Search NASA⌕ Search

SEARCH · Search NASA

Results for “Resource scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,027 records · Page 57

Guide to Operating and Maintaining EnergySmart Schools

Through a commitment to high performance, school districts are discovering that smart energy choices can create lasting benefits for students, communities, and the environment. For example, an energy efficient school district with 4,000 students can save as much as $160,000 a year in energy costs. Over 10 years, those savings can reach $1.6 million, translating into the ability to hire more teachers, purchase more textbooks and computers, or invest in additional high performance facilities. Beyond these bottomline benefits, schools can better foster student health, decrease absenteeism, and serve as centers of community life. The U.S. Department of Energy's EnergySmart Schools Program promotes a 30 percent improvement in existing school energy use. It also encourages the building of new schools that exceed code (ASHRAE 90.11999) by 50 percent or more. The program provides resources like this Guide to Operating and Maintaining EnergySmart Schools to assist school decisionmakers in planning, financing, operating, and maintaining energy efficient, high performance schools. It also offers education and training for building industry professionals. Operations and maintenance refer to all scheduled and unscheduled actions for preventing equipment failure or decline with the goal of increasing efficiency, reliability, and safety. A preventative maintenance program is the organized and planned performance of maintenance activities in order to prevent system or production problems or failures from occurring. In contrast, deferred maintenance or reactive maintenance (also called diagnostic or corrective maintenance) is conducted to address an existing problem. This guide is a primary resource for developing and implementing a districtor schoolwide operations and maintenance (O&M) program that focuses on energy efficiency. The EnergySmart Schools Solutions companion CD contains additional supporting information for design, renovation, and retrofit projects. The objective of this guide is to provide organizational and technical information for integrating energy and high performance facility management into existing O&M practices. The guide allows users to adapt and implement suggested O&M strategies to address specific energy efficiency goals. It recognizes and expands on existing tools and resources that are widely used throughout the high performance school industry. External resources are referenced throughout the guide and are also listed within the EnergySmart Schools O&M Resource List (Appendix J). While this guide emphasizes the impact of the energy efficiency component of O&M, it encourages taking a holistic approach to maintaining a high-performance school. This includes considering various environmental factors where energy plays an indirect or direct role. For example, indoor air quality, site selection, building orientation, and water efficiency should be considered. Resources to support these overlapping aspects will be cited throughout the guide.

54 ENVIRONMENTAL SCIENCES↗

An Integrated Paradigm for the Management of Delivery Risk in Electricity Markets: From Batteries to Insurance and Beyond [Slides]

In wholesale electricity markets today, flexibility from a limited number of distributed energy resources (DERs) is offered daily, and the value of flexibility is not yet recognized for economic hedging of delivery risk. Under a three-year project funded by the ARPA-E PERFORM program, a collaborative team is working towards developing an integrated risk management framework that will leverage flexibility from distributed and bulk resources to cost-effectively and reliably manage delivery risk of intermittent resources. Two concepts are at the core of the proposed integrated risk management framework: (A) flexibility options, which are a novel type of options and enable wholesale electricity market participants to hedge uncertainty by buying flexibility. (B) DER flexibility scores, which provide a way for utilities or aggregators to classify assets in groups with different likelihood of delivering contracted flexibility. This report presentation will focus on the proposed ISO-product "flexibility options," which is complementary to ramp and other products being introduced by ISOs/RTOs to manage net load uncertainties. Participating resources with imbalance risk can buy flexibility options to hedge their production, whereas grid-connected resources that can provide physical flexibility can offer flexibility options. We will present basics of the formulation for a day-ahead ISO market that matches buyers and sellers of this hedge in coordination with existing capabilities to schedule energy and ancillary services, and outline how their settlements mitigate the impact of imbalance risk.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Development and Application of a Risk Analysis Toolkit for Plant Resources Optimization

