Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,027 records · Page 57

Decision Gate Process for Assessment of a NASA Technology Development Portfolio

The NASA Dust Management Project (DMP) was established to provide technologies (to Technology Readiness Level (TRL) 6) required to address adverse effects of lunar dust to humans and to exploration systems and equipment, to reduce life cycle cost and risk, and to increase the probability of sustainable and successful lunar missions. The technology portfolio of DMP consisted of different categories of technologies whose final product was either a technology solution in itself, or one that contributes toward a dust mitigation strategy for a particular application. A Decision Gate Process (DGP) was developed to assess and validate the achievement and priority of the dust mitigation technologies as the technologies progress through the development cycle. The DGP was part of continuous technology assessment and was a critical element of DMP risk management. At the core of the process were technology-specific criteria developed to measure the success of each DMP technology in attaining the technology readiness levels assigned to each decision gate. The DGP accounts for both categories of technologies and qualifies the technology progression from technology development tasks to application areas. The process provided opportunities to validate performance, as well as to identify non-performance in time to adjust resources and direction. This paper describes the overall philosophy of the DGP and the methodology for implementation for DMP, and describes the method for defining the technology evaluation criteria. The process is illustrated by example of an application to a specific DMP technology.

Kohli, Rajiv↗

Advanced Assay Systems for Radionuclide Contamination in Soils

Through the support of the Department of Energy (DOE) Office of Environmental Management (EM) Technical Assistance Program, the Idaho National Laboratory (INL) has developed and deployed a suite of systems that rapidly scan, characterize, and analyze surface soil contamination. The INL systems integrate detector systems with data acquisition and synthesis software and with global positioning technology to provide a real-time, user-friendly field deployable turn-key system. INL real-time systems are designed to characterize surface soil contamination using methodologies set forth in the Multi-Agency Radiation Surveys and Site Investigation Manual (MARSSIM). MARSSIM provides guidance for planning, implementing, and evaluating environmental and facility radiological surveys conducted to demonstrate compliance with a dose or risk-based regulation and provides real-time information that is immediately available to field technicians and project management personnel. This paper discusses the history of the development of these systems and describes some of the more recent examples and their applications.

42 ENGINEERING↗

AmeriFlux FLUXNET-1F US-StJ St Jones Reserve

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site US-StJ St Jones Reserve. This is the FLUXNET version of the carbon flux data for the site US-StJ St Jones Reserve produced by applying the standard ONEFlux (1F) software. Site Description - This tower is located in St Jones, near Dover Delaware. This area is part of the National Estuarine Research Reserve. It was established in 1993, and estuarine ecosystems from the Mid-Atlantic region are represented here. This region has been influenced by agricultural fields along the watershed. The EC tower is located in a tidal marsh near the Dover headquarters, there is a board walk that goes along the marsh. Restoring natural vegetation is on the long term management plan.

Vargas, Rodrigo↗

MAN-004 Design Standards Manual

At Sandia National Laboratories in New Mexico (SNL/NM), the design, construction, operation, and maintenance of facilities is guided by industry standards, a graded approach, and the systematic analysis of life cycle benefits received for costs incurred. The design of the physical plant must ensure that the facilities are "fit for use," and provide conditions that effectively, efficiently, and safely support current and future mission needs. In addition, SNL/NM applies sustainable design principles, using an integrated whole-building design approach, from site planning to facility design, construction, and operation to ensure building resource efficiency and the health and productivity of occupants. The safety and health of the workforce and the public, any possible effects on the environment, and compliance with building codes take precedence over project issues, such as performance, cost, and schedule. These design standards generally apply to all disciplines on all SNL/NM projects. Architectural and engineering design must be both functional and cost-effective. Facility design must be tailored to fit its intended function, while emphasizing low-maintenance, energy-efficient, and energy-conscious design. Design facilities that can be maintained easily, with readily accessible equipment areas, low maintenance, and quality systems. To promote an orderly and efficient appearance, architectural features of new facilities must complement and enhance the existing architecture at the site. As an Architectural and Engineering (A/E) professional, you must advise the Project Manager when this approach is prohibitively expensive. You are encouraged to use professional judgment and ingenuity to produce a coordinated interdisciplinary design that is cost-effective, easily contractible or buildable, high-performing, aesthetically pleasing, and compliant with applicable building codes. Close coordination and development of civil, landscape, structural, architectural, fire protection, mechanical, electrical, telecommunications, and security features is expected to ensure compatibility with planned functional equipment and to facilitate constructability. If portions of the design are subcontracted to specialists, delivery of the finished design documents must not be considered complete until the subcontracted portions are also submitted for review. You must, along with support consultants, perform functional analyses and programming in developing design solutions. These solutions must reflect coordination of the competing functional, budgetary, and physical requirements for the project. During design phases, meetings between you and the SNL/NM Project Team to discuss and resolve design issues are required. These meetings are a normal part of the design process. For specific design-review requirements, see the project-specific Design Criteria. In addition to the design requirements described in this manual, instructive information is provided to explain the sustainable building practice goals for design, construction, operation, and maintenance of SNL/NM facilities. Please notify SNL/NM personnel of design best practices not included in this manual, so they can be incorporated in future updates.

