Search NASA⌕ Search

SEARCH · Search NASA

Results for “CAPACITY PLANNING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,027 records · Page 57

RIVER PROTECTION PROJECT SYSTEM PLAN

The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, the ORP is responsible for the retrieval, treatment, and disposal of the approximately 57 million gallons of radioactive waste contained in the Hanford Site waste tanks and closure of all the tanks and associated facilities. The previous revision of the System Plan was issued in September 2003. ORP has approved a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. The ORP has established contracts to implement this strategy to establish a basic capability to complete the overall mission. The current strategy for completion of the mission uses a number of interrelated activities. The ORP will reduce risk to the environment posed by tank wastes by: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) for treatment and disposal; (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) and about half of the low-activity waste (LAW) contained in the tank farms, and maximizing its capability and capacity; (3) Developing and deploying supplemental treatment capability or a second WTP LAW Facility that can safely treat about half of the LAW contained in the tank farms; (4) Developing and deploying treatment and packaging capability for transuranic (TRU) tank waste for shipment to and disposal at the Waste Isolation Pilot Plant (WIPP); (5) Deploying interim storage capacity for the immobilized HLW and shipping that waste to Yucca Mountain for disposal; (6) Operating the Integrated Disposal Facility for the disposal of immobilized LAW, along with the associated secondary waste, (7) Closing the SST and DST tank farms, ancillary facilities, and al1 waste management and treatment facilities, (8) Developing and implementing technical solutions to mitigate the impact from substantial1y increased estimates of Na added during the pretreatment of the tank waste solids, This involves a combination of: (1) refining or modifying the flowsheet to reduce the required amount of additional sodium, (2) increasing the overall LAW vitrification capacity, (3) increasing the incorporation of sodium into the LAW glass, or (4) accepting an increase in mission duration, ORP has made and continues to make modifications to the WTP contract as needed to improve projected plant performance and address known or emerging risks, Key elements of the implementation of this strategy are included within the scope of the Tank Operations Contract, currently in procurement Since 2003, the ORP has conducted over 30 design oversight assessments of the Waste Treatment and Immobilization Plant (WTP). The estimated cost at completion has increased and the schedule for construction and commissioning of the WTP has extended, The DOE, Office of Environmental Management (EM), sanctioned a comprehensive review of the WTP flowsheet, focusing on throughput. In 2005, the TFC completed interim stabilization of the SSTs and as of March 2007, has completed the retrieval of seven selected SSTs. Demonstration of supplemental treatment technologies continues. The ongoing tank waste retrieval experience, progress with supplemental treatment technologies, and changes in WTP schedule led to the FY 2007 TFC baseline submittal in November 2006. The TFC baseline submittal was developed before the WTP schedule was fully understood and approved by ORP, and therefore reflects an earlier start date for the WTP facilities. This System Plan is aligned with the current WTP schedule with hot commissioning beginning in 2018 and full operations beginning in 2019. Major decisions regarding the use of supplemental treatment and the associated technology, the ultimate needed capacity, and its relationship to the WTP have not yet been finalized. This System Plan assumes that the outcome of this decision will be to provide a supplemental LAW treatment system using in-container vitrification (ICV{trademark}) as the enabling technology. No final implementation decisions regarding supplemental technology can be made until the Tank Closure and Waste Management Environmental Impact Statement is completed and a Record of Decision is issued by the DOE.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Multi-Model Framework for Assessing Long- and Short-Term Climate Influences on the Electric Grid

