Search NASA⌕ Search

SEARCH · Search NASA

Results for “Unit testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,009 records · Page 56

GeoMelt{sup R} ICV{sup TM} Treatment of Sellafield Pond Solids Waste - 13414

Kurion, Inc., in partnership with AMEC Ltd., is demonstrating its GeoMelt{sup R} In-Container Vitrification (ICV){sup TM} Technology to Sellafield Ltd. (SL). SL is evaluating the proposition of directly converting a container (skip/box/drum) of raw solid ILW into an immobilized waste form using thermal treatment, such that the resulting product is suitable for interim storage at Sellafield and subsequent disposal at a future Geological Disposal Facility. Potential SL feed streams include sludges, ion-exchange media, sand, plutonium contaminated material, concrete, uranium, fuel cladding, soils, metals, and decommissioning wastes. The solid wastes have significant proportions of metallic constituents in the form of containers, plant equipment, structural material and swarf arising from the nuclear operations at Sellafield. GeoMelt's proprietary ICV process was selected for demonstration, with the focus being high and reactive metal wastes arising from solid ILW material. A composite surrogate recipe was used to demonstrate the technology towards treating waste forms of diverse types and shapes, as well as those considered difficult to process; all the while requiring few (if any) pre-treatment activities. Key strategic objectives, along with their success criterion, were established by SL for this testing, namely: 1. Passivate and stabilize the raw waste simulant, as demonstrated by the entire quantity of material being vitrified, 2. Immobilize the radiological and chemo-toxic species, as demonstrated via indicative mass balance using elemental analyses from an array of samples, 3. Production of an inert and durable product as evidenced by transformation of reactive metals to their inert oxide forms and satisfactory leachability results using PCT testing. Two tests were performed using the GeoMelt Demonstration Unit located at AMEC's Birchwood Park Facilities in the UK. Post-melt examination of the first test indicated some of the waste simulant had not fully processed, due to insufficient processing time and melt temperature. A second test, incorporating operational experience from the first test, was performed and resulted in all of the 138 kg of feed material being treated. The waste simulant portion, at 41 kg, constituted 30 wt% of the total feed mass, with over 90% of this being made up of various reactive and non-reactive metals. The 95 liters of staged material was volume reduced to 41 liters, providing a 57% overall feed to product volume reduction in a fully passivated two-phase glass/metal product. The GeoMelt equipment operated as designed, vitrifying the entire batch of waste simulant. Post-melt analytical testing verified that 91-99+% of the radiological tracer metals were uniformly distributed within the glass/cast refractory/metal product, and the remaining fraction was captured in the offgas filtration systems. PCT testing of the glass and inner refractory liner showed leachability results that outperform the DOE regulatory limit of 2 g/m{sup 2} for the radiological species of interest (Sr, Ru, Cs, Eu, Re), and by more than an order of magnitude better for standard reference analytes (B, Na, Si). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SU-D-201-04: Evaluation of Elekta Agility MLC Performance Using Statistical Process Control

Purpose: to evaluate the performance and stability of the Elekta Agility MLC model using an automated quality control (QC) test in combination with statistical process control tools. Methods: Leaf positions were collected daily for 11 Elekta units over 5–19 months using the automated QC test, which analyzes 23 MV images to determine the location of MLC leaves relative to the radiation isocenter. The leaf positions are measured at 5 nominal positions, and images are acquired at collimator 0° and 180° to capture all MLC leaves in the field-of-view. Leaf positioning accuracy was assessed using individual and moving range control charts. Control limits were recomputed following MLC recalibration (occurred 1–2 times for 4 units). Specification levels of ±0.5, ±1 and ±1.5mm were tested. The mean and range of duration between out-of-control and out-of-specification events were determined. Results: Leaf position varied little over time, as confirmed by very tight individual control limits (mean ±0.19mm, range 0.09–0.44). Mean leaf position error was −0.03mm (range −0.89–0.83). Due to sporadic out-of-control events, the mean in-control duration was 3.3 days (range 1–23). Data stayed within ±1mm specification for 205 days on average (range 3–372) and within ±1.5mm for the entire date range. Measurements stayed within ±0.5mm for 1 day on average (range 0–17); however, our MLC leaves were not calibrated to this level of accuracy. Conclusion: The Elekta Agility MLC model was found to perform with high stability, as evidenced by the tight control limits. The in-specification durations support the current recommendation of monthly MLC QC tests with a ±1mm tolerance. Future work is on-going to determine if Agility performance can be optimized further using high-frequency QC test results to drive recalibration frequency. Factors that can affect leaf positioning accuracy, including beam spot motion, leaf gain calibration, drifting leaves, and image artifacts, are under investigation.

