Induced seismicity potential based on probabilistic geomechanics for the San Juan Basin CarbonSAFE project

Although geologic carbon sequestration projects have yet to induce — or may never induce — a damaging earthquake, experiences from other deep injection industries such as hydraulic fracturing, enhanced geothermal systems, and saltwater disposal suggest that effective quantitative seismic risk assessment is necessary for deep saline carbon capture and sequestration (CCS) projects. One such imminent CCS project is the San Juan Basin CarbonSAFE Phase III program. We use Monte Carlo probabilistic geomechanical analyses combined with observations of the geologic and operational parameters of the San Juan Basin site and suggest that this project is of low-induced seismic risk. The primary analysis is split into four sections. First, we assess the literature for faults and past seismicity, and at least five faulting scenarios are directly relevant. Second, we develop and calibrate an integrated earth model for the project site. Third, we perform Monte Carlo simulations that consider reasonable uncertainties of the geomechanical parameters. Of five tested faulting scenarios, only one presents high Coulomb failure functions, but fourth, we determine the risk to be low based on the combined lack of historical seismicity, the geologic framework of the faulting scenario, and the presence of saltwater injection at the same depth as the proposed supercritical carbon dioxide injection. The most sensitive parameters in the geomechanical calculations are the fault dip and the coefficient of friction. The least sensitive are the fault strike and the orientation of the maximum horizontal principal stress.

58 GEOSCIENCES↗

Considering uncertainties expands the lower tail of maize yield projections

Crop yields are sensitive to extreme weather events. Improving the understanding of the mechanisms and the drivers of the projection uncertainties can help to improve decisions. Previous studies have provided important insights, but often sample only a small subset of potentially important uncertainties. Here we expand on a previous statistical modeling approach by refining the analyses of two uncertainty sources. Specifically, we assess the effects of uncertainties surrounding crop-yield model parameters and climate forcings on projected crop yield. We focus on maize yield projections in the eastern U.S.in this century. We quantify how considering more uncertainties expands the lower tail of yield projections. We characterized the relative importance of each uncertainty source and show that the uncertainty surrounding yield model parameters is the main driver of yield projection uncertainty.

59 BASIC BIOLOGICAL SCIENCES↗

Dixie Valley Engineered Geothermal System Exploration Methodology Project, Baseline Conceptual Model Report

The Engineered Geothermal System (EGS) Exploration Methodology Project is developing an exploration approach for EGS through the integration of geoscientific data. The overall project area is 2500km2 with the Calibration Area (Dixie Valley Geothermal Wellfield) being about 170km2. The Final Scientific Report (FSR) is submitted in two parts (I and II). FSR part I presents (1) an assessment of the readily available public domain data and some proprietary data provided by terra-gen power, llc, (2) a re-interpretation of these data as required, (3) an exploratory geostatistical data analysis, (4) the baseline geothermal conceptual model, and (5) the EGS favorability/trust mapping. The conceptual model presented applies to both the hydrothermal system and EGS in the Dixie Valley region. FSR Part II presents (1) 278 new gravity stations; (2) enhanced gravity-magnetic modeling; (3) 42 new ambient seismic noise survey stations; (4) an integration of the new seismic noise data with a regional seismic network; (5) a new methodology and approach to interpret this data; (5) a novel method to predict rock type and temperature based on the newly interpreted data; (6) 70 new magnetotelluric (MT) stations; (7) an integrated interpretation of the enhanced MT data set; (8) the results of a 308 station soil CO2 gas survey; (9) new conductive thermal modeling in the project area; (10) new convective modeling in the Calibration Area; (11) pseudo-convective modeling in the Calibration Area; (12) enhanced data implications and qualitative geoscience correlations at three scales (a) Regional, (b) Project, and (c) Calibration Area; (13) quantitative geostatistical exploratory data analysis; and (14) responses to nine questions posed in the proposal for this investigation. Enhanced favorability/trust maps were not generated because there was not a sufficient amount of new, fully-vetted (see below) rock type, temperature, and stress data. The enhanced seismic data did generate a new method to infer rock type and temperature (However, in the opinion of the Principal Investigator for this project, this new methodology needs to be tested and evaluated at other sites in the Basin and Range before it is used to generate the referenced maps. As in the baseline conceptual model, the enhanced findings can be applied to both the hydrothermal system and EGS in the Dixie Valley region).

