Search NASA⌕ Search

SEARCH · Search NASA

Results for “protocol”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,009 records · Page 56

SU-E-I-89: Assessment of CT Radiation Dose and Image Quality for An Automated Tube Potential Selection Algorithm Using Pediatric Anthropomorphic and ACR Phantoms

Purpose: To assess the impact of General Electrics automated tube potential algorithm, kV assist (kVa) on radiation dose and image quality, with an emphasis on optimizing protocols based on noise texture. Methods: Radiation dose was assessed by inserting optically stimulated luminescence dosimeters (OSLs) throughout the body of a pediatric anthropomorphic phantom (CIRS). The baseline protocol was: 120 kVp, 80 mA, 0.7s rotation time. Image quality was assessed by calculating the contrast to noise ratio (CNR) and noise power spectrum (NPS) from the ACR CT accreditation phantom. CNRs were calculated according to the steps described in ACR CT phantom testing document. NPS was determined by taking the 3D FFT of the uniformity section of the ACR phantom. NPS and CNR were evaluated with and without kVa and for all available adaptive iterative statistical reconstruction (ASiR) settings, ranging from 0 to 100%. Each NPS was also evaluated for its peak frequency difference (PFD) with respect to the baseline protocol. Results: For the baseline protocol, CNR was found to decrease from 0.460 ± 0.182 to 0.420 ± 0.057 when kVa was activated. When compared against the baseline protocol, the PFD at ASiR of 40% yielded a decrease in noise magnitude as realized by the increase in CNR = 0.620 ± 0.040. The liver dose decreased by 30% with kVa activation. Conclusion: Application of kVa reduces the liver dose up to 30%. However, reduction in image quality for abdominal scans occurs when using the automated tube voltage selection feature at the baseline protocol. As demonstrated by the CNR and NPS analysis, the texture and magnitude of the noise in reconstructed images at ASiR 40% was found to be the same as our baseline images. We have demonstrated that 30% dose reduction is possible when using 40% ASiR with kVa in pediatric patients.

60 APPLIED LIFE SCIENCES↗

SU-E-J-06: Additional Imaging Guidance Dose to Patient Organs Resulting From X-Ray Tubes Used in CyberKnife Image Guidance System

Purpose: The use of image-guided radiation therapy (IGRT) has become increasingly common, but the additional radiation exposure resulting from repeated image guidance procedures raises concerns. Although there are many studies reporting imaging dose from different image guidance devices, imaging dose for the CyberKnife Robotic Radiosurgery System is not available. This study provides estimated organ doses resulting from image guidance procedures on the CyberKnife system. Methods: Commercially available Monte Carlo software, PCXMC, was used to calculate average organ doses resulting from x-ray tubes used in the CyberKnife system. There are seven imaging protocols with kVp ranging from 60 – 120 kV and 15 mAs for treatment sites in the Cranium, Head and Neck, Thorax, and Abdomen. The output of each image protocol was measured at treatment isocenter. For each site and protocol, Adult body sizes ranging from anorexic to extremely obese were simulated since organ dose depends on patient size. Doses for all organs within the imaging field-of-view of each site were calculated for a single image acquisition from both of the orthogonal x-ray tubes. Results: Average organ doses were <1.0 mGy for every treatment site and imaging protocol. For a given organ, dose increases as kV increases or body size decreases. Higher doses are typically reported for skeletal components, such as the skull, ribs, or clavicles, than for softtissue organs. Typical organ doses due to a single exposure are estimated as 0.23 mGy to the brain, 0.29 mGy to the heart, 0.08 mGy to the kidneys, etc., depending on the imaging protocol and site. Conclusion: The organ doses vary with treatment site, imaging protocol and patient size. Although the organ dose from a single image acquisition resulting from two orthogonal beams is generally insignificant, the sum of repeated image acquisitions (>100) could reach 10–20 cGy for a typical treatment fraction.