60 APPLIED LIFE SCIENCES↗

Post-Closure Monitoring Letter Report for Corrective Action Unit (CAU) 97: Yucca Flat/Climax Mine; CAU 98: Frenchman Flat; and CAU 99: Rainier Mesa/Shoshone Mountain, Underground Test Area, Nevada National Security Site, Nevada, for Calendar Year 2020 (Rev. 1, May 2021)

This letter serves as the annual post-closure letter for Corrective Action Unit (CAU) 97, Yucca Flat/Climax Mine (YF/CM); CAU 98, Frenchman Flat (FF); and CAU 99, Rainier Mesa/Shoshone Mountain (RM/SM) for calendar year (CY) 2020. This letter will discuss the post-closure monitoring activities that occurred during CY 2020, identify any triggers reached, and summarize water usage on the Nevada National Security Site (NNSS) and surrounding hydrographic basins at the three CAUs.

54 ENVIRONMENTAL SCIENCES↗

Hydronic Heating Coil Versus Propane Furnace, Rehoboth Beach, Delaware (Fact Sheet)

Insight Homes constructed two houses in Rehoboth Beach, Delaware, with identical floor plans and thermal envelopes but different heating and domestic hot water (DHW) systems. Each house is 1,715-ft 2 with a single story, three bedrooms, two bathrooms, and the heating, ventilation, and air conditioning (HVAC) systems and ductwork located in conditioned crawlspaces. The standard house, which the builder offers as its standard production house, uses an air source heat pump (ASHP) with supplemental propane furnace heating. The Building America test house uses the same ASHP unit with supplemental heat provided by the DHW heater (a combined DHW and hydronic heating system, where the hydronic heating element is in the air handler). Both houses were occupied during the test period. Results indicate that efficiency of the two heating systems was not significantly different. Three issues dominate these results; lower system design performance resulting from the indoor refrigerant coil selected for the standard house, an incorrectly functioning defrost cycle in the standard house, and the low resolution of the natural gas monitoring equipment. The thermal comfort of both houses fell outside the ASHRAE Standard 55 heating range but was within the ACCA room-to-room temperature range when compared to the thermostat temperature. The monitored DHW draw schedules were input into EnergyPlus to evaluate the efficiency of the tankless hot water heater model using the two monitored profiles and the Building America House Simulation Protocols. The results indicate that the simulation is not significantly impacted by the draw profiles.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A design chart for estimation of horizontal displacement in municipal landfills

This paper describes the development of a design chart for the estimation of maximum horizontal displacement within a municipal landfill using the height and the side slope of the landfill. The design chart is based on the results of a finite element parametric study in which the behaviour of the municipal solid waste (MSW) was modeled using a non-linear elastic hyperbolic model. The model input parameters, i.e. non-linear stiffness, shear strength and unit weight of MSW, were obtained from laboratory testing data and an extensive stochastic numerical modelling exercise. Non-linear variations of unit weight as well as Young's modulus of MSW with depth were incorporated in the finite element analyses. The validity of the design chart was assessed using field monitoring results from a large landfill located in Ontario, Canada.

42 ENGINEERING↗

Model for Interpreting Discordant SARS-CoV-2 Diagnostic Test Results

We devised a model to interpret discordant SARS-CoV-2 test results. We estimate that, during March 2020–May 2022, a patient in the United States who received a positive rapid antigen test result followed by a negative nucleic acid test result had only a 15.4% (95% CI 0.6%–56.7%) chance of being infected.