42 ENGINEERING↗

Model for Simulating a Spiral Software-Development Process

A discrete-event simulation model, and a computer program that implements the model, have been developed as means of analyzing a spiral software-development process. This model can be tailored to specific development environments for use by software project managers in making quantitative cases for deciding among different software-development processes, courses of action, and cost estimates. A spiral process can be contrasted with a waterfall process, which is a traditional process that consists of a sequence of activities that include analysis of requirements, design, coding, testing, and support. A spiral process is an iterative process that can be regarded as a repeating modified waterfall process. Each iteration includes assessment of risk, analysis of requirements, design, coding, testing, delivery, and evaluation. A key difference between a spiral and a waterfall process is that a spiral process can accommodate changes in requirements at each iteration, whereas in a waterfall process, requirements are considered to be fixed from the beginning and, therefore, a waterfall process is not flexible enough for some projects, especially those in which requirements are not known at the beginning or may change during development. For a given project, a spiral process may cost more and take more time than does a waterfall process, but may better satisfy a customer's expectations and needs. Models for simulating various waterfall processes have been developed previously, but until now, there have been no models for simulating spiral processes. The present spiral-process-simulating model and the software that implements it were developed by extending a discrete-event simulation process model of the IEEE 12207 Software Development Process, which was built using commercially available software known as the Process Analysis Tradeoff Tool (PATT). Typical inputs to PATT models include industry-average values of product size (expressed as number of lines of code), productivity (number of lines of code per hour), and number of defects per source line of code. The user provides the number of resources, the overall percent of effort that should be allocated to each process step, and the number of desired staff members for each step. The output of PATT includes the size of the product, a measure of effort, a measure of rework effort, the duration of the entire process, and the numbers of injected, detected, and corrected defects as well as a number of other interesting features. In the development of the present model, steps were added to the IEEE 12207 waterfall process, and this model and its implementing software were made to run repeatedly through the sequence of steps, each repetition representing an iteration in a spiral process. Because the IEEE 12207 model is founded on a waterfall paradigm, it enables direct comparison of spiral and waterfall processes. The model can be used throughout a software-development project to analyze the project as more information becomes available. For instance, data from early iterations can be used as inputs to the model, and the model can be used to estimate the time and cost of carrying the project to completion.

Mizell, Carolyn↗

Environmental Management

Another key aspect of the NNSS mission is Environmental Management program, which addresses the environmental legacy from historic nuclear weapons related activities while also ensuring the health and safety of present day workers, the public, and the environment as current and future missions are completed. The Area 5 Radioactive Waste Management site receives low-level and mixed low-level waste from some 28 different generators from across the DOE complex in support of the legacy clean-up DOE Environmental Management project. Without this capability, the DOE would not be able to complete the clean up and proper disposition of these wastes. The program includes environmental protection, compliance, and monitoring of the air, water, plants, animals, and cultural resources at the NNSS. Investigation and implementation of appropriate corrective actions to address the contaminated ground water facilities and soils resulting from historic nuclear testing activities, the demolition of abandoned nuclear facilities, as well as installation of ground water wells to identify and monitor the extent of ground water contamination.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

History and Logic Model NASA Goddard Space Flight Center Instrument and Payload Systems Engineering Technical Performance Study

