Search NASA⌕ Search

SEARCH · Search NASA

Results for “construction technologies”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,009 records · Page 56

Construction of a Virtual Scanning Electron Microscope (VSEM)

The Imaging Technology Group (ITG) proposed to develop a Virtual SEM (VSEM) application and supporting materials as the first installed instrument in NASA s Virtual Laboratory Project. The instrument was to be a simulator modeled after an existing SEM, and was to mimic that real instrument as closely as possible. Virtual samples would be developed and provided along with the instrument, which would be written in Java.

Fried, Glenn↗

Ultra-High Temperature Ceramic Composites for Leading Edges

Ultra-high temperature ceramics (UHTC) have performed unreliably due to material flaws and attachment design. These deficiencies are brought to the fore by the low fracture toughness and thermal shock resistance of UHTC. If these deficiencies are overcome, we are still faced with poor oxidation resistance as a limitation on UHTC applicability to reusable launch vehicles. We have been addressing the deficiencies of UHTC for the past two years via a small task at GRC that is in the Airframe part of the Next Generation Launch Technology Program. Our focus is on composite constructions and functional grading to address the mechanical issues and on composition modification to address the oxidation issue. The progress on approaches to improving oxidation resistance by alloying and functional grading will be reported. In particular, initial tests of tantalum additions have shown potential for major improvement. Results for additional tests at higher temperatures will be presented. These oxidation improvements are being incorporated in the composites approaches. Two fabrication approaches are being persued to produce carbon fiber reinforced UHTC composites: prepregging and rigid perform infiltration. Fabrication procedures, microstructures, and initial mechanical property and oxidation results for composites will be reported.

Levine, Stanley R.↗

A Roof for the Lions' House

Fans of the National Football League s Detroit Lions don't worry about game day weather. Their magnificent new Pontiac Stadium has a domed, air-supported, fabric roof that admits light but protects the playing field and patrons from the elements. The 80,000-seat Silverdome is the world s largest fabric-covered structure-and aerospace technology played an important part in its construction. The key to economical construction of the Silverdome--and many other types of buildings--is a spinoff of fiber glass Beta yarn coated with Teflon TFE fluorocarbon resin. The big advance it offers is permanency.The team of DuPont, Chemical Fabrics and Birdair have collaborated on a number of fabric structures. Some are supported by air pressure, others by cables alone. Most of the structures are in the recreational category. With conventional construction costs still on the upswing, you're likely to see a great many more permanent facilities enclosed by the aerospace spinoff fabric.

Source record↗

Ultra-high Temperature Ceramic Composites for Leading Edges, 2004

Ultrahigh temperature ceramics (UHTC) have performed unreliably due to material flaws and attachment design. These deficiencies are brought to the fore by the low fracture toughness and thermal shock resistance of the UHTC. If these deficiencies are overcome, we are still faced with poor oxidation resistance as a limitation on UHTC applicability to reusable launch vehicles. We have been addressing the deficiencies of UHTC for the past two years via a small task at GRC that is in the Airframe part of the Next Generation Launch Technology Program. Our focus is on composite constructions and functional grading to address the mechanical issues and on composition modification to address the oxidation issue. The progress on approaches to improving oxidation resistance by alloying and functional grading will be reported.

Levine, Stanley R.↗

A Roof for the Lion's House

Fans of the National Football League's Detroit Lions don't worry about gameday weather. Their magnificent new Pontiac Stadium has a domed, air-supported, fabric roof that admits light but protects the playing field and patrons from the elements. The 80,000-seat "Silverdome" is the world's largest fabric-covered structure-and aerospace technology played an important part in its construction. The key to economical construction of the Silverdome-and many other types of buildings-is a spinoff of fiber glass Beta yarn coated with Teflon TFE fluorocarbon resin. The big advance it offers is permanency. Fabric structures-tents, for example have been around since the earliest years of human civilization. But their coverings-hides, canvas and more recently plastics-were considered temporary; though tough, these fabrics were subject to weather deterioration. Teflon TFE-coated Beta Fiberglas is virtually impervious to the effects of weather and sunlight and it won't stretch, shrink, mildew or rot, thus has exceptional longevity; it is also very strong, lightweight, flame resistant and requires no periodic cleaning, because dirt will not stick to the surface of Teflon TFE. And to top all that, it costs only 30 to 40 percent as much as conventional roofing.

