Search NASA⌕ Search

SEARCH · Search NASA

Results for “Operating Systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,027 records · Page 57

Coordination of Retail Demand Response with Midwest ISO Markets

The Organization of Midwest ISO States (OMS) launched the Midwest Demand Resource Initiative (MWDRI) in 2007 to identify barriers to deploying demand response (DR) resources in the Midwest Independent System Operator (MISO) region and develop policies to overcome them. The MWDRI stakeholders decided that a useful initial activity would be to develop more detailed information on existing retail DR programs and dynamic pricing tariffs, program rules, and utility operating practices. This additional detail could then be used to assess any"seams issues" affecting coordination and integration of retail DR resources with MISO's wholesale markets. Working with state regulatory agencies, we conducted a detailed survey of existing DR programs, dynamic pricing tariffs, and their features in MISO states. Utilities were asked to provide information on advance notice requirements to customers, operational triggers used to call events (e.g. system emergencies, market conditions, local emergencies), use of these DR resources to meet planning reserves requirements, DR resource availability (e.g., seasonal, annual), participant incentive structures, and monitoring and verification (M&V) protocols. This report describes the results of this comprehensive survey and discusses policy implications for integrating legacy retail DR programs and dynamic pricing tariffs into organized wholesale markets. Survey responses from 37 MISO members and 4 non-members provided information on 141 DR programs and dynamic pricing tariffs with a peak load reduction potential of 4,727 MW of retail DR resource. Major findings of this study area:- About 72percent of available DR is from interruptible rate tariffs offered to large commercial and industrial customers, while direct load control (DLC) programs account for ~;;18percent. Almost 90percent of the DR resources included in this survey are provided by investor-owned utilities. - Approximately, 90percent of the DR resources are available with less than two hours advance notice and over 1,900 MW can be dispatched on less than thirty minutes notice. These legacy DR programs are increasingly used by utilities for economic in addition to reliability purposes, with over two-thirds (68percent) of these programs callable based on market conditions. - Approximately 60percent of DLC programs and 30percent of interruptible rate programs called ten or more DR events in 2006. Despite the high frequency of DR events, customer complaints remained low. The use of economic criteria to trigger DR events and the flexibility to trigger a large number of events suggests that DR resources can help improve the efficiency of MISO wholesale markets. - Most legacy DR programs offered a reservation payment ($/kW) for participation; incentive payment levels averaged about $5/kW-month for interruptible rate tariffs and $6/kW-month for DLC programs. Few programs offered incentive payments that were explicitly linked to actual load reductions during events and at least 27 DR programs do not have penalties for non-performance. - Measurement and verification (M&V) protocols to estimate load impacts vary significantly across MISO states. Almost half of the DR programs have not been evaluated in recent times and thus performance data for DR events is not available. For many DLC programs, M&V protocols may need to be enhancedin order to allow participation in MISO's proposed EDR schedule. System operators and planners will need to develop more accurate estimates of the load reduced capability and actual performance.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Space Mission Operations Ground Systems Integration Customer Service

The facility, which is now the Huntsville Operations Support Center (HOSC) at Marshall Space Flight Center in Huntsville, AL, has provided continuous space mission and related services for the space industry since 1961, from Mercury Redstone through the International Space Station (ISS). Throughout the long history of the facility and mission support teams, the HOSC has developed a stellar customer support and service process. In this era, of cost cutting, and providing more capability and results with fewer resources, space missions are looking for the most efficient way to accomplish their objectives. One of the first services provided by the facility was fax transmission of documents to, then, Cape Canaveral in Florida. The headline in the Marshall Star, the newspaper for the newly formed Marshall Space Flight Center, read "Exact copies of Documents sent to Cape in 4 minutes." The customer was Dr. Wernher von Braun. Currently at the HOSC we are supporting, or have recently supported, missions ranging from simple ISS payloads requiring little more than "bentpipe" telemetry access, to a low cost free-flyer Fast, Affordable, Science and Technology Satellite (FASTSAT), to a full service ISS payload Alpha Magnetic Spectrometer 2 (AMS2) supporting 24/7 operations at three operations centers around the world with an investment of over 2 billion dollars. The HOSC has more need and desire than ever to provide fast and efficient customer service to support these missions. Here we will outline how our customer-centric service approach reduces the cost of providing services, makes it faster and easier than ever for new customers to get started with HOSC services, and show what the future holds for our space mission operations customers. We will discuss our philosophy concerning our responsibility and accessibility to a mission customer as well as how we deal with the following issues: initial contact with a customer, reducing customer cost, changing regulations and security, and cultural differences, to ensure an efficient response to customer issues using a small Customer Service Team (CST) and adaptability, constant communication with customers, technical expertise and knowledge of services, and dedication to customer service. The HOSC Customer Support Team has implemented a variety of processes, and procedures that help to mitigate the potential problems that arise when integrating ground system services for a variety of complex missions and the lessons learned from this experience will lead the future of customer service in the space operations industry.