15 GEOTHERMAL ENERGY↗

Permafrost Thaw, Uneven Subsidence and Projected Drying of Ice-wedge Polygon Tundra: Modeling Archive

This dataset is a model archive of the paper Permafrost Thaw, Uneven Subsidence and Projected Drying of Ice-wedge Polygon Tundra (in prep) to support a modeling study investigating how projected increases in Arctic temperature and precipitation will jointly influence hydrologic conditions in ice-rich tundra landscapes. With this dataset, this study is to address the research question: Will Arctic tundra landscapes become wetter or drier with increasing precipitation and temperature in the future when thaw-induced ground subsidence and associated microtopographic evolution are represented? The simulations focus on ice-wedge polygon tundra, a widespread form of ice-rich permafrost terrain that is highly sensitive to thaw-driven landscape change. This dataset contains model input and output data for four study watersheds in Alaska: Anaktuvuk, Utqiagvik (formerly Barrow), Brooks Foothills, and Prudhoe Bay. Simulations were performed using the Advanced Terrestrial Simulator (ATS, v1.5), a physics-rich integrated surface–subsurface hydrologic model. For each watershed, ten modeling cases were performed representing two landscape evolution conditions (with subsidence and without subsidence) combined with five climate forcing scenarios derived from Shared Socioeconomic Pathways (SSP5, SSP5 with precipitation trend, SSP2, SSP2 with precipitation trend, and SSP2 with double precipitation trend). Particularly, for each watershed under the forcing SSP2 with precipitation trend, there are two additional simulations considering spatially heterogeneous subsidence distributions: one assumes randomly distributed scaling and the other includes elevation dependent distribution scaling. These simulations span 1980–2099 and include spin-up runs (1980–2009) followed by transient projections (2010–2099). To facilitate reproducibility of simulations, all datasets are organized by watershed. For each study watershed, the dataset contains: (1) Pre-partitioned mesh files for 32-core modeling (.par.32.XX), located in EACH_WATERSHED/mesh/basin; and also a non-partitioned mesh file (.exo) located in EACH_WATERSHED/mesh; (2) Climate forcings corresponding to the five SSP scenarios (.h5), located in EACH_WATERSHED/data; (3) Final states (.h5) from column spin-up modeling used to initialize historical watershed-scale spin-up runs from 1980 to 2009, located in EACH_WATERSHED/PreSpinupHistorical; (4) Final states (.h5) of historical watershed-scale spin-up runs from 1980 to 2009 used to initialize projection runs, located in EACH_WATERSHED/Spinup_daymetERA5; (5) ATS modeling input files (.xml), located in EACH_WATERSHED/EACH_SIMULATION_SCENARIO/inputfiles; (6) ATS modeling output files (.dat), located in in EACH_WATERSHED/EACH_SIMULATION_SCENARIO/combined_obs; (7) For the Brooks Foothills watershed, additional spatial model outputs are provided (.h5) for selected years (2033 and 2093) used to generate spatial figures in this study, located in Brooksfoothills/EACH_SIMULATION_SCENARIO/results-WITH/WITHOUT_SUBSIDENCE-year2033/2093. All data files with suffix .h5 can be accessible through Python h5py, and all data files with suffix of .dat can be imported by Python pandas. Mesh file with .exo can be visualized through Paraview or read by Python netCDF. The Next-Generation Ecosystem Experiments in the Arctic (NGEE Arctic) project is a research effort to reduce uncertainty in the Department of Energy’s Energy Exascale Earth System Model (E3SM) by developing a predictive understanding of Arctic tundra ecosystems underlain by permafrost and to quantify feedbacks from the Arctic tundra to the Earth system. NGEE Arctic is supported by the Department of Energy's Office of Biological and Environmental Research. Over Phases 1–3, observations made by the NGEE Arctic team across a gradient of permafrost landscapes in Arctic Alaska improved the representation of tundra processes in the land surface component of E3SM (the E3SM Land Model, ELM). Model improvements emphasized unique aspects of permafrost environments and explored reductions in model complexity while retaining predictive power. The Arctic-informed ELM developed by NGEE Arctic has been used to make novel predictions on processes ranging from permafrost thaw to soil biogeochemical cycling to Earth system feedbacks associated with the unique characteristics of tundra plants. In Phase 4, the NGEE Arctic team is evaluating our new predictive understanding under novel conditions across the Arctic domain. In collaboration with partners at long-term pan-Arctic research sites we are examining whether an Arctic-informed ELM can faithfully simulate interactions among surface and subsurface processes at site, regional, and pan-Arctic scales. In turn, we are using variety of tools to dynamically extend and evaluate ELM inference, with an emphasis on data synthesis and pan-Arctic model evaluation, reintegration of code with an evolving E3SM, scaling across heterogeneous Arctic landscapes, and the appropriate representation of the impacts of increasingly frequent Arctic disturbances.

