Search NASA⌕ Search

SEARCH · Search NASA

Results for “Accelerator Applications”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,027 records · Page 57

Application of mesh refinement to relativistic magnetic reconnection

During relativistic magnetic reconnection, antiparallel magnetic fields undergo a rapid change in topology, releasing a large amount of energy in the form of non-thermal particle acceleration. This work explores the application of mesh refinement to 2D reconnection simulations to efficiently model the inherent disparity in length-scales. We have systematically investigated the effects of mesh refinement and determined necessary modifications to the algorithm required to mitigate non-physical artifacts at the coarse–fine interface. We have used the ultrahigh-order pseudo-spectral analytical time-domain Maxwell solver to analyze how its use can mitigate the numerical dispersion that occurs with the finite-difference time-domain (or “Yee”) method. Absorbing layers are introduced at the coarse–fine interface to eliminate spurious effects that occur with mesh refinement. We also study how damping the electromagnetic fields and current density in the absorbing layer can help prevent the non-physical accumulation of charge and current density at the coarse–fine interface. Using a mesh refinement ratio of 8 for two-dimensional magnetic reconnection simulations, we obtained good agreement with the high-resolution baseline simulation, using only 36% of the macroparticles and 71% of the node-hours needed for the baseline. The methods presented here are especially applicable to 3D systems where higher memory savings are expected than in 2D, enabling comprehensive, computationally efficient 3D reconnection studies in the future.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Modeling of the interaction of a volumetric metallic metamaterial structure with a relativistic electron beam

We present the design of a volumetric metamaterial (MTM) structure and its interaction with a relativistic electron beam. This novel structure has promising applications in particle beam diagnostics, acceleration and microwave generation. The volumetric MTM has a cubic unit cell allowing structures of arbitrary size to be configured as an array of identical cells. This structure allows the exploration of the properties of a metamaterial structure without having to consider substrates or other supporting elements. The dispersion characteristics of the unit cell are obtained using eigenmode simulations in the HFSS code and also using an effective medium theory with spatial dispersion. Good agreement is obtained between these two approaches. The lowest order mode of the MTM structure is found to have a negative group velocity in all directions of propagation. The frequency spectrum of the radiation from a relativistic electron beam passing through the MTM structure is calculated analytically and also calculated with the CST code, with very good agreement. The radiation pattern from the relativistic electron beam is found to be backward Cherenkov radiation, which is a promising tool for particle diagnostics. Calculations are also presented for the application of a MTM-based wakefield accelerator as a possible all-metal replacement for the conventional dielectric wakefield structure. The proposed structure may also be useful for MTM-based vacuum electron devices for microwave generation and amplification.

43 PARTICLE ACCELERATORS↗

Particle Beam Acceleration Using 3 Petawatt Laser Pulses

The Zettawatt-Equivalent Ultrashort pulse laser System (ZEUS) is presently operational at the Gerard Mourou Center for Ultrafast Optical Science (CUOS) at the University of Michigan. ZEUS is a significant upgrade of the previous high power laser systems at CUOS and consists of two beamlines thatoperate in perfect synchronization. The 500 TW beamline became operational in 2023, 2 PW operation started in 2025 and full 3 PW power levels will be available in 2026. It is presently the highest power laser system in the US. In this grant the high field science group at CUOS has leveraged this unique high power laser facility to investigate laser wake field acceleration (LWFA) in ultra-high power laser plasma interactions and have shown how this can scale for future electron–positron colliders at high energy. The dual beam experimental configuration enables flexibility for many frontier experiments in laser-driven acceleration research, in particular, enabling extended channelling/acceleration experiments, positron generation/acceleration experiments and proof-of-principle transverse pumping “dephasingless” electron acceleration experiment and theory. LWFA may be able to miniaturize particle accelerators for high energy physics and also enable new sources of ultrafast, extreme brightness and precise x-rays for a wide variety of applications. In laser wake field acceleration, an electron bunch “surfs” on the electron plasma wave (the “wake field”) generated by the ponderomotive force of an intense laser. The plasma wave has a strong longitudinal electric field that stays in phase with the relativistic driver. A relativistic charged particle may, therefore, remain in phase with the accelerating field over long distances and gain ultra-relativistic energies. The accelerating electric field strength that the plasma wave can support can be many orders of magnitude higher than that of conventional accelerators, which makes laser wakefield acceleration an exciting prospect as an advanced accelerator concept. In this research project we have investigated the scaling of this mechanism to laser powers of 2 PW and have measured the x-ray emission and radio frequency emission resulting from the acceleration process. We have also performed theoretical investigation of mechanisms to scale laser driven accelerators to much higher energy using dephasingless acceleration processes.

