAT facility and resume transient operations. In November 2017, the TREAT reactor was successfully restarted and is currently performing operational testing in preparation for initial experiment irradiations and transient testing. This paper reports on efforts to reactivate the TREAT neutron radiography station. A few minor shielding and system improvement upgrades have been completed along with the installation of a dedicated room for computed radiography equipment. Detailed beam characterization work was not performed following the last reactor upgrade. To characterize the neutron beam, gold foil activation measurements were made to determine an average neutron flux and flux profile. Additional multi-foil activation measurements will be made to calculate the energy spectrum. An open beam image will be taken that will provide the information about variations in the beam profile. A series of system qualification shots will also take place to accurately determine the effective image quality and image acquisition parameters. Full operational status of the TREAT neutron radiography system is scheduled for late summer of 2018.
This paper presents the design approaches and test facility operation methods used to successfully accomplish a 56-day test for Skylab to permit evaluation of selected Skylab medical experiments in a ground test simulation of the Skylab environment with an astronaut crew. The systems designed for this test include the two-gas environmental control system, the fire suppression and detection system, equipment transfer lock, ground support equipment, safety systems, potable water system, waste management system, lighting and power system, television monitoring, communications and recreation systems, and food freezer.
Spacecraft being developed for future exploration missions incorporate Environmental Control and Life Support Systems (ECLSS) that limit weight, power, and volume thus requiring systems with higher levels of efficiency while maintaining high dependability and robustness. For air revitalization, an approach that meets those goals utilizes a regenerative Vacuum-Swing Adsorption (VSA) system that removes 100% of the CO2 from the cabin atmosphere as well as 100% of the water. A Sorbent Based Atmosphere Revitalization (SBAR) system is a VSA system that utilizes standard commercial adsorbents that have been proven effective and safe in spacecraft including Skylab and the International Space Station. The SBAR system is the subject of a development, test, and evaluation program that is being conducted at NASA s Marshall Space Flight Center. While previous testing had validated that the technology is a viable option, potential improvements to system design and operation were identified. Modifications of the full-scale SBAR test articles and adsorption cycles have been implemented and have shown significant performance gains resulting in a decrease in the consumables required for a mission as well as improved mission safety. Previous testing had utilized single bed test articles, during this period the test facility was enhanced to allow testing on the full 2-bed SBAR system. The test facility simulates a spacecraft ECLSS and allows testing of the SBAR system over the full range of operational conditions using mission simulations that assess the real-time performance of the SBAR system during scenarios that include the metabolic transients associated with extravehicular activity. Although future manned missions are currently being redefined, the atmosphere revitalization requirements for the spacecraft are expected to be quite similar to the Orion and the Altair vehicles and the SBAR test program addressed validation to the defined mission requirements as well as operation in other potential vehicle architectures. The development program, including test articles, the test facility, and tests and results through early 2011 is discussed.
Fermilab is developing the Conductor on Molded Barrel (COMB) magnet technology that works well with round REBCO conductors. COMB-STAR-1 magnet based on STAR wire by AMPeers was fabricated and tested in liquid nitrogen in 2023. The magnet demonstrated >90 Ic retention in the coils (before/after winding). Even though the magnet was not originally designed for operation at lower than 77 K temperatures, it was decided to test it in liquid helium to: - check the instrumentation and the DAQ system; - check the ability to detect resistive transitions or quenches and to protect the magnet; - gather the information on possible magnet design chances and upgrades of the test facility for future testing of HTS magnets. The magnet was re-assembled with a larger iron yoke and the axial supports and tested in liquid helium in 2024 at Fermilab s Vertical Magnet Test Facility (VMTF). It was the first HTS magnet test at that facility ever.
Safety Analysis Challenges With Restart of the Idaho National Laboratory Transient Reactor Test (TREAT) Facility Dr. James Parry David Broussard Anthony LaPorta Douglas Gerstner Battelle Energy Alliance Idaho National Laboratory P.O. Box 1625/MS6194 Idaho Falls, ID 83415 The Transient Reactor Test Facility, commonly referred to as TREAT, is an air-cooled, thermal spectrum test reactor facility designed to: • Induce intense fission heating in the nuclear fuel being tested. • Test nuclear reactor fuels under severe reactor-accident conditions. • Study fuel meltdowns, metal-water reactions, interactions between overheated fuel and coolant, and the transient behavior of fuels for high-temperature systems. • Provide nondestructive test data through neutron radiography of fuel samples. • Allow for the detailed monitoring of the experiments during the test. TREAT was specifically designed to test prototypic-sized reactor fuel pins and bundles under transient power conditions. During its 35 year operating history, it conducted thousands of transient experiments. Today, these capabilities are required for predicting safety margins for next generation fuels and advanced reactor design safety. Even though TREAT has not operated since 1994, return to operable conditions and resumption of testing will occur in FY 2018. This paper discusses the unique challenges with performing and documenting the safety analyses that demonstrate that the TREAT restart may be performed safely. This includes a discussion of 1) the TREAT capability, design, and operations, 2) identification of the format and content of the required safety basis document changes, and 3) demonstration that the consequences of potential accidents during TREAT operations meet the consequence guidelines.
Here, the US High-Luminosity LHC Accelerator Upgrade Project (AUP) is responsible for delivering cryo-assemblies for the Q1/Q3 quadrupole optical components of the High Luminosity LHC upgrade at CERN. Total of 10 cryo-assemblies containing two Nb3Sn quadrupole magnets per cold mass will be delivered within this program. After the successful test of the first pre-series cryo-assembly in 2023, two more cryo-assemblies were tested at Fermilab's horizontal test facility. Production overview and the test results of the LQXFA/B02 and LQXFA/B03 cryo-assemblies are summarized in this paper. After the first test, to increase the capability of the horizontal test facility, various improvements have been made. These improvements are also described in this paper.
Model testing for design evaluation of major components and configurations of static test and launch facilities, noting hot jet model