Roth, Karl↗

NASTRAN migration to UNIX

COSMIC/NASTRAN, as it is supported and maintained by COSMIC, runs on four main-frame computers - CDC, VAX, IBM and UNIVAC. COSMIC/NASTRAN on other computers, such as CRAY, AMDAHL, PRIME, CONVEX, etc., is available commercially from a number of third party organizations. All these computers, with their own one-of-a-kind operating systems, make NASTRAN machine dependent. The job control language (JCL), the file management, and the program execution procedure of these computers are vastly different, although 95 percent of NASTRAN source code was written in standard ANSI FORTRAN 77. The advantage of the UNIX operating system is that it has no machine boundary. UNIX is becoming widely used in many workstations, mini's, super-PC's, and even some main-frame computers. NASTRAN for the UNIX operating system is definitely the way to go in the future, and makes NASTRAN available to a host of computers, big and small. Since 1985, many NASTRAN improvements and enhancements were made to conform to the ANSI FORTRAN 77 standards. A major UNIX migration effort was incorporated into COSMIC NASTRAN 1990 release. As a pioneer work for the UNIX environment, a version of COSMIC 89 NASTRAN was officially released in October 1989 for DEC ULTRIX VAXstation 3100 (with VMS extensions). A COSMIC 90 NASTRAN version for DEC ULTRIX DECstation 3100 (with RISC) is planned for April 1990 release. Both workstations are UNIX based computers. The COSMIC 90 NASTRAN will be made available on a TK50 tape for the DEC ULTRIX workstations. Previously in 1988, an 88 NASTRAN version was tested successfully on a SiliconGraphics workstation.

Chan, Gordon C.↗

Los Angeles Air Force Base Vehicle-to-Grid Demonstration (Final Project Report)

Electrification of non-tactical vehicle fleets represents a key efficiency and energy security objective for the United States Department of Defense. To achieve electrification, the department targeted vehicle-to-grid services as a way to decrease the overall cost of operating the vehicle fleet and achieve rough parity with traditional internal combustion engine vehicle fleets. This report describes efforts to aggregate a fleet of bi-directional electric vehicles and charging stations to provide regulation up and regulation down in the California Independent System Operator ancillary services market. A 29-vehicle electric vehicle demonstration fleet, consisting of mixed purpose and duty vehicles such as sedans, pickups, vans, and medium-duty trucks, was deployed at the Los Angeles Air Force base. The fleet provided frequency regulation to the California Independent System Operator’s wholesale electricity market to determine the capability of recouping some of the additional costs of procuring electric vehicles and their supporting infrastructure. Lawrence Berkeley National Laboratory, with its partner Kisensum, LLC, developed the fleet scheduling, optimization, and control software to allow the vehicle fleet at the air force base to participate in the ancillary services markets. This report focuses on the control software and market interactions, the significant challenges faced and solutions devised to address them, and examines the potential of using the electric vehicle fleet as an energy storage resource for the base buildings, an application known as vehicle-tobuilding, in providing demand response and emergency backup power. The report discusses key findings related to providing frequency regulation to the California Independent System Operator market, electric vehicle fleet performance, compatibility of varying resource parameters of vehicle fleet aggregation, the need for automated methods for communicating hour-ahead energy bidding, challenges related to battery capacity and charge/discharge rates, and monthly settlement revenue.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Systems architecture for distributed applications

This paper describes the kernel of a distributed operating system called ADAPT. The system runs on top of existing single host operating systems that are networked together. It's purpose is to transform this network of individual systems into a single system that will be easier for application programmers to use. This single system need not be monolithic; ADAPT facilitates the construction of both integrated and modular distributed systems.