EARTH SCIENCE > ATMOSPHERE > PRECIPITATION↗

Concerns in Marine Renewable Energy Projects

To accelerate the adoption of these emerging marine hydrokinetic technologies, navigational and environmental issues and concerns must be identified and addressed. As hydrokinetic projects move forward, various stakeholders will need to be engaged; one of the key issues that project proponents face as they engage stakeholders is that many conflicting uses and environmental issues are not well-understood. Much of this lack of understanding comes from a limited understanding of the technologies themselves. To address this issue, in September 2008, RE Vision consulting, LLC, was selected by the Department of Energy, under their market acceleration program, to apply a scenario-based assessment approach to the emerging hydrokinetic technology sector. The goal was to improve understanding of potential environmental and navigation impacts of these technologies and focus stakeholders on the critical issues. To meet this goal, the study established baseline scenarios for wave and tidal power conversion at potential future deployment sites. The scenarios captured variations in technical approaches and deployment scales and thus grounded the analysis in realistic constraints. The work conducted under this award provides an important foundation to other market acceleration activities carried out by the DOE and other stakeholders in this sector. The scenarios were then evaluated using a framework developed by H.T. Harvey & Associates to identify and characterize key environmental concerns and uncertainties. In collaboration with PCCI and the U.S. Coast Guard, navigation issues were assessed and guidelines developed to assure the safe operation of these systems. Finally, the work highlights “next steps” to take to continue development and adoption of marine hydrokinetic energy. Throughout the project, close collaboration with device developers, project developers and regulatory stakeholders was pursued to ensure that assumptions and constraints are realistic. Results concur with most of the permitting hurdles experienced by on-going projects in the U.S., and specific recommendations are provided for identifying and addressing them. While many areas of further research were identified, the study did not identify any major show-stoppers, largely because these technologies have a relatively low environmental risk-profile if compared to other activities routinely permitted in the marine environment. The frameworks and representative scenarios developed provide an objective and transparent tool for stakeholders, regulators and developers to assist in the decision-making process for siting wave and tidal energy plants, and meet our goal of improving understanding between all stakeholders. The final product consists of three reports: Report 1 - Wave Energy Scenarios. This report includes: A technology characterization of four different wave energy technologies, including major technical specifications, device performance, and technical siting considerations; A site characterization of two potential deployment sites located in Hawaii and California; Outlines of device installation, O&M and decommissioning activities; Navigational demarcation requirements; and, Deployment Scenarios, identifying all the major life-cycle-related impacts. Report 2 - Tidal Energy Scenarios. This report includes: A technology characterization of three tidal energy technologies, including major technical specifications, device performance, and technical siting considerations; A site characterization of one potential deployment location in the Puget Sound, Washington; Outlines of device installation, O&M and decommissioning activities; Navigational demarcation requirements; and, Deployment Scenarios, identifying all the major life-cycle-related impacts.Report 3 - Framework for Identifying Key Environmental Concerns. This report describes frameworks for identifying key environmental effects and applies them to the wave and tidal energy deployment scenarios described in the first two reports. It highlights critical issues and recommendations for future research.