60 APPLIED LIFE SCIENCES↗

SU-E-T-96: An Analysis of VMAT SBRT Lung Treatment Plans

Purpose: To present an analysis of 218 lung sbrt treatment plans delivered using Varian Eclipse RapidArc software and delivered with Varian linear accelerators. Methods: A retrospective analysis of treatment plans generated using the Varian Eclipse PRO RapidArc VMAT optimization and AAA photon beam calculation algorithms was done for 218 plans delivered using Varian Trilogy and TrueBeam linear accelerators. Some of the patients were enrolled in the RTOG 0813 and RTOG 0915 lung protocols. All of the patients’ plans were optimized using the guidelines outlined by these protocols. The plans presented were normalized so that 95% of the PTV volume received 100% of the prescribed dose. Results: The dose co formality constraints from the RTOG protocols and the number of plans within those constraints were:Tumor dose between 60% of maximum dose and 90% of maximum: 218/218 = 100%.Volume of 105% tumor dose outside put less than 15% of the PTV volume: 218/218 = 100%.Maximum dose 2 cm away from PTV within protocol table guidelines: No minor deviation: 188/218 = 86.2%. No major deviation: 216/218 = 99.1%.Ratio of 50% dose volume to PTV volume less than R50 in protocol table: No minor deviation 148/218 = 67.9%. No major deviation: 213/218 = 97.7%.Percent of lung receiving 20 Gy less than 10% (no minor violation): 218/218 = 100%.99% of PTV receiving at least 90% of the tumor dose: 214/218 = 98.2%. Conclusion: Varian RapidArc VMAT can successfully deliver lung SBRT treatments as outlined in the RTOG 0813 and 0915 protocols. The largest deviations were seen in the R50 constraints for the larger PTV volumes.

60 APPLIED LIFE SCIENCES↗

SU-G-IeP2-10: Lens Dose Reduction by Patient Position Modification During Neck CT Exams

Purpose: Irradiation of the lens during a neck CT may increase a patient’s risk of developing cataracts later in life. Radiologists and technologists at the National Institutes of Health Clinical Center (NIHCC) have developed new CT imaging protocols that include a reduction in scan range and modifying neck positioning using a head tilt. This study will evaluate the efficacy of this protocol in the reduction of lens dose. Methods: We retrieved CT images of five male patients who had two sets of CT images: before and after the implementation of the new protocol. The lens doses before the new protocol were calculated using an in-house CT dose calculator, National Cancer Institute dosimetry system for CT (NCICT), where computational human phantoms with no head tilt are included. We also calculated the lens dose for the patient CT conducted after the new protocol by using an adult male computational phantom with the neck position deformed to match the angle of the head tilt. We also calculated the doses to other radiosensitive organs including the globes of the eye, brain, pituitary gland and salivary glands before and after head tilt. Results: Our dose calculations demonstrated that modifying neck position reduced dose to the lens by 89% on average (range: 86–96%). Globe, brain, pituitary and salivary gland doses also decreased by an average of 65% (51–95%), 38% (−8–66%), 34% (−43–84%) and 14% (13–14%), respectively. The new protocol resulted in a nearly ten-fold decrease in lens dose. Conclusion: The use of a head tilt and scan range reduction is an easy and effective method to reduce radiation exposure to the lens and other radiosensitive organs, while still allowing for the inclusion of critical neck structures in the CT image. We are expanding our study to a total of 10 males and 10 females.

60 APPLIED LIFE SCIENCES↗

Implementation of ISO 15118-202 messages within Everest EV Charging Open Source Framework [SWR-25-56]

This software implements the messages defined in the ISO 15118-202 standard within the Everest EV Charging open source framework. The protocol and messages defined in the ISO 15118-202 standard enable the exchange of additional information which is not available for exchange within the currently deployed EV/EVSE communications protocols. This information includes co-identification parameters, error message exchange and more. This fork of the everest-core repository adds a prototype of the Extensible Supply Equipment Communication Controller (SECC) Discovery Protocol (ESDP) implemented based on a draft of the ISO 15118-202 standard. This is achieved through additions and modifications to the EvseV2G module. The implementation provides a demonstration of the ESDP messages, encoding and decoding but does not include a full integration within the Everest framework. Much of the information being sent over ESDP in this implementation is set statically for the sake of demonstrating the protocol itself. This fork of the ext-switchev-iso15118 repository adds a prototype of the Extensible Supply Equipment Communication Controller (SECC) Discovery Protocol (ESDP) implemented based on a draft of the ISO 15118-202 standard. The implementation provides a demonstration of the ESDP messages, encoding and decoding but does not include a full integration within the Everest framework. Much of the information being sent over ESDP in this implementation is set statically for the sake of demonstrating the protocol itself. This fork adds the ESDP features for only the EVCC controller because that is the only portion that is utilized in the everest Software-in-the-Loop.

