Search NASA⌕ Search

SEARCH · Search NASA

Results for “GROUND LEVEL”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,027 records · Page 57

Cleared for Launch - Lessons Learned from the OSIRIS-REx System Requirements Verification Program

Requirements verification of a large flight system is a challenge. It is especially challenging for engineers taking on their first role in space systems engineering. This paper describes our approach to verification of the Origins, Spectral Interpretation, Resource Identification, Security-Regolith Explorer (OSIRIS-REx) system requirements. It also captures lessons learned along the way from developing systems engineers embroiled in this process. We begin with an overview of the mission and science objectives as well as the project requirements verification program strategy. A description of the requirements flow down is presented including our implementation for managing the thousands of program and element level requirements and associated verification data. We discuss both successes and methods to improve the managing of this data across multiple organizational interfaces. Our approach to verifying system requirements at multiple levels of assembly is presented using examples from our work at instrument, spacecraft, and ground segment levels. We include a discussion of system end-to-end testing limitations and their impacts to the verification program. Finally, we describe lessons learned that are applicable to all emerging space systems engineers using our unique perspectives across multiple organizations of a large NASA program.

Requirements Verification↗

Slow polaritons with orbital angular momentum in atomic gases

Polariton formalism is applied for studying the propagation of a probe field of light in a cloud of cold atoms influenced by two control laser beams of larger intensity. The laser beams couple resonantly three hyperfine atomic ground states to a common excited state, thus forming a tripod configuration of the atomic energy levels involved. The first control beam can have an optical vortex, with the intensity of the beam going to zero at the vortex core. The second control beam without a vortex ensures the lossless (adiabatic) propagation of the probe beam at a vortex core of the first control laser. We investigate the storage of the probe pulse into atomic coherences by switching off the control beams and its subsequent retrieval by switching the control beams on. The optical vortex is transferred from the control to the probe fields during the storage or retrieval of the probe field. We analyze the conditions needed for the vortex to be transferred efficiently to the regenerated probe beam and discuss the possibilities of experimental implementation of the proposed scheme using atoms such as rubidium or sodium.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Basic Data Report for Drillhole SNL-6 and -6A (C-3151)

SNL-6 and SNL-6A were drilled in the southeast quarter of section 7, T21S, R32E, in western Lea County, NM. This location places the drillholes north-northeast of the WIPP site. An original drillhole (now designated SNL-6A) on the wellpad could not be completed and was plugged and abandoned. A second well (known as SNL-6) was drilled and completed on the same wellpad, and it is monitored for water levels. The focus of this report is the completed well (SNL-6), with reference as appropriate to geologic and other data from SNL.6A. Appendix material will be referred to in the text for details of drilling, logging, and plugging and abandoning of SNL-6A. SNL-6 is located 1,847 ft from the south line (fsl) and 1,413 ft from the east line (fel) of the section. SNL-6 was begun on August 23, 2005, and was completed September 10, 2005. SNL-6 is used to monitor groundwater levels of the Culebra Dolomite Member of the Permian Rustler Formation for WIPP in an area of low transmissivity and near the northeastern corner of the hydrological modeling domain. SNL-6 was permitted by the NM State Engineer as C-3151. Official correspondence regarding permitting and regulatory information must reference this permit number. Most drillholes at WIPP have been described after completion to provide an account of the geologic, hydrologic, or other basic data acquired during drilling and immediate completion of the drillhole. In addition, the basic data report provides an account of the drilling procedures and activities that may be helpful to later interpretations of data or for further work in the drillhole, including test activities and eventual plugging and abandoning activities. The basic data report also provides a convenient means of reporting information about administrative activities necessary to drill the hole.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Basic Data Report for Drillhole SNL-8 (C-3150)

SNL-8 was drilled near the southeast corner of section 14, T22S, R31E, in eastern Eddy County, New Mexico (Fig. 1-1). It is located 853 ft from the south line (fsl) and 116 ft from the east line (fel) of the section (Fig. 1.2). This location places the drillhole northeast of the WIPP site and on the drillpad used for P-20 (Jones, 1978), which has been plugged and abandoned. SNL-8 was begun on June 13, 2005, and was completed June 28, 2005. SNL-8 will be used to monitor groundwater levels of the Culebra Dolomite Member of the Permian Rustler Formation for WIPP in an area of low transmissivity and near many oil and gas wells. SNL-8 was permitted by the New Mexico State Engineer as C-3150. Official correspondence regarding permitting and regulatory information must reference this permit number. Most drillholes at WIPP have been described after completion to provide an account of the geology, hydrology, or other basic data acquired during drilling and immediate completion of the drillhole. In addition, the basic data report provides an account of the drilling procedures and activities that may be helpful to later interpretations of data or for further work in the drillhole, including test activities and eventual plugging and abandoning activities. The basic data report also provides a convenient means of reporting information about administrative activities necessary to drill the hole.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