16 TIDAL AND WAVE POWER↗

Final Technical Report on STTR Project DE-FG02-06ER86281 Particle Tracking in Matter-Dominated Beam Lines (G4beamline)

This project has been for software development of the G4beamline [1] program, which is a particle-tracking simulation program based on the Geant4 toolkit [2], optimized for beam lines. This program can perform more realistic simulations than most alternatives, while being significantly easier to use by physicists. This project has fostered the general acceptance of G4beamline within the muon community, and has assisted in expanding its role outside that community. During this project, the G4beamline user community has grown from about a half-dozen users to more than 200 users around the world. This project also validated our business decision to keep G4beamline an open-source program, judging that an STTR project would provide more development resources than would marketing and selling the program. G4beamline is freely available to the physics community, and has been well validated against experiments and other codes within its domain. Muons, Inc. continues to support and develop the program, and a major part of the company's continued success and growth is directly related to our expertise in applying this program to interesting applications.

43 PARTICLE ACCELERATORS↗

Underground Test Area Quality Assurance Project Plan Nevada National Security Site, Nevada, Revision 0

This Quality Assurance Project Plan (QAPP) provides the overall quality assurance (QA) program requirements and general quality practices to be applied to the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Underground Test Area (UGTA) Sub-Project (hereafter the Sub-Project) activities. The requirements in this QAPP are consistent with DOE Order 414.1C, Quality Assurance (DOE, 2005); U.S. Environmental Protection Agency (EPA) Guidance for Quality Assurance Project Plans for Modeling (EPA, 2002); and EPA Guidance on the Development, Evaluation, and Application of Environmental Models (EPA, 2009). The QAPP Revision 0 supersedes DOE--341, Underground Test Area Quality Assurance Project Plan, Nevada Test Site, Nevada, Revision 4.

54 ENVIRONMENTAL SCIENCES↗

Safety Design Strategy for the Advanced Test Reactor Primary Coolant Pump and Motor Replacement Project

In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, “Program and Project Management for the Acquisition of Capital Assets,” safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, “Facility Safety,” and the expectations of DOE-STD-1189-2008, “Integration of Safety into the Design Process,” provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Safety Design Strategy for the Advanced Test Reactor Emergency Firewater Injection System Replacement Project

In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, “Program and Project Management for the Acquisition of Capital Assets,” safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, “Facility Safety,” and the expectations of DOE-STD-1189-2008, “Integration of Safety into the Design Process,” provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Safety Design Strategy for the Advanced Test Reactor Diesel Bus (E-3) and Switchgear Replacement Project

In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, “Program and Project Management for the Acquisition of Capital Assets,” safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, “Facility Safety,” and the expectations of DOE-STD-1189-2008, “Integration of Safety into the Design Process,” provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

SkyMine Carbon Mineralization Pilot Project

This Topical Report addresses accomplishments achieved during Phase 1 of the SkyMine{reg_sign} Carbon Mineralization Pilot Project. The primary objectives of this project are to design, construct, and operate a system to capture CO{sub 2} from a slipstream of flue gas from a commercial coal-fired cement kiln, convert that CO{sub 2} to products having commercial value (i.e., beneficial use), show the economic viability of the CO{sub 2} capture and conversion process, and thereby advance the technology to a point of readiness for commercial scale demonstration and proliferation. The project will also substantiate market opportunities for the technology by sales of chemicals into existing markets, and identify opportunities to improve technology performance and reduce costs at commercial scale. The primary objectives of Phase 1 of the project were to elaborate proven SkyMine{reg_sign} process chemistry to commercial pilot-scale operation and complete the preliminary design ('Reference Plant Design') for the pilot plant to be built and operated in Phase 2. Additionally, during Phase 1, information necessary to inform a DOE determination regarding NEPA requirements for the project was developed, and a comprehensive carbon lifecycle analysis was completed. These items were included in the formal application for funding under Phase 2. All Phase 1 objectives were successfully met on schedule and within budget.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Observation Targeting for the Tehachapi Pass and Mid-Columbia Basin: WindSENSE Phase III Project Summary Report