Watt, Ed [National Renewable Energy Laboratory (NR↗

Modernization of PLC-Based Control Systems at SNS

When the SNS site was built around 20 years ago, the Conventional Facilities (CF) control systems were de-signed using 2 communication protocols to allow pro-grammable logic controllers (PLCs) to interface with motors, variable frequency drives (VFDs), and remote input and output (I/O) devices. The protocol chosen to control motors and VFDs is DeviceNet, a CANbus-based protocol developed by Allen-Bradley, a subsidiary of Rockwell Automation. The protocol chosen to communi-cate with remote I/O is ControlNet, another protocol developed by Allen-Bradley. Both of these protocols are obsolete and present reliability and maintainability is-sues, particularly DeviceNet. As the Control Systems Section at SNS is working to modernize control systems throughout the machine, a major goal for PLC-based systems is to remove the obsolete communication proto-cols in favor of standard, ubiquitous Ethernet. To this end, any new VFDs installed use Ethernet communica-tion. Many VFDs are currently being replaced in the Central Utilities Building (CUB) and the Central Exhaust Facility (CEF) and are being removed from DeviceNet in favor of Ethernet communication. Planning is underway to retrofit Eaton Intelligent Technology motor control centers (MCCs) in the Target Building to remove particu-larly troublesome DeviceNet adaptors and replace them with Ethernet adaptors for each motor starter. The Con-trolNet network in the CUB has been demolished, with I/O drops integrated into a local Ethernet network, im-proving sustainability and maintainability.

Beaushaw, Isaiah [ORNL]↗

The Challenge for Arms Control Verification in the Post-New START World

Nuclear weapon arms control treaty verification is a key aspect of any agreement between signatories to establish that the terms and conditions spelled out in the treaty are being met. Historically, arms control negotiations have focused more on the rules and protocols for reducing the numbers of warheads and delivery systems - sometimes resorting to complex and arcane procedures for counting forces - in an attempt to address perceived or real imbalances in a nation's strategic posture that could lead to instability. Verification procedures are generally defined in arms control treaties and supporting documents and tend to focus on technical means and measures designed to ensure that a country is following the terms of the treaty and that it is not liable to engage in deception or outright cheating in an attempt to circumvent the spirit and the letter of the agreement. As the Obama Administration implements the articles, terms, and conditions of the recently ratified and entered-into-force New START treaty, there are already efforts within and outside of government to move well below the specified New START levels of 1550 warheads, 700 deployed strategic delivery vehicles, and 800 deployed and nondeployed strategic launchers (Inter-Continental Ballistic Missile (ICBM) silos, Submarine-Launched Ballistic Missile (SLBM) tubes on submarines, and bombers). A number of articles and opinion pieces have appeared that advocate for significantly deeper cuts in the U.S. nuclear stockpile, with some suggesting that unilateral reductions on the part of the U.S. would help coax Russia and others to follow our lead. Papers and studies prepared for the U.S. Department of Defense and at the U.S. Air War College have also been published, suggesting that nuclear forces totaling no more than about 300 warheads would be sufficient to meet U.S. national security and deterrence needs. (Davis 2011, Schaub and Forsyth 2010) Recent articles by James M. Acton and others suggest that the prospects for maintaining U.S. security and minimizing the chances of nuclear war, while deliberately reducing stockpiles to a few hundred weapons, is possible but not without risk. While the question of the appropriate level of cuts to U.S. nuclear forces is being actively debated, a key issue continues to be whether verification procedures are strong enough to ensure that both the U.S. and Russia are fulfilling their obligations under the current New Start treaty and any future arms reduction treaties. A recent opinion piece by Henry Kissinger and Brent Scowcroft (2012) raised a number of issues with respect to governing a policy to enhance strategic stability, including: in deciding on force levels and lower numbers, verification is crucial. Particularly important is a determination of what level of uncertainty threatens the calculation of stability. At present, that level is well within the capabilities of the existing verification systems. We must be certain that projected levels maintain - and when possible, reinforce - that confidence. The strengths and weaknesses of the New START verification regime should inform and give rise to stronger regimes for future arms control agreements. These future arms control agreements will likely need to include other nuclear weapons states and so any verification regime will need to be acceptable to all parties. Currently, China is considered the most challenging party to include in any future arms control agreement and China's willingness to enter into verification regimes such as those implemented in New START may only be possible when it feels it has reached nuclear parity with the U.S. and Russia. Similarly, in keeping with its goals of reaching peer status with the U.S. and Russia, Frieman (2004) suggests that China would be more willing to accept internationally accepted and applied verification regimes rather than bilateral ones. The current verification protocols specified in the New START treaty are considered as the baseline case and are contrasted with possible alternative verification protocols that could be effective in a post-New START era of significant reductions in U.S. and other countries nuclear stockpiles. Of particular concern is the possibility of deception and breakout when declared and observed numbers of weapons are below the level considered to pose an existential threat to the U.S. In a regime of very low stockpile numbers, 'traditional' verification protocols as currently embodied in the New START treaty might prove less than adequate. I introduce and discuss a number of issues that need to be considered in future verification protocols, many of which do not have immediate solutions and so require further study. I also discuss alternatives and enhancements to traditional verification protocols, for example, confidence building measures such as burden sharing against the common threat of weapon of mass destruction (WMD) terrorism, joint research and development.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Kansas Consortium Plug-in Hybrid Medium Duty

