Search NASA⌕ Search

SEARCH · Search NASA

Results for “CALENDARS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,027 records · Page 57

LAMP Project Facility and Space Requirements

The project will require significant space over the lifetime of the project to successfully execute design, technology maturation, component testing and verification, and final removal and installation. The types of space required falls into three general categories: office, storage, and laboratory. Figure 1 below summarizes the project space requirements by project lifecycle. The specific color coding indicates the availability (and potential risk to the project) of the particular type of space: green indicates space that is already allocated and in use by the LAMP project; yellow indicates space that is expected to be easily transitioned from its current use to the project; red indicates a space that is use by multiple users or other projects, and will most likely require high-level negotiations and planning to become available to the project. Figure 2 summarizes the LAMP Space Requirements by calendar year and type throughout the duration of the project. As can be seen in Fig. 2, the maximum space needed by the project exceeds 40,000 square feet, with an average space requirement over the lifetime of the project equal to approximately 25,000 square feet.

43 PARTICLE ACCELERATORS↗

Assessment of BQ-9000 Biodiesel Properties for 2024

This is the eighth in a series of reports documenting the quality of biodiesel from U.S.- and Canadian-based producers that participate in the BQ-9000 program, the biodiesel industry's voluntary quality assurance program. Participants provided monthly data on critical quality parameters for calendar year 2024 with quality data provided to a team of experts, who removed any identifying company information and provided anonymized data to the National Renewable Energy Laboratory (NREL) for statistical analysis. Similar to 2023, data on kinematic viscosity, sulfated ash, distillation temperature, carbon residue, and cetane were collected, as well as individual levels of sodium, potassium, calcium, and magnesium.

09 BIOMASS FUELS↗

2024 Annual Site Environmental Report for Sandia National Laboratories, Livermore, California

Sandia National Laboratories is a multimission laboratory managed and operated by National Technology & Engineering Solutions of Sandia, LLC, a wholly-owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy’s National Nuclear Security Administration. The National Nuclear Security Administration’s Sandia Field Office administers the Prime Contract and oversees contractor operations at Sandia National Laboratories, California. Activities at this multi-program engineering and science laboratory support the nuclear weapons stockpile program, energy and environmental research, homeland security, micro- and nanotechnologies, and basic science and engineering research. The U.S. Department of Energy’s National Nuclear Security Administration and its management and operating contractor are committed to fulfilling regulatory obligations, safeguarding the environment, assessing sustainability practices, and ensuring the validity and accuracy of the monitoring data presented in this annual site environmental report (ASER). This report provides a summary of environmental monitoring and compliance activities that occurred at Sandia National Laboratories, California, during calendar year 2024, unless noted otherwise. General site and environmental program information is also included. This report was prepared in accordance with DOE Order 231.1B, Admin Change 1, Environment, Safety and Health Reporting.

54 ENVIRONMENTAL SCIENCES↗

Annual Site Environmental Report: 2021 (ASER) for the SLAC National Accelerator Laboratory

This report, prepared by the SLAC National Accelerator Laboratory (SLAC) for the U.S. Department of Energy (DOE), SLAC Site Office (SSO), provides a comprehensive summary of the environmental program activities at SLAC for calendar year 2021. Annual Site Environmental Reports (ASERs) are prepared for all DOE sites with significant environmental activities and distributed to relevant external regulatory agencies and other interested organizations or individuals. To the best of my knowledge, this report accurately summarizes the results of the 2021 environmental monitoring, compliance, and restoration programs at SLAC. This assurance can be made based on SSO and SLAC review of the ASER, and quality assurance protocols applied to monitoring and data analyses at SLAC.

54 ENVIRONMENTAL SCIENCES↗

Site A and Plot M 2024 Surveillance Report and 2025 Inspection Report

The results of the environmental surveillance program conducted at Site A/Plot M for calendar year (CY) 2024 are presented within this document. Site A/Plot M is in the Palos Area Preserves managed by the Forest Preserve District of Cook County. The surveillance program consists of the collection and analysis of surface and groundwater samples to determine the amount of hydrogen-3 and strontium-90 present in the environment within and surrounding the site of the former research facility (Site A) and waste burial site (Plot M).