43 PARTICLE ACCELERATORS↗

IMPACC: A Tightly Integrated MPI+OpenACC Framework Exploiting Shared Memory Parallelism

We propose IMPACC, an MPI+OpenACC framework for heterogeneous accelerator clusters. IMPACC tightly integrates MPI and OpenACC, while exploiting the shared memory parallelism in the target system. IMPACC dynamically adapts the input MPI+OpenACC applications on the target heterogeneous accelerator clusters to fully exploit target system-specific features. IMPACC provides the programmers with the unified virtual address space, automatic NUMA-friendly task-device mapping, efficient integrated communication routines, seamless streamlining of asynchronous executions, and transparent memory sharing. We have implemented IMPACC and evaluated its performance using three heterogeneous accelerator systems, including Titan supercomputer. Results show that IMPACC can achieve easier programming, higher performance, and better scalability than the current MPI+OpenACC model.

Kim, Jungwon↗

GASNet-EX Memory Kinds: Support for Device Memory in PGAS Programming Models

There is an emerging need for adaptive, lightweight communication in irregular HPC applications at exascale, where GPU accelerators provide the majority of available compute cycles. To address this need, Lawrence Berkeley National Lab is developing a programming system to support distributed-memory HPC application development using the Partitioned Global Address Space (PGAS) model. This work includes two major components: UPC++ and GASNet-EX. UPC++ is a C++ template library providing Remote Memory Access (RMA) and Remote Procedure Call (RPC) communication interfaces. GASNet-EX is a portable, high-performance communication middleware library, used by the implementations of UPC++ and many other PGAS programming models. We describe recent advances in GASNet-EX to efficiently implement zero-copy Remote Memory Access (RMA) communication to and from memory on accelerator devices such as GPUs. We demonstrate performance improvements via benchmark results from UPC++ (on Summit) and the Legion programming system (on DGX-1), both using GASNet-EX for communication.

Hargrove, Paul H↗

High Average Current Bunched Electron Source for RF Accelerators

High-average current high-quality electron beams are imperative for high-power RF accelerators used in various energy and environmental applications in industry, medicine, and national security as well as for advanced existing and future accelerator systems such as PIP II, particle colliders (eRHIC BNL) for cooling high-energy proton, ion, and hadron beams, storage rings, wakefield accelerators (AWA), and energy recovery linacs. The most common current approach to generate high-peak current high-brightness short electron bunches uses photoemission excited by intense laser radiation. However, to avoid overheating photocathodes are operated at a subharmonic of the linac frequency that in turn restricts the average beam current. There are also limitations in the electron-beam average current due to the average power available from drive lasers. On the other hand, the state of the art thermionic sources that produce high average current electron beams do not have yet good emission gating methods to realize sufficiently short and good quality electron bunches. We develop a robust thermionic electron source (e-source) of >1 A average current with advanced gating of the emission at the linac-frequency and its 3rd harmonic. Central to the approach is a novel scheme for energy efficient feeding of the 3rd-harmonic power in the RF gap. The cathode is attached to the gun cavity through this small emission-gating gap in which the RF modes are excited. The use of thermionic emission allows for the desired high-average current CW electron beams. Adding the 3rd emission gating harmonic shortens the electron bunches and by this means lessens impact of the RF curvature on the beam quality resulting in the smaller energy spread and bunch emittances. Such high current electron beam is suitable for injection into high-power normal- or superconducting linacs in CW mode at a high repetition rate of the linac frequency. In Phase I, we performed modeling and beam dynamics, parametric, and optimization studies. A >1A average current e-source with 200,000hrs lifetime expectancy has been demonstrated in the simulations. We have developed baseline design of the e-source and its components. It is anticipated that the e-source will be in demand for normal- and superconducting particle accelerators and will benefit many commercial and energy and environmental applications such as treating waste and potable water, sludge, stack gases, and medical waste as well as X-ray sources for medicine, sterilization, materials processing, geology, and non-intrusive imaging.

