Search NASA⌕ Search

SEARCH · Search NASA

Results for “Waste Transfer”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,009 records · Page 56

Pooling the resources of the CMS Tier-1 sites

The CMS experiment at the LHC relies on 7 Tier-1 centres of the WLCG to perform the majority of its bulk processing activity, and to archive its data. During the first run of the LHC, these two functions were tightly coupled as each Tier-1 was constrained to process only the data archived on its hierarchical storage. This lack of flexibility in the assignment of processing workflows occasionally resulted in uneven resource utilisation and in an increased latency in the delivery of the results to the physics community.The long shutdown of the LHC in 2013-2014 was an opportunity to revisit this mode of operations, disentangling the processing and archive functionalities of the Tier-1 centres. The storage services at the Tier-1s were redeployed breaking the traditional hierarchical model: each site now provides a large disk storage to host input and output data for processing, and an independent tape storage used exclusively for archiving. Movement of data between the tape and disk endpoints is not automated, but triggered externally through the WLCG transfer management systems.With this new setup, CMS operations actively controls at any time which data is available on disk for processing and which data should be sent to archive. Thanks to the high-bandwidth connectivity guaranteed by the LHCOPN, input data can be freely transferred between disk endpoints as needed to take advantage of free CPU, turning the Tier-1s into a large pool of shared resources. The output data can be validated before archiving them permanently, and temporary data formats can be produced without wasting valuable tape resources. Lastly, the data hosted on disk at Tier-1s can now be made available also for user analysis since there is no risk any longer of triggering chaotic staging from tape.In this contribution, we describe the technical solutions adopted for the new disk and tape endpoints at the sites, and we report on the commissioning and scale testing of the service. We detail the procedures implemented by CMS computing operations to actively manage data on disk at Tier-1 sites, and we give examples of the benefits brought to CMS workflows by the additional flexibility of the new system.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Initial Evaluation of Microreactor Disposition Options

The United States Department of Energy is supporting the U.S advanced reactor industry through funding, legislation and regulatory development to actively pursue several microreactor design concepts. The Idaho National Laboratory (INL) is strategically positioned to support demonstration of microreactor technology in the next three to five years. This report provides and initial evaluation of the disposition options for microreactor spent nuclear fuel (SNF) generated as part of the microreactor technology demonstration program. Currently available information constitutes the basis for the options identified and discussions thereof. In the absence of detailed microreactor design information, assumptions were made to facilitate the identification of disposition options Particulars pertaining to any component of an identified disposition pathway are naturally highly microreactor design specific and in general such details are not provided. The diverse nature of potential microreactor SNF is reflected in the diverse nature of DOE owned SNF stored at INL. Therefore, it is anticipated that DOE currently stores and manages fuels that can serve as analogs for most microreactor fuel concepts. As such disposition options for microreactor SNF are expected to be much the same as that for these existing fuels. Two generic microreactor concepts have been selected for the purposes of this options assessment. The selected reactor concepts are a tristructural isotropic (TRISO) fueled high temperature gas reactor concept and a sodium/potassium bonded heat pipe reactor with uranium oxide fuel. Both concepts are assumed to be using high-assay low enriched uranium (HALEU) as the initial fuel composition. Interim storage, treatment and neutralization, material recovery, packaging and extended dry storage options are identified these reactors. The disposition options include existing INL facilities and capabilities and new facilities and capabilities developed as part of the microreactor program or as part of DOE's overall strategy for the eventual transfer of all SNF at INL to a permanent repository.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Space Bioreactor Science Workshop

The first space bioreactor has been designed for microprocessor control, no gaseous headspace, circulation and resupply of culture medium, and a slow mixing in very low shear regimes. Various ground based bioreactors are being used to test reactor vessel design, on-line sensors, effects of shear, nutrient supply, and waste removal from continuous culture of human cells attached to microcarriers. The small (500 ml) bioreactor is being constructed for flight experiments in the Shuttle middeck to verify systems operation under microgravity conditions and to measure the efficiencies of mass transport, gas transfer, oxygen consumption, and control of low shear stress on cells. Applications of microcarrier cultures, development of the first space bioreactor flight system, shear and mixing effects on cells, process control, and methods to monitor cell metabolism and nutrient requirements are among the topics covered.