54 ENVIRONMENTAL SCIENCES↗

Annual Site Environmental Report: 2024 (ASER) for the SLAC National Accelerator Laboratory

This report, prepared by the SLAC National Accelerator Laboratory (SLAC) for the U.S. Department of Energy (DOE) SLAC Site Office (SSO), provides a comprehensive summary of the environmental program activities at SLAC for calendar year 2024. Annual Site Environmental Reports (ASERs) are prepared for all DOE sites with significant environmental activities and distributed to relevant external regulatory agencies and other interested organizations or individuals.

54 ENVIRONMENTAL SCIENCES↗

Environmental Performance Report 2024: Annual Site Environmental Report per the U.S. Department of Energy Order 231.1B Chg 1

The National Renewable Energy Laboratory's (NREL's) Environmental Performance Report provides a description of the laboratory's environmental management activities in calendar year 2024, including information on environmental and sustainability performance, environmental compliance activities and status, and environmental protection programs, highlights, and successes. The purpose of this report is to ensure that the U.S. Department of Energy (DOE) and the public receive timely, accurate information about events that have positively affected or could adversely affect the health and safety of the public or workers, the environment, or the operations of DOE facilities. This report meets the DOE requirements of the Annual Site Environmental Report (ASER) and has been prepared in accordance with DOE Order 231.1B Chg 1, Environment, Safety and Health Reporting.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Analyses of Dose Rates for Second Inner Reflector Plug Replacement at Spallation Neutron Source

The Inner Reflector Plug (IRP) is a central component of the Spallation Neutron Source (SNS) target monolith, which houses the liquid mercury target and four liter-sized neutron moderator units. It is exposed to high-level radiation fields during routine operation and builds up significant activity. The IRP needs to be replaced due to moderator neutron poison and decoupler burn-out, which is used for shaping neutron pulses. The first IRP exchange took place in March 2018 and next one, which is IRP2, is planned to be replaced during the facility maintenance period in the end of December 2025, beginning of January 2026 calendar year. The replacement of IRP is a complex task due to its location in the area receiving high irradiation, being under significant amount of shielding, and size, which requires removal in segments. For planning the replacement workflow to help to reduce radiation exposure to workers dose rates for each stage of extraction/replacement operation are predicted.

42 ENGINEERING↗

Batteries 2022 Annual Progress Report

This document summarizes the progress of VTO battery R&D projects supported during the fiscal year 2022. Its R&D focus was on the development of high-energy batteries for PEVs. The electrochemical energy storage roadmap describes ongoing and planned efforts to develop electrochemical storage technologies for EVs. To advance battery technology, which can in turn improve market penetration of PEVs, the program investigates various battery chemistries to overcome specific technical barriers, e.g., battery cost, performance, life (both the calendar life and the cycle life), its tolerance to abusive conditions, and its recyclability/sustainability.

25 ENERGY STORAGE↗

Batteries (2023 Annual Progress Report)

This document summarizes the progress of VTO battery R&D projects supported during the fiscal year 2023. Its R&D focus was on the development of high-energy batteries for PEVs. The electrochemical energy storage roadmap describes ongoing and planned efforts to develop electrochemical storage technologies for EVs. To advance battery technology, which can in turn improve market penetration of PEVs, the program investigates various battery chemistries to overcome specific technical barriers, e.g., battery cost, performance, life (both the calendar life and the cycle life), its tolerance to abusive conditions, and its recyclability/sustainability.

25 ENERGY STORAGE↗

Spent Nuclear Fuel and Reprocessing Waste Inventory

This report provides information on the inventory of spent nuclear fuel (SNF) in the United States located at Nuclear Power Reactor (NPR) and Independent Spent Fuel Storage Installation (ISFSI) sites, as well as SNF and reprocessing waste located at U.S. Department of Energy (DOE) sites and other research and development (R&D) centers as of the end of calendar year 2024. Actual quantitative values for current inventories are provided along with inventory forecasts derived from examining different future nuclear power generation scenarios, based on information available and assumptions made at the time the scenarios were developed. The report also includes select information on the characteristics associated with the wastes examined (e.g., type, packaging, heat generation rate, decay curves).

