Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,027 records · Page 57

Single-Stage Bunch Compressor for ILC-SB2009

The Project Management Design Team of the International Linear Collider has recently proposed fundamental changes to the published ILC RDR baseline with the goal of presenting a potential alternate design providing a more cost-effective solution. In this framework a new lattice for the Damping Rings has been presented, shortening the exit bunch length from the RDR value of 9 mm down to 6 mm. The shorter bunch length allowed the adoption of a simpler single-stage bunch compressor, instead of the RDR two-stage compressor. The new single-stage compressor has a compression ratio of 20 and still achieves the nominal RDR value of 0.3 mm bunch length at the Interaction Point. The new design has been optimized to generate the required compression while having a small SR emittance growth, and reduced energy spread. The new lattice and its optimization procedure are presented in this paper.

43 PARTICLE ACCELERATORS↗

The Geothermal Data Repository: Ten Years of Supporting the Geothermal Industry with Open Access to Geothermal Data

The Department of Energy's (DOE) Geothermal Data Repository (GDR) is celebrating its tenth anniversary! Over the last decade it has grown from the simple idea of storing public data in a centralized location to a valuable tool at the center of the US geothermal scientific community and an integral part of the DOE Geothermal Technologies Office (DOE GTO) project management strategy. Researchers funded by the DOE GTO have contributed over 1,300 data submissions to the GDR. These data have been used to further advancements in geothermal science, economic analysis, exploration, research, development, and operational efficiency. The adoption of open data methodologies and a data management strategy that prioritizes universal open access and standardized, interoperable data have further increased the value of GDR data, making them available across a distributed network of data sharing partners and improving their utility to other industries and related fields, including material science and space exploration. Incorporating feedback from users has been critical to the GDR's success, allowing it to grow over the years to meet the evolving needs of the geothermal community. This paper will explore some of many changes that occurred throughout the GDRs tenure and the lessons learned along the way, as well as highlight some of the new features and recent improvements that been implemented to support innovation, reduce duplication of effort, and advance the geothermal industry as a whole.

access↗

Status of U.S. DOE Deliverables 0 July 2023

An annual status of the US TRISO fuel qualification program is provided, with a focus on activities linked to the Generation IV International Forum (GIF) Very High Temperature Reactor (VHTR) Fuel and Fuel Cycle (FFC) Project Management Board (PMB).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Gas well deliquification. 2nd. ed.

Chapter 1: Introduction; Chapter 2: Recognizing Symptoms of Liquid Loading in Gas Wells; Chapter 3: Critical Velocity; Chapter 4: Systems Nodal Analysis; Chapter 5: Sizing Tubing; Chapter 6: Compression; Chapter 7: Plunger Lift; Chapter 8: Use of Foam to Deliquefy Gas Wells; Chapter 9: Hydraulic Pumping; Chapter 10: Use of Beam Pumps to Deliquefy Gas Wells; Chapter 11: Gas Lift; Chapter 12: Electric Submersible Pumps; Chapter 13: Progressing Cavity Pumps; Chapter 14: Coal Bed Methane; Chapter 15: Production Automation. Chapter 14, by David Simpson, based in the San Juan Basin, addresses issues in coal bed methane, low pressure operations, gas compression, gas measurement, oil field construction, gas well deliquification and project management.

01 COAL, LIGNITE, AND PEAT↗

The Cold and Dark Process at the Savannah River Site

The deactivation and decommissioning (D and D) of a facility exposes D and D workers to numerous hazards. One of the more serious hazards is coming into contact to hazardous energy sources (e.g. electrical, pressurized steam). At the Savannah River Site (SRS) a formal process for identifying and eliminating sources of hazardous energy was developed and is called 'Cold and Dark'. Several 'near miss' events involving cutting of energized conductors during D and D work in buildings thought to be isolated identified the need to have a formal process to identify and isolate these potentially hazardous systems. This process was developed using lessons learned from D and D activities at the Rocky Flats Environmental Technology Site (Rocky Flats) in Colorado. The Cold and Dark process defines an isolation boundary (usually a building perimeter) and then systematically identifies all of the penetrations through this boundary. All penetrations that involve hazardous energy sources are then physically air-gapped. The final product is a documented declaration of isolation performed by a team involving operations, engineering, and project management. Once the Cold and Dark declaration is made for a building work can proceed without the usual controls used in an operational facility (e.g. lockout/tag-out, arc flash PPE). It is important to note that the Cold and Dark process does not remove all hazards from a facility. Work planning and controls still need to address hazards that can be present from such things as chemicals, radiological contamination, residual liquids, etc., as well as standard industrial hazards. Savannah River Site experienced 6 electrical events prior to declaring a facility 'cold and dark' and has had zero electrical events after 'cold and dark' declaration (263 facilities to date). The formal Cold and Dark process developed at SRS has eliminated D and D worker exposures to hazardous energy sources. Since the implementation of the process there have been no incidents involving energized conductors or pressurized liquids/gases. During this time SRS has demolished over 200 facilities. The ability to perform intrusive D and D activities without the normal controls such as lock outs results in shorter schedule durations and lower overall costs for a facility D and D.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Challenges in the development of high-fidelity LWR core neutronics tools