The overall goal of this multi-phased research project known as WindSENSE is to develop an observation system deployment strategy that would improve wind power generation forecasts. The objective of the deployment strategy is to produce the maximum benefit for 1- to 6-hour ahead forecasts of wind speed at hub-height (~80 m). In Phase III of the project, the focus was on the Mid-Columbia Basin region which encompasses the Bonneville Power Administration (BPA) wind generation area shown in Figure 1 that includes Klondike, Stateline, and Hopkins Ridge wind plants. The typical hub height of a wind turbine is approximately 80-m above ground level (AGL). So it would seem that building meteorological towers in the region upwind of a wind generation facility would provide data necessary to improve the short-term forecasts for the 80-m AGL wind speed. However, this additional meteorological information typically does not significantly improve the accuracy of the 0- to 6-hour ahead wind power forecasts because processes controlling wind variability change from day-to-day and, at times, from hour-to-hour. It is also important to note that some processes causing significant changes in wind power production function principally in the vertical direction. These processes will not be detected by meteorological towers at off-site locations. For these reasons, it is quite challenging to determine the best type of sensors and deployment locations. To address the measurement deployment problem, Ensemble Sensitivity Analysis (ESA) was applied in the Phase I portion of the WindSENSE project. The ESA approach was initially designed to produce spatial fields that depict the sensitivity of a forecast metric to a set of prior state variables selected by the user. The best combination of variables and locations to improve the forecast was determined using the Multiple Observation Optimization Algorithm (MOOA) developed in Phase I. In Zack et al. (2010a), the ESA-MOOA approach was applied and evaluated for the wind plants in the Tehachapi Pass region for a period during the warm season. That research demonstrated that forecast sensitivity derived from the dataset was characterized by well-defined, localized patterns for a number of state variables such as the 80-m wind and the 25-m to 1-km temperature difference prior to the forecast time. The sensitivity patterns produced as part of the Tehachapi Pass study were coherent and consistent with the basic physical processes that drive wind patterns in the Tehachapi area. In Phase II of the WindSENSE project, the ESA-MOOA approach was extended and applied to the wind plants located in the Mid-Columbia Basin wind generation area of Washington-Oregon during the summer and to the Tehachapi Pass region during the winter. The objective of this study was to identify measurement locations and variables that have the greatest positive impact on the accuracy of wind forecasts in the 0- to 6-hour look-ahead periods for the two regions and to establish a higher level of confidence in ESA-MOOA for mesoscale applications. The detailed methodology and results are provided in separate technical reports listed in the publications section below. Ideally, the data assimilation scheme used in the Phase III experiments would have been based upon an ensemble Kalman filter (EnKF) that was similar to the ESA method used to diagnose the Mid-Columbia Basin sensitivity patterns in the previous studies. However, running an EnKF system at high resolution is impractical because of the very high computational cost. Thus, it was decided to use a three-dimensional variational (3DVAR) analysis scheme that is less computationally intensive. The objective of this task is to develop an observation system deployment strategy for the mid Columbia Basin (i.e. the BPA wind generation region) that is designed to produce the maximum benefit for 1- to 6-hour ahead forecasts of hub-height (~80 m) wind speed with a focus on periods of large changes in wind speed. There are two tasks in the current project effort designed to validate the ESA observational system deployment approach in order to move closer to the overall goal: (1) Perform an Observing System Experiment (OSE) using a data denial approach. (2) Conduct a set of Observing System Simulation Experiments (OSSE) for the Mid-Columbia basin region.