Climate change influences many aspects of the electric grid, but prior work and industry practices often ignore the potential effects of changing climate, or they only consider a single effect or individual effects in isolation. Challenges vary with each grid and include adapting to long-term trends such as changing temperature and precipitation or shorter-term events such as drought or storms that could increase in frequency or intensity. Here we present a multi-model framework designed to analyze the effects of long and short-term climate impacts in combination. This framework couples capacity expansion and production cost models with hydrologic models and future climate scenario data to analyze alternative climate and energy futures at high spatial, temporal, and process resolutions. Furthermore, we constructed and evaluated the results of a suite of simulated scenarios exploring climate impacts on capacity investment and stress-tested the resulting future infrastructures using hourly dispatch modeling under alternative drought and load conditions. We demonstrate the approach through a case study of the U.S. Western Interconnection, where climate impacts depend on interactions between temperature-induced load, water availability for hydropower, technology competitiveness, and demand flexibility. Changes in 2038 generating capacity range from -8.5-16.6 GW, and changes in 2038 transmission capacity range from -1-2 GW. Capacity increases are driven by higher load from higher temperatures, while capacity reductions can be achieved in scenarios with higher future hydropower availability and increased demand flexibility. Scenarios requiring additional capacity cost an additional $\$5$-$\$17$ billion (discounted) from 2018 to 2038; however, scenarios with capacity reductions cost $\$1$-$\$18$ billion less. Stress tests on four 2038 infrastructures demonstrated that the identified systems were able to serve at least 99.999% of load and 99.96% of reserves. However, drought and unexpected high-load conditions can result in reduced capacity to respond to contingency events we did not model. Although these results are system and scenario specific, they highlight the importance of considering multiple climate change impacts simultaneously in long-term planning efforts and demonstrate a multi-model, multiscale approach that can be flexibly applied to any system and set of climate change concerns.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Market Implications of Alternative Operating Reserve Modeling in Wholesale Electricity Markets

Pricing and settlement mechanisms are crucial for efficient resource allocation, investment incentives, market competition, and regulatory oversight. In the United States, Regional Transmission Operators (RTOs) adopts a uniform pricing scheme that hinges on the marginal costs of supplying additional electricity. This study investigates the pricing and settlement impacts of alternative reserve constraint modeling, highlighting how even slight variations in the modeling of constraints can drastically alter market clearing prices, reserve quantities, and revenue outcomes. Focusing on the diverse market designs and assumptions in ancillary services by U.S. RTOs, particularly in relation to capacity sharing and reserve substitutions, the research examines four distinct models that combine these elements based on a large-scale synthetic power system test data. Our study provides a critical insight into the economic implications and the underlying factors of these alternative reserve constraints through market simulations and data analysis.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

WBS 1.2.3.405 - Life Cycle Assessment of Storage Technologies

Recent commitments by the Biden administration have established targets to achieve a net-zero energy system by 2050. Meeting these targets will spur a rapid transition to clean energy technologies and a commensurate need to develop and deploy energy storage technologies at scale. Pumped Storage Hydro (PSH) is expected to be part of this solution because its ability to provide grid flexibility and stability and enable the dispatching of disparate variable renewable energy technologies. Despite PSH being a mature technology with a history of deployment dating back several decades, there is very little information on the greenhouse gas (GHG) implications of PSH as compared to other storage technologies. The objective of this project is to perform a full lifecycle assessment (LCA) of new PSH projects in the U.S. This LCA includes all project phases (resource extraction, construction, operation, maintenance, end-of-life). The functional unit for this study is 1 kWh electricity delivered by system to grid substation connection point and the estimated lifetime for our base case is 80 years. Data used in this study are based on over 30 potential PSH projects that are in preliminary planning phases and are represent a wide range of potential closed-loop PSH systems in terms of location, technology, and capacity. The project approach, data sources, and modeling assumptions have been informed by a technical review committee of stakeholders that include experts from academia, national and international government, industry, and utilities. The GHGs and energy return on investment (EROI) from PSH will be compared to other storage technologies (e.g., stationary battery storage). Results from this project will improve the PSH community's understanding of the environmental impacts and sustainability of new PSH projects and how PSH compares to other storage technologies. The approach used in this project relies on open-source programming. The analysis framework (source code and data) and will be made publicly available at the end of the project. In addition to reporting results for the base case, we will perform rigorous sensitivity analysis to identify the major drivers, understand impacts of different configurations, and future energy markets. Results from this project will be published in a suitable journal.