43 PARTICLE ACCELERATORS↗

Celeritas: Accelerating Geant4 with GPUs

Celeritas [1] is a new Monte Carlo (MC) detector simulation code designed for computationally intensive applications (specifically, High Lumi- nosity Large Hadron Collider (HL-LHC) simulation) on high-performance heterogeneous architectures. In the past two years Celeritas has advanced from prototyping a GPU-based single physics model in infinite medium to implementing a full set of electromagnetic (EM) physics processes in complex geometries. The current release of Celeritas, version 0.3, has incorporated full device-based navigation, an event loop in the presence of magnetic fields, and detector hit scoring. New functionality incorporates a scheduler to offload electromagnetic physics to the GPU within a Geant4-driven simulation, enabling integration of Celeritas into high energy physics (HEP) experimental frameworks such as CMSSW. On the Summit supercomputer, Celeritas performs EM physics between 6 and 32 faster using the machine’s Nvidia GPUs compared to using only CPUs. When running a multithreaded Geant4 ATLAS test beam application with full hadronic physics, using Celeritas to accelerate the EM physics results in an overall simulation speedup of 1.8–2.3× on GPU and 1.2× on CPU.

Johnson, Seth R.↗

Applications of AMS {sup 14}C on Climate and Archaeology

We describe the Accelerator Mass Spectrometry (AMS) technique and two distinct applications of its use with {sup 14}C to study environmental problems in Brazil, such as forest fires and climate changes in the Amazon region and archaeological studies on the early settlements in the Southeast Brazilian coast.

54 ENVIRONMENTAL SCIENCES↗

Linear colliders based on laser-plasma accelerators

Laser-plasma accelerators are capable of sustaining accelerating fields of 10–100 GeV/m, 100–1000 times that of conventional technology and the highest fields produced by any of the widely researched advanced accelerator concepts. Laser-plasma accelerators also intrinsically accelerate short particle bunches, several orders of magnitude shorter than that of conventional technology, which leads to reductions in beamstrahlung and, hence, savings in the overall power consumption to reach a desired luminosity. These properties make laser-plasma accelerators a promising accelerator technology for a more compact, less expensive high-energy linear collider providing multi-TeV polarized leptons. In this submission to the Snowmass 2021 Accelerator Frontier, we discuss the motivation for a laser-plasma-accelerator-based linear collider, the status of the field, and potential linear collider concepts up to 15 TeV. Herein, we outline the research and development path toward a collider based on laser-plasma accelerator technology, and highlight near-term and mid-term applications of this technology on the collider development path. The required experimental facilities to carry out this research are described. We conclude with community recommendations developed during Snowmass.

43 PARTICLE ACCELERATORS↗

Optimizing $\mathrm{ACRT}$ to reduce inclusion formation during the $\mathrm{VGF}$ growth of cadmium zinc telluride: II. Application to experiments

Here two different accelerated crucible rotation technique (ACRT) rotation schedules are assessed, via theoretical computations and growth experiments, according to their ability to reduce tellurium-rich inclusions during the vertical gradient freeze (VGF) of cadmium zinc telluride (CZT). A vigorous rotation schedule based on classical ACRT guidelines produces a well-mixed melt that is expected to reduce tellurium inclusions compared to growth without crucible rotation. In contrast, a new ACRT schedule, derived from model-based optimization for interface stability, employs slower rotation with longer periods and is predicted to further reduce inclusions. Growth experiments corroborate these expectations. Namely, both ACRT schedules result in crystals with inclusion size and volume significantly decreased from levels found in material grown with no rotation, and material grown using the computationally optimized ACRT parameters exhibits a median inclusion size that is smaller and with a sharper distribution than in material grown via classical ACRT.