Morrison, Dennis R.↗

Suspension cell culture in microgravity and development of a space bioreactor

NASA has methodically developed unique suspension type cell and recovery apparatus culture systems for bioprocess technology experiments and production of biological products in microgravity. The first space bioreactor has been designed for microprocessor control, no gaseous headspace, circulation and resupply of culture medium, and slow mixing in very low shear regimes. Various ground based bioreactors are being used to test reactor vessel design, on-line sensors, effects of shear, nutrient supply, and waste removal from continuous culture of human cells attached to microcarriers. The small (500 ml) bioreactor is being constructed for flight experiments in the Shuttle middeck to verify systems operation under microgravity conditions and to measure the efficiencies of mass transport, gas transfer, oxygen consumption, and control of low shear stress on cells.

Morrison, Dennis R.↗

Transition and Transfer of Remediated FUSRAP Sites from USACE to US DOE for Long-Term Surveillance and Maintenance - 16209

The US Department of Energy (DOE) expects to receive the transfer of 10 FUSRAP Sites from the US Army Corps of Engineers (USACE) over the next 10 years; however, the timing of the transfers is highly dependent upon federal funding of the ongoing remedial actions. When remediation for each site is complete and the 2-year operations and maintenance period has concluded, each site will transfer from USACE to DOE for long-term surveillance and maintenance (LTS and M). US DOE's Office of Legacy Management (LM) will accept program responsibility for these sites and conduct LTS and M activities required to maintain protectiveness, preserve site-specific knowledge, and retain the cleanup and stewardship records while keeping stakeholders informed. Since the last FUSRAP site transfer occurred in 2007, LM in coordination with USACE intends to establish a transition process to promote the seamless transfer of sites from the time when the first record of decision is signed to the completion of FUSRAP activities. The approach to transfer active FUSRAP sites to completed sites status has been historically outlined in foundational documents such as the 1999 Memorandum of Understanding and supporting letters of agreement between the two agencies. As more complex FUSRAP sites are completed, this transition process will provide a model between the two agencies to communicate future long-term care liabilities. Ultimately, the FUSRAP transition process is structured to acquire and preserve site knowledge and information necessary for protecting the environment and public health. As of 2015, LM has transitioned and accepted programmatic responsibility for over 90 sites. From LM's perspective, successful transition of any site includes understanding the long-term environmental liabilities. LM uses site transition framework requirements from past transitions to develop site-specific transition plans. Site-specific transition plans are developed by LM in coordination with USACE and executed during the 2-year operations and maintenance period. An integrated project team of subject matter experts is assembled to address the conditions of the transitioning site; acquire a site records collection; evaluate site operations and final site conditions and associated risks; identify and contact stakeholders; and document the basis for site LTS and M requirements. While the majority of the transition activities are completed by LM, close coordination between US DOE LM and USACE throughout this process is essential for an effective and seamless transfer to assure that there is no lapse in site protectiveness. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Maintenance of Maywood Laboratory Operations Support During Contractor Transition and Replacement of the Project Databases - 16329