ENERGY PLANNING, POLICY, AND ECONOMY,HYDRO ENERGY↗

Lawrence Livermore National Laboratory Experimental Test Site (Site 300) Potable Water System Operations Plan

The existing Lawrence Livermore National Laboratory (LLNL) Site 300 drinking water system operation schematic is shown in Figures 1 and 2 below. The sources of water are from two Site 300 wells (Well #18 and Well #20) and San Francisco Public Utilities Commission (SFPUC) Hetch-Hetchy water through the Thomas shaft pumping station. Currently, Well #20 with 300 gallons per minute (gpm) pump capacity is the primary source of well water used during the months of September through July, while Well #18 with 225 gpm pump capacity is the source of well water for the month of August. The well water is chlorinated using sodium hypochlorite to provide required residual chlorine throughout Site 300. Well water chlorination is covered in the Lawrence Livermore National Laboratory Experimental Test Site (Site 300) Chlorination Plan (“the Chlorination Plan”; LLNL-TR-642903; current version dated August 2013). The third source of water is the SFPUC Hetch-Hetchy Water System through the Thomas shaft facility with a 150 gpm pump capacity. At the Thomas shaft station the pumped water is treated through SFPUC-owned and operated ultraviolet (UV) reactor disinfection units on its way to Site 300. The Thomas Shaft Hetch- Hetchy water line is connected to the Site 300 water system through the line common to Well pumps #18 and #20 at valve box #1.

54 ENVIRONMENTAL SCIENCES↗

LLNL Experimental Test Site (Site 300) Potable Water System Operations Plan

The existing Lawrence Livermore National Laboratory (LLNL) Site 300 drinking water system operation schematic is shown in Figures 1 and 2 below. The sources of water are from two Site 300 wells (Well #18 and Well #20) and San Francisco Public Utilities Commission (SFPUC) Hetch-Hetchy water through the Thomas shaft pumping station. Currently, Well #20 with 300 gallons per minute (gpm) pump capacity is the primary source of well water used during the months of September through July, while Well #18 with 225 gpm pump capacity is the source of well water for the month of August. The well water is chlorinated using sodium hypochlorite to provide required residual chlorine throughout Site 300. Well water chlorination is covered in the Lawrence Livermore National Laboratory Experimental Test Site (Site 300) Chlorination Plan (“the Chlorination Plan”; LLNL-TR-642903; current version dated August 2013). The third source of water is the SFPUC Hetch-Hetchy Water System through the Thomas shaft facility with a 150 gpm pump capacity. At the Thomas shaft station the pumped water is treated through SFPUC-owned and operated ultraviolet (UV) reactor disinfection units on its way to Site 300. The Thomas Shaft Hetch- Hetchy water line is connected to the Site 300 water system through the line common to Well pumps #18 and #20 at valve box #1.