System Level Aerothermal Testing for the Adaptive Deployable Entry and Placement Technology (ADEPT)

The Adaptive Deployable Entry and Placement Technology (ADEPT), a mechanically deployable entry vehicle technology, has been under development at NASA since 2011. As part of the technical maturation of ADEPT, designs capable of delivering small payloads (10 kg) are being considered to rapidly mature sub 1 m deployed diameter designs. The unique capability of ADEPT for small payloads comes from its ability to stow within a slender volume and deploy to achieve a mass efficient drag surface with a high heat rate capability. The low ballistic coefficient results in entry heating and mechanical loads that can be met by a revolutionary three-dimensionally woven carbon fabric supported by a deployable skeleton structure. This carbon fabric has test proven capability as both primary structure and payload thermal protection system. In order to rapidly advance ADEPTs technical maturation, the project is developing test methods that enable thermostructural design requirement verification of ADEPT designs at the system level using ground test facilities. Results from these tests are also relevant to larger class missions and help us define areas of focused component level testing in order to mature material and thermal response design codes. The ability to ground test sub 1 m diameter ADEPT configurations at or near full-scale provides significant value to the rapid maturation of this class of deployable entry vehicles. This paper will summarize arc jet test results, highlight design challenges, provide a summary of lessons learned and discuss future test approaches based upon this methodology.

Hypersonic↗

Changes in site-specific shape resonances in nitrogen K-shell photoionization of N 2 O induced by vibrational excitation

The central (Nc) and terminal (Nt) nitrogen K-shell photoelectron spectra (PESs) of N 2 O molecules have been measured in the σ shape resonance energy region at temperatures of ~300 and ~630 K. Estimating vibrational populations based on the Boltzmann distribution at these temperatures, PESs of vibrationally ground and bending-excited levels in the initial electronic ground state were extracted. Vibrationally integrated partial cross sections and asymmetry parameters for ionization from vibrationally ground and bending-excited levels were obtained as a function of the incident photon energy by integrating PESs over the vibrational levels of the core-hole states. In N c photoionization, the shape resonance from the bending-excited level was found to be shifted to the lower photon energy side and to become narrower than that from the ground vibrational level. In N t photoionization from the bending-excited level, the downward shift of the resonance is more significant than that in N c ionization. These experimental findings are qualitatively consistent with theoretical predictions and suggest that the shape resonance associated with the N t core hole is more sensitive to the bending angle of the initial state than is the shape resonance associated with the N c core hole. Finally, the asymmetry parameters for photoionization from the bending-excited level, however, showed almost the same behavior as those from the ground vibrational level for both K-shell photoionization channels and in the photon energy range studied here.

74 ATOMIC AND MOLECULAR PHYSICS↗

New, low-energy excitations in 107 Mo and 109 Mo

New ground-state level with spin-parity 1/2 + is established in 109 Mo, 69.8 keV below the previously reported 5/2(+) ground state in this nucleus, based on precise spectroscopy measurements of gamma radiation following spontaneous fission of 248 Cm performed using the Eurogam2 array of anti-Compton spectrometers. Analogous measurement of gamma radiation following spontaneous fission of 252 Cf, performed using the Gammasphere array, confirms the new 1/2 + ground state of 107 Mo, proposed recently and establishes the isomeric character of the 5/2 + first excited state in 107 Mo. Two beta-decaying isomers are suggested in 111 Mo nucleus based on regular energy systematics, supporting previous predictions. Low-energy excitations in Mo isotopes are interpreted and compared to calculations reported in the literature. The results suggest shape transition from prolate to oblate deformation at N >= 67.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Properties of a two-dimensional semimetal in a strong magnetic field

A system of two-dimensional electrons and holes ha s been investigated in a strong magnetic field, when it is sufficient to take into account only the ground Landau level. It has been shown that the interaction of electrons and holes can lead to an ordered state. In this problem, the exchange interaction in electron and hole subsystems is significant. The following two cases have been considered: (a) there are one electron and one hole valleys, and at some magnetic field strength, there exists an ordered state, as in an excitonic insulator; and (b) there exist one electron and two equivalent hole valleys (as in the experiment performed by Kvon et al. [1]), and the hole system has an ordered state of the Stoner ferromagnetic type in a specific range of magnetic field strengths. The spectra of elementary excitations of the Bose and Fermi types have been obtained. The Fermi excitations have a gap in the energy spectrum, whereas the Bose excitations in the ordered states begin with zero (to these excitations there corresponds an electric dipole moment). The self-consistent field approximation has been used, which is exact when the numbers of electrons and holes are equal to each other.