59 BASIC BIOLOGICAL SCIENCES↗

Higher education responses to COVID-19 in the United States: Evidence for the impacts of university policy

With a dataset of testing and case counts from over 1,400 institutions of higher education (IHEs) in the United States, we analyze the number of infections and deaths from SARS-CoV-2 in the counties surrounding these IHEs during the Fall 2020 semester (August to December, 2020). We find that counties with IHEs that remained primarily online experienced fewer cases and deaths during the Fall 2020 semester; whereas before and after the semester, these two groups had almost identical COVID-19 incidence. Additionally, we see fewer cases and deaths in counties with IHEs that reported conducting any on-campus testing compared to those that reported none. To perform these two comparisons, we used a matching procedure designed to create well-balanced groups of counties that are aligned as much as possible along age, race, income, population, and urban/rural categories—demographic variables that have been shown to be correlated with COVID-19 outcomes. We conclude with a case study of IHEs in Massachusetts—a state with especially high detail in our dataset—which further highlights the importance of IHE-affiliated testing for the broader community. The results in this work suggest that campus testing can itself be thought of as a mitigation policy and that allocating additional resources to IHEs to support efforts to regularly test students and staff would be beneficial to mitigating the spread of COVID-19 in a pre-vaccine environment.

60 APPLIED LIFE SCIENCES↗

Verification Testing For Solid-Element Material Models 11-19 in DYNA3D/ParaDyn

This technical report documents the creation and implementation of verification tests for solid-element material models 11 through 19 available in DYNA3D/ParaDyn. The verification tests covered all aspects of each material model, except for the Weibull distribution functionality in material models 15 and 19. General test cases were created to verify the elastic and plastic behavior of the material models. Other additional tests were developed to examine the intricacies of each material model. Each test involved the use a kinematic load case and specification of material parameters necessary to activate corresponding features of the material model. The load cases prescribed the full time history of the kinematic motion for the solid elements, and these loads are independent of the material model or element formulation. When possible, closed form solutions were then derived for each verification test in a continuum setting. The DYNA3D simulations for each test were carried out over a unit time interval, t ϵ [0, 1], and the as implemented DYNA3D response was compared to the closed form solutions evaluated at discrete points in time. A relative error measure was determined for each test to justify the proper implementation of the material model. The relative errors comparing the DYNA3D solution to the analytical solution were, in general, on the order of machine precision except where noted. This signifies the proper implementation of solid-element material models 11-19. In the development of these verification tests, six bugs were found and fixed in the source code. Additionally, this work generated eighteen DYNA3D input decks and answer extraction scripts in the DYNA3D/ParaDyn Software Quality Assurance test suite, which are comprised of a total of 285 solid-element tests. Testing for each material model utilizes two input decks and answer extraction scripts, where one focuses on the linear elastic response and the other examines the inelastic and remaining functionalities of the material model. In total, this work added 285 individual verification test problems in the DYNA3D/ParaDyn test suite.

42 ENGINEERING↗

RH Packaging Maintenance Manual (Rev. 0)

This document provides instructions for performing (1) Inner containment vessel (IV) and outer containment vessel (OC) maintenance leakage rate test on packaging seals and corresponding seal surfaces using a nondestructive helium (He) leak test; (2) IV and OC periodic leakage rate test using nondestructive He leak test; and (3) IV and OC structural pressure tests.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Can Simple Metrics Identify the Process(es) Driving Extreme Precipitation?

This work seeks an automatic algorithm to determine the primary meteorological cause(s) of individual extreme precipitation events. Such determinations have been made before, but required a by-hand analysis of each separate event. This is very time-consuming and the field would benefit from an automatic process. This is especially relevant when comparing different datasets to determine which ones most closely hew towards reality. This paper tests three simple metrics over the continental United States using the European Center for Medium-Range Weather Forecasting’s (ECMWF) atmospheric reanalysis (ERA5). The metrics tested measure and compare the strength of three meteorological processes associated with extreme precipitation: fronts, convection, and cyclones. A multivariate statistical technique as well as individual case studies show evidence that the three meteorological processes of interest cannot be isolated from one another using these simple physical metrics. This shows the difficulty in finding “pure” cases of these precipitation-generating processes and suggests approaching these processes with an eye toward mixed-type events.