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

S4PST: Stewardship and Advancement for Programming Systems and Tools 2024-2025 Project Report

We present the "Stewardship and Advancement of Programming Systems and Tools" (S4PST) project report for the calendar years 2024 and 2025. S4PST is dedicated to the stewardship and advancement of Programming Systems and Tools (PST) mainly targeting high-performance computing (HPC) for the scientific community. The project is part of the funded software stewardship organizations (SSOs) selected by ASCR as part of the NGSST program, and a member of CASS: the Consortiumfor the Advancement of Scientific Software.

97 MATHEMATICS AND COMPUTING↗

Illustration of VERA Capabilities to Model a Typical iPWR SMR

Small modular reactors (SMRs) are being considered by the commercial nuclear power industry as an option for more distributed generation and for replacement of older fossil fuel generating facilities. SMRs are more compact than operating pressurized water reactors (PWRs), producing about 200 MWe as compared to 1000 MWe or higher for their full-sized cousins, and are offered as “expandable” units; that is, their modular design allows the utility to add more units progressively at the same site. In Summer 2014, CASL reported on a progression of demonstrations illustrating VERA’s ability to simulate a typical SMR of the iPWR type, while developing a simple core cycle design for cycle economic studies. The work included development of fuel assembly lattices, 3D single assembly and full core (quarter symmetry) simulations of the proposed core cycle design using the CASL Virtual Environment for Reactor Applications (VERA). The report concluded that it would be difficult for the SMR to operate for the target 1400 EFPD cycle length and that the fuel cost would be on the order of 50% higher as compared with a PWR. Unfortunately, the Reference 4 core cycle design did not include control component management. The iPWR is intended to be operated using the control rods for reactivity control, as opposed to using soluble boron (like most currently operating PWRs), and the introduction of the control rods is expected to affect the length of the cycle. Therefore, this work continues the previous CASL demonstration of VERA capability to simulate a typical iPWR core, including the development of a control component management strategy using the Reference 4 core design and utilizing the soon-to-be released VERA3.3 tools. Note that this study is not intended as a validation study; rather it is merely an illustration of VERA’s capabilities to simulate a typical iPWR. Simulations included two variations on control rod banks – a two-bank scheme and a ten-bank scheme. Both schemes were modelled using the VERA Common Input, and more than six iterations on each control rod scheme were simulated to arrive at a combination of rod banks and insertion depths that provided a core reactivity near the target k eff of 1.000 ± 0.001 (more than 50 cases run) over two calendar months. In particular, VERA was used to determine the hot excess reactivity for the core design with all rods out (ARO), and then iterative simulations with the rod banks inserted to determine the critical control rod bank positions were completed. VERA options to simplify the process were exercised as possible, particularly restart functionality, coupled thermal-hydraulics using the internal T-H solver, xenon, and depletion capability. The fuel shuffling functionality was not exercised, since the iPWR SMR features a once-through cycle. The VERA method of characteristics (MOC) neutronics subcomponent was used to predict power and reactivity with control rod maneuvering, both with and without thermal-hydraulic feedback. The problem was scaled from 35 CPU cores to 3815, effectively demonstrating the solution time with respect to computing capacity. Computer clusters at Oak Ridge National Laboratory, Idaho National Laboratory and Tennessee Valley Authority were used. These studies provide an additional illustration of the application of VERA to a typical iPWR SMR. Reference 4 previously demonstrated that the codes could handle the differences in geometry for the iPWR, and this study expanded the illustration to include control rod management. Further, the work illustrates the need for in-depth simulations to support effective control rod maneuvering for an iPWR and highlights the need for control rod reactivity search capability within VERA. Additionally, the development of a control rod bank reactivity search capability will be extremely useful for not only this application, but also for BWRs as CASL develops BWR capability in Phase 2.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Automated Ride Hailing - Status, Projections, and Critical Safety Review