On September 30, 2008, the US Department of Energy (DoE), issued a cooperative agreement award, DE-FC26-08NT01914, to the Metropolitan Energy Center (MEC), for a project known as “Kansas Consortium Plug-in Hybrid Medium Duty Certification” project. The cooperative agreement was awarded pursuant to H15915 in reference to H. R. 2764 Congressionally Directed Projects. The original agreement provided funding for The Consortium to implement the established project objectives as follows: (1) to understand the current state of the development of a test protocol for PHEV configurations; (2) to work with industry stakeholders to recommend a medium duty vehicle test protocol; (3) to utilize the Phase 1 Eaton PHEV F550 Chassis or other appropriate PHEV configurations to conduct emissions testing; (4) and to make an industry PHEV certification test protocol recommendation for medium duty trucks. Subsequent amendments to the initial agreement were made, the most significant being a revised Scope of Project Objectives (SOPO) that did not address actual field data since it was not available as originally expected. This project was mated by DOE with a parallel project award given to the South Coast Air Quality Management District (SCAQMD) in California. The SCAQMD project involved designing, building and testing of five medium duty plug-in hybrid electric trucks. SCAQMD had contracted with the Electric Power Research Institute (EPRI) to manage the project. EPRI provided the required match to the federal grant funds to both the SCAQMD project and the Kansas Consortium project. The rational for linking the two projects was that the data derived from the SCAQMD project could be used to validate the protocols developed by the Kansas Consortium team. At the same time, the consortium team would be a useful resource to SCAQMD in designating their test procedures for emissions and operating parameters and determining vehicle mileage. The years between award of the cooperative agreements and their completion were problematic for the US and world economies. This resulted in the President and Congress implementing the American Recovery and Reinvestment Act of 2009, abbreviated ARRA (Pub.L. 111-5), commonly referred to as the Stimulus or The Recovery Act. The stimulus money available for transportation projects encouraged the SCAQMD to seek additional funds. In August of 2009, they eventually were awarded an additional $45.5 M, and the scope of their project was expanded to 378 vehicles. However, as a consequence of the stimulus money and the inundation of DOE with applications for new project under the ARRA, the expected time table for producing and testing vehicles was significantly delayed. As a result, these vehicles were not available for validating the protocols developed by the Kansas Consortium. Therefore, in April of 2011, the Scope of Project Objectives (SOPO) for the project was revised, and limited to producing the draft protocol for PHEV certification as its deliverable.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A Data-Driven Approach to Real-World Degradation of Backsheets