In December 2013, Cabrera Services (Cabrera) executed transition of the FUSRAP Maywood Superfund Site remediation project operations, including an on-site accredited environmental lab, from a large business that had established technology infrastructure in place for over a decade which required updating to support the expected remediation scope and client needs. As of November 2015, Cabrera has shipped over 116,000 yd{sup 3} of contaminated soil to disposal facilities. During the transition, the USACE FUSRAP Maywood Laboratory (UFML) continued to support project operations, providing the expected timely and reliable results and maintaining their New Jersey Department of Environmental Protection certification for all parameters of concern, while having to cope with new challenges and additional tasks having the potential to disrupt the laboratory's ability to support project operations. This case study examines the challenges with maintaining a certified radiochemistry laboratory and an aggressive remediation schedule during a period of prime contractor transition which included a complete IT infrastructure overhaul, and conversion of the existing Microsoft Access laboratory database and project Electronic Data Management System (EDMS) to a customized commercial solution. Challenges: I. Procurement of a new database subcontractor and working closely with them to achieve the following: a. Migration of all environmental (including radiological, chemical, and quality control), health and safety, and spatial data as well as reports, queries, and analytical instrument software processes from a MS Access data management system to a SQL server system; and b. Verification that the functionality and data integrity of the databases remained intact. II. The onsite laboratory was changed over to a new onsite network and the following tasks were completed with little or no interruption to site operations by January 10, 2014: i. Installation of new instrument personal computers (PCs) and making them fully operational; ii. Configuration of the lab domain and server to host the LIMS (replaced all servers/domain/workstations with Windows 7 and Server 2012 machines). iii. Networking of the laboratory building into the rest of the project site via fiber optic cabling across the site. iv. Upgrade of the wide area network (WAN) data connection to high-speed Fiber Optic service; v. Upgrade of the telephones into voice over internet protocol (VOIP) phones. vi. Splitting of the database into front ends and a centralized back-end hosted on the new server to allow simultaneous access for fixes and improvements. III. Phone service interruption; phone systems were operational by January 10, 2014. Additional Tasks: I. Revision of the USACE FUSRAP Maywood Laboratory (UFML) Quality Systems Manual Rev. 1 Submitted 01/16/14; II. Writing of the Uniform Federal Policy Quality Assurance Project Plan Rev. 1 (UFP-QAPP) submitted 1/21/14. This document replaced the prior project data quality plan, the Chemical Data Quality Management Plan. III. Support of USACE communications to the New Jersey Department of Environmental Protection (NJDEP) on lab management and personnel transition to Cabrera. This work was important since it ensured a smooth transition and shows how critical project records infrastructure such as databases, can be upgraded with minimal interruption of project support. Such work may provide benefit to other similar projects, especially long term projects where database infrastructure upgrades may be beneficial in terms of improved efficiencies in data recording and transfer, and improved security in data storage. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Site Composite Analysis: LLBG-200-W B Vadose Zone Model

The objectives of the vadose modeling for the updated Hanford Site Composite Analysis (CA) are to simulate the flow and transport of water and radionuclide releases from the surface to the water table and to provide radionuclide transfer rates to the CA saturated zone model (CP-57037, Model Package Report: Plateau to River Groundwater Model, Version 8.3). Water additions include natural recharge and water discharged to the ground as a result of industrial processes associated with Hanford Site operations. Contaminant sources include radionuclides in water discharged to the ground during operations and radionuclides disposed “dry” in solid waste burial grounds or other means. The following 16 radionuclides were selected for this modeling effort: carbon-14 (C-14), chlorine-36 (Cl-36), tritium (H-3), iodine-129 (I-129), neptunium-237 (Np-237), rhenium-187 (Re-187), strontium-90 (Sr-90), technetium-99 (Tc-99), uranium-232 (U-232), uranium-233 (U-233), uranium-234 (U-234), uranium-235 (U-235), uranium-236 (U-236), uranium-238 (U-238), radium-226 (Ra-226), and thorium-230 (Th-230). The simulation time starts in 1943 and ends at 12070, which is 10,000 years after assumed Hanford Site closure in 2070. The parallel version of the Subsurface Transport Over Multiple Phases (STOMP 1 ) simulator, officially named the exascale Subsurface Transport Over Multiple Phases (eSTOMP), is used to simulate flow and transport for the vadose models. The documentation for the STOMP code is comprehensive. The theoretical and numerical approaches applied in the STOMP code are documented in a published theory guide (PNNL-12030, STOMP Subsurface Transport Over Multiple Phases Version 2.0 Theory Guide). The code has undergone a rigorous verification procedure against analytical solutions, laboratory-scale experiments, and field-scale demonstrations. The application guide (PNNL-11216, STOMP Subsurface Transport Over Multiple Phases Application Guide) provides instructive examples in the application of the code to classical groundwater problems. The user’s guide (PNNL-15782, STOMP: Subsurface Transport Over Multiple Phases Version 4.0: User’s Guide) describes the general use, input file formatting, compilation, and execution of the code. The primary output of the vadose zone modeling is radionuclide transfer rates to the groundwater for input into the saturated zone model. The rates will be summed over the 100 by 100 m saturated zone model grid cells that fall within the vadose zone model source domain.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Practical Considerations of Waste Heat Reuse for a Mars Mission Advanced Life Support System