17 WIND ENERGY↗

Hualapai Wind Project Feasibility Report

The Hualapai Department of Planning and Economic Development, with funding assistance from the U.S. Department of Energy, Tribal Energy Program, with the aid of six consultants has completed the four key prerequisites as follows: 1. Identify the site area for development and its suitability for construction. 2. Determine the wind resource potential for the identified site area. 3. Determine the electrical transmission and interconnection feasibility to get the electrical power produced to the marketplace. 4. Complete an initial permitting and environmental assessment to determine the feasibility for getting the project permitted. Those studies indicated a suitable wind resource and favorable conditions for permitting and construction. The permitting and environmental study did not reveal any fatal flaws. A review of the best power sale opportunities indicate southern California has the highest potential for obtaining a PPA that may make the project viable. Based on these results, the recommendation is for the Hualapai Tribal Nation to move forward with attracting a qualified wind developer to work with the Tribe to move the project into the second phase - determining the reality factors for developing a wind project. a qualified developer will bid to a utility or negotiate a PPA to make the project viable for financing.

17 WIND ENERGY↗

White Paper on the Use of Team Calendars with the JIRA Issue Tracking System and Confluence Collaboration Tools for the xLPR Project

ORNL was tasked by xLPR project management to propose a team calendar for use within the xLPR consortium. Among various options that were considered, the approach judged by ORNL to best fit the needs of the xLPR project is presented in this document. The Atlassian Team Calendars plug-in used with the Confluence collaboration tool was recommended for several reasons, including the advantage that it provides for a tight integration between Confluence (found at https://xlpr.ornl.gov/wiki ) and xLPR s JIRA issue tracking system (found at https://xlpr.ornl.gov/jira ). This document is divided into two parts. The first part (Sections 1-6) consists of the white paper, which highlights some of the ways that Team Calendars can improve com mun ication between xLPR project managers, group leads, and team members when JIRA is applied for both issue tracking and change-management activities. Specific points emphasized herein are as follows: The Team Calendar application greatly enhances the added value that the JIRA and Confluence tools bring to the xLPR Project. The Team Calendar can improve com mun ication between xLPR project managers, group leads, and team members when JIRA is applied for both issue tracking and change-management activities. The Team Calendar works across different email tools such as Outlook 2011, Outlook 2010, Outlook 2007, Google Calendars and Mac s iCalendar to name a few. xLPR users can now access the wiki Confluence (with embedded Team Calendars) directly from JIRA without having to re-validate their login. The second part consists of an Annex (Section 7), which describes how users can subscribe to Team Calendars from different calendar applications. Specific instructions are given in the Annex that describe how to Import xLPR Team Calendar to Outlook Version Office 2010 Import xLPR Team Calendar to Outlook Version Office 2007 Subscribe to Team Calendar from Google Calendar The reader is directed to Section 4 for instructions on adding events to the Team Calendar or accessing ORNL staff for assistance with such additions. To seek help with your questions and problems regarding the content of this document, please contact Hilda Klasky at klaskyhb@ornl.gov

97 MATHEMATICS AND COMPUTING↗

Global Threat Reduction Initiative Fuel Thermo-Physical Characterization Project: Sample Management Plan

This sample management plan provides guidelines for sectioning, preparation, acceptance criteria, analytical path, and end-of-life disposal for the fuel element segments utilized in the Global Threat Reduction Initiative (GTRI), Fuel Thermo-Physical Characterization Project. The Fuel Thermo-Physical Characterization Project is tasked with analysis of irradiated Low Enriched Uranium (LEU) Molybdenum (U-Mo) fuel element samples to support the GTRI conversion program. Sample analysis may include optical microscopy (OM), scanning electron microscopy (SEM) fuel-surface interface analysis, gas pycnometry (density) measurements, laser flash analysis (LFA), differential scanning calorimetry (DSC), thermogravimetry and differential thermal analysis with mass spectroscopy (TG /DTA-MS), Inductively Coupled Plasma Spectrophotometry (ICP), alpha spectroscopy, and Thermal Ionization Mass Spectroscopy (TIMS). The project will utilize existing Radiochemical Processing Laboratory (RPL) operating, technical, and administrative procedures for sample receipt, processing, and analyses. Test instructions (TIs), which are documents used to provide specific details regarding the implementation of an existing RPL approved technical or operational procedure, will also be used to communicate to staff project specific parameters requested by the Principal Investigator (PI). TIs will be developed, reviewed, and issued in accordance with the latest revision of the RPL-PLN-700, RPL Operations Plan. Additionally, the PI must approve all project test instructions and red-line changes to test instructions.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