The objectives of this project are as follows: • The population behavior of fielded modules in various conditions of use • Predictions of materials in specific climatic zones • Understanding of a module’s local environment in the field on its degradation It aims to understand how and what backsheet materials of photovoltaic modules degrade in the real world field. • Field Survey Protocol This project is started from the protocol, because all the data, information, domain knowledge are from experience of the real world field surveys, which is based on the protocol. The Protocol is explored from the experience of the field survey observations. With the increasing of the field surveys, it is refined for three versions, which are Task 1.0 (Section 3.1), Task 6.0 (Section 3.6), Task 10.0 (Section 3.10) respectively. It includes a document and a training video, which is able to direct other teams to follow the same procedure with the sites surveyed during this project. The documents include the detailed information but is not limited to the terminology definition, instruments SOP, preparation items for the surveys, form for the data collections, the order of the information collection. The final version of the protocol can be found at Appendix A, see Section 5. Additional, It can also be found at Open Science Framework (OSF), see Section 3.18 for detail. • Written Waiver Request Before staring the field surveys, the request of the waiver for international surveys is completed, because the limitation of climate zone in the United States, see Appendix B in Section 6 for the request documents. Unfortunately, only 1 international site from Taiwan, China can be finished, due to the COVID-19. • Field Survey According to the protocol we built in Section 3.1, 3.6 and 3.10, 41 sites have been surveyed across seven different climate zones (Cfa, Csa, Csb, BSk, Dfa, Dfb, Am). A variety of materials, including Polyethylene Naphthalate (PEN), Polyethylene Terephthalate (PET), Polyvinyl Fluoride (PVF), Polyvinylidene Fluoride (PVDF), Acrylic PVDF, Fluoroethylene Vinyl Ether (FEVE), and Glass, were identified. These sites are located in various states including California, South Carolina, New Mexico, Maryland, Ohio, Tennessee, Florida, Massachusetts, Illinois, Minnesota, Oregon, Colorado, and Taiwan, Republic of China. The ages of the sites ranged from 2 - 38 years in service and the field size varied from 1 MW - 25 MW. All requirements for the modeling have been satisfied. Some observations like ’Edge Effect’ for the rows and Junction box heating will also be a useful knowledge to build the model. Section 3.7 provides detailed information on the sites visited during this reporting period.

14 SOLAR ENERGY↗

Mercury Calibration System

U.S. Environmental Protection Agency (EPA) Performance Specification 12 in the Clean Air Mercury Rule (CAMR) states that a mercury CEM must be calibrated with National Institute for Standards and Technology (NIST)-traceable standards. In early 2009, a NIST traceable standard for elemental mercury CEM calibration still does not exist. Despite the vacature of CAMR by a Federal appeals court in early 2008, a NIST traceable standard is still needed for whatever regulation is implemented in the future. Thermo Fisher is a major vendor providing complete integrated mercury continuous emissions monitoring (CEM) systems to the industry. WRI is participating with EPA, EPRI, NIST, and Thermo Fisher towards the development of the criteria that will be used in the traceability protocols to be issued by EPA. An initial draft of an elemental mercury calibration traceability protocol was distributed for comment to the participating research groups and vendors on a limited basis in early May 2007. In August 2007, EPA issued an interim traceability protocol for elemental mercury calibrators. Various working drafts of the new interim traceability protocols were distributed in late 2008 and early 2009 to participants in the Mercury Standards Working Committee project. The protocols include sections on qualification and certification. The qualification section describes in general terms tests that must be conducted by the calibrator vendors to demonstrate that their calibration equipment meets the minimum requirements to be established by EPA for use in CAMR monitoring. Variables to be examined include linearity, ambient temperature, back pressure, ambient pressure, line voltage, and effects of shipping. None of the procedures were described in detail in the draft interim documents; however they describe what EPA would like to eventually develop. WRI is providing the data and results to EPA for use in developing revised experimental procedures and realistic acceptance criteria based on actual capabilities of the current calibration technology. As part of the current effort, WRI worked with Thermo Fisher elemental mercury calibrator units to conduct qualification experiments to demonstrate their performance characteristics under a variety of conditions and to demonstrate that they qualify for use in the CEM calibration program. Monitoring of speciated mercury is another concern of this research. The mercury emissions from coal-fired power plants are comprised of both elemental and oxidized mercury. Current CEM analyzers are designed to measure elemental mercury only. Oxidized mercury must first be converted to elemental mercury prior to entering the analyzer inlet in order to be measured. CEM systems must demonstrate the ability to measure both elemental and oxidized mercury. This requires the use of oxidized mercury generators with an efficient conversion of the oxidized mercury to elemental mercury. There are currently two basic types of mercuric chloride (HgCl{sub 2}) generators used for this purpose. One is an evaporative HgCl{sub 2} generator, which produces gas standards of known concentration by vaporization of aqueous HgCl{sub 2} solutions and quantitative mixing with a diluent carrier gas. The other is a device that converts the output from an elemental Hg generator to HgCl{sub 2} by means of a chemical reaction with chlorine gas. The Thermo Fisher oxidizer system involves reaction of elemental mercury vapor with chlorine gas at an elevated temperature. The draft interim protocol for oxidized mercury units involving reaction with chlorine gas requires the vendors to demonstrate high efficiency of oxidation of an elemental mercury stream from an elemental mercury vapor generator. The Thermo Fisher oxidizer unit is designed to operate at the power plant stack at the probe outlet. Following oxidation of elemental mercury from reaction with chlorine gas, a high temperature module reduces the mercuric chloride back to elemental mercury. WRI conducted work with a custom laboratory configured stand-alone oxidized mercury generator unit provided by Thermo Fisher to perform experiments to demonstrate the high efficiency of oxidation on reaction with chlorine gas, and reduction back to elemental mercury.