Energy conservation is a key issue in design optimization of Advanced Life Support Systems (ALSS) for long-term space missions. By considering designs for conservation at the system level, energy saving opportunities arise that would otherwise go unnoticed. This paper builds on a steady-state investigation of system-level waste heat reuse in an ALSS with a low degree of crop growth for a Mars mission. In past studies, such a system has been defined in terms of technology types, hot and cold stream identification and stream energy content. The maximum steady-state potential for power and cooling savings within the system was computed via the Pinch Method. In this paper, several practical issues are considered for achieving a pragmatic estimate of total system savings in terms of equivalent system mass (ESM), rather than savings solely in terms of power and cooling. In this paper, more realistic ESM savings are computed by considering heat transfer inefficiencies during material transfer. An estimate of the steady-state mass, volume and crewtime requirements associated with heat exchange equipment is made by considering heat exchange equipment material type and configuration, stream flow characteristics and associated energy losses during the heat exchange process. Also, previously estimated power and cooling savings are adjusted to reflect the impact of such energy losses. This paper goes one step further than the traditional Pinch Method of considering waste heat reuse in heat exchangers to include ESM savings that occur with direct reuse of a stream. For example, rather than exchanging heat between crop growth lamp cooling air and air going to a clothes dryer, air used to cool crop lamps might be reused directly for clothes drying purposes. When thermodynamically feasible, such an approach may increase ESM savings by minimizing the mass, volume and crewtime requirements associated with stream routing equipment.

Levri, Julie↗

M-Star ® Software Test and Verification

Savannah River Mission Completion (SRMC) currently manages the risk for retained hydrogen in the Defense Waste Processing Facility (DWPF) vessels by implementing a Retained Hydrogen Program. The current program relies on Sludge Batch (SB) 8 Gas Chromatograph data and on conservative assumptions concerning gas release and retention to determine allowable vessel Quiescent time (Q-time). The authors identified M-Star ® CFD as a software that could simulate processes such as fluid flow, heat transfer, species transport, chemical reactions, particle transport, and retained hydrogen gas release. Preliminary simulation results suggest that more realistic assumptions on gas retention and release may be feasible for the DWPF retained hydrogen program. Because of the desire to use the M-Star ® software to perform analyses that support nuclear safety, SRMC has requested Savannah River National Laboratory (SRNL) to upgrade the software classification level of M-Star ® CFD from level D to level A to perform analyses that support nuclear safety.

08 HYDROGEN↗

CELSS Antarctic Analog Project (CAAP): A New Paradigm for Polar Life Support and CELSS Research