Source record↗

Construction and Resource Utilization Explorer: Regolith Characterization Using a Modular Instrument Suite and Analysis Tools

The Construction Resource Utilization Explorer (CRUX) is a technology maturation project for the U.S. National Aeronautics and Space Administration to provide enabling technology for lunar and planetary surface operations (LPSO). The CRUX will have 10 instruments, a data handling function (Mapper - with features of data subscription, fusion, interpretation, and publication through geographical information system [GIs] displays), and a decision support system DSS) to provide information needed to plan and conduct LPSO. Six CRUX instruments are associated with an instrumented drill to directly measure regolith properties (thermal, electrical, mechanical, and textural) and to determine the presence of water and other hydrogen sources to a depth of about 2 m (Prospector). CRUX surface and geophysical instruments (Surveyor) are designed to determine the presence of hydrogen, delineate near subsurface properties, stratigraphy, and buried objects over a broad area through the use of neutron and seismic probes, and ground penetrating radar. Techniques to receive data from existing space qualified stereo pair cameras to determine surface topography will also be part of the CRUX. The Mapper will ingest information from CRUX instruments and other lunar and planetary data sources, and provide data handling and display features for DSS output. CRUX operation will be semi-autonomous and near real-time to allow its use for either planning or operations purposes.

Moon↗

GeoLab: A Geological Workstation for Future Missions

The GeoLab glovebox was, until November 2012, fully integrated into NASA's Deep Space Habitat (DSH) Analog Testbed. The conceptual design for GeoLab came from several sources, including current research instruments (Microgravity Science Glovebox) used on the International Space Station, existing Astromaterials Curation Laboratory hardware and clean room procedures, and mission scenarios developed for earlier programs. GeoLab allowed NASA scientists to test science operations related to contained sample examination during simulated exploration missions. The team demonstrated science operations that enhance theThe GeoLab glovebox was, until November 2012, fully integrated into NASA's Deep Space Habitat (DSH) Analog Testbed. The conceptual design for GeoLab came from several sources, including current research instruments (Microgravity Science Glovebox) used on the International Space Station, existing Astromaterials Curation Laboratory hardware and clean room procedures, and mission scenarios developed for earlier programs. GeoLab allowed NASA scientists to test science operations related to contained sample examination during simulated exploration missions. The team demonstrated science operations that enhance the early scientific returns from future missions and ensure that the best samples are selected for Earth return. The facility was also designed to foster the development of instrument technology. Since 2009, when GeoLab design and construction began, the GeoLab team [a group of scientists from the Astromaterials Acquisition and Curation Office within the Astromaterials Research and Exploration Science (ARES) Directorate at JSC] has progressively developed and reconfigured the GeoLab hardware and software interfaces and developed test objectives, which were to 1) determine requirements and strategies for sample handling and prioritization for geological operations on other planetary surfaces, 2) assess the scientific contribution of selective in-situ sample characterization for mission planning, operations, and sample prioritization, 3) evaluate analytical instruments and tools for providing efficient and meaningful data in advance of sample return and 4) identify science operations that leverage human presence with robotic tools. In the first year of tests (2010), GeoLab examined basic glovebox operations performed by one and two crewmembers and science operations performed by a remote science team. The 2010 tests also examined the efficacy of basic sample characterization [descriptions, microscopic imagery, X-ray fluorescence (XRF) analyses] and feedback to the science team. In year 2 (2011), the GeoLab team tested enhanced software and interfaces for the crew and science team (including Web-based and mobile device displays) and demonstrated laboratory configurability with a new diagnostic instrument (the Multispectral Microscopic Imager from the JPL and Arizona State University). In year 3 (2012), the GeoLab team installed and tested a robotic sample manipulator and evaluated robotic-human interfaces for science operations.