01 COAL, LIGNITE, AND PEAT↗

Mercury Calibration System

U.S. Environmental Protection Agency (EPA) Performance Specification 12 in the Clean Air Mercury Rule (CAMR) states that a mercury CEM must be calibrated with National Institute for Standards and Technology (NIST)-traceable standards. In early 2009, a NIST traceable standard for elemental mercury CEM calibration still does not exist. Despite the vacature of CAMR by a Federal appeals court in early 2008, a NIST traceable standard is still needed for whatever regulation is implemented in the future. Thermo Fisher is a major vendor providing complete integrated mercury continuous emissions monitoring (CEM) systems to the industry. WRI is participating with EPA, EPRI, NIST, and Thermo Fisher towards the development of the criteria that will be used in the traceability protocols to be issued by EPA. An initial draft of an elemental mercury calibration traceability protocol was distributed for comment to the participating research groups and vendors on a limited basis in early May 2007. In August 2007, EPA issued an interim traceability protocol for elemental mercury calibrators. Various working drafts of the new interim traceability protocols were distributed in late 2008 and early 2009 to participants in the Mercury Standards Working Committee project. The protocols include sections on qualification and certification. The qualification section describes in general terms tests that must be conducted by the calibrator vendors to demonstrate that their calibration equipment meets the minimum requirements to be established by EPA for use in CAMR monitoring. Variables to be examined include linearity, ambient temperature, back pressure, ambient pressure, line voltage, and effects of shipping. None of the procedures were described in detail in the draft interim documents; however they describe what EPA would like to eventually develop. WRI is providing the data and results to EPA for use in developing revised experimental procedures and realistic acceptance criteria based on actual capabilities of the current calibration technology. As part of the current effort, WRI worked with Thermo Fisher elemental mercury calibrator units to conduct qualification experiments to demonstrate their performance characteristics under a variety of conditions and to demonstrate that they qualify for use in the CEM calibration program. Monitoring of speciated mercury is another concern of this research. The mercury emissions from coal-fired power plants are comprised of both elemental and oxidized mercury. Current CEM analyzers are designed to measure elemental mercury only. Oxidized mercury must first be converted to elemental mercury prior to entering the analyzer inlet in order to be measured. CEM systems must demonstrate the ability to measure both elemental and oxidized mercury. This requires the use of oxidized mercury generators with an efficient conversion of the oxidized mercury to elemental mercury. There are currently two basic types of mercuric chloride (HgCl{sub 2}) generators used for this purpose. One is an evaporative HgCl{sub 2} generator, which produces gas standards of known concentration by vaporization of aqueous HgCl{sub 2} solutions and quantitative mixing with a diluent carrier gas. The other is a device that converts the output from an elemental Hg generator to HgCl{sub 2} by means of a chemical reaction with chlorine gas. The Thermo Fisher oxidizer system involves reaction of elemental mercury vapor with chlorine gas at an elevated temperature. The draft interim protocol for oxidized mercury units involving reaction with chlorine gas requires the vendors to demonstrate high efficiency of oxidation of an elemental mercury stream from an elemental mercury vapor generator. The Thermo Fisher oxidizer unit is designed to operate at the power plant stack at the probe outlet. Following oxidation of elemental mercury from reaction with chlorine gas, a high temperature module reduces the mercuric chloride back to elemental mercury. WRI conducted work with a custom laboratory configured stand-alone oxidized mercury generator unit provided by Thermo Fisher to perform experiments to demonstrate the high efficiency of oxidation on reaction with chlorine gas, and reduction back to elemental mercury.