The CELSS Antarctic Analog Project (CAAP) is a joint National Science Foundation (NSF) and National Aeronautics and Space Administration (NASA) project for the development, deployment and operation of CELSS technologies at the Amundsen-Scott South Pole Station. CAAP is implemented through the joint NSF/NASA Antarctic Space Analog Program (ASAP), initiated to support the pursuit of future NASA missions and to promote the transfer of space technologies to the NSF. Under a Memorandum of Agreement, the CAAP represents an example of a working dual agency cooperative project. NASA goals are operational testing of CELSS technologies and the conduct of scientific study to facilitate . technology selection, system design and methods development, including human dynamics as required for the operation of a CELSS. Although not fully closed, food production, water purification, and waste recycle and reduction provided by CAAP will improve the quality of life for the South Pole inhabitants, reduce logistics dependence, and minimize environmental impacts associated with human presence on the polar plateau. The CAAP facility will be highly integrated with the new South Pole Station infrastructure and will be composed of a deployed hardware facility and a research activity. This paper will include a description of CAAP and its functionality, conceptual designs, component selection and sizing for the crop growth chamber, crop production expectations, and a brief report on an initial on-site visit. This paper will also provide a discussion of issues associated with power and energy use and the applicability of CAAP to direct technology transfer to society in general and remote communities in particular.

Bubenheim, David L.↗

Logistics resupply and emergency crew return system for Space Station Freedom

Sometime in the late 1990's, if all goes according to plan, Space Station Freedom will allow the United States and its cooperating partners to maintain a permanent presence in space. Acting as a scientific base of operations, it will also serve as a way station for future explorations of the Moon and perhaps even Mars. Systems onboard the station will have longer lifetimes, higher reliability, and lower maintenance requirements than seen on any previous space flight vehicle. Accordingly, the station will have to be resupplied with consumables (air, water, food, etc.) and other equipment changeouts (experiments, etc.) on a periodic basis. Waste materials and other products will also be removed from the station for return to Earth. The availability of a Logistics Resupply Module (LRM), akin to the Soviet's Progress vehicle, would help to accomplish these tasks. Riding into orbit on an expendable launch vehicle, the LRM would be configured to rendezvous autonomously and dock with the space station. After the module is emptied of its cargo, waste material from the space station would be loaded back into it. The module would then begin its descent to a recovery point on Earth. Logistics Resupply Modules could be configured in a variety of forms depending on the type of cargo being transferred. If the LRM's were cycled to the space station in such a way that at least one vehicle remained parked at the station at all times, the modules could serve double duty as crew emergency return capsules. A pressurized LRM could then bring two or more crew-persons requiring immediate return (because of health problems, system failure, or unavoidable catastrophes) back to Earth. Large cost savings would be accrued by combining the crew return function with a logistics resupply system.

Ahne, D.↗

Packaging, Transportation and Recycling of NPP Condenser Modules - 12262

Perma-Fix was awarded contract from Energy Northwest for the packaging, transportation and disposition of the condenser modules, water boxes and miscellaneous metal, combustibles and water generated during the 2011 condenser replacement outage at the Columbia Generating Station. The work scope was to package the water boxes and condenser modules as they were removed from the facility and transfer them to the Perma-Fix Northwest facility for processing, recycle of metals and disposition. The condenser components were oversized and overweight (the condenser modules weighed ∼102,058 kg [225,000 lb]) which required special equipment for loading and transport. Additional debris waste was packaged in inter-modals and IP-1 boxes for transport. A waste management plan was developed to minimize the generation of virtually any waste requiring landfill disposal. The Perma-Fix Northwest facility was modified to accommodate the ∼15 m [50-ft] long condenser modules and equipment was designed and manufactured to complete the disassembly, decontamination and release survey. The condenser modules are currently undergoing processing for free release to a local metal recycler. Over three millions pounds of metal will be recycled and over 95% of the waste generated during this outage will not require land disposal. There were several elements of this project that needed to be addressed during the preparation for this outage and the subsequent packaging, transportation and processing. - Staffing the project to support 24/7 generation of large components and other wastes. - The design and manufacture of the soft-sided shipping containers for the condenser modules that measured ∼15 m X 4 m X 3 m [50 ft X 13 ft X 10 ft] and weighed ∼102,058 kg [225,000 lbs] - Developing a methodology for loading the modules into the shipping containers. - Obtaining a transport vehicle for the modules. - Designing and modifying the processing facility. - Movement of the modules at the processing facility. If any of these issues were not adequately resolved prior to the start of the outage, costly delays would result and the re-start of the power plant could be impacted. The main focus of this project was to find successful methods for keeping this material out of the landfills and preserving the natural resources. In addition, this operation provided a significant cost savings to the public utility by minimizing landfill disposal. The onsite portion of the project has been completed without impact to the overall outage schedule. By the date of presentation, the majority of the waste from the condenser replacement project will have been processed and recycled. The goals for this project included helping Energy Northwest maintain the outage schedule, package and characterize waste compliantly, perform transportation activities in compliance with 49CFR (Ref-1), and minimize the waste disposal volume. During this condenser replacement project, over three millions pounds of waste was generated, packaged, characterized and transported without injury or incident. It is anticipated that 95% of the waste generated during this project will not require landfill disposal. All of the waste is scheduled to be processed, decontaminated and recycled by June of 2012. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Economic Losses From a Fire in a Dense-Packed U.S. Spent Fuel Pool