Swenson, Leif M. (ORCID:0000000199708735)↗

Development of Waste Disposal Strategy for RH LLW Stored in the ATR Canal - 19453

The Advanced Test Reactor (ATR), located at Idaho National Laboratory (INL), is 250 megawatt research reactor designed and operated for the United States Department of Energy for irradiation testing of advanced nuclear fuels and material samples. The pressurized light-water moderated and cooled reactor achieved criticality in 1967. It is designed to allow high neutron flux irradiation of structural materials and nuclear fuels to replicate long-term exposure of materials in traditional lower-flux reactor cores. The ATR also produces rare isotopes for the use in the medical and other industries. The ATR is one of only four reactors in the world with this high-flux irradiation capability. Adjacent to the ATR is a water-filled canal which is used to handle casks, prepare experiments, perform irradiation experiments, and store irradiated components generated from reactor operations. The canal is used to store irradiated (activated) metals that are subsequently determined to be waste. In many instances, these items are too radioactive to remove from the canal and remain in temporary storage until a sufficient decay period has elapsed to where they can be safely removed. The more highly-radioactive remote-handled (RH) waste items requiring hundreds of years to decay have been in storage in the canal since the first ATR core internal changeout (CIC) which was conducted in the 1970's. The INL has recently completed construction and startup of a new Remote-Handled Low-Level Waste (RH LLW) Disposal Facility, which will serve as the final disposal capability for legacy RH (greater than 200 mR/hr on contact) metal waste currently stored in the canal. The ATR will need to develop a method for packaging, characterizing, removing, and shipping this material to the new disposal facility. Based on the configuration of the new disposal cells at the RH LLW Disposal Facility, the ATR must produce an entire new process for handing and packaging the legacy RH waste and preparing it for transport and final disposal. The ATR Canal RH LLW Cleanup Project scope is to develop the processes, tools, and equipment for safely sizing, packaging, and removing RH LLW from the canal. This paper presents highlights and challenges the project faces to develop and implement this capability: - Designing new tools, fabricating new equipment, and implementing new processes at an active Hazard Category-I nuclear facility. - Ensuring new equipment and tools are compatible with the existing equipment and processes at both the generator and the disposal facilities. - Sizing legacy waste under water using remote tools and equipment to minimize void space in waste disposal canisters while ensuring as low as reasonably achievable (ALARA) goals are met. - Loading waste containers underwater and preparing them to meet the liquid-free criteria of the disposal facility waste acceptance criteria (WAC). - Providing a new shielded transport container to transfer waste from ATR to the new on-site RH LLW Disposal Facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

JV Task 90 - Activated Carbon Production from North Dakota Lignite

The Energy & Environmental Research Center (EERC) has pursued a research program for producing activated carbon from North Dakota lignite that can be competitive with commercial-grade activated carbon. As part of this effort, small-scale production of activated carbon was produced from Fort Union lignite. A conceptual design of a commercial activated carbon production plant was drawn, and a market assessment was performed to determine likely revenue streams for the produced carbon. Activated carbon was produced from lignite coal in both laboratory-scale fixed-bed reactors and in a small pilot-scale rotary kiln. The EERC was successfully able to upgrade the laboratory-scale activated carbon production system to a pilot-scale rotary kiln system. The activated carbon produced from North Dakota lignite was superior to commercial grade DARCO{reg_sign} FGD and Rheinbraun's HOK activated coke product with respect to iodine number. The iodine number of North Dakota lignite-derived activated carbon was between 600 and 800 mg I{sub 2}/g, whereas the iodine number of DARCO FGD was between 500 and 600 mg I{sub 2}/g, and the iodine number of Rheinbraun's HOK activated coke product was around 275 mg I{sub 2}/g. The EERC performed both bench-scale and pilot-scale mercury capture tests using the activated carbon made under various optimization process conditions. For comparison, the mercury capture capability of commercial DARCO FGD was also tested. The lab-scale apparatus is a thin fixed-bed mercury-screening system, which has been used by the EERC for many mercury capture screen tests. The pilot-scale systems included two combustion units, both equipped with an electrostatic precipitator (ESP). Activated carbons were also tested in a slipstream baghouse at a Texas power plant. The results indicated that the activated carbon produced from North Dakota lignite coal is capable of removing mercury from flue gas. The tests showed that activated carbon with the greatest iodine number was superior to commercial DARCO FGD for mercury capture. The results of the activated carbon market assessment indicate an existing market for water treatment and an emerging application for mercury control. That market will involve both existing and new coal-fired plants. It is expected that 20% of the existing coal-fired plants will implement activated carbon injection by 2015, representing about 200,000 tons of annual demand. The potential annual demand by new plants is even greater. In the mercury control market, two characteristics are going to dominate the customer's buying habit-performance and price. As continued demonstration testing of activated carbon injection at the various coal-fired power plants progresses, the importance of fuel type and plant configuration on the type of activated carbon best suited is being identified.