Historically, some NASA missions have exceeded schedule and cost commitments. Studies suggest technical performance is a contributor. The 1980 NASA Project Management Study concluded, "one of the most significant contributors to cost and schedule growth is inadequate definition of technical and management aspects of a program..." (as cited in GAO/NSIAD-93-97, p. 11). The 1991 NASA Roles and Missions Report identified a "need for increased emphasis on technological readiness and requirements on the front end of a program" (as cited in GAO/NSIAD-93-97, p. 11). The 1992 NASA Program Costs Report stated that NASA officials identified, among other things, "insufficient definition studies... [and] program redesigns and technical complexities" as reasons for cost and schedule overruns (GAO/NSAID-93-97, p. 11). The 2002 Task Force on Acquisition of National Security Space Programs found "requirements definition and control issues, unhealthy cost bias in proposal evaluation, widespread lack of budget reserves required to implement high risk programs on schedule, and an overall underappreciation of the importance of appropriately staffed and trained system engineering staff to manage the technologically demanding and unique aspects of space programs" (DoD, 2003, p.i.) In 2007, The NASA Office of the Chief Engineer chartered the NASA Instrument Capability Study (NICS) “to determine whether NASA instrument developers are facing challenges that impact the capability to design and build quality instruments or whether there are flaws in the acquisition strategy evidenced by schedule delays, cost overruns, and increased technical risk via design deficiencies. The... team was also chartered to determine if occurrences [are]... isolated cases or if there are generic issues... If the issues [are] found to be generic, the team [is] to offer solutions to recover such capability" (NICS Report, 2008, p. vi). The 2008 NICS Report, led by Goddard Space Flight Center (GSFC), identified challenges to instrument technical performance consistent with findings from previous reports. In 2017, the Instrument Project Division (IPD) Implementation Study was initiated to determine if there was a change in meeting schedule and cost commitments after implementing certain NICS recommendations. In 2018, the Instrument Technical Performance Study was initiated to determine the current state of Instrument Technical Performance in the GSFC Payload & Instrument Systems Engineering Branch. The purpose of the combined studies is to answer the question, "Is there a relationship between meeting NASA scientific instrument technical success and meeting schedule and cost commitments? If yes, what is the relationship?" References Department of Defense Office of the Under Secretary of Defense for Acquisition, Technology, and Logistics. (2003). The report of the defense science board/ air force scientific advisory board joint task force on acquisition of national security space programs. Washington DC. Government Accounting Office. (1992). NASA program costs: Space missions require substantially more funding than initially estimated. GAO/NSIAD-93-97. Washington DC. National Aeronautics and Space Administration, National Oceanic and Atmospheric Agency, Department of Defense. (2008). The NASA instrument capability study final report. NP-2008-11-058-GSFC. Washington DC.

Robbins, Geraldine↗

Up-skilling and Re-skilling for the Nuclear Industry - 17276

In the UK, nuclear skills and qualifications have been the subject of several studies in higher levels of Government, including one by UK Cabinet Office. The newly formed UK Nuclear Skills Strategy Group (NSSG) has been tasked with addressing the current skills and people gaps for the UK nuclear industry. The NSSG is working with several key organisations in the UK: The National Skills Academy for Nuclear, (NSAN), which covers skills interventions, training and workforce development and experience, and the newly forming National College for Nuclear (NCfN) which will become a nuclear qualifications awarding body, regulating educational qualifications and curriculum in the nuclear sector. The NSSG has published its own UK Nuclear Skills Strategy in December 2016, aligned to the UK Cabinet Office study. It is the intent that, in the near future, nuclear qualifications and experience will be directly transferable across different organisations and nuclear sites in the UK, enabling the maintenance of high standards of behaviours and improved mobility throughout the sector. The UK needs to maintain and grow a diverse workforce and nuclear Suitably Qualified and Experienced Personnel (SQEP) people. The 2015 UK Nuclear Labour Market Intelligence (LMI) report, produced by Cogent for the Nuclear Energy Skills Alliance (NESA), concluded that the total nuclear workforce demand for the UK Nuclear Civil and Defence sector needed to grow by 33,000 people in the next five years, which includes replacement and expansion demand. This involved all disciplines and grades, with for example, higher level skilled workers needing to increase by 2200 FTEs every year. The main discipline pinch points were in, for example, Mechanical; Electrical; Project Management; Safety Case Specialists; Commissioning Engineers. Of the overall workforce, around 10% is over 60 years old and around 38% is over 50 years old. Jacobs in the UK is widely involved in many aspects of skills and competence development, with active involvement in local and national training programmes, and driving new methodologies to accelerate our staff's journey to nuclear competence. As well as looking at the immediate future, there is a risk in the UK that, over the 120-year plus clean-up mission, there won't be enough people with the right skills. Jacobs is developing sustainable solutions to this in our skills and development strategy for the nuclear sector. Jacobs has developed a variety of approaches to help us maintain and grow our diverse workforce and nuclear 'SQEP' people. This includes: - Identifying and developing our employees' technical and personal skills and capabilities, particularly the requirements of our millennials in both technical and social aspects of their working lives. - Identifying and planning for our future skills needs to meet our projected business requirements. - Our programme to transfer skilled employees from other sectors into the nuclear industry. - Our extensive school student placement scheme, aligned to the UK's 'Industrial Cadet' scheme, which has helped to bring school-aged students into Jacobs on workplace experience. - Our collaboration with our customers to develop UK national level Trailblazer Apprentice programmes. - Our involvement at a UK national level in the work of the National Skills Academy for Nuclear (NSAN), the Nuclear Energy Skills Alliance (NESA) High Level Skills Committee and the newly forming UK National College for Nuclear (NCfN). - Our work to ensure diversity is valued in our workplace, for example in our involvement in 'Women in Nuclear'. (authors)