Evans, Cynthia↗

Challenges of In Space Robotic Servicing

As future space missions extend beyond the friendly confines of low earth orbit, robots are becoming an increasingly vital component on flight manifests. While the main focus to-date has been on satellite servicing due to its high commercial potential, robots are also being considered for orbital debris removal, space construction, and asteroid sample retrieval. The robotic technologies and automation required to carry out these missions represent a significant advancement beyond the manipulation technology used previously on the Space Shuttle, the International Space Station, and planetary rovers. While higher demands are being driven by the more ambitious nature of the tasks, the handling of uncooperative targets such as satellites and asteroids, present a greater challenge.

robotic technologies↗

UAS-NAS Integrated Human in the Loop: Test Environment Report

The desire and ability to fly Unmanned Aircraft Systems (UAS) in the National Airspace System (NAS) is of increasing urgency. The application of unmanned aircraft to perform national security, defense, scientific, and emergency management are driving the critical need for less restrictive access by UAS to the NAS. UAS represent a new capability that will provide a variety of services in the government (public) and commercial (civil) aviation sectors. The growth of this potential industry has not yet been realized due to the lack of a common understanding of what is required to safely operate UAS in the NAS. NASA's UAS Integration in the NAS Project is conducting research in the areas of Separation Assurance/Sense and Avoid Interoperability (SSI), Human Systems Integration (HSI), and Communication to support reducing the barriers of UAS access to the NAS. This research was broken into two research themes namely, UAS Integration and Test Infrastructure. UAS Integration focuses on airspace integration procedures and performance standards to enable UAS integration in the air transportation system, covering Sense and Avoid (SAA) performance standards, command and control performance standards, and human systems integration. The focus of the Test Infrastructure theme was to enable development and validation of airspace integration procedures and performance standards, including the execution of integrated test and evaluation. In support of the integrated test and evaluation efforts, the Project developed an adaptable, scalable, and schedulable relevant test environment incorporating live, virtual, and constructive elements capable of validating concepts and technologies for unmanned aircraft systems to safely operate in the NAS. To accomplish this task, the Project planned to conduct three integrated events: a Human-in-the-Loop simulation and two Flight Test series that integrated key concepts, technologies and/or procedures in a relevant air traffic environment. Each of the integrated events were built on the technical achievements, fidelity and complexity of previous simulations and tests, resulting in research findings that support the development of regulations governing the access of UAS into the NAS. The purpose of this document is to describe how well the system under test was representative

Human in the Loop↗

The JWST Science Instrument Payload: Mission Context and Status

The James Webb Space Telescope (JWST) is the scientific successor to the Hubble Space Telescope. It is a cryogenic infrared space observatory with a 25 sq m aperture (6 m class) telescope that will achieve diffraction limited angular resolution at a wavelength of 2 microns. The science instrument payload includes four passively cooled near-infrared instruments providing broad- and narrow-band imagery, coronography, as well as multi-object and integral-field spectroscopy over the 0.6 < lambda < 5.0 microns spectrum. An actively cooled mid-infrared instrument provides broad-band imagery, coronography, and integral-field spectroscopy over the 5.0 < lambda < 29 microns spectrum. The JWST is being developed by NASA, in partnership with the European and Canadian Space Agencies, as a general user facility with science observations to be proposed by the international astronomical community in a manner similar to the Hubble Space Telescope. Technology development and mission design are complete. Construction, integration and verification testing is underway in all areas of the program. The JWST is on schedule for launch during 2018.

cryogenic infrared space observatory↗

The James Webb Space Telescope: Mission Overview and Status

The James Webb Space Telescope (JWST) is the scientific successor to the Hubble Space Telescope. It is a cryogenic infrared space observatory with a 25 m2 aperture (6 m class) telescope that will achieve diffraction limited angular resolution at a wavelength of 2 um. The science instrument payload includes four passively cooled near-infrared instruments providing broad- and narrow-band imagery, coronography, as well as multi-object and integral-field spectroscopy over the 0.6 < λ < 5.0 µm spectrum. An actively cooled mid-infrared instrument provides broad-band imagery, coronography, and integral-field spectroscopy over the 5.0 < λ < 29 µm spectrum. The JWST is being developed by NASA, in partnership with the European and Canadian Space Agencies, as a general user facility with science observations proposed by the international astronomical community in a manner similar to the Hubble Space Telescope. Technology development and mission design are complete. Construction, integration and verification testing is underway in all areas of the program. The JWST is on schedule for launch during 2021.