74 ATOMIC AND MOLECULAR PHYSICS↗

Ground Measurements of the Shock-Wave Noise from Airplanes in Level Flight at Mach Numbers to 1.4 and at Altitudes to 45000 Feet

Time histories of noise pressures near ground level were measured during flight tests of fighter-type airplanes over fairly flat, partly wooded terrain in the e Mach number range between 1.13 and 1.4 and at altitudes from 25,000 to 45,000 feet. Atmospheric soundings and radar tracking studies were made for correlation with the measured noise data. The measured and calculated values of the pressure rise across the shock wave were generally in good agreement. There is a tendency for the theory to overestimate the pressure at locations remote from the track and to underestimate the pressures for conditions of high tailwind at altitude. The measured values of ground-reflection factor averaged about 1.8 f or the surface tested as compared to a theoretical value of 2.0. P o booms were measured in all cases. The observers also generally reported two booms; although, in some cases, only one boom was reported. The shock-wave noise associated with some of the flight tests was judged to be objectionable by ground observers, and in one case the cracking of a plate-glass store window was correlated in time with the passage of the airplane at an altitude of 25,000 feet.

Maglieri, Domenic J.↗

Web Monitoring of EOS Front-End Ground Operations, Science Downlinks and Level 0 Processing

This paper addresses the efforts undertaken and the technology deployed to aggregate and distribute the metadata characterizing the real-time operations associated with NASA Earth Observing Systems (EOS) high-rate front-end systems and the science data collected at multiple ground stations and forwarded to the Goddard Space Flight Center for level 0 processing. Station operators, mission project management personnel, spacecraft flight operations personnel and data end-users for various EOS missions can retrieve the information at any time from any location having access to the internet. The users are distributed and the EOS systems are distributed but the centralized metadata accessed via an external web server provide an effective global and detailed view of the enterprise-wide events as they are happening. The data-driven architecture and the implementation of applied middleware technology, open source database, open source monitoring tools, and external web server converge nicely to fulfill the various needs of the enterprise. The timeliness and content of the information provided are key to making timely and correct decisions which reduce project risk and enhance overall customer satisfaction. The authors discuss security measures employed to limit access of data to authorized users only.

Cordier, Guy R.↗

Experimental study of flow deflectors designed to alleviate ground winds induced by exhaust of 80-by 120-foot wind tunnel

An experimental study directed at finding a deflector ramp that will reduce to an acceptable level the ground winds under the exhaust jet of the 80 by 120 Foot Wind Tunnel at NASA Ames Center is described. A one-fifieth scale model of the full-scale facility was used to investigate how the jet flow field was modified by the various design parameters of the ramp. It was concluded that the ground winds were alleviated sufficiently by a ramp with end plates located next to the wind tunnel building along the ground edge of the exhaust opening. At full scale, the ramp should have a slant length of 7.62 m (25 ft) or more, and would be elevated at about 45 degrees to the ground plane. The material should have holes less than 15.2 (6 in) in diameter distributed uniformly over its surface to produce a porosity of about 30%.

Rossow, V. J.↗

Annual Status Report (FY 2018): Performance Assessment for the Disposal of Low-Level Waste in the 200 West Area Burial Grounds (Rev. 0)