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

An Integrated Approach to Exploration Launch Office Requirements Development

The proposed paper will focus on the Project Management and Systems Engineering approach utilized to develop a set of both integrated and cohesive requirements for the Exploration Launch Office, within the Constellation Program. A summary of the programmatic drivers which influenced the approach along with details of the resulting implementation will be discussed as well as metrics evaluating the efficiency and accuracy of the various requirements development activities. Requirements development activities will focus on the procedures utilized to ensure that technical content was valid and mature in preparation for the Crew Launch Vehicle and Constellation System s Requirements Reviews. This discussion will begin at initial requirements development during the Exploration Systems Architecture Study and progress through formal development of the program structure. Specific emphasis will be given to development and validation of the requirements. This discussion will focus on approaches to garner the appropriate requirement owners (or customers), project infrastructure utilized to emphasize proper integration, and finally the procedure to technically mature, verify and validate the requirements. Examples of requirements being implemented on the Launch Vehicle (systems, interfaces, test & verification) will be utilized to demonstrate the various processes and also provide a top level understanding of the launch vehicle(s) performance goals. Details may also be provided on the approaches for verification, which range from typical aerospace hardware development (qualification/acceptance) through flight certification (flight test, etc.). The primary intent of this paper is to provide a demonstrated procedure for the development of a mature, effective, integrated set of requirements on a complex system, which also has the added intricacies of both heritage and new hardware development integration. Ancillary focus of the paper will include discussion of Test and Verification approaches along with top level systems/elements performance capabilities.