Greenhouse, Matthew↗

Fabrication of monocrystalline silicon x-ray mirrors

Progress within the fi eld of x-ray astronomy depends on astronomical x-ray observations of ever-increasing quality and speed. Fast and high-resolution x-ray observations over a broad spectral range promise amazing new discoveries. These observations, however, require a spaceborne x-ray telescope of unprecedented imaging power. Of the numerous technological concerns associated with the design and construction of such a telescope, the x-ray focusing optics present a particularly complex and arduous set of challenges. An x-ray optical assembly comprises many thousands of x-ray mirrors, a most critical element. Our group at NASA Goddard Space Flight Center (GSFC) pursues the development of an x-ray mirror manufacturing process capable of meeting the stringent quality, production time, and cost requirements of the next-generation of x-ray telescopes. The manufacturing process employs monocrystalline silicon: a lightweight, stiff, thermally conductive, and readily available material which is free of internal stress; it is a nearly ideal material for a thin mirror substrate. The process involves various traditional optical fabrication techniques adapted to x-ray mirror geometry. Presently, our process is capable of fabricating sub-arcsecond half-power diameter (HPD) resolution mirror pairs (primary and secondary) at a mirror thickness of 0.5 mm and of virtually any x-ray optical design (e.g. Wolter-I, Wolter-Schwarzschild, etc.). The mirror substrate surface quality is comparable to, and sometimes exceeding, that of the mirrors on the Chandra X-ray Observatory. This paper describes the various manufacturing steps involved in the production of x-ray mirror substrates and a present status report.

Raul E. Riveros↗

PERFORMANCE EVALUATION OF A SUSTAINABLE AND ENERGY EFFICIENT RE-ROOFING TECHNOLOGY USING FIELD-TEST DATA

Three test attics were constructed to evaluate a new sustainable method of re-roofing utilizing photo-voltaic (PV) laminates, metal roofing panels, and PCM heat sink in the Envelope Systems Research Apparatus (ESRA) facility in the ORNL campus. Figure 1 is a picture of the three attic roofs located adjacent to each other. The leftmost roof is the conventional shingle roof, followed by the metal panel roof incorporating the cool-roof coating, and third from left is the roof with the PCM. On the PCM roof, the PV panels are seen as well; they're labelled from left-to-right as panels 5, 6 and 7. The metal panel roof consists of three metal panels with the cool-roof coating; in further discussion this is referred to as the infrared reflective (IRR) metal roof. The IRR metal panels reflect the incoming solar radiation and then quickly re-emit the remaining absorbed portion, thereby reducing the solar heat gain of the attic. Surface reflectance of the panels were measured using a Solar Spectrum Reflectometer. In the 0.35-2.0 {mu}m wavelength interval, which accounts for more than 94% of the solar energy, the IRR panels have an average reflectance of 0.303. In the infrared portion of the spectrum, the IRR panel reflectance is 0.633. The PCM roof consists of a layer of macro-encapsulated bio-based PCM at the bottom, followed by a 2-cm thick layer of dense fiberglass insulation with a reflective surface on top, and metal panels with pre-installed PV laminates on top. The PCM has a melting point of 29 C (84.2 F) and total enthalpy between 180 and 190 J/g. The PCM was macro-packaged in between two layers of heavy-duty plastic foil forming arrays of PCM cells. Two air cavities, between PCM cells and above the fiberglass insulation, helped the over-the-deck natural air ventilation. It is anticipated that during summer, this extra ventilation will help in reducing the attic-generated cooling loads. The extra ventilation, in conjunction with the PCM heat sink, are used to minimize thermal stresses due to the PV laminates on sunny days. In PV laminates sunlight is converted into electricity and heat simultaneous. In case of building integrated applications, a relatively high solar absorption of amorphous silicon laminates can be utilized during the winter for solar heating purposes with PCM providing necessary heat storage capacity. However, PV laminates may also generate increased building cooling loads during the summer months. Therefore, in this project, the PCM heat sink was to minimize summer heat gains as well. The PCM-fibreglass-PV assembly and the IRR metal panels are capable of being installed directly on top of existing shingle roofs during re-roofing, precluding the need for recycling or disposal of waste materials. The PV laminates installed on the PCM attic are PVL-144 models from Uni-Solar. Each laminate contains 22 triple junction amorphous silicon solar cells connected in series. The silicon cells are of dimensions 356 mm x 239 mm (14-in. x 9.4-in.). The PVL-144 laminate is encapsulated in durable ETFE (poly-ethylene-co-tetrafluoroethylene) high light-transmissive polymer. Table 1 lists the power, voltage and current ratings of the PVL-144 panel.