01 COAL, LIGNITE, AND PEAT↗

Thermal Analysis Of Saltstone Disposal Units

SRR requested that SRNL develop a two-dimensional computer simulation model to be capable of predicting grout temperatures attained in Saltstone Disposal Units (SDUs) during the transient addition of saltstone grout and its subsequent storage period. A simulation model was developed to calculate the transient grout temperatures of the SDU facility by taking an axisymmetric and two-dimensional Computational Fluid Dynamics (CFD) approach. The final performance calculations were based on the conduction and radiation model without a convection cooling mechanism for conservative estimate of the grout temperatures and computational efficiency. While convection within the SDU is disabled in the current calculations, the simulation model has the capability of turning convection back on if desired by the user. Hence, the thermal model in its current configuration is best characterized as a finite-volume heat transfer model. However, given that the model can account for convection if desired by the user, it will be referred to as a CFD model. The grout material contains a transient heat source due to the exothermic hydration reactions of the cementitious material mixed with salt solution. The model can predict the transient temperatures at point locations within the poured grout and the overlying vapor space, and at the interior and exterior surfaces of the structure. The thermal model has been developed for two SDUs at the Savannah River Site (SRS); namely, SDU 2A and SDU 6. SDU 2A is a cylindrical unit measuring 150 feet (ft) in diameter, 22 ft tall, and holds approximately three million gallons of grout. SDU 6 is 375 ft in diameter and 43 ft high with a capacity of over thirty million gallons. Prior to performing the thermal calculations for the SDU 6 facility, the benchmarking test for the smaller SDU 2A unit was performed to establish the solution method and to verify the computational results using existing thermocouple data. Based on the Lagrangian discrete method and boundary conditions established by the SDU 2A benchmarking test, the CFD calculations were performed to predict the transient temperatures at local positions of the poured grout and air spaces within the SDU 6 structure.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Study of an ammonia-based wet scrubbing process in a continuous flow system

A continuous gas and liquid flow, regenerative scrubbing process for CO{sub 2} capture was demonstrated at the bench-scale level. An aqueous ammonia-based solution captures CO{sub 2} from simulated flue gas in an absorber and releases a nearly pure stream of CO{sub 2} in the regenerator. After the regeneration, the solution of ammonium compounds is recycled to the absorber. The design of a continuous flow unit was based on earlier exploratory results from a semi-batch reactor, where a CO{sub 2} and N{sub 2} simulated flue gas mixture flowed through a well-mixed batch of ammonia-based solution. During the semi-batch tests, the solution was cycled between absorption and regeneration steps to measure the carrying capacity of the solution at various initial ammonia concentrations and temperatures. Consequentially, a series of tests were conducted on the continuous unit to observe the effect of various parameters on CO{sub 2} removal efficiency and regenerator effectiveness within the flow system. The parameters that were studied included absorber temperature, regenerator temperature, initial NH{sub 3} concentration, simulated flue gas flow rate, liquid solvent inventory in the flow system, and height of the packed-bed absorber. From this testing and subsequent testing, ammonia losses from both the absorption and regeneration steps were quantified, and attempts were made to maintain steady state during operations. Implications of experimental results with respect to process design are discussed.