Holladay, Jon B.↗

Improvements in Hanford TRU Program Utilizing Systems Modeling and Analyses

Hanford's Transuranic (TRU) Program is responsible for certifying contact-handled (CH) TRU waste and shipping the certified waste to the Waste Isolation Pilot Plant (WIPP). Hanford's CH TRU waste includes material that is in retrievable storage as well as above ground storage, and newly generated waste. Certifying a typical container entails retrieving and then characterizing it (Non-Destructive Examination [NDE], Non-Destructive Assay [NDA], and Head Space Gas Sampling [HSG]), validating records (data review and reconciliation), and designating the container for a payload. The certified payload is then shipped to WIPP. Systems modeling and analysis techniques were applied to Hanford's TRU Program to help streamline the certification process and increase shipping rates. The modeling and analysis yields several benefits: - Maintains visibility on system performance and predicts downstream consequences of production issues. - Predicts future system performance with higher confidence, based on tracking past performance. - Applies speculation analyses to determine the impact of proposed changes (e.g., apparent shortage of feed should not be used as basis to reassign personnel if more feed is coming in the queue). - Positively identifies the appropriate queue for all containers (e.g., discovered several containers that were not actively being worked because they were in the wrong 'physical' location - method used previously for queuing up containers). - Identifies anomalies with the various data systems used to track inventory (e.g., dimensional differences for Standard Waste Boxes). A model of the TRU Program certification process was created using custom queries of the multiple databases for managing waste containers. The model was developed using a simplified process chart based on the expected path for a typical container. The process chart was augmented with the remediation path for containers that do not meet acceptance criteria for WIPP. Containers are sorted into queues based on their current status in the process. A container can be in only one queue at any given time. Existing data systems are queried to establish the quantity of containers in each queue on any given day. This sets the amount of feed available that is then modeled to be processed according to the daily production plans. The daily production plans were created by identifying the equipment necessary and the staff that performs each process step, and determining the expected production rate for each step. Production performance is monitored on a weekly basis with Project senior staff to establish a total operating efficiency (TOE) for each step (comparing actual performance to production capacity). The unit operations were modeled to be constrained by each day's feed queue plus the performance of the preceding step. The TOE for each unit operation was applied to an integrated model to determine bottlenecks and identify areas for improvement. All of the steps were linked to predict future system performance based on available feed and integrated system-level TOE. It has been determined that at times sub-optimization of a particular unit operation is necessary to ensure the system remains balanced (e.g., having excess capacity in assay does no good if there is no feed available because the real-time radiography [RTR] is working at half capacity). Several recommendations have been provided to the Project management team resulting in improvements in the performance of TRU certification activities by Hanford's TRU Program. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Gandalf Staff: A Mobile Tool for Lunar Exploration (2nd year of development)

The Gandalf Staff is a mobile tool designed to be a flexible device supporting crewed and uncrewed operations on the lunar surface. The core of the device is a 24v battery with communications and data storage systems. Initial optional components supporting crewed Extra-Vehicular Activity (EVA) include a LiDAR and 360˚ camera. These provide 3D mapping of the traverse for documentation, and to aid future planning. The mapping also creates outreach opportunities for the public to “stand beside” the astronaut in Virtual Reality (VR). The staff provides external lighting for field site illumination in the south polar region low sun angle environment. Navigation instruments for crew position determination with Lunar Search and Rescue (LunaSAR) are also included. The staff itself can be used as a walking aid or as a splint for Incapacitated Crew Rescue (ICR). As a stand-alone device, the staff operates as a long duration untended science platform collecting environmental data and sending it to a lunar base station. The stand-alone mode requires connection to an auxiliary power source (e.g. solar array) and energy storage system (e.g. battery), so it could become an electrical recharging station. To make rapid progress in the 1st year, and also to demonstrate innovative project management techniques, NASA guided a private industry partner, T STAR, in leading Capstone Engineering student teams at Texas A&M University (TAMU) for proof-of-concept development and testing. These teams developed the power system and demonstrated successful integration of LiDAR, WiFi communications, and external lighting subsystems. Another industry team at Jacobs Technology prototyped a tripod to hold the staff upright. For the 2nd year (FY’22), NASA will again collaborate with partners to prototype enhanced power and lighting concepts. Year 2 will also add new capability for LunaSAR and geophysical science instrumentation using a heat probe. The heat probe is based upon Apollo heritage but modified to measure subsurface volatile ice regimes at the Artemis landing site. Components of the Gandalf Staff can be developed, tested, and deployed independently, or on the integrated staff, rovers, or utility trailers. The project supports crew safety, lunar sample curation, mission science, and public outreach goals of NASA. PLAIN TEST SUMMARY: Gandalf Staff is a 24v battery powered mobile tool for the lunar surface supporting crewed geologic field site exploration, or as a stand-alone science platform. As a tool assisting astronauts conducting field geology, the Gandalf Staff provides external lighting to illuminate shadowed regions on the surface. It also documents the process of collecting rocks and dust samples using a LiDAR (laser range instrument) and cameras. The staff provides a beacon for emergency location of astronauts and augments communications when the astronauts are blocked by large boulders. As a standalone science platform, the Gandalf Staff provides a power system for instruments and sensors to measure the lunar environment over long periods of time. The staff gathers data and sends the results to a lunar base station for analysis.