54 ENVIRONMENTAL SCIENCES↗

U.S. Department of Energy Critical Materials Strategy

This report examines the role of rare earth metals and other materials in the clean energy economy. It was prepared by the U.S. Department of Energy (DOE) based on data collected and research performed during 2010. Its main conclusions include: (a) Several clean energy technologies -- including wind turbines, electric vehicles, photovoltaic cells and fluorescent lighting -- use materials at risk of supply disruptions in the short term. Those risks will generally decrease in the medium and long term. (b) Clean energy technologies currently constitute about 20 percent of global consumption of critical materials. As clean energy technologies are deployed more widely in the decades ahead, their share of global consumption of critical materials will likely grow. (c) Of the materials analyzed, five rare earth metals (dysprosium, neodymium, terbium, europium and yttrium), as well as indium, are assessed as most critical in the short term. For this purpose, 'criticality' is a measure that combines importance to the clean energy economy and risk of supply disruption. (d) Sound policies and strategic investments can reduce the risk of supply disruptions, especially in the medium and long term. (e) Data with respect to many of the issues considered in this report are sparse. In the report, DOE describes plans to (i) develop its first integrated research agenda addressing critical materials, building on three technical workshops convened by the Department during November and December 2010; (ii) strengthen its capacity for information-gathering on this topic; and (iii) work closely with international partners, including Japan and Europe, to reduce vulnerability to supply disruptions and address critical material needs. DOE will work with other stakeholders -- including interagency colleagues, Congress and the public -- to shape policy tools that strengthen the United States' strategic capabilities. DOE also announces its plan to develop an updated critical materials strategy, based upon additional events and information, by the end of 2011.DOE's strategy with respect to critical materials rests on three pillars. First, diversified global supply chains are essential. To manage supply risk, multiple sources of materials are required. This means taking steps to facilitate extraction, processing and manufacturing here in the United States, as well as encouraging other nations to expedite alternative supplies. In all cases, extraction and processing should be done in an environmentally sound manner. Second, substitutes must be developed. Research leading to material and technology substitutes will improve flexibility and help meet the material needs of the clean energy economy. Third, recycling, reuse and more efficient use could significantly lower world demand for newly extracted materials. Research into recycling processes coupled with well-designed policies will help make recycling economically viable over time.The scope of this report is limited. It does not address the material needs of the entire economy, the entire energy sector or even all clean energy technologies. Time and resource limitations precluded a comprehensive scope. Among the topics that merit additional research are the use of rare earth metals in catalytic converters and in petroleum refining. These topics are discussed briefly in Chapter 2.

36 MATERIALS SCIENCE↗

State Policies Provide Critical Support for Renewable Electricity

Growth in renewable energy in the U.S. over the past decade has been propelled by a number of forces, including rising fossil fuel prices, environmental concerns, and policy support at the state and federal levels. In this article, we review and discuss what are arguably the two most important types of state policies for supporting electricity generation from geothermal and other forms of renewable energy: renewables portfolio standards and utility integrated resource planning requirements. Within the Western U.S., where the vast majority of the nation's readily-accessible geothermal resource potential resides, these two types of state policies have been critical to the growth of renewable energy, and both promise to continue to play a fundamental role for the foreseeable future. In its essence, a renewables portfolio standard (RPS) requires utilities and other retail electricity suppliers to produce or purchase a minimum quantity or percentage of their generation supply from renewable resources. RPS purchase obligations generally increase over time, and retail suppliers typically must demonstrate compliance on an annual basis. Mandatory RPS policies are backed by various types of compliance enforcement mechanisms, although most states have incorporated some type of cost-containment provision, such as a cost cap or a cap on retail rate impacts, which could conceivably allow utilities to avoid (full) compliance with their RPS target. Currently, 27 states and the District of Columbia have mandatory RPS requirements. Within the eleven states of the contiguous Western U.S., all but three (Idaho, Utah, and Wyoming) now have a mandatory RPS legislation (Utah has a more-voluntary renewable energy goal), covering almost 80% of retail electricity sales in the region. Although many of these state policies have only recently been established, their impact is already evident: almost 1800 MW of new renewable capacity has been installed in Western states following the implementation of RPS policies. To date, wind energy has been the primary beneficiary of state RPS policies, representing approximately 83% of RPS-driven renewable capacity growth in the West through 2007. Geothermal energy occupies a distant second place, providing 7% of RPS-driven new renewable capacity in the West since the late 1990s, though geothermal's contribution on an energy (MWh) basis is higher. Looking to the future, a sizable quantity of renewable capacity beyond pre-RPS levels will be needed to meet state RPS mandates: about 25,000 MW by 2025 within the Western U.S. Geothermal energy is beginning to provide an increasingly significant contribution, as evidenced by the spate of new projects recently announced to meet state RPS requirements. Most of this activity has been driven by the RPS policies in California and Nevada, where the Geothermal Energy Association has identified 47 new geothermal projects, totaling more than 2,100 MW, in various stages of development. Additional geothermal projects in Arizona, New Mexico, Oregon, and Washington are also under development to meet those states RPS requirements. The other major state policy driver for renewable electricity growth, particularly in the West, is integrated resource planning (IRP). IRP was first formalized as a practice in the 1980s, but the practice was suspended in some states as electricity restructuring efforts began. A renewed interest in IRP has emerged in the past several years, however, with several Western states (California, Montana, and New Mexico) reestablishing IRP and others developing new rules to strengthen their existing processes. In its barest form, IRP simply requires that utilities periodically submit long-term resource procurement plans in which they evaluate alternative strategies for meeting their resource needs over the following ten to twenty years. However, many states have developed specific requirements for the IRP process that directly or indirectly support renewable energy. The most general of these is an explicit requirement that utilities evaluate renewables, and that they do so on an 'equivalent' or 'comparable' basis to conventional supply-side generation options. Many states also require that utilities include various types of risk analyses within their IRP. For example, utilities are often required to evaluate fuel price risk within their resource plan, which can reveal the value of renewables as a hedge against rising and volatile fuel prices. Of particular importance for supporting renewable energy is the increasingly common requirement that utilities evaluate the potential costs and risks associated with future greenhouse gas regulations. Virtually all of the major Western utilities that prepare IRPs incorporated future carbon dioxide regulations in their analyses of alternative resource strategies in their most recent resource plans.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Climate Change Mitigation Potential of Wind Energy