14 SOLAR ENERGY↗

Thermal-mechanical modeling of deep borehole disposal of high-level radioactive waste.

Disposal of high-level radioactive waste, including spent nuclear fuel, in deep (3 to 5 km) boreholes is a potential option for safely isolating these wastes from the surface and near-surface environment. Existing drilling technology permits reliable and cost-effective construction of such deep boreholes. Conditions favorable for deep borehole disposal in crystalline basement rocks, including low permeability, high salinity, and geochemically reducing conditions, exist at depth in many locations, particularly in geologically stable continental regions. Isolation of waste depends, in part, on the effectiveness of borehole seals and potential alteration of permeability in the disturbed host rock surrounding the borehole. Coupled thermal-mechanical-hydrologic processes induced by heat from the radioactive waste may impact the disturbed zone near the borehole and borehole wall stability. Numerical simulations of the coupled thermal-mechanical response in the host rock surrounding the borehole were conducted with three software codes or combinations of software codes. Software codes used in the simulations were FEHM, JAS3D, Aria, and Adagio. Simulations were conducted for disposal of spent nuclear fuel assemblies and for the higher heat output of vitrified waste from the reprocessing of fuel. Simulations were also conducted for both isotropic and anisotropic ambient horizontal stress in the host rock. Physical, thermal, and mechanical properties representative of granite host rock at a depth of 4 km were used in the models. Simulation results indicate peak temperature increases at the borehole wall of about 30 C and 180 C for disposal of fuel assemblies and vitrified waste, respectively. Peak temperatures near the borehole occur within about 10 years and decline rapidly within a few hundred years and with distance. The host rock near the borehole is placed under additional compression. Peak mechanical stress is increased by about 15 MPa (above the assumed ambient isotropic stress of 100 MPa) at the borehole wall for the disposal of fuel assemblies and by about 90 MPa for vitrified waste. Simulated peak volumetric strain at the borehole wall is about 420 and 2600 microstrain for the disposal of fuel assemblies and vitrified waste, respectively. Stress and volumetric strain decline rapidly with distance from the borehole and with time. Simulated peak stress at and parallel to the borehole wall for the disposal of vitrified waste with anisotropic ambient horizontal stress is about 440 MPa, which likely exceeds the compressive strength of granite if unconfined by fluid pressure within the borehole. The relatively small simulated displacements and volumetric strain near the borehole suggest that software codes using a nondeforming grid provide an adequate approximation of mechanical deformation in the coupled thermal-mechanical model. Additional modeling is planned to incorporate the effects of hydrologic processes coupled to thermal transport and mechanical deformation in the host rock near the heated borehole.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Guide to Minimizing Compressor-based Cooling in Data Centers

This best practice guide is one in a series created by the Lawrence Berkeley National Laboratory for the Federal Energy Management Program (FEMP), a program of the U.S. Department of Energy. Geared towards architects, engineers, and data center Information Technology (IT) and facility managers, this guide provides information about technologies and practices to use in designing, constructing, and operating sustainable high-performance data centers.