External Lighting↗

AmeriFlux FLUXNET-1F US-xDS NEON Disney Wilderness Preserve (DSNY)

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site US-xDS NEON Disney Wilderness Preserve (DSNY). This is the FLUXNET version of the carbon flux data for the site US-xDS NEON Disney Wilderness Preserve (DSNY) produced by applying the standard ONEFlux (1F) software. Site Description - The 12,000-acre Disney Wilderness Preserve straddles the headwaters of the Everglades ecosystem in south-central Florida. This site is seasonally wet and flooded. The Disney site was heavily logged and used as ranchland for decades. However, vegetation and site conditions have been restored to closely represent site condition records, documented by the area’s first Spanish missionaries. The large-scale wetland and upland restoration at Disney included the removal of non-native, invasive plants and grasses and the removal of agricultural ditches. The primary management activity is controlled burns.

Network), NEON (National Ecological Observatory↗

AmeriFlux FLUXNET-1F CA-MA2 Manitoba Agricultural Site 2

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site CA-MA2 Manitoba Agricultural Site 2. This is the FLUXNET version of the carbon flux data for the site CA-MA2 Manitoba Agricultural Site 2 produced by applying the standard ONEFlux (1F) software. Site Description - This field had been in perennial forages (grass with small amount of legume) for several decades. Field size = 60 ha. In 2009, the producer tilled the land so that part of the summer had perennial forage, and the remainder was fallow (see effect outlined by Fraser and Amiro 2013). In 2010, oats were planted. In 2011, the field was too wet to plant and remained fallow. Cattle were in the field for a brief period in June 2011to feed on weeds. See Table 2 in Taylor et al (2013) describing site management practices.

Amiro, Brian↗

Effects of Exhaust Gas Recirculation (EGR) on Turbulent Combustion and Emissions in Advanced Gas Turbine Combustors with High-Hydrogen-Content (HHC) Fuels (Final Report)

This Final Report documents the entire four years of the Cooperative Agreement DE-FE0011822, from October 1, 2013 through September 30, 2017, that was competitively awarded under Funding Opportunity Announcement DE-FOA-0000795 in support of the U.S. Department of Energy’s (DOE) National Energy Technology Laboratory (NETL) University Turbine Systems Research (UTSR) Program. Under the UTSR Program, DOE typically issues Funding Opportunity Announcement (FOA) solicitations every 1-2 years so that U.S. colleges/universities may propose research & development (R&D) projects in specific technical topic areas (e.g., combustion, aerodynamics/heat transfer, advanced materials) that have been identified as both scientifically and industrially relevant to the gas turbine industry. The primary objectives of this Purdue University project (in collaboration with Princeton University through a sub-award) was to develop experimental methods, kinetic models, and numerical tools to help quantify and predict the impact of exhaust gas recirculation (EGR) on NOx and CO emissions, combustion kinetics, radiation heat transfer, turbulent combustion, and combustion instabilities for natural gas and high hydrogen content (HHC) fuels by using laminar and turbulent flow reactors and gas turbine combustors operating at high temperatures and pressures. This project has obtained detailed data for improving chemical kinetic models to study EGR effects and provide insight into the effects of EGR on flame speeds and turbulent flame structure, as well as assessing the impact of EGR on emissions in a high-pressure combustion test rig. The project was divided into six primary tasks: 1) Project Management and Program Planning; 2) Flow Reactor Investigation of EGR Chemical Kinetics; 3) Combustion Bomb Investigation of EGR Effects on Flame Speed; 4) Investigation of EGR Effects on Turbulent Flame Structure in Reactor-Assisted Turbulent Slot (RATS) Burner; 5) Investigation of EGR Effects in Purdue Staged Combustion Test Rig; and 6) Development and Validation of a Large Eddy Simulation (LES) Tool for Gas Turbine Combustion and Emission Modeling using HHC Fuels. Details on the execution and results of each of these tasks are provided in the main report. To assist the reader, each task is described in a chapter-like format with its own separate listing of tables, figures, and references so that the results of each task/subtask (i.e., technical sections covering various experiments and modeling work focused on a specific area) can be quickly obtained while also getting an overall feel of the project execution. This chapter-like format also allows for acknowledgement of support from other programs relative to specific tasks. In this manner, the reader can more conveniently digest the R&D results in the various task/subtask sections that may be of most interest to the reader. In addition to this Final Report, the Purdue/Princeton team was able to publish 7 journal articles and provide 7 presentations at national scientific meetings/conferences to disseminate results. A listing of these journal articles and presentations is provided at the end of this report