Peebles, R.↗

A Case Study of Luminaire-Level Lighting Control: Lighting the Northwest Energy Efficiency Alliance (NEEA) Office in Portland, OR

What happens when advanced lighting and control systems are installed in the real world? Are the advantages and energy savings realized? By observing the design, installation, commissioning, and ongoing use of connected lighting systems in real-world settings, it is possible to identify the strengths, challenges, and points of human-technology interaction that may be new or unfamiliar to those responsible for implementing or maintaining the lighting system. Ultimately, understanding and experiencing each stakeholder’s interaction with the technology can allow the research team to synthesize feedback for manufacturers, improve industry understanding of the technology, and increase adoption. The Northwest Energy Efficiency Alliance (NEEA) office in Portland, OR, is a single-floor installation that puts tunable-white, interoperability, and luminaire-level advanced control capabilities to the test. Compared to simpler, “out-of-the-box” systems that minimize field-adjustable settings, the system utilized in this space allowed for granular field adjustments which required the system specifier, client, and programming agent to make additional decisions regarding system operation while the system was being programmed. This report communicates the observational findings from the installation, programming, and ongoing operation of an advanced office LLLC system.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Severe storms measurement system real time data processing and displays

The objectives of the system are to provide the system operator with real time system performance check and to provide data recording of all SSMS data. Meteorologists are provided with real time indication of meteorological data measurements including aid for directing flight profiles in real time and aid for directing SSMS operations. A day-to-day feedback is provided to meteorologists, system operators, and flight crews for flight planning on subsequent flight tests days.

Jeffreys, H. B.↗

Implications of Power Plant Idling and Cycling on Water Use Intensity

Survey data from the Energy Information Administration (EIA) was combined with data from the Environmental Protection Agency (EPA) to explore ways in which operations might impact water use intensity (both withdrawals and consumption) at thermoelectric power plants. Two disparities in cooling and power systems operations were identified here that could impact water use intensity: 1) Idling Gap—where cooling systems continue to operate when their boilers and generators are completely idled; and 2) Cycling Gap—where cooling systems operate at full capacity, while their associated boiler and generator systems cycle over a range of loads. Analysis of the EIA and EPA data indicated that cooling systems operated on average 13% more than their corresponding power system (Idling Gap), while power systems operated on average 30% below full load when the boiler was reported as operating (Cycling Gap). Regression analysis was then performed to explore whether the degree of power plant idling/cycling could be related to the physical characteristics of the plant, its environment or time of year. While results suggested that individual power plants’ operations were unique, weak trends consistently pointed to a plant’s place on the dispatch curve as influencing patterns of cooling system, boiler, and generator operation. This insight better positions us to interpret reported power plant water use data as well as improve future water use projections.

54 ENVIRONMENTAL SCIENCES↗

Wavelet Denoising of Mobile Radiation Data

The FY08 phase of this project investigated the merits of video fusion as a method for mitigating the false alarms encountered by vehicle borne detection systems in an effort to realize performance gains associated with wavelet denoising. The fusion strategy exploited the significant correlations which exist between data obtained from radiation detectors and video systems with coincident fields of view. The additional information provided by optical systems can greatly increase the capabilities of these detection systems by reducing the burden of false alarms and through the generation of actionable information. The investigation into the use of wavelet analysis techniques as a means of filtering the gross-counts signal obtained from moving radiation detectors showed promise for vehicle borne systems. However, the applicability of these techniques to man-portable systems is limited due to minimal gains in performance over the rapid feedback available to system operators under walking conditions. Furthermore, the fusion of video holds significant promise for systems operating from vehicles or systems organized into stationary arrays; however, the added complexity and hardware required by this technique renders it infeasible for man-portable systems.

07 ISOTOPE AND RADIATION SOURCES↗

A new solid state extractor pulser for the FNAL magnetron ion source

A new solid state extractor pulser has been installed on the Fermi National Accelerator Laboratory (FNAL) magnetron ion source, replacing a vacuum tube style pulser that was used for over 40 years. The required ion source extraction voltage is 35 kV for injection into the radio frequency quadrupole. At this voltage, the old pulser had a rise time of over 150 μs due to the current limit of the vacuum tube. The new solid state pulsers are capable of 50 kV, 100 A peak current pulses and have a rise time of 9 μs when installed in the operational system. This paper will discuss the pulser design and operational experience to date.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Computer program compatible with a laser nephelometer

The laser nephelometer data system was updated to provide magnetic tape recording of data, and real time or near real time processing of data to provide particle size distribution and liquid water content. Digital circuits were provided to interface the laser nephelometer to a Data General Nova 1200 minicomputer. Communications are via a teletypewriter. A dual Linc Magnetic Tape System is used for program storage and data recording. Operational programs utilize the Data General Real-Time Operating System (RTOS) and the ERT AIRMAP Real-Time Operating System (ARTS). The programs provide for acquiring data from the laser nephelometer, acquiring data from auxiliary sources, keeping time, performing real time calculations, recording data and communicating with the teletypewriter.