Global wind resources greatly exceed current electricity demand and the levelized cost of energy from wind turbines has shown precipitous declines. Accordingly, the installed capacity of wind turbines grew at an annualized rate of about 14% during the last two decades and wind turbines now provide ~6–7% of the global electricity supply. This renewable electricity generation source is thus already playing a role in reducing greenhouse gas emissions from the energy sector. Here we document trends within the industry, examine projections of future installed capacity increases and compute the associated climate change mitigation potential at the global and regional levels. Key countries (the USA, UK and China) and regions (e.g., EU27) have developed ambitious plans to expand wind energy penetration as core aspects of their net-zero emissions strategies. The projected climate change mitigation from wind energy by 2100 ranges from 0.3–0.8 °C depending on the precise socio-economic pathway and wind energy expansion scenario followed. The rapid expansion of annual increments to wind energy installed capacity by approximately two times current rates can greatly delay the passing of the 2 °C warming threshold relative to pre-industrial levels. To achieve the required expansion of this cost-effective, low-carbon energy source, there is a need for electrification of the energy system and for expansion of manufacturing and installation capacity.

17 WIND ENERGY↗

Component-to-Optimization Workflow Demonstration

This report aims to demonstrate workflow-generating algorithms for optimizing dispatch across a broad range of Integrated Energy System applications using the Framework for Optimization of Resources and Economics (FORCE) tool suite. The optimization is performed at two different time scales. In the coarse time scale, the optimization focuses on a class of energy sources and consumers and aims to find the optimal combinations and flows of energy based on real-time price data information. In the fine time scale, the optimization focuses on a specific thermal energy delivery system and aims to find the optimal setpoints of components in order to meet the energy demands from coarse-time-scale optimizations. In this demonstration, the coarse-scale optimization is implemented using the newly developed Dispatch Optimization Variable Engine (DOVE), while the fine-scale optimization used Optimization of Real-Time Capacity Allocation (ORCA).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Task 2 Report - A GIS-Based Technical Potential Assessment of Domestic Energy Resources for Electricity Generation