Guide, Minimizing, Compressor-based, Cooling, Data↗

Target Design Optimization of KIPT Neutron Source Facility

Argonne National Laboratory (ANL) of the United States developed and designed a neutron source facility for Kharkov Institute of Physics and Technology (KIPT) of Ukraine. The facility was constructed at Kharkov, Ukraine and its commissioning process has been started. The facility has an electron accelerator driving a subcritical assembly. The electron beam power is 100 kW using 100 MeV electrons. The subcritical assembly has WWR-M2 fuel assemblies with U-235 enrichment of 19.7 wt%. The facility will be utilized to perform basic and applied nuclear research, to produce medical isotopes, and to train young nuclear specialists. Solid target design with stacked disks is selected and each target disk is cooled by water from both side. Tungsten or natural uranium is the target material. This paper presents the target design optimization to maximize the neutron yield and the neutron flux level of the facility while satisfying the thermal-hydraulic design criteria. Monte Carlo computer code MCNPX is utilized for the neutron yield analyses with ENDF/B-VII.0 nuclear data libraries, as a function of target thickness using a simplified target model without cladding or coolant channels. It’s found that the neutron yield saturates at target thickness 60 ~ 70 mm for both tungsten and uranium materials. For the final target design with cladding and coolant channels, the total uranium thickness is 56.5 mm, and the total tungsten thickness is only 33.0 mm. The tungsten material has a large absorption cross section for thermal neutrons. If the tungsten thickness is increased, the neutron yield gain is offset by the neutron absorption reaction. The paper presents the design optimization analyses for both target materials.

electron accelerator↗

ASME Code Rules and ASTM Standards Integration for Ceramic Composite Core Materials and Components 1

Fiber-reinforced ceramic matrix composites have many desirable properties for high-temperature nuclear applications, including excellent thermal and mechanical properties and reasonable to outstanding radiation resistance. Over the last 20 years, the use of ceramic composite materials has already expanded in many commercial nonnuclear industries as fabrication and application technologies mature. The new ASME design and construction rules under Section III, Subsection HH, Subpart B lay out the requirements and criteria for materials, design, machining and installation, inspection, examination, testing, and the marking procedure for ceramic composite core components, which is similar to the established graphite code under Section III, Subsection HH, Subpart A. Moreover, the general requirements listed in Section III, Subsection HA, Subpart B are also expanded to include ceramic composite materials. The code rules rely heavily on the development and publication of standards for composite specification, classification, and testing of mechanical, thermal, and other properties. These test methods are developed in the American Society for Testing and Materials Committee C28 on Advanced Ceramics with a current focus on ceramic composite tubes. Details of the composites code, design methodology, and similarities to the graphite code, as well as guidance for the development of specifications for ceramic composites for nuclear application and recent standard developments, are discussed. The next step is to "close the gap" to support licensing aspects by validating the code with benchmarking data.

Geringer, Josina↗

Managing Knowledge Over Time for Supporting Radioactive Waste Geological Disposal Project Development - 19028

Projects designed to define, build, operate and monitor radioactive waste disposal solutions require the transmission of knowledge over several decades and the preservation of memory over several centuries. This is particularly acute for the geological disposal project 'Cigeo' led by the French national radioactive waste management agency (Andra) as far as the requirements in terms of reversibility lead to the choice of an incremental design that allows to integrate learning resulting from continuous improvement of knowledge. For instance, for robustness purposes, Cigeo is designed on the basis of currently proven technologies, but its step-by-step construction in successive stages must make it possible to integrate improvements derived from the scientific and technical progress as well as from experience feedback from its exploitation. In the field of industrial activity, a significant proportion of the knowledge and skills implemented by employees of a company are not known or even identified by the human resources organization or the mid-management staff. This is mainly due to the fact that (i) the organized knowledge-sharing is often based on documentary tools but little on social modalities and (ii) the organization of knowledge is mostly cross-cutting to the managerial lines. To overcome this bias, a global and integrated approach to knowledge management is currently the focus of Andra's specific efforts. Cross-disciplinary groups and close intergenerational links positioned throughout the life of the projects aim specifically at continuous and participative knowledge sharing, capitalization and transmission. Then, devices aiming at systematic dissemination of and access to knowledge support experience feedback and provide unified collaboration, traceability and decision-support at all scales. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