Paroskie, R. M.↗

Performance impacts of look-ahead execution in the conversation scheme

The look-ahead execution approach, which allows participant processes that exist early to exit from a conversation before other participants finish their conversation activities, is presented here as a fundamental approach to reducing the synchronization overhead. Queuing network models are developed for systems operating under the basic conversation execution scheme and systems operating under the look-ahead execution scheme. Based on the models, various performance indicators such as the system throughput, the average number of processors idling inside a conversation due to the synchronization required, and the average time spent in conversation are evaluated numerically for different application environments. The results provide insights into the extent of benefits provided by the look-ahead execution approach.

Kim, K. H.↗

Hybridized Agile Software Development of Flight Control Team Tools for International Space Station's Payload Operations Integration Center

Ground systems operations at the National Aeronautics and Space Administration's (NASA) Payload Operations and Integration Function (POIF) is increasing, via the High Operations Tempo (HOT) initiative, its ability to support more science activities with a fourth crew member on the International Space Station (ISS). The Flight Control Team's need to support this increased crew presence mandated the need for a series of software tools to better handle the increasing pace of payload science operations. The overall need was clear from the outset, but the full scope and user experience for each tool, were not as well understood, so establishing a fixed set of initial requirements was not feasible. An Agile Software Development (ASD) paradigm takes advantage of uncertainty, and plans for it, so it was deemed the most appropriate approach to create room for exploring novel concepts, and to mount a rapid and flexible response to inevitiably changing requirements. It facilitated the need for unprecedented collaboration between the Product Team (i.e. users from the Flight Control Team) and the Development Team (i.e. POIC systems engineers, developers, testers). This is a process shift in the development, test, and release of software from one that is prescriptive to one that is adaptive, which is necessary for these tools to have longevity. The application of ASD to the product development lifecycle permitted the timely incorporation of customer feedback, and, allowed for continuous quality improvements. This resulted in a suite of tools that are efficient, user-friendly, and enable POIF ground systems to support the increasing pace of payload science operations. ASD is not as much a set of prescriptive processes as it is a shift in mindset; one that moves from planning against change, to planning for change, thereby iteratively growing software towards user-defined value.

Albers, Cerese M.↗

Short-Term Load Forecasting Error Distributions and Implications for Renewable Integration Studies: Preprint

Load forecasting in the day-ahead timescale is a critical aspect of power system operations that is used in the unit commitment process. It is also an important factor in renewable energy integration studies, where the combination of load and wind or solar forecasting techniques create the net load uncertainty that must be managed by the economic dispatch process or with suitable reserves. An understanding of that load forecasting errors that may be expected in this process can lead to better decisions about the amount of reserves necessary to compensate errors. In this work, we performed a statistical analysis of the day-ahead (and two-day-ahead) load forecasting errors observed in two independent system operators for a one-year period. Comparisons were made with the normal distribution commonly assumed in power system operation simulations used for renewable power integration studies. Further analysis identified time periods when the load is more likely to be under- or overforecast.

17 WIND ENERGY↗

Transmission Operator Workflows for Real-Time Reliability Studies: A Review of Control Room Practices and Naturalistic Decision Making

This report provides an overview of real-time reliability study tools and their use by power system operators in the control room environment. After introducing some of the nuances of the control room environment and the differences in perspectives between power system engineers and operators, the roles and responsibilities of key entities involved in RTCA workflows are introduced. These are specifically the transmission system operator (TOP) and reliability coordinator (RC), which are required to run tools such as real-time contingency analysis (RTCA) as part of a real-time reliability assessment every 30 minutes, as dictated by a series of standards issued by the North American Electric Reliability Corporation (NERC). The process by which power systems operators operate the grid is discussed in terms of naturalistic decision making (NDM) and the recognition-primed decision-making (RPD) model. This cognitive model describe how experts working in high-risk, high-stress environments make safety-critical decisions under uncertainty and time pressure. For power system operators, the mental simulations involved in the traditional RPD model are supplemented by physics-based simulations using numerical tools, such as RTCA, to improve situational awareness and effectiveness of control actions. Next, a generic workflow is introduced to describe operator decision making for running RTCA tools and responding to system violations on a pre-contingent basis. The types of analysis performed and control actions chosen by power system operators are described in detail. The overall high-level workflow is then expanded in subsequent sections, with special attention given to high-voltage violations, low-voltage violations, and thermal overloads. Each type of violation is described in detail, with explanations of common causes, impacts on equipment and customers, and mitigation strategies. An additional workflow diagram is provided for each type of violation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Alliance Project: Secure Control Systems for the Energy Sector