03 NATURAL GAS↗

Production of Salable Rare Earths Products from Coal and Coal Byproducts in the U.S. Using Advanced Separation Processes (Final Technical Report)

The entirety of the report that follows this brief Executive Summary Chapter is the product of a Funding Announcement by the US Department of Energy (DOE), Office of Fossil Energy, originally issued 09/28/2016, otherwise known as Funding Opportunity Number: DE-FOA-0001627, under the title of “Production of Rare Earth Elements from Domestic U.S. Coal and Coal By-Products” The solicitation was subsequently amended several times ending in amendment 000005. Ultimately a consortium designated “Minerals Refining and Rare Earth Consortium” (to which many of the remaining participants recited in this report joined) filed a proposal on December 8, 2016. On June 9, 2017, the contracting office of the US DOE, National Energy Technology Laboratory (NETL), alerted Dr. Keim, the Authorized Representative of the December 08, 2016, proposal, that the consortium proposal had been selected. In summary, this report presents the results of the efforts in meeting the stated project objectives as outlined in DE-FOA-0001627 to wit: “The main objective of the proposed work is to design and construct a demonstration plant that can extract rare earth elements (REEs) from domestic U.S. coal and coal by-products. The plant will produce salable rare earth elements and intermediates, including at a minimum three individual REEs (preferably heavy rare earths) at 90-99% purities, with output capacities in excess of 10 pounds per day of composite rare earth products (reported as oxides). In addition, the plant will produce high value premium solid fuels, magnetite and other materials to increase the economic viability of the plant and to create jobs. If successful, the proposed work will help develop a domestic supply chain of the critical materials that are essential for the development of renewable energy resources, high-tech industries and a strong national defense.” The principal investigators immediately launched the tasks outlined in the Statement of Project Objectives (SOPO) in accordance to its Project Management Plan (PMP) based on their collective knowledge of the subject matter and the expectations generated by preliminary laboratory results. Events and circumstances related in part to the vagaries of the coal mining, processing, and marketing industry triggered a series of carefully deliberated step-wise transitions from the original Lower Kittanning coal source in West Virginia to an ultimate stopping point with the Fire Clay Seam (Hazard No. 4) rejects from Blue Diamond Coal Company in Kentucky (Operated by Blackhawk Mining LLC). These transitional steps are discussed in substantial detail in the body of this report. Notably, substantial data of potential future significance, both in terms of sample collection, processing, and testing, were collected in the process. Unfortunately, as reported in the Techno-Economic Chapter of this report, none of these efforts resulted in an anticipated economically viable venture. Thus, the principals associated with this project elected not to transition into a “Pilot Plant” operation. A proposal for funding that pilot plant was therefore not requested. The outcome of this initiative under DE-FOA-0001627 notwithstanding, the following portions of this Executive Summary outline the activities of the investigators. That said, the reader is encouraged to examine the main body of this report in which each chapter is assembled as a free-standing product, complete with Table of Contents, for practical and easy reference purposes.

01 COAL, LIGNITE, AND PEAT↗

Leading University Students to the Edge of Space

For over 16 years, the Louisiana Space Grant Consortium (LaSPACE), the NASA Balloon Program Office (BPO), and the NASA Columbia Scientific Balloon Facility (CSBF) have collaborated in a series of high altitude balloon-based programs involving hands-on authentic learning experiences that expose university students and other participants to technical skills, teamwork dynamics, and effective communication methods. Such programs go beyond what is possible to achieve in a normal classroom and help prepare future engineers and scientists for a successful aerospace workforce career. In our collaborative effort, LaSPACE has focused on the program content and student mentoring while NASA BPO and CSBF provide balloon flight support and operations. The entry-level Louisiana Aerospace Catalyst Experiences for Students (LaACES) builds students’ skills in basic electronics, sensor interfacing, real-time programming, mechanical development, and project management. These skills are then applied to the design, development, fabrication, and flight of a small (∼500 gram) balloon payload. Finally, the payloads are flight-tested to an altitude of ∼30 km using a 2 kg latex sounding balloon. The LaACES program includes a set of lectures, activities, and Arduino Mega based electronic kits that are used for skill building and as a core control system for the student payload. The more advanced High Altitude Student Platform (HASP) is designed to carry ∼twelve 3 to 20 kg student payloads to an altitude of about 36 kilometers with flight durations of 10 to 20 hours using a ∼311,500 cubic meter, zero pressure balloon. HASP provides all student payloads with power, downlink telemetry, uplink commanding, and real-time HD video for instrument control and assessment during the flight. While originally developed for university students, these programs have been adapted to projects focused on high school teachers as well as affecting minorities underrepresented in aerospace related science and engineering fields. We are now in the process of adapting the LaACES materials to a pre-engineering curriculum for high school students as well as for widespread access over the internet. During this presentation, we will provide details of both the LaACES and HASP programs, how these programs have engaged participants from all demographic groups, and our current plans for continuing and expanding upon our success.