36 MATERIALS SCIENCE↗

Parallel general purpose multiobjective optimization framework with application to electron beam dynamics

Particle accelerators are invaluable tools for research in the basic and applied sciences, such as materials science, chemistry, the biosciences, particle physics, nuclear physics and medicine. The design, commissioning, and operation of accelerator facilities is a nontrivial task, due to the large number of control parameters and the complex interplay of several conflicting design goals. The Argonne Wakefield Accelerator facility has some unique challenges resulting from its purpose to carry out advanced accelerator R&D. Individual experiments often have challenging beam requirements, and the physical configuration of the beam lines is often changed to accommodate the variety of supported experiments. The need for rapid deployment of different operational settings further complicates the optimization work that must be done for multiple constraints and challenging operational regimes. One example of this is an independently staged two-beam acceleration experiment which requires the construction of an additional beam line (this is now in progress). The high charge drive beam, well into the space charge regime, must be threaded through small aperture (17.6 mm) decelerating structures. In addition, the bunch length must be sufficiently short to maximize power generation in the decelerator. We propose to tackle this problem by means of multiobjective optimization algorithms which also facilitate a parallel deployment. In order to compute solutions in a meaningful time frame, a fast and scalable software framework is required. In this paper, we present a general-purpose framework for simulation-based multiobjective optimization methods that allows the automatic investigation of optimal sets of machine parameters. Using evolutionary algorithms as the optimizer and opal as the forward solver, validation experiments and results of multiobjective optimization problems in the domain of beam dynamics are presented. Optimized solutions for the new high charge drive beam line found by the framework were used to finish the design of a two beam acceleration experiment. The selected solution along with the associated beam parameters is presented.

43 PARTICLE ACCELERATORS↗

(U) Computation acceleration using dynamic memory

Many computational applications require the repeated use of quantities, whose calculations can be expensive. In order to speed up the overall execution of the program, it is often advantageous to replace computation with extra memory usage. In this approach, computed values are stored and then, when they are needed again, they are quickly retrieved from memory rather than being calculated again at great cost. Sometimes, however, the precise amount of memory needed to store such a collection is not known in advance, and only emerges in the course of running the calculation. One problem accompanying such a situation is wasted memory space in overdimensioned (and possibly sparse) arrays. Another issue is the overhead of copying existing values to a new, larger memory space, if the original allocation turns out to be insufficient. In order to handle these runtime problems, the programmer therefore has the extra task of addressing them in the code.

97 MATHEMATICS AND COMPUTING↗

20 Years Experience with the World's Largest Superconducting RF Application: CEBAF

The Continuous Electron Beam Accelerator Facility (CEBAF) uses over 350 multi-cell resonant rf structures to accelerate a precision high-power electron beam for nuclear physics research. These cavities are made of bulk niobium and operated CW at 2.07K, employing the world's 2nd largest sub-lambda cryogenics system. The superconducting system is a vital part of this unique tool for fundamental research. Through 20 years of system construction and operation the preparation methods have evolved and the performance levels have continued to climb. State-of-the practice now supports > 50 MV/m surface electric fields and > 100 mT surface magnetic fields while maintaining < 30 nOhm surface resistance. The evolution of the superconducting aspects of CEBAF will be reviewed, together with the associated production methods.

Reece, Charles↗

A New High-Current Proton Accelerator

A high-current (>20 mA) dc proton accelerator is being developed for applications such as boron neutron capture therapy (BNCT) and the detection of explosive materials by nuclear resonance absorption (NRA) of gamma radiation. The high-voltage dc accelerator (adjustable between 1.4 and 2.8 MeV) will be a single-ended industrial Dynamitron registered system equipped with a compact high-current, microwave-driven proton source. A magnetic mass analyzer inserted between the ion source and the acceleration tube will select the protons and reject heavier ions. A sorption pump near the ion source will minimize the flow of neutral hydrogen gas into the acceleration tube. For BNCT, a lithium target for generating epithermal neutrons is being developed that will be capable of dissipating the high power (>40 kW) of the proton beam. For NRA, special targets will be used to generate gamma rays with suitable energies for exciting nuclides typically present in explosive materials. Proton accelerators with such high-current and high-power capabilities in this energy range have not been developed previously.