Coastal Ohio Wind Project for Reduced Barriers to Deployment of Offshore Wind Energy

The Coastal Ohio Wind Project was created to establish the viability of wind turbines on the coastal and offshore regions of Northern Ohio. The project’s main goal was to improve operational unit strategies used for environmental impact assessment of offshore turbines on lake wildlife by optimizing and fusing data from the multi-instrument surveillance system and providing an engineering analysis of potential design/operational alternatives for offshore wind turbines. The project also developed a general economic model for offshore WTG deployment to quantify potential revenue losses due to wind turbine shutdown related to ice and avian issues. In a previous phase of this project (Award Number: DE-FG36-06GO86096), we developed a surveillance system that was used to collect different parameters such as passage rates, flight paths, flight directions, and flight altitudes of nocturnal migrating species, movements of birds and bats, and bird calls for assessing patterns and peak passage rates during migration. To derive such parameters we used thermal IR imaging cameras, acoustic recorders, and marine radar Furuno (XANK250), which was coupled with a XIR3000B digitizing card from Russell Technologies and open source radR processing software. The integration yielded a development of different computational techniques and methods, which we further developed and optimized as a combined surveillance system. To accomplish this task we implemented marine radar calibration, optimization of processing parameters, and fusion of the multi-sensor data in order to make inferences about the potential avian targets. The main goal of the data fusion from the multi-sensor environment was aimed at reduction of uncertainties while providing acceptable confidence levels with detailed information about the migration patterns. Another component comprised of an assessment of wind resources in a near lake environment and an investigation of the effectiveness of ice coating materials to mitigate adverse effects of ice formation on wind turbine structures. Firstly, a Zephir LiDAR system was acquired and installed at Woodlands School in Huron, Ohio, which is located near Lake Erie. Wind resource data were obtained at ten measurement heights, 200m, 150m, 100m, 80m, 60m, 40m, 38m, 30m, 20m, and 10m. The Woodlands School’s wind turbine anemometer also measured the wind speed at the hub height. These data were collected for approximately one year. The hub anemometer data correlated well with the LiDAR wind speed measurements at the same height. The data also showed that on several days different power levels were recorded by the turbine at the same wind speed as indicated by the hub anemometer. The corresponding LiDAR data showed that this difference can be attributed to variability in the wind over the turbine rotor swept area, which the hub anemometer could not detect. The observation suggests that single point hub wind velocity measurements are inadequate to accurately estimate the power generated by a turbine at all times since the hub wind speed is not a good indicator of the wind speed over the turbine rotor swept area when winds are changing rapidly. To assess the effectiveness of ice coatings to mitigate the impact of ice on turbine structures, a closed-loop icing research tunnel (IRT) was designed and constructed. By controlling the temperature, air speed, water content and liquid droplet size, the tunnel enabled consistent and repeatable ice accretion under a variety of conditions with temperatures between approximately 0°C and -20°C and wind speeds up to 40 miles per hour in the tunnel’s test section. The tunnel’s cooling unit maintained the tunnel temperature within ±0.2°C. The coatings evaluated in the study were Boyd Coatings Research Company’s CRC6040R3, MicroPhase Coatings Inc.’s PhaseBreak TP, ESL and Flex coatings. Similar overall performance was observed in all coatings tested in that water droplets form on the test articles beginning at the stagnation region and spreading in the downstream direction in time. When comparing ice accumulation characteristics for the four coatings tested, for ice thickness during accumulation the CRC6040R3 had the least, followed by the ESL, Flex, and TP. However, when comparing the coatings’ ability to reduce ice adhesion, the Flex showed the highest adhesion reduction, followed by the ESL, TP and CRC 6040R3 coatings. The ice accumulated on the Flex coated surface shed under gravity when rotated 90 degrees following the tests while the other coatings required application of varying degrees of force to remove the ice. In conclusion, the ice coatings tested were not sufficient in preventing ice accumulation on all surfaces. However, Flex coating shows promise in mitigating ice on the rotor blades under the gravitational and centrifugal forces. Only the effect of gravity in shedding the ice was considered in this study. Further research will be needed to evaluate this coating on rotating blades in the icing tunnel to characterize its effectiveness. Lastly, the development of economic feasibility models used existing approaches adapted for offshore deployment in marine settings to one more suitable for Lake Erie deployment. Two different wind turbine models were tested and dynamic return on investment (ROI) model scenarios were generated. For the purpose of estimating power generation three bladed wind turbines of 3 MW capacity were selected including Model1- Leitwind LTW101-3.000-kW and Model2-Vostro V90-3.0 MW. The analysis were based on the revenue aspect of decision making of deploying wind turbines in the Ohio coastal region. The installation cost, maintenance and operational aspects were disregarded due to unavailability of data. The adjusted varying price (residential and industrial sector) and projected future price of electricity in different years suggested that the Leitwind model could generate $\$ $32.4 million of revenue in 25 years if the supply electricity is in the residential sector, while it would be $\$ $14.7million if the supply is in the industrial sector. For the Vostro model these figures are $\$ $28.6 million for residential sector and $\$ $12.9 million for industrial sector for 25 years.