Modern computing has made possible the solution of extremely large-scale reactor simulations, and the literature has numerous examples of high-resolution methods (often Monte Carlo) applied to full-core reactor problems. However, there are currently no examples in the literature of application of such 'High-Fidelity' or 'First Principles' methods to operating Light Water Reactor (LWR) analysis. This paper seeks to remind code developers, project managers, and analysts of the many important aspects of LWR simulation that must be incorporated to produce truly high-fidelity analysis tools. The authors offer a monetary prize to the first person (or group) that successfully solves a new two-cycle operational PWR depletion benchmark problem using high-fidelity tools and demonstrates acceptable accuracy by comparison with measured operational plant data (open source) provided to the reactor analysis community. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Study on Shielding Requirements for Radioactive Waste Transportation in a Mo-99 Production Plant - 13382

Brazil is currently planning to produce {sup 99}Mo from fission of low enriched uranium (LEU) targets. The planned end of irradiation activity of {sup 99}Mo is about 185 TBq (5 kCi) per week to meet the present domestic demand of {sup 99m}Tc generators. The radioactive wastes from the production plant will be transferred to a waste treatment facility at the same site. The total activity of the actinides, fission and activation products present in the wastes can be predicted based on the yields of fission and activation data for the irradiation conditions, such as composition and mass of uranium targets, irradiation time, neutron flux, production schedule, etc., which were in principle already established by the project management. The transportation of the wastes from the production plant to the treatment facility will be done by means of special shielded packages. An assessment of the shielding required for the packages has been done and the results are presented here, aiming at contributing to the design of the waste management facility for the {sup 99}Mo production plant. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

New Developments in the Technology Readiness Assessment Process in US DOE-EM - 13247

A Technology Readiness Assessment (TRA) is a systematic, metric-based process and accompanying report that evaluates the maturity of the technologies used in systems; it is designed to measure technology maturity using the Technology Readiness Level (TRL) scale pioneered by the National Aeronautics and Space Administration (NASA) in the 1980's. More recently, DoD has adopted and provided systematic guidance for performing TRAs and determining TRLs. In 2007 the GAO recommended that the DOE adopt the NASA/DoD methodology for evaluating technology maturity. Earlier, in 2006-2007, DOE-EM had conducted pilot TRAs on a number of projects at Hanford and Savannah River. In March 2008, DOE-EM issued a process guide, which established TRAs as an integral part of DOE-EM's Project Management Critical Decision Process. Since the development of its detailed TRA guidance in 2008, DOE-EM has continued to accumulate experience in the conduct of TRAs and the process for evaluating technology maturity. DOE has developed guidance on TRAs applicable department-wide. DOE-EM's experience with the TRA process, the evaluations that led to recently developed proposed revisions to the DOE-EM TRA/TMP Guide; the content of the proposed changes that incorporate the above lessons learned and insights are described. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The National Historic Preservation Act is Not Your Problem, But How You are Addressing it for Your CERCLA Project May Be - 12344

The 1995 Environmental Protection Agency (EPA) and U.S. Department of Energy (DOE) joint 'Policy on Decommissioning of Department of Energy Facilities Under CERCLA was developed so that decommissioning could occur in a manner that ensures protection of worker and public health and the environment, that is consistent with Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), that provides for stakeholder involvement, and that achieves risk reduction without unnecessary delay'. The source of the 'unnecessary delays' the joint policy intended to avert could be attributed to numerous factors such as obtaining permits, conducting administrative activities, or implementing regulatory processes that could yield, among other things, differing preferred alternatives. Why, you might ask, more than fifteen years later, does DOE continue to struggle through CERCLA projects with unnecessary delays? From problem identification, to determination of nature and extent, to alternative analysis and ultimately remedy selection and implementation, reaching a compliant and effective clean-up end-point can be a process that seems to mimic geologic timescales. The source of these delays is often the failure to use all of the tools the CERCLA process offers. As one example, renewed commitment to follow the CERCLA process to address the regulatory reviews pursuant to the National Historic Preservation Act (NHPA) is called for. Project managers implementing CERCLA actions in any agency, not only DOE, do not need to be apprehensive about using the CERCLA process for NHPA review but should welcome it. It is critical that methods are used that address substantive NHPA requirements clearly and consistently, and that they are shared and communicated as frequently as needed to interested and questioning stakeholders. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