This report summarizes the R&D activities of the Risk Informed Asset Management (RIAM) project during fiscal year 2020 (FY20). This project focuses on the development of methods designed to optimize plant operations (e.g., maintenance/replacement schedule, optimal maintenance posture) provided system/component health/cost data. This project development lives in cooperation with the Plant Health Management (PHM) project which focuses on the development of methods that integrate component health data and propagate such information at the system level to evaluate most relevant sources of risk. This year’s activities for the RIAM project focused on the continuation of schedule optimization algorithms developed in FY19. While in FY19 we focused on both deterministic and stochastic capital budgeting methods, in FY20 we moved forward by implementing two versions of schedule optimization methods. The first one reformulates the capital budgeting problem in a distributionally robust form which allows the user to rely on data directly rather than proposing a distribution from the data itself. The second version reformulates the capital budgeting explicitly using risk measures as variables to maximize/minimize. Lastly, we focused on the development of methods designed to identify the optimal maintenance posture based on the Pareto Frontier analysis. Rather than performing a tradeoff analysis (i.e., identify the absolute best posture), the Pareto Frontier analysis performs a trade space exploration approach (i.e., identify value and costs of several postures and have the analyst perform the task of imposing desired value and cost constraints). This is performed by identifying maintenance postures that maximize value (e.g., system availability) and minimize operational costs, i.e., the Pareto frontier in a value-cost trade space.

97 MATHEMATICS AND COMPUTING↗

A Non-Cooperative Game-Based Distributed Beam Scheduling Framework for 5G Millimeter-Wave Cellular Networks

Here, this paper studies the problem of distributed beam scheduling for 5G millimeter-Wave (mm-Wave) cellular networks where base stations (BSs) belonging to different operators share the same spectrum without centralized coordination among them. Our goal is to design efficient distributed scheduling algorithms to maximize the network utility, which is a function of the achieved throughput by the user equipment (UEs), subject to the average and instantaneous power consumption constraints of the BSs. We propose a Media Access Control (MAC) and a power allocation/adaptation mechanism utilizing the Lyapunov stochastic optimization framework and non-cooperative games. In particular, we first decompose the original utility maximization problem into two sub-optimization problems for each time frame, which are a convex optimization problem and a non-convex optimization problem, respectively. By formulating the distributed scheduling problem as a non-cooperative game where each BS is a player attempting to optimize its own utility, we provide a distributed solution to the non-convex sub-optimization problem via finding the Nash Equilibrium (NE) of the game whose weights are determined optimally by the Lyapunov optimization framework. Finally, we conduct simulation under various network settings to show the effectiveness of the proposed game-based beam scheduling algorithm in comparison to that of several reference schemes.

42 ENGINEERING↗

Airport Risk Assessment Model (ARAM)

The Airport Risk Assessment Model (ARAM) model automatically determines the optimal allocation of limited security resources to minimize total risk to the airport. At the same time, the model adds an element of randomness to the, reducing the predictability of asset schedules and further increasing countermeasure effectiveness.

Brigantic, Robert↗

Partnership For Edge Physics Simulation

In this effort, we will extend our prior work as part of CPES (i.e., DART and DataSpaces) to support in-situ tight coupling between application codes that exploits data locality and core-level parallelism to maximize on-chip data exchange and reuse. This will be accomplished by mapping coupled simulations so that the data exchanges are more localized within the nodes. Coupled simulation workflows can more effectively utilize the resources available on emerging HEC platforms if they can be mapped and executed to exploit data locality as well as the communication patterns between application components. Scheduling and running such workflows requires an extended framework that should provide a unified hybrid abstraction to enable coordination and data sharing across computation tasks that run on the heterogeneous multi-core-based systems, and develop a data-locality based dynamic tasks scheduling approach to increase on-chip or intra-node data exchanges and in-situ execution. This effort will extend our prior work as part of CPES (i.e., DART and DataSpaces), which provided a simple virtual shared-space abstraction hosted at the staging nodes, to support application coordination, data sharing and active data processing services. Moreover, it will transparently manage the low-level operations associated with the inter-application data exchange, such as data redistributions, and will enable running coupled simulation workflow on multi-cores computing platforms.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Automatic Imagery Data Analysis for Proactive Computer-Based Workflow Management during Nuclear Power Plant Outages