In 2013, the staff of the U.S. Nuclear Regulatory Commission estimated the reduction of the off-site economic losses from a fire in a drained U.S. spent fuel pool if fuel that had cooled for more than five years were transferred to dry cask storage—an option it called “expedited transfer.” In this article, it is shown that the savings would be much higher than the NRC estimated. Savings increase to about $2 trillion if: losses beyond 50 miles are included; the land-contamination threshold for long-term population relocation is changed to that used for the Chernobyl and Fukushima accidents and recommended by the U.S. Environmental Protection Agency; and, based on the experience of Japan, decontamination of land areas to levels acceptable for population return is assumed to take at least four years. If expedited transfer were implemented, the off-site economic losses would be reduced by about 98%.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Simulation of Proposed Heat Treatment Methods for the Sister Rods

The High Burnup Spent Fuel Data Project (the 'project'), sponsored by the U.S. Department of Energy (DOE) Office of Nuclear Energy (NE), is focused on experimentally evaluating the effects of long-term dry storage and transportation on high burnup (HBU) pressurized water reactor (PWR) fuel (>45 gigawatt days per metric ton uranium). The goals of the project are to provide confirmatory data for analytical model validation and potential improvement; to provide input to future dry storage cask design; to support license renewals and new licenses for Independent Spent Fuel Storage Installation facilities; and to support transportation licensing for high burnup used fuel. In support of these project goals, an instrumented TN-32B bolted-lid cask (the Research Project Cask or RPC) at the North Anna reactor site will be loaded with intact, HBU PWR fuel assemblies (Project Assemblies) having four different kinds of cladding: standard Zircaloy-4, low-tin Zircaloy-4, ZIRLO{sup R}, and M5{sup R}. In approximately ten years, the instrumented cask will be opened for inspection and several fuel rods from the Project Assemblies will be characterized. The project has also removed 25 'sister rods' from assemblies at North Anna: 9 directly from the project assemblies and 16 from similarly constructed and operated HBU assemblies. The 25 sister rods are all high burnup and cover the range of domestically-used cladding alloys. The 25 sister rods were shipped to Oak Ridge National Laboratory (ORNL) in early 2016 for detailed non-destructive examinations (NDE) followed by destructive examination (DE). Examination of the sister rods will provide a baseline for comparison with the cask rods and will allow for separate effects testing. Dry storage canister loading is completed under water in a designated area of the plant's spent fuel pool. In preparation for dry storage, the fuel assemblies and canister cavity must be drained and dried. Typically, the highest temperatures experienced by the fuel during dry storage are encountered either during drying or transfer of the canister to the storage pad; therefore, as a part of the sister rod testing these temperatures will be simulated in the lab to produce samples that are representative of the peak cladding temperature the fuel experiences either during drying, transfer, or storage. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Vadose Zone Model for S Farms Area for Composite Analysis