LAWPS Technology Maturation Program and Scaled Testing - 17408

The Technology Maturation Program for the Low-Activity Waste Pre-Treatment System (LAWPS) had been developed utilizing the guidance of DOE-Order 413.3B 'Program and Project Management for the Acquisition of Capital Assets' for Technology Readiness and Technology Maturation. The technology maturation plan (TMP) for LAWPS established principal technology elements (TE) for the proposed process, designated critical technology elements (CTE), and identified the necessary activities to mature the technologies for successful deployment of the LAWPS. The testing progress for the integrated engineering scale testing and support activities are presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Starting DIADEM medium-level waste interim storage's construction - 15034

As part of its decommissioning policy, the nuclear energy division of CEA has identified materials whose high enough radioactive features authorize neither sustainable storage in existing facilities nor evacuation to a French operational geological disposal. Pending availability of definitive solutions, it was decided to explore the possibility to store these materials in a new installation, the subject of DIADEM project [1]. The need was first identified in Marcoule's site, especially to accommodate future waste dismantling of Phenix reactor. Quickly the interest of a centralized storage for all CEA waste of this type appeared to bring together the best expertise to the design and operation of storage. Waste will be stored either to use benefits of radioactive decay or to wait for the commissioning of a new disposal. DIADEM is designed for an operating estimated lifetime of fifty years. This paper deals with the prior safety assessment completed in 2014, the project management and the first steps of the facility construction. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

US EPA superfund radon vapor intrusion preliminary remediation goal (RAD-VIPRG) electronic calculator - 15349

Currently, there is no U.S. EPA guidance on correlating soil or groundwater levels of radon with indoor radon concentrations at Superfund sites. EPA is developing the Radon Vapor Intrusion Preliminary Remediation Goal (RAD-VIPRG) Calculator which is a spreadsheet tool that (1) lists two radon isotopes (Rn-220 and Rn-222) known to pose a potential cancer risk through the inhalation pathway; (2) provides generally recommended risk and Applicable or Relevant and Appropriate Requirements (ARAR) based preliminary remediation goals (PRG) for groundwater, soil gas (exterior to buildings and sub-slab) and indoor air for default target risk and ARAR based levels and exposure scenarios; and (3) allows calculation of site-specific PRGs based on user-defined target risk and ARAR levels and exposure scenarios. EPA developed the RAD-VIPRG calculator to help risk assessors, remedial project managers, and others involved with risk assessment and decision making at radioactively contaminated sites.(authors)

61 RADIATION PROTECTION AND DOSIMETRY↗

Authorization to proceed with production engineering for the waste treatment and immobilization plant's high-level waste facility - 15595

The U.S. Department of Energy restricted certain engineering, procurement, and construction work on the Waste Treatment and Immobilization Plant's (WTP) Pretreatment Facility, and to a lesser degree the High-Level Waste (HLW) Facility in 2012 and early 2013 because of the impact of unresolved technical issues on the facility design, and a misalignment between the facility design and nuclear safety basis. The U.S. Department of Energy, Office of River Protection (ORP) needed a way to minimize project management risk, while continuing limited critical path construction work for the HLW Facility and resolving the technical and safety basis issues. ORP developed a process to systematically address and resolve the technical, management, and quality issues that led DOE to restrict HLW Facility production activities in 2012 and 2013. This process provided for a phased resumption of HLW engineering, procurement, and construction activities on an incremental basis and a final decision for release to full production. In August 2014, ORP provided authorization for the WTP contractor to resume all engineering work necessary to finalize the HLW Facility design. The decision to proceed with production engineering in the HLW Facility, representing the first of two decision points, was based on significant progress in resolving HLW technical issues and improving work processes to align the HLW design and safety basis. Full release for HLW equipment procurements and construction is forthcoming based on conditions that must be fully satisfied and demonstrated during a transition period expected to continue for the next few years. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