54 ENVIRONMENTAL SCIENCES↗

Screening Compounds for Fast Pyrolysis and Catalytic Biofuel Upgrading Using Artificial Neural Networks

Abstract There is significant interest among researchers in finding economically sustainable alternatives to fossil-derived drop-in fuels and fuel additives. Fast pyrolysis, a method for converting biomass into liquid hydrocarbons with the potential for use as fuels or fuel additives, is a promising technology that can be two to three times less expensive at scale when compared to alternative approaches such as gasification and fermentation. However, many bio-oils directly derived from fast pyrolysis have a high oxygen content and high acidity, indicating poor performance in diesel engines when used as fuels or fuel additives. Thus, a combination of selective fast pyrolysis and chemical catalysis could produce tuned bioblendstocks that perform optimally in diesel engines. The variance in performance for derived compounds introduces a feedback loop in researching acceptable fuels and fuel additives, as various combustion properties for these compounds must be determined after pyrolysis and catalytic upgrading occurs. The present work aims to reduce this feedback loop by utilizing artificial neural networks trained with quantitative structure-property relationship values to preemptively screen pure component compounds that will be produced from fast pyrolysis and catalytic upgrading. The quantitative structure-property relationship values selected as inputs for models are discussed, the cetane number and sooting propensity of compounds derived from the catalytic upgrading of phenol are predicted, and the viability of these compounds as fuels and fuel additives is analyzed. The model constructed to predict cetane number has a test set prediction root-mean-squared error of 9.874 cetane units, and the model constructed to predict yield sooting index has a test set prediction root-mean-squared error of 13.478 yield sooting index units (on the unified scale).

09 BIOMASS FUELS↗

SECARB Report on Post-Injection In-Situ Monitoring

The Southeast Carbon Sequestration Partnership Phase III Anthropogenic Test at Citronelle Field is the United States’ largest prototype of commercial CO 2 capture from a coal-fired power station and transportation, injection, storage and monitoring. This report focuses on the results of the post-injection monitoring period for the Anthropogenic Test. Monitoring methods include both direct and indirect measurements. The Class V Experimental Permit requires extensive monitoring of injected CO 2 at the surface and at deep and shallow depths. The safety, integrity and information objectives of the CO 2 monitoring plan are in place to: (1) create and sustain wellbore integrity; (2) assure safe CO 2 injection operations; (3) verify the location and migration of the injected CO 2 plume; and (4) monitor for any CO 2 leakage. A robust suite of monitoring approaches is utilized for the in-situ monitoring and include, pressure monitoring, various seismic surveys, pulsed neutron logging, reservoir fluid sampling and injection surveys. Data and observations collected using these monitoring methods will be used in the numerical model to inform the post-injection site care monitoring plan. This report describes actions pertaining to in situ monitoring at the Anthropogenic Test Site that were undertaken during the period of September 2014 to May 2016. These monitoring techniques include the acquisition of pressure data, seismic data, pulsed neutron capture logs, reservoir fluid sampling, and tracer gas monitoring. CO 2 injection operations began on August 20, 2012 and terminated on September 1, 2014.

01 COAL, LIGNITE, AND PEAT↗

Detection of Damage Inducing Impact Events in Vibration Test Fixtures Using Holder Exponents

The Shock and Vibration team within the Test Engineering group at Los Alamos National Laboratory (LANL) aids in the development and qualification of weapon systems for the United States Department of Energy (DOE). Performing tests that replicate shock and vibration environments representative of a weapon’s lifetime is critical in ensuring safety, survivability, and reliability. A key factor in shock and vibration testing is accurate representation of the weapon’s boundary conditions in its end use configuration. The boundary conditions representative of a reentry body in flight are particularly difficult to replicate on an electrodynamic shaker. When executing shock and vibration tests on a reentry body, two system axes are tested with the system in a cantilevered configuration. This cantilevered testing configuration results in a moment load being applied to the system while undergoing vibration environments. A special fixture, known as the Flex-Web, was developed to decouple this moment load from the reentry body in order to more accurately represent real world boundary conditions while replicating flight environments.

42 ENGINEERING↗