This annual review provides the projected dose estimates of radionuclide inventories disposed in the active 200 West Area Low-Level Waste Burial Grounds (LLBGs) since September 26, 1988. These estimates are calculated using the original dose methodology developed in the performance assessment (PA) analysis. The estimates are compared with performance objectives defined in U.S. Department of Energy (DOE) requirements (DOE 435.1 Chg 1 and its companion documents DOE M 435.1-1 Chg 1 and DOE G 435.1-1). All performance objectives are currently satisfied, and operational waste acceptance criteria and waste acceptance practices continue to be sufficient to maintain compliance with performance objectives. Inventory estimates and associated dose estimates from future waste disposal actions are unchanged from previous years' evaluations that indicate potential impacts well below performance objectives; therefore, future compliance with DOE O 435.1 Chg 1 is expected. Within the active burial grounds, low-level waste and mixed low-level waste currently may be disposed only in two lined trenches in the 218-W-5 Burial Ground (Trenches 31 and 34) until they are either filled or a decision is made to close these trenches. Some mixed low-level waste is also disposed at the Environmental Restoration Disposal Facility in the 200 West Area (which is covered under a separate PA). During this reporting period (fiscal year 2018, from October 1, 2017, through September 30, 2018), waste was disposed to the 200 West Area LLBGs. Results from the multi-year diffusion experiments are summarized for this reporting period to quantify the efficacy of concrete waste forms in retaining key radionuclides (e.g., uranium-238, technetium-99, and iodine-123). The results of sorption experiments initiated in FY 2017 to evaluate sorption coefficients for iodine and technetium are also summarized. The test durations ranged from 1 to 6 months. Continued groundwater monitoring of the 200 West Area LLBGs indicates no groundwater contamination due to LLBG waste. Current assumptions about future land use at the Hanford Site are consistent with PA analysis1 assumptions of a post-closure facility that will not be degraded by human activity. The LLBGs are located in an area identified for waste management and containment of residual contamination. Overall, there are no substantive changes to primary PA assumptions and no changes to the PA analysis conclusion; therefore, compliance with DOE O 435.1 Chg 1 is being maintained.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Magnetoelectric Coupling in a Mn 4 Na–Organic Complex under Pulsed Magnetic Fields up to 73 T

Research on the magnetoelectric (ME) effect (or spin-electric coupling) in molecule-based magnetic materials is a relatively nascent but promising topic. Molecule-based magnetic materials have diverse magnetic functionalities that can be coupled to electrical properties. Here, in this study, we investigate a realization of ME coupling that is fundamental but not heavily studied─the coupling of magnetic spin level crossings to changes in electric polarization. A mixed-valence Mn 4 Na complex with a total ground-state spin S = 5/2 under zero magnetic field and S = 17/2 under high magnetic field undergoes a cascade of ground-state level crossings of the S z states with increasing magnetic field. Magnetization and electrical polarization measurements under pulsed magnetic fields up to 73 T show that each spin level crossing is accompanied by a significant change in electric polarization that is an even function of the applied magnetic field. A molecular Hamiltonian describing antiferromagnetic exchange in a distorted tetrahedron of three Mn III and one Mn II ions matches the data well. We conclude that the ME coupling is caused by magnetostriction within the polar molecule as it distorts to lower its magnetic exchange energy.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Emergence of Preformed Cooper Pairs from the Doped Mott Insulating State in Bi{2}Sr{2}CaCu{2}O{8+delta}

Superconductors are characterized by an energy gap that represents the energy needed to break the pairs of electrons (Cooper pairs) apart. At temperatures considerably above those associated with superconductivity, the high-transition-temperature copper oxides have an additional 'pseudogap'. It has been unclear whether this represents preformed pairs of electrons that have not achieved the coherence necessary for superconductivity, or whether it reflects some alternative ground state that competes with superconductivity. Paired electrons should display particle-hole symmetry with respect to the Fermi level (the energy of the highest occupied level in the electronic system), but competing states2, 3, 4 need not show such symmetry. Here we report a photoemission study of the underdoped copper oxide Bi{sub 2}Sr{sub 2}CaCu{sub 2}O{sub 8+{delta}} that shows the opening of a symmetric gap only in the anti-nodal region, contrary to the expectation that pairing would take place in the nodal region. It is therefore evident that the pseudogap does reflect the formation of preformed pairs of electrons and that the pairing occurs only in well-defined directions of the underlying lattice.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Eruptions of Pavlof Volcano and their possible modulation by ocean load and tectonic stresses

Data pertaining to the basic features (such as the volume of erupted materials and the rate of mass ejection) of the eruptions of the Pavlof Volcano, Alaska, and the accompanying seismicity were related to other geophysical data, including atmospheric pressure, earth and ocean-load tides, long-period sea level, and ground tilt. A significant correlation was found between the eruptions of the volcano and yearly nontidal variations in sea level, that possibly resulted from ocean loading; volume changes beneath the volcano due to ocean loading were calculated to be from 0.02 to 2 times eruption volumes. It is suggested that the volcano acts as a long-period volume strain meter, with lava being preferentially erupted when strain beneath the volcano is compressive. No eruptions occurred during the period of 1978-1980, when tilt, seismic data, and sea level data indicated that a deep aseismic slip may have occurred. Models of this aseismic event predict a volume increase beneath the volcano that might have compensated strain from magma injection.