43 PARTICLE ACCELERATORS↗

High Power SRF Linacs for ADS Reactors

We discuss plans to develop Accelerator-Driven Subcritical Reactor (ADSR) nuclear power stations producing more than 5 to 10 GWe in an inherently safe region below criticality, generating no greenhouse gases, producing minimal nuclear waste and no byproducts that are useful to rogue nations or terrorists, incinerating waste from conventional nuclear reactors, and efficiently using abundant thorium fuel that does not need enrichment. Fermilab is developing concepts for Project X [1], which would use a superconducting RF (SRF) linear proton accelerator to provide beams for particle physics at the intensity and energy frontiers. We propose to extend this linac design to serve as a prototype for a practical accelerator that can drive several nuclear reactors at once and also provide beams for reactor development. We also propose that a Recirculating Linear Accelerator be developed for ADSR applications by extrapolating from techniques developed for the CEBAF machine.

43 PARTICLE ACCELERATORS↗

Definition of Capabilities Needed for a Single Event Effects Test Facility

The Federal Aviation Administration (FAA) is contemplating new regulations mandating testing of the vulnerability of flight-critical avionics to single event effects (SEE). A limited number of high-energy neutron test facilities currently serve the SEE industrial and institutional research community. The FAA recognizes that existing facilities have insufficient test capacity to meet new demand from such mandates; it desires more flexible irradiation capabilities to test complete, large systems and would like capabilities to address greater concerns for thermal neutrons. For this reason, the FAA funded this study by Spallation Neutron Source (SNS) staff with the ultimate aim of developing options for SEE test facilities using high-energy neutrons at the SNS complex. After an investigation of current SEE test practices and assessment of future testing requirements, three concepts were identified covering a range of test functionality, neutron flux levels, and fidelity to the atmospheric neutron spectrum. The costs and times required to complete each facility were also estimated. SEE testing is generally performed by accelerating the event rate to a point where the effects are still dominated by single events and double event causes of failures are negligible. In practice, acceleration factors of as high as 10 6 are applicable for component testing, whereas for systems testing acceleration factors of 10 4 seem to be the upper limit. It is strongly desirable that the irradiation facility be tunable over a large range of high-energy neutron fluxes of 10 2 - 10 4 n/cm²/s for systems testing and from 10 4 - 10 7 n/cm²/s for components testing. The most capable, most flexible, and highest-test-capacity option is a new stand-alone target station named the High-Energy neutron Test Station (HETS). It is also the most expensive option, with a cost to complete of approximately $100 million. Dual test enclosures would allow for simultaneous testing activity effectively doubling overall test capacity per HETS operating hour. Using about 1 kilowatt (kW) of proton power extracted from the accelerator before injection in the accumulator ring, its operation would be unnoticeable by neutron scattering users at the SNS target station. The H beam laser stripping technique would allow for control of beam power on the HETS target independent from power delivered to the SNS. Large systems with frontal areas of up to 1 x 2 m² could be accommodated with integral high-energy flux values (above 10 megaelectron-volt, or MeV) to at most 10 4 n/cm²/s; components could also be tested with flux levels to at most 10 7 n/cm²/s on beam sizes of up to 0.2 x 0.2 m². Selectable moderating material and neutron filters would allow tailoring of the neutron spectrum to user demands; charged particle deflectors could be switched to allow or deflect protons, pions, and muons. It is estimated that HETS would take 5 years to complete after award of contract, including engineering design and construction. Commissioning would take at least another 6 months. Interference with SNS principal operations was not considered in the construction time estimate; connection of the proton transport line and tunnel from the accelerator high energy beam transport (HEBT) and construction around existing site utilities would require careful planning and coordination with beam operations at the SNS. A high-energy (HE) neutron test facility using an available beam line on the SNS target station is a technically and financially attractive option. Inspired by the new ChipIR instrument on the ISIS TS 2 spallation source in the UK, a similar facility could be placed on an unused beam line in the SNS instrument hall [e.g., on