01 COAL, LIGNITE, AND PEAT↗

The Dynamic Assimilation Technique measures photosynthetic CO2 response curves with similar fidelity as steady-state approaches in half the time

The net CO2 assimilation (A) response to intercellular CO2 concentration (Ci) is a fundamental measurement in photosynthesis and plant physiology research. The conventional A/Ci protocols rely on steady-state measurements and take 15-40 minute per measurement, limiting data resolution or biological replication. Additionally, there are several CO2 protocols employed across the literature, without clear consensus as to the optimal protocol or systematic biases in their estimations. We compared the non-steady state Dynamic Assimilation Technique (DAT) protocol and the three most used CO2 protocols in steady-state measurements, and tested whether different CO2 protocols lead to systematic differences in estimations of the biochemical limitations to photosynthesis.

A/Ci response↗

Cost Sensitive Moving Target Consensus

Consensus is a fundamental approach to implementing fault-tolerant services through replication where there exists a tradeoff between the cost and the resilience. For instance, Crash Fault Tolerant (CFT) protocols have a low cost but can only handle crash failures while Byzantine Fault Tolerant (BFT) protocols handle arbitrary failures but have a higher cost. Hybrid protocols enjoy the benefits of both high performance without failures and high resiliency under failures by switching among different subprotocols. However, it is challenging to determine which subprotocols should be used. We propose a moving target approach to switch among protocols according to the existing system and network vulnerability. At the core of our approach is a formalized cost model that evaluates the vulnerability and performance of consensus protocols based on real-time Intrusion Detection System (IDS) signals. Based on the evaluation results, we demonstrate that a safe, cheap, and unpredictable protocol is always used and a high IDS error rate can be tolerated.

Duan, Sisi↗

Extracting value from coal mine methane

Emerging US policy to regulate greenhouse gas (GHG) emissions through a cap-and-trade program presents mine managers with a new opportunity to explore and develop methane utilization or abatement projects that generate value from the anodization of carbon offset credits. In addition, the rising focus on US energy security and domestic energy supply is promoting mine managers and engineers to give further consideration to the importance of their methane gas by-products. The market through which coal mine methane offset projects can be developed and carbon offset credits monetized is quickly maturing. While many methane utilization projects have previously been uneconomical, the carbon offset credit market provides a new set of financing tools for mine engineers to capitalize these projects today. Currently , there are two certification programs that have approved project protocols for CMM projects. The Voluntary Carbon Standard (VCS) offers a methodology approved under the Clean Development Mechanism, the international compliance based offset market under the Kyoto Protocol. The VCS protocol is applicable to projects that combust ventilation air methane (VAM) and methane extracted from pre-and post-mine drainage systems. The Chicago Climate Exchange (CCX), which operates a voluntary yet binding cap-and-trade market, also has an approved protocol for CMM projects. CCX's protocol can be applied to projects combusting VAM, and methane extracted from pre-and-post-mine drainage systems, as well as abandoned mines. The article describes two case studies - Developing a gob gas utilization project financed by carbon offset credits and First VAM oxidation system to be commissioned at an operating mine in the US. 1 tab., 4 photos.

01 COAL, LIGNITE, AND PEAT↗

Hot Springs and Geysers: Exploring Historical and Modern Impacts of Geothermal Energy Production on Associated Natural Surface Systems and Standardizing Management Practices