The purpose of this report is to support the Lao Ministry of Energy and Mines (MEM) in assessing the technical potential of domestic energy resources for utility scale electricity generation in the Lao PDR. Specifically, this work provides assessments of technical potential, and associated maps of developable areas, for energy technologies of interest. This report details the methodology, assumptions, and datasets employed in this analysis to provide a transparent, replicable process for future analyses. The methodology and results presented are intended to be a fundamental input to subsequent decision making and energy planning-related analyses. This report is the second output of the Energy Alternatives Study for the Lao PDR (Energy Alternatives Study), a collaboration led by MEM and the United States Agency for International Development under the auspices of the Smart Infrastructure for the Mekong program.1 The Energy Alternatives Study is composed of five successive tasks that collectively support the project’s goals as shown in FIGURE ES-1. This work is focused on Task 2 – Assess technical potential of domestic energy resources for electricity generation . The work was carried out by a team from the U.S. Department of Energy’s National Renewable Energy Laboratory (NREL) in collaboration with MEM and other Lao power sector stakeholders. This work concentrates on domestic energy resources for utility-scale electricity generation and considers solar photovoltaic (PV), wind, biomass, and coal resources. This work does not consider potentially imported energy resources (e.g., natural gas) or domestic energy resources that are not present in sufficient quantity for utility-scale generation (e.g., geothermal resources). A technical potential assessment of hydropower resources is currently not feasible due to the absence of required data including site-level assessments of multiple characteristics (e.g., geology environment and access) as well as spatial data on estimated non-exploited hydropower resources (Lee et al. 2018). Previous studies estimated total hydropower resource potential to be between 23,000 and 26,000 MW, of which approximately 3,894 MW has been developed (IES and MKE 2016; MEM 2015b, 2011). MEM and Électricité du Laos have gained significant experience in the evaluation and development of hydropower resources and expect to develop close to 10,034 MW of additional capacity by 2025 (MEM 2017).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Nuclear Forensics in Support of National Response Plans [Slides]

Become familiar with nuclear forensics methodologies in support of nuclear security investigations and how Los Alamos National Laboratory supports the development of sustainable global nuclear forensics capacities.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Remediation of the Highland Drive South Ravine, Port Hope, Ontario: Contaminated Groundwater Discharge Management Using Permeable Reactive Barriers and Contaminated Sediment Removal - 13447

The Highland Drive South Ravine (HDSR) is the discharge area for groundwater originating from the Highland Drive Landfill, the Pine Street North Extension (PSNE) roadbed parts of the Highland Drive roadbed and the PSNE Consolidation Site that contain historical low-level radioactive waste (LLRW). The contaminant plume from these LLRW sites contains elevated concentrations of uranium and arsenic and discharges with groundwater to shallow soils in a wet discharge area within the ravine, and directly to Hunt's Pond and Highland Drive South Creek, which are immediately to the south of the wet discharge area. Remediation and environmental management plans for HDSR have been developed within the framework of the Port Hope Project and the Port Hope Area Initiative. The LLRW sites will be fully remediated by excavation and relocation to a new Long-Term Waste Management Facility (LTWMF) as part of the Port Hope Project. It is projected, however, that the groundwater contaminant plume between the remediated LLRW sites and HDSR will persist for several hundreds of years. At the HDSR, sediment remediation within Hunt's Ponds and Highland Drive South Creek, excavation of the existing and placement of clean fill will be undertaken to remove current accumulations of solid-phase uranium and arsenic associated with the upper 0.75 m of soil in the wet discharge area, and permeable reactive barriers (PRBs) will be used for in situ treatment of contaminated groundwater to prevent the ongoing discharge of uranium and arsenic to the area in HDSR where shallow soil excavation and replacement has been undertaken. Bench-scale testing using groundwater from HDSR has confirmed excellent treatment characteristics for both uranium and arsenic using permeable reactive mixtures containing granular zero-valent iron (ZVI). A sequence of three PRBs containing ZVI and sand in backfilled trenches has been designed to intercept the groundwater flow system prior to its discharge to the ground surface and the creek and ponds in the HDSR. The first of the PRBs will be installed immediately up-gradient of the wet discharge area approximately 50 m from the creek, the other two will be installed across the area of shallow soil replacement, and all will extend from ground surface to the base of the water table aquifer through which the impacted groundwater flows. The PRBs have been designed to provide the removal of uranium and arsenic for decades, although the capacity of the treatment mixture for contaminant removal suggests that a longer period of treatment may be feasible. The environmental management plan includes an allowance for on-going monitoring, and replacement of a PRB(s) as might be required. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Climate Change Impacts on Texas Water: A White Paper Assessment of the Past, Present and Future and Recommendations for Action