The Alliance Project addresses Area of Interest 4: Secure Remote Access for the Energy Sector, by combining physical and cyber access under one cybersecurity access system. The Alliance Project built on the successful completion of the Lemnos and Padlock Project (DOE-Funded Project started in 2007 and 2010) and researched and developed a solution for an Ethernet Security Gateway with the functionality required to integrate the physical access control cyber system and interface with legacy and new proximity card readers used for physical access requests. This project focused on securing and enhancing the cyber system the physical access control system operates on. The team tested and demonstrated the system solution on the SEL campus. Currently the physical access cyber system is completely separate from the cyber access control cyber system. With a single system industry benefits include: (1) Single system to learn and teach employees; (2) Single system that collects and alerts on logs and events simplifying incident response plans and NERC CIP compliance; (3) Unifies trust management to a single system reducing the potential errors in privilege escalation or revocation; (4) Provides a stronger cybersecurity platform the physical access control system operates on. Today they are mostly plain text protocols and little cyber awareness; (5) Integration of physical access awareness allows the cyber system to react and adjust. In some cases, the cyber access can be enhanced with authorized physical access and other cases the cyber access can be more restricted with unauthorized physical access; and (6) Enables the utility to establish as large or as small a physical access control system as they require. One example would be when a utility shares a substation with a neighbor utility and can’t rely on the substation door for the physical access control. The Alliance technology enables them to lock equipment racks simply with no scalability issues because it stands on the cyber security infrastructure which is already highly scalable.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Operations management system advanced automation: Fault detection isolation and recovery prototyping

The purpose of this project is to address the global fault detection, isolation and recovery (FDIR) requirements for Operation's Management System (OMS) automation within the Space Station Freedom program. This shall be accomplished by developing a selected FDIR prototype for the Space Station Freedom distributed processing systems. The prototype shall be based on advanced automation methodologies in addition to traditional software methods to meet the requirements for automation. A secondary objective is to expand the scope of the prototyping to encompass multiple aspects of station-wide fault management (SWFM) as discussed in OMS requirements documentation.

Hanson, Matt↗

Implementation and Operation of Power Flow Control Solutions for Transmission Systems

Power-flow controls (PFCs) technologies provide a suite of alternatives to more-efficiently direct the flow of power on the grid, improving flexibility and enabling the grid to be more responsive and resilient. PFCs can be used in many cases to mitigate overloads and consequently defer the installation of grid-expansion projects. They can also be suitable options in situations where new transmission lines cannot be built because of environmental constraints, land use, or other types of restrictions. Other uses include mitigation of loop or unintended flows, forcing of contractual or scheduled flows, reduction of congestion, and mitigation solutions during large maintenance or construction projects. While many studies have demonstrated the potential economic benefits of PFC for different types of applications, the implementation implications of using multiple PFCs for system operation and reliability have not been analyzed in detail. The lack of information and practical experience on these aspects hinders adoption of this technology. One use case would be that multiple PFCs are required to coordinate congestion management. In such cases, multiple PFCs are deployed in a meshed power system to control power flows across a wide area. The challenges are associated with PFC interaction—namely, the self and mutual power-flow sensitivity of each PFC, which must be accounted for in the calculation of the respective operating setpoints. This report analyzes implementation and operation that must be considered in evaluating transmission solutions using PFCs. The report first analyzes attributes with which PFC-based solutions should comply, based on the objective and characteristics of each particular use case. It then describes different approaches for coordinated control of multiple PFC devices for different applications, including options to avoid adverse interactions and reduce risks due to inappropriate coordination. Control and operation are illustrated through case studies performed on both generic and actual power system models. This report provides insights for transmission planners and operation engineers about the implementation of PFC-based transmission solutions; consequently, it will help them make informed decisions about the adoption of the technology.

24 POWER TRANSMISSION AND DISTRIBUTION↗