17 WIND ENERGY↗

CMI Report on Project 2.3.2 Activities – 09/2013 to 03/2014

The objective of this project is to develop and apply a Materials-Design Simulator (MDS) for predicting thermodynamic phase stability, structural and magnetic properties, and performance of complex REE-based materials. We seek to create a knowledge base for identifying alloys with desirable properties. The aim of this project is to develop an efficient infrastructure for creating a knowledge base for identifying new alloys with enhance performance and reduced REE-content, and for managing material data acquired within the Focus Area 2 and with input from Focus Area 4. This project integrates two approaches to alloy process modeling that so far have been developed largely independently: (1) electronic structure theory of alloys and (2) semi-empirical methods of computational thermodynamics and kinetics (such as CALPHAD). This project will greatly benefit from experimental data on phase characterization, heat of formation (from differential scanning calorimetry), and magnetism as a function of pressure to support the search for REE substitutes without compromising on target properties for applications. The MDS will be also greatly enhanced through the use of state-of-the-art methods of materials informatics and data mining. The MDS will facilitate examination of research results, discovery of trends, identification of knowledge gaps, and even possibly underlying scientific principles, MDS will be developed and assembled for gathering, accessing, and analyzing available material data generated externally and within CMI projects by experimentalists and modelers. The data in our knowledge base will be accessible to all hub participants via a web interface and underlying engine that will allow targeted searches through heterogeneous data on composition, property and structure spaces encompassing all contributed data.

36 MATERIALS SCIENCE↗

Waste-to-Energy Cogeneration Project, Centennial Park

The Waste-to-Energy Cogeneration Project at Centennial Park has allowed methane from the closed Centennial landfill to export excess power into the the local utility’s electric grid for resale. This project is part of a greater brownfield reclamation project to the benefit of the residents of Munster and the general public. Installation of a gas-to-electric generator and waste-heat conversion unit take methane byproduct and convert it into electricity at the rate of about 103,500 Mwh/year for resale to the local utility. The sale of the electricity will be used to reduce operating budgets by covering the expenses for streetlights and utility bills. The benefits of such a project are not simply financial. Munster’s Waste-to Energy Cogeneration Project at Centennial Park will reduce the community’s carbon footprint in an amount equivalent to removing 1,100 cars from our roads, conserving enough electricity to power 720 homes, planting 1,200 acres of trees, or recycling 2,000 tons of waste instead of sending it to a landfill.

09 BIOMASS FUELS↗