Texas comprises the eastern portion of the Southwest region, where the convergence of climatological and geopolitical forces has the potential to put extreme stress on water resources. Geologic records indicate that Texas experienced large climate changes on millennial time scales in the past, and over the last thousand years, tree-ring records indicate that there were significant periods of drought in Texas. These droughts were of longer duration than the 1950s 'drought of record' that is commonly used in planning, and they occurred independently of human-induced global climate change. Although there has been a negligible net temperature increase in Texas over the past century, temperatures have increased more significantly over the past three decades. Under essentially all climate model projections, Texas is susceptible to significant climate change in the future. Most projections for the 21st century show that with increasing atmospheric greenhouse gas concentrations, there will be an increase in temperatures across Texas and a shift to a more arid average climate. Studies agree that Texas will likely become significantly warmer and drier, yet the magnitude, timing, and regional distribution of these changes are uncertain. There is a large uncertainty in the projected changes in precipitation for Texas for the 21st century. In contrast, the more robust projected increase in temperature with its effect on evaporation, which is a dominant component in the region's hydrologic cycle, is consistent with model projections of frequent and extended droughts throughout the state. For these reasons, we recommend that Texas invest resources to investigate and anticipate the impacts of climate change on Texas water resources, with the goal of providing data to inform resource planning. This investment should support development of (1) research programs that provide policy-relevant science; (2) education programs to engage future researchers and policy-makers; and (3) connections between policy-makers, scientists, water resource managers, and other stakeholders. It is proposed that these goals may be achieved through the establishment of a Texas Climate Consortium, consisting of representatives from academia, industry, government agencies, water authorities, and other stakeholders. The mission of this consortium would be to develop the capacity to provide decision makers with the information needed to develop adaptation strategies in the face of future climate change and uncertainty.

54 ENVIRONMENTAL SCIENCES↗

The Impact of Energy Efficiency and Demand Response Programs on the U.S. Electricity Market

This study analyzes the impact of the energy efficiency (EE) and demand response (DR) programs on the grid and the consequent level of production. Changes in demand caused by EE and DR programs affect not only the dispatch of existing plants and new generation technologies, the retirements of old plants, and the finances of the market. To find the new equilibrium in the market, we use the Oak Ridge Competitive Electricity Dispatch Model (ORCED) developed to simulate the operations and costs of regional power markets depending on various factors including fuel prices, initial mix of generation capacity, and customer response to electricity prices. In ORCED, over 19,000 plant units in the nation are aggregated into up to 200 plant groups per region. Then, ORCED dispatches the power plant groups in each region to meet the electricity demands for a given year up to 2035. In our analysis, we show various demand, supply, and dispatch patterns affected by EE and DR programs across regions.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A new water-equivalent 2D plastic scintillation detectors array for the dosimetry of megavoltage energy photon beams in radiation therapy