Surface thermal features, most notably hot springs and geysers are increasingly being recognized for their importance to ecosystems, indigenous cultures, and in some cases agriculture, recreation, and tourism. Geothermal project development poses a potential risk to these natural features but current regulatory requirements for assessing and managing these risks during exploration, permitting and monitoring are somewhat inconsistent and unpredictable across different geothermal fields. This has resulted in uncertainty and increases in exploration risk for geothermal energy developers that have led to costly project delays, cancellations, or hesitation to commit. Varying regulatory requirements may also influence public perception, fostering confusion, distrust and ultimately opposition to geothermal projects, further contributing to project delays or cancellations. At a time when there is an increasing urgency for reliable baseload clean energy, geothermal is a net-zero, renewable solution that additionally provides access to more equitable and environmentally just clean power. Continued integration of geothermal energy into the national energy roadmap can be facilitated through consistent and predictable permitting, providing regulators the framework they need, developers a clear path forward, and transparency that the public deserves. This project, currently in its beginning phases, seeks to address this important issue by providing a technical basis from which to build a preliminary protocol for assessing and managing potential impacts from new or existing geothermal energy projects to surface thermal features and their associated ecosystems. Development of this preliminary protocol will be informed by (1) a literature review of well-documented case studies in the western U.S. and New Zealand to understand the range of conditions that exemplify geothermal-surface thermal systems; (2) development of generic illustrative conceptual-numerical models to quantify, understand, and predict the first-order controls (e.g., pressure and permeability) on surface flows; and (3) additional independent and scientifically rigorous evaluations of geothermal-surface thermal system case studies from the Basin and Range Province that incorporate publicly available data as well as data provided by industry through data-sharing agreements. Learning from the successes of the process used to develop the Induced Seismicity Management Protocol (ISMP), we ultimately aim to use these initial efforts as a springboard for establishing a surface thermal feature management working group that will work collaboratively to finalize the protocol as well as co-create recommended best practices for implementation. We envision that the working group will primarily be composed of representatives from regulatory entities, government agencies, Tribes, academia, national laboratories, and industry, and will include early and regular engagement with community organizations and environmental groups. This will help ensure broad acceptance and implementation of the protocol, which will facilitate a more consistent, predictable, and standardized regulatory process, and help to ensure that geothermal energy continues to provide a reliable source of clean energy, and a pathway to achieving greater energy equity in the U.S.

Best Practices↗

Metabolic Incorporation of N ‐Acetyl Muramic Acid Probes into Bacterial Peptidoglycan

Abstract Bacterial cells utilize small carbohydrate building blocks to construct peptidoglycan (PG), a highly conserved mesh‐like polymer that serves as a protective coat for the cell. PG production has long been a target for antibiotics, and its breakdown is a source for human immune recognition. A key component of bacterial PG, N ‐acetyl muramic acid (NAM), is a vital element in many synthetically derived immunostimulatory compounds. However, the exact molecular details of these structures and how they are generated remain unknown due to a lack of chemical probes surrounding the NAM core. A robust synthetic strategy to generate bioorthogonally tagged NAM carbohydrate units is implemented. These molecules serve as precursors for PG biosynthesis and recycling. Escherichia coli cells are metabolically engineered to incorporate the bioorthogonal NAM probes into their PG network. The probes are subsequently modified using copper‐catalyzed azide‐alkyne cycloaddition to install fluorophores directly into the bacterial PG, as confirmed by super‐resolution microscopy and high‐resolution mass spectrometry. Here, synthetic notes for key elements of this process to generate the sugar probes as well as streamlined user‐friendly metabolic labeling strategies for both microbiology and immunological applications are described. © 2019 by John Wiley & Sons, Inc. Basic Protocol 1 : Synthesis of peracetylated 2‐azido glucosamine Basic Protocol 2 : Synthesis of 2‐azido and 2‐alkyne NAM Basic Protocol 3 : Synthesis of 3‐azido NAM methyl ester Basic Protocol 4 : Incorporation of NAM probes into bacterial peptidoglycan Basic Protocol 5 : Confirmation of bacterial cell wall remodeling by mass spectrometry

DeMeester, Kristen E.↗

Global optimal consensus for discrete-time multi-agent systems with bounded controls

In this paper, we consider the global optimal consensus problem for discrete-time multi-agent systems with bounded control protocols over xed undirected communication networks. Each agent is described by a discrete-time single integrator and endowed with a quadratic objective function which is private to itself. For each agent, we develop two bounded distributed protocols: bounded proportional-integral (PI) protocol and bounded integral (I) protocol, based on information receiving from its neighboring agents through the communication network and the gradient of its own objective function. We show that the proposed bounded distributed protocols with properly chosen parameters solve the global optimal consensus problem if the communication network is connected, i.e., the multi-agent system achieves consensus at a state that minimizes the sum of the objective functions of all agents. The theoretical results are illustrated by numerical simulations.

Consensus, multi-agent system, optimal control↗