The objectives of the vadose modeling for the updated Hanford Site composite analysis (CA) are to simulate the flow and transport of water and radionuclide releases from the surface to the water table and to provide radionuclide transfer rates for the plateau to river (P2R) model, version 8.3 (CP-57037, Model Package Report: Plateau to River Groundwater Model, Version 8.3). Water additions include natural recharge and water discharged to the ground as a result of industrial processes associated with Hanford Site operations. Contaminant sources include radionuclides in water discharged to the ground during operations and radionuclides disposed "dry" in solid waste burial grounds or other means. The following 16 radionuclides were selected for this modeling effort: carbon-14 (C-14), chloiine-36 (Cl-36), tritium (H-3), iodine-129 (I-129), neptunium-237 (Np-237), rhenium-187 (Re-187), strontium-90 (Sr-90), technetium-99 (Tc-99), uranium-232 (U-232), uranium-233 (U-233), uranium-234 (U-234), uranium-235 (U-235), uranium-236 (U-236), uranium-238 (U-238), radium-226 (Ra-226), and thmium-230 (Th-230). The simulation time struts in 1943 and ends at 12070, which is 10,000 years after assumed Hanford Site closure in 2070. The parallel version of the Subsurface Transport Over Multiple Phases (STOMP) simulator, officially named the exascale Subsurface Transport Over Multiple Phases ( eSTOMP), is used to simulate flow and transport for the vadose models. The documentation for the STOMP code is comprehensive. The theoretical and numerical approaches applied in the STOMP code are documented in a published theory guide (PNNL-12030, STOMP Subsurface Transport Over Multiple Phases Version 2.0 Theory Guide). The code has undergone a rigorous verification procedure against analytical solutions, laboratory-scale experiments, and field-scale demonstrations. The application guide (PNNL-11216, STOMP Subsurface Transport Over Multiple Phases Application Guide) provides instructive examples in the application of the code to classical groundwater problems. The user's guide (PNNL-15782, STOMP: Subsurface Transport Over Multiple Phases Version 4.0: User 's Guide) describes the general use, input file formatting, compilation, and execution of the code. The primary output of the vadose zone modeling is radionuclide transfer rates to the groundwater for input into the P2R model. The rates will be summed over the 100 by 100 m P2R grid cells that fall within the vadose zone model source domain.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nuclear Safety [Vol. 29, No. 1, January-March 1988]

Nuclear Safety is a review journal that covers significant developments in the field of nuclear safety. Its scope includes the analysis and control of hazards associated with nuclear energy, operations involving fissionable materials, and the products of nuclear fission and their effects on the environment. Primary emphasis is on safety in reactor design, construction, and operation; however, the safety aspects of the entire fuel cycle, including fuel fabrication, spent-fuel processing, nuclear waste disposal, handling of radioisotopes, and environmental effects of these operations, are also treated. Table of Contents for this issue follows. THE CHERNOBYL ACCIDENT: 1 Core History and Nuclide Inventory of the Chernobyl Core at the Time of Accident by Gerald Kirchner and Cornelius C. Noack; GENERAL SAFETY CONSIDERATIONS: 6 Nonprescriptive Nuclear Safety Regulation: The Example of Loss of Offsite Power by M. W. Golay, V. P. Manno, and C. Vlahoplus, Jr., 20 Nuclear Power Safety Goals in Light of the Chernobyl Accident by C. Whipple and C. Starr; ACCIDENT ANALYSIS: 29 Containment Loads from Severe Accidents—U.S. Program by W. Kerr and M. K. Dey; PLANT SAFETY FEATURES: 36 Safety Characteristics of Modern High-Temperature Reactors: Focus on German Designs by W. Kröger, H. Nickel, and R. Schulten; ENVIRONMENTAL EFFECTS: 49 Radiation Hormesis and Nuclear Safety by C. C. Congdon; OPERATING EXPERIENCES: 58 Evaluation of Nonradiological Water Chemistry at Power Reactors by Harvey Zibulsky, James J. Kottan, Walter J. Pasciak, Mary Ann Castrogivanni, and Sujit Banerjee, 64 Reactor Shutdown Experience Compiled by J. W. Cletcher, 67 Operating U.S. Power Reactors Compiled by E. G. Silver; RECENT DEVELOPMENTS: 85 General Administrative Activities Compiled by E. G. Silver, 94 Reports, Standards, and Safety Guides by D. S. Queener, 100 Status of Power-Reactor Projects Undergoing Licensing Review Compiled by E. G. Silver, 103 Proposed Rule Changes as of Sept. 30, 1987; ANNOUNCEMENTS: 5 Northwestern University Short Course on Radiation Safety, 28 International Approach to Nuclear Safety (After Three-Mile Island and Chernobyl), 57 RPI Short Course on Modern Developments in Boiling Heat Transfer and Two-Phase Flow, 107 20th DOE/NRC Nuclear Air Cleaning Conference, 110 Third International Topical Meeting on Nuclear Power Plant Thermal Hydraulics and Operations, 108 The Authors, 111 Indexes to Nuclear Safety, Volume 28.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