Automated ride-hailing services, commonly known as 'robo-taxis' are beginning to proliferate and scale. Currently they are available in four major US cities with another 10 cities planning their implementation in the near future. In the US, automated ride-hailing services are dominated by a single provider, with announcements from several competitors of service offerings by end of calendar year 2025. Internationally, only three companies are currently in commercial operations, with many more planned. The scaling of robo-taxi services appears to be the leading application of automated vehicles (AVs), and provides evidence of their anticipated safety in comparison to conventional vehicles. This presentation will provide an overview of the status of deployments of fully operational AVs in ride-hailing services, projections of the number of trips, vehicles, and vehicle miles traveled for the immediate future, and a critical review of the safety data that has been reported, both in the US as well as internationally.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Comparison of GPU-Accelerated Multiphase CFD Solvers on the Polaris Supercomputer: Part 1

This report is in support of the Innovative and Novel Computational Impact on Theory and Experiment (INCITE) program sponsored by the U.S. Department of Energy (USDOE). With INCITE-level resources, one project, titled BubblyFlow, was granted computational resources for the 2025 calendar year on the Polaris supercomputer at the Argonne Leadership Computing Facility (ALCF). The project aims to conduct simulations to understand the fundamental characteristics of turbulent bubbly flow phenomena in nature. Staff at the ALCF and Argonne’s Computational Science division, along with collaborators at the City College of New York and University of Illinois at Chicago, helped a summer student to assess the accuracy and performance of two high performance computing (HPC) codes. Both codes, ImExLBM and FluTAS, are fundamentally different in their mathematical and numerical modeling. However, both may be used to solve the same physical problem. The collaboration sought to better understand the differences between both codes in terms of accuracy and efficiency. This would ultimately help the BubblyFlow project better utilize resources and establish a knowledge-base of code capabilities in future simulation campaigns. We compare ImExLBM and FluTAS, two high-performance multiphase computational fluid dynamics (CFD) solvers, in terms of physical fidelity, time-to-solution, and parallel efficiency. We validate ImExLBM (Implicit-Explicit Lattice Boltzmann Method) against a canonical benchmark and assess it’s performance relative to FluTAS (Fluid Transport Accelerated Solver), a well-established open-source CFD code.

97 MATHEMATICS AND COMPUTING↗

2025 Mykonos Facility Report

This document summarizes the activities at the Mykonos Pulsed Power Facility during the calendar year 2025. Section 1 reports on the yearly shot statistics along with some facility highlights. Section 2 discusses the many improvements we were able to complete this year, thanks to the generous Mykonos Academic Access Programs (MAAP) funding from SSAP and Sandia strategic investments. Section 3 focuses on each individual campaign and their respective results.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Central Hanford Ecological Integrity Assessments: Final Report

The Hanford Site is comprised of an expanse of shrub-steppe habitats that provides exceptional ecological value to plants and animals located on the site and in the surrounding greater Columbia Basin. The U.S. Department of Energy, Hanford Field Office (HFO)-managed portion of the Hanford Site, referred to herein as Central Hanford, has been the focus of various ecological monitoring efforts, such as vegetation monitoring. The scope and goals of vegetation surveys have varied greatly since the Hanford Site was established, but studies have documented a rapidly changing landscape, making it clear that routine vegetation monitoring is integral to understanding ecological changes and preserving the ecological value of the Hanford Site. A new vegetation monitoring effort was initiated in calendar year (CY) 2023 and continued through CY 2025 using methods based on ecological integrity assessments (EIA) (NHR-2024-04, Field Manual for Applying Rapid Ecological Integrity Assessments in Upland Plant Communities of Washington State ) developed by the Washington Natural Heritage Program (WNHP), a division of the Department of Natural Resources (DNR), and NatureServe.® The methods were modified and supplemented to meet monitoring goals at the Hanford Site. The EIA monitoring effort consisted of field surveys to evaluate vegetation and soil conditions for upland habitats throughout Central Hanford. Vegetation cover estimates were used to score a variety of metrics for vegetation condition. This report summarizes monitoring methods, monitoring results, and provides management recommendations.

54 ENVIRONMENTAL SCIENCES↗