University↗

Planetary Balloon-Based Science Platform Evaluation and Program Implementation

This report describes a study evaluating the potential for a balloon-based optical telescope as a planetary science asset to achieve decadal class science. The study considered potential science achievable and science traceability relative to the most recent planetary science decadal survey, potential platform features, and demonstration flights in the evaluation process. Science Potential and Benefits: This study confirms the cost the-benefit value for planetary science purposes. Forty-four (44) important questions of the decadal survey are at least partially addressable through balloon based capabilities. Planetary science through balloon observations can provide significant science through observations in the 300 nm to 5 m range and at longer wavelengths as well. Additionally, balloon missions have demonstrated the ability to progress from concept to observation to publication much faster than a space mission increasing the speed of science return. Planetary science from a balloon-borne platform is a relatively low-cost approach to new science measurements. This is particularly relevant within a cost-constrained planetary science budget. Repeated flights further reduce the cost of the per unit science data. Such flights offer observing time at a very competitive cost. Another advantage for planetary scientists is that a dedicated asset could provide significant new viewing opportunities not possible from the ground and allow unprecedented access to observations that cannot be realized with the time allocation pressures faced by current observing assets. In addition, flight systems that have a relatively short life cycle and where hardware is generally recovered, are excellent opportunities to train early career scientists, engineers, and project managers. The fact that balloon-borne payloads, unlike space missions, are generally recovered offers an excellent tool to test and mature instruments and other space craft systems. Desired Gondola Features: Potential gondola characteristics are assessed in this study and a concept is recommended, the Gondola for High-Altitude Planetary Science (GHAPS). This first generation platform is designed around a 1 m or larger aperture, narrow-field telescope with pointing accuracies better than one arc-second. A classical Cassegrain, or variant like Ritchey-Chretien, telescope is recommended for the primary telescope. The gondola should be designed for multiple flights so it must be robust and readily processed at recovery. It must be light-weighted to the extent possible to allow for long-duration flights on super-pressure balloons. Demonstration Flights: Recent demonstration flights achieved several significant accomplishments that can feed forward to a GHAPS gondola project. Science results included the first ever Earth-based measurements for CO2 in a comet, first measurements for CO2 and H2O in an Oort cloud comet, and the first measurement of 1 Ceres at 2.73 m to refine the shape of the infrared water absorption feature. The performance of the Fine Steering Mirror (FSM) was also demonstrated. The BOPPS platform can continue to be leveraged on future flights even as GHAPS is being developed. The study affirms the planetary decadal recommendations, and shows that a number of Top Priority science questions can be achieved. A combination GHAPS and BOPPS would provide the best value for PSD for realizing that science.

Dankanich, John W.↗

Data Analysis & Statistical Methods for Command File Errors

This paper explains current work on modeling for managing the risk of command file errors. It is focused on analyzing actual data from a JPL spaceflight mission to build models for evaluating and predicting error rates as a function of several key variables. We constructed a rich dataset by considering the number of errors, the number of files radiated, including the number commands and blocks in each file, as well as subjective estimates of workload and operational novelty. We have assessed these data using different curve fitting and distribution fitting techniques, such as multiple regression analysis, and maximum likelihood estimation to see how much of the variability in the error rates can be explained with these. We have also used goodness of fit testing strategies and principal component analysis to further assess our data. Finally, we constructed a model of expected error rates based on the what these statistics bore out as critical drivers to the error rate. This model allows project management to evaluate the error rate against a theoretically expected rate as well as anticipate future error rates.

Correlation Analysis↗