Purpose: The objective of this work is to present a new 2D plastic scintillation detectors array (2D-PSDA) designed for the dosimetry of megavoltage (MV) energy photon beams in radiation therapy and to characterize its basic performance. Methods: We developed a 2D detector array consisting of 781 plastic scintillation detectors (PSDs) inserted into a plane of a water-equivalent phantom. The PSDs were distributed on a 26 x 26 cm{sup 2} grid, with an interdetector spacing of 10 mm, except for two perpendicular lines centered on the detection plane, where the spacing was 5 mm. Each PSD was made of a 1 mm diameter by 3 mm long cylindrical polystyrene scintillating fiber coupled to a clear nonscintillating plastic optical fiber. All of the light signals emitted by the PSDs were read simultaneously with an optical system at a rate of one measurement per second. We characterized the performance of the optical system, the angular dependency of the device, and the perturbation of dose distributions caused by the hundreds of PSDs inserted into the phantom. We also evaluated the capacity of the system to monitor complex multileaf collimator (MLC) sequences such as those encountered in step-and-shoot intensity modulated radiation therapy (IMRT) plans. We compared our results with calculations performed by a treatment planning system and with measurements taken with a 2D ionization chamber array and with a radiochromic film. Results: The detector array that we developed allowed us to measure doses with an average precision of better than 1% for cumulated doses equal to or greater than 6.3 cGy. Our results showed that the dose distributions produced by the 6-MV photon beam are not perturbed (within {+-}1.1%) by the presence of the hundreds of PSDs located into the phantom. The results also showed that the variations in the beam incidences have little effect on the dose response of the device. For all incidences tested, the passing rates of the gamma tests between the 2D-PSDA and the treatment planning system were higher than 97.5% when the standard clinical tolerances of 3% or 3 mm were used. Excellent agreement was obtained between the doses measured and calculated when we used the 2D-PSDA for monitoring a MLC sequence from a step-and-shoot IMRT plan. Conclusions: We demonstrated the feasibility of using a large number of PSDs in a new 2D-PSDA for the dosimetry of MV energy photon beams in radiation therapy. The excellent precision, accuracy, and low angular dependence of the device indicate that such a prototype could potentially be used as a high-accuracy quality assurance tool for IMRT and arc therapy patient plan verification. The homogeneity and water-equivalence of the prototype we built suggest that this technology could be extended to multiple detection planes by arranging the fibers into more complex orientations, opening the possibility for 3D dosimetry with PSDs.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Control of Greenhouse Gas Emissions by Optimal DER Technology Investment and Energy Management in Zero-Net-Energy Buildings

The U.S. Department of Energy has launched the commercial building initiative (CBI) in pursuit of its research goal of achieving zero-net-energy commercial buildings (ZNEB), i.e. ones that produce as much energy as they use. Its objective is to make these buildings marketable by 2025 such that they minimize their energy use through cutting-edge, energy-efficiency technologies and meet their remaining energy needs through on-site renewable energy generation. This paper examines how such buildings may be implemented within the context of a cost- or CO2-minimizing microgrid that is able to adopt and operate various technologies: photovoltaic modules (PV) and other on-site generation, heat exchangers, solar thermal collectors, absorption chillers, and passive/demand-response technologies. A mixed-integer linear program (MILP) that has a multi-criteria objective function is used. The objective is minimization of a weighted average of the building's annual energy costs and CO2 emissions. The MILP's constraints ensure energy balance and capacity limits. In addition, constraining the building's energy consumed to equal its energy exports enables us to explore how energy sales and demand-response measures may enable compliance with the ZNEB objective. Using a commercial test site in northernCalifornia with existing tariff rates and technology data, we find that a ZNEB requires ample PV capacity installed to ensure electricity sales during the day. This is complemented by investment in energy-efficient combined heat and power (CHP) equipment, while occasional demand response shaves energy consumption. A large amount of storage is also adopted, which may be impractical. Nevertheless, it shows the nature of the solutions and costs necessary to achieve a ZNEB. Additionally, the ZNEB approach does not necessary lead to zero-carbon (ZC) buildings as is frequently argued. We also show a multi-objective frontier for the CA example, whichallows us to estimate the needed technologies and costs for achieving a ZC building or microgrid.

03 NATURAL GAS↗