Mcnutt, S. R.↗

Limitation of Ground-based Estimates of Solar Irradiance Due to Atmospheric Variations

The uncertainty in ground-based estimates of solar irradiance is quantitatively related to the temporal variability of the atmosphere's optical thickness. The upper and lower bounds of the accuracy of estimates using the Langley Plot technique are proportional to the standard deviation of aerosol optical thickness (approx. +/- 13 sigma(delta tau)). The estimates of spectral solar irradiance (SSI) in two Cimel sun photometer channels from the Mauna Loa site of AERONET are compared with satellite observations from SOLSTICE (Solar Stellar Irradiance Comparison Experiment) on UARS (Upper Atmospheric Research Satellite) for almost two years of data. The true solar variations related to the 27-day solar rotation cycle observed from SOLSTICE are about 0.15% at the two sun photometer channels. The variability in ground-based estimates is statistically one order of magnitude larger. Even though about 30% of these estimates from all Level 2.0 Cimel data fall within the 0.4 to approx. 0.5% variation level, ground-based estimates are not able to capture the 27-day solar variation observed from SOLSTICE.

Wen, Guoyong↗

Low level detection of Cs-135 and Cs-137 in environmental samples by ICP-MS

The measurement of the fission product cesium isotopes 135Cs and 137Cs at low femtogram (fg) 10-15 levels in ground water by Inductively Coupled Plasma-Mass Spectrometry ICP-MS is reported. To eliminate the potential natural barium isobaric interference on the cesium isotopes, in-line chromatographic separation of the cesium from barium was performed followed by high sensitivity ICP-MS analysis. A high efficiency desolvating nebulizer system was employed to maximize ICP-MS sensitivity ~10cps/femtogram. The three sigma detection limit measured for 135Cs was 2fg/ml (0.1uBq/ml) and for 137Cs 0.9fg/ml (0.0027Bq/ml) with analysis time of less than 30 minutes/sample. Cesium detection and 135/137 isotope ratio measurement at very low femtogram levels using this method in a ground water matrix is also demonstrated.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

Improvements in Container Management of Transuranic and Low-Level Radioactive Waste Stored at the Central Waste Complex at Hanford

The Central Waste Complex (CWC) is the interim storage facility for Resource Conservation and Recovery Act (RCRA) mixed waste, transuranic waste, transuranic mixed waste, low-level and low-level mixed radioactive waste at the Department of Energy's (DOE's) Hanford Site. The majority of the waste stored at the facility is retrieved from the low-level burial grounds in the 200 West Area at the Site, with minor quantities of newly generated waste from on-site and offsite waste generators. The CWC comprises 18 storage buildings that house 13,000 containers. Each waste container within the facility is scanned into its location by building, module, tier and position and the information is stored in a site-wide database. As waste is retrieved from the burial grounds, a preliminary non-destructive assay is performed to determine if the waste is transuranic (TRU) or low-level waste (LLW) and subsequently shipped to the CWC. In general, the TRU and LLW waste containers are stored in separate locations within the CWC, but the final disposition of each waste container is not known upon receipt. The final disposition of each waste container is determined by the appropriate program as process knowledge is applied and characterization data becomes available. Waste containers are stored within the CWC based on their physical chemical and radiological hazards. Further segregation within each building is done by container size (55-gallon, 85-gallon, Standard Waste Box) and waste stream. Due to this waste storage scheme, assembling waste containers for shipment out of the CWC has been time consuming and labor intensive. Qualitatively, the ratio of containers moved to containers in the outgoing shipment has been excessively high, which correlates to additional worker exposure, shipment delays, and operational inefficiencies. These inefficiencies impacted the LLW Program's ability to meet commitments established by the Tri-Party Agreement, an agreement between the State of Washington, the Department of Energy, and the Environmental Protection Agency. These commitments require waste containers to be shipped off site for disposal and/or treatment within a certain time frame. Because the program was struggling to meet production demands, the Production and Planning group was tasked with developing a method to assist the LLW Program in fulfilling its requirements. Using existing databases for container management, a single electronic spreadsheet was created to visually map every waste container within the CWC. The file displays the exact location (e.g., building, module, tier, position) of each container in a format that replicates the actual layout in the facility. In addition, each container was placed into a queue defined by the LLW and TRU waste management programs. The queues were developed based on characterization requirements, treatment type and location, and potential final disposition. This visual aid allows the user to select containers from similar queues and view their location within the facility. The user selects containers in a centralized location, rather than random locations, to expedite shipments out of the facility. This increases efficiency for generating the shipments, as well as decreasing worker exposure and container handling time when gathering containers for shipment by reducing movements of waste containers. As the containers are collected for shipment, the remaining containers are segregated by queue, which further reduces future container movements. (authors)

42 ENGINEERING↗