beam line 8 (both A and B channels would be needed) or on beam line 10]. The performance would approach that of an HETS (~80%), but it would be operationally more limited, with only a single user at a time. Space is more limited, so the maximum system size would be about half of that in an HETS. Flexibility to tailor the spectrum would be somewhat more limited. While this concept was not as fully developed and characterized, preliminary work indicates very high HE flux levels should be possible, with ample thermal neutrons as well. Flux control would be more difficult than at HETS because proton power on target be whatever the SNS was operating at for neutron scattering. Neutron attenuation devices would have to be employed with as-yet undetermined control resolution. However, no new buildings would be needed, and the necessary utilities are already present in the SNS Experiment Hall. The estimated cost for a beam line option is around $15 million; the time to complete would be 3 years after award of contract, plus at least 6 months for commissioning. Interference of construction activities with SNS operations should be negligible. This option would require negotiation with the Department of Energy Basic Energy Sciences (BES) office -- the primary stakeholder of SNS -- for an application outside the usual scope of neutron scattering sciences. Furthermore, these presently open beam lines are highly desirable locations for proposed neutron scattering instruments and obtaining one of them for an SEE test facility will come only with persuasive and timely arguments to SNS leadership and the DOE BES. The third option is a tunnel extension/target cave facility providing the most basic system-level irradiation capability with minimal flexibility. Again not as well developed a concept as HETS, it would use a laser-stripping technique like an HETS, redirecting protons to a tunnel similar to the initial HETS proton transport tunnel. Indeed, this concept is intended to be upgradable to a full HETS facility. Only a small fraction of a watt of proton power would be used in this basic configuration, though. An uncooled target and primitive shielding arrangement would provide beam on modestly sized systems that must be placed in close proximity to the target. The neutron fluence would be less uniform over the system than with the HETS or the beam line option. A data acquisition room and support area would be located on the ground level; access to the target cave would be via elevator and/or stairway. As a result of the required excavation, new tunnel construction, shielding, data acquisition building, utilities, and other items, the estimated cost is $30 million. The time to complete is expected be more than 3 years; here again construction interference with SNS operations has not been accounted for, but it could have a significant impact.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Phase I Final Technical Report on Energy-Efficient Reconfigurable Universal Accelerator Interconnect

It is well known that application specific computing systems, optimally designed and configured for a given workload, offer much higher energy-efficiency and throughput than general purpose systems. In modern computing systems, heterogeneous computing systems have emerged that exploit the energy and performance benefits of combining various different domain-specific processor architectures. Application domains such as high-performance computing and machine learning now process terabyte-sized data sets, requiring enormous processing and memory resources. These applications have very high-power consumption due to bottlenecks in the electrical interconnection between processing units. This project aims to reduce both communication energy and latency by integrating universally available accelerators with silicon photonics. It also aims to increase system throughput by exploiting emerging technologies in silicon photonic reconfigurable interconnects; this will allow the system to balance itself in real time to accommodate changes in workloads and data flows.

2.5D/3D integration↗

Helium refrigeration considerations for cryomodule design

Many of the present day accelerators are based on superconducting radio frequency (SRF) cavities, packaged in cryo-modules (CM), which depend on helium refrigeration at sub-atmospheric pressures, nominally 2 K. These specialized helium refrigeration systems are quite cost intensive to produce and operate. Particularly as there is typically no work extraction below the 4.5-K supply, it is important that the exergy loss between this temperature level and the CM load temperature(s) be minimized by the process configuration choices. This paper will present, compare and discuss several possible helium distribution process arrangements to support the CM loads.

43 PARTICLE ACCELERATORS↗