WTP Modifications to Support DFLAW: LAW, BOF, Lab - 16219

The Hanford Tank Waste Treatment and Immobilization Plant (WTP) is a one-of-a-kind nuclear waste treatment facility being designed and constructed for the U.S. Department of Energy by Bechtel National, Inc. and principal subcontractor URS to process and vitrify radioactive waste stored in underground tanks at the Hanford Site. The Tank Operations Contractor, Washington River Protection Solutions, has responsibility to retrieve, stage, pretreat, and deliver the tank waste feed to WTP. To treat tank waste as soon as practicable, a scenario is being considered to deliver pretreated feed straight to WTP's Low-Activity Waste (LAW) Vitrification Facility. This scenario is called the Direct Feed LAW (DFLAW) program. Balance of Facility utility and system facilities are designed for full WTP operation. Thirteen of these are needed to support reduced throughput during DFLAW operation, of which eight require moderate to extensive changes. Extensive changes include permanent plant modifications that allow DFLAW to operate if the Pretreatment (PT) Facility is unavailable. Under full WTP operation, effluents from the LAW Facility will be returned to the PT Facility for further processing and/or transfer to the Liquid Effluent Retention Facility/Effluent Treatment Facility. The PT Facility also handles all flush water from the tank farm transfers. To address these requirements, a Value Improvement Project was performed. The recommended approach is to provide a 'split stream' Effluent Management Facility (EMF) with an evaporator to support DFLAW. The required modifications for DFLAW facilities are discussed in this paper. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hybrid-energy approach enabled by heat storage and oxy-combustion to generate electricity with near-zero or negative CO 2 emissions

We assess a hybrid-energy approach that modifies a steam-turbine power plant to use renewable energy sources (electricity, plus options for geothermal and solar heat), plus fossil fuel (natural gas and coal) and/or waste biomass (e.g., Douglas fir woodchips). Heat storage allows heat to be created during periods of excess energy supply and for that heat to be converted to electricity when demanded. Excess electricity, such as from variable renewable energy (VRE), is used to generate oxygen for oxy-combustion furnaces that create very-hot, high-purity CO 2 that heats granular rock beds in insulated vessels. Cool CO 2 leaving the beds is dried, sent to compressors powered by excess VRE electricity, before being sent by pipeline to geologic CO 2 storage. Very-hot CO 2 transfers high-grade heat from storage to the power plant in a closed loop that returns medium-grade heat back to storage, allowing low- and medium-grade renewable-heat sources to be stacked beneath combustion heat, with all heat sources being converted to electricity at the same (high) thermal efficiency. Reliable, on-demand power may be generated with near-zero CO 2 emissions with fossil fuel and with negative CO 2 emissions with waste biomass. Our analyses show that with fossil fuel, up to 35% of gross power can be derived from renewable sources, while for waste biomass, it can be entirely derived from renewable sources. Because our approach has the potential to ensure that grids have a continuous supply of clean energy and because electricity is only generated once, when demanded, it could serve as an efficient alternative to bulk energy storage.

30 DIRECT ENERGY CONVERSION↗