This report is being submitted for the task “Final Report” of DOE NEUP Project 15-8121 “Automatic Imagery Data Analysis for Proactive Computer-Based Workflow Management during Nuclear Power Plant Outages.” Typical nuclear power plant (NPP) outages always involve thousands of maintenance and refueling activities and a large number of workers in limited workspaces, while having tight schedules and zero-tolerance for accidents. During an outage, thousands of workers will be working in various workspaces across the NPP. High outage costs and expensive delays (approximately 1.5 million dollars of loss per day of delay) in NPP maintenance demand tight outage schedules. In packed workspaces, an automatic system that monitors human behaviors in real-time and provides insights about current and pending schedule deviations from the plan is critical for ensuring: 1) effective collaboration among workers and worker teams from different trades; 2) less waste of time and resources due to the lack of situational awareness; and 3) proactive outage project control. The overall goal of this project is to test the hypothesis that real-time imagery-based object tracking and spatial analysis, as well as human behavior modeling of outage participants, will significantly improve the efficiency of outage control while lowering the rates of accidents and incidents. Three objectives of this project are: 1) Establish real-time object tracking and spatiotemporal analysis methods that automatically assess the productivity of field activities and detect anomalous spatiotemporal relationships among activities that cause inefficiencies and risks; 2) Establish realtime human tracking and human factor modeling methods for automatically diagnosing unexpected actions of and interactions between outage participants, those which cause inefficient collaborations between Advanced Outage Control Center (AOCC), satellite outage centers, NPP workers, and maintenance service providers; and 3) Test the proposed automated object tracking, human behavior modeling, and spatiotemporal analysis methods in outage control case studies in order to characterize the effectiveness of automated imagery-data-driven methods in proactively improving the efficiency and safety of workflows in outage coordination and risk management. Recent studies of detailed human behavior monitoring on construction sites have examined the potential of applying advanced computer vision algorithms in detecting and tracking anomalous workers (i.e., workers who do not wear hard hats or safety vests) for ensuring job site safety. Some studies of human factor studies revealed the importance of modeling detailed interactions between individuals within and across teams in better understanding the impact of human in proactive project control. Other studies in the construction domain have developed computational simulation frameworks that formalize detailed spatiotemporal interactions between tasks in order to simulate the impacts of individual tasks on the performance of workflows. While integrated analyses that combine human factor assessment, as well as image processing and simulation, are in demand for effective decision-making, limited studies have examined the potential of such integrated analyses in NPP outage control. This research project has examined an automatic outage monitoring and control system that integrates human factor analysis, computer vision techniques, and simulation methods in order to enable engineers to better understand the interactions between humans, resources, and workflows during outage processes. The project aims at providing NPP maintenance agencies insights into more efficient use of limited resources in extending the life of a nuclear plant, as well as reducing waste while ensuring sufficient generation of electricity. This study is significant for the safety of nuclear plants, sustainable electricity generation for livable communities, and cost savings for maintaining electricity infrastructures in the United States.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Beneficial uses of space

The study elicited over 100 ideas for Space Processing. Of the elicited ideas, more than 20% involved processing of biologicals, or related medical and life sciences applications. Among these were High Purity Separation of Isoenzymes, and Development of Biorhythms applications data. Program planning for four products is outlined. Experimentation and testing resulted in definition of nearly 70 series of tests in ground-based laboratories, sounding rockets, etc., and space shuttle. Development schedules established timing and interrelationships of decisions involved in carrying these products to the point of production. The potential profitability of the four products is determined. Resources needed to achieve full scale production included use of shuttle for transportation, for which cost apportionment model was developed. R and D resources for the four products totalled $46,000,000 with Isoenzymes requiring the smallest expenditure, $4,000,000. A computerized profitability model (INVEST) was used to determine the measures of profitability of each product. Results build confidence that there will be a payoff.

Bloom, H. L.↗

C++ Planning and Resource Reasoning (PARR) shell

This paper describes a generic, C++ version of the Planning and Resource Reasoning (PARR) shell which has been developed to supersede the C-based versions of PARR that are currently used to support AI planning and scheduling applications in flight operations centers at Goddard Space Flight Center. This new object-oriented version of PARR can be more easily customized to build a variety of planning and scheduling applications, and C++ PARR applications can be more easily ported to different environments. Genetic classes, constraints, strategies, and paradigms are described along with two types of PARR interfaces.

Mcintyre, James↗

Demand access communications for TDRSS users

The Tracking and Data Relay Satellite System (TDRSS) has long been used to provide reliable low and high-data rate relay services between user spacecraft in Earth orbit and the ground. To date, these TDRSS services have been implemented via prior scheduling based upon estimates of user needs and mission event timelines. While this approach may be necessary for large users that require greater amounts of TDRSS resources, TDRSS can potentially offer the planned community of smaller science missions (e.g., the small explorer missions), and other emerging users, the unique opportunity for services on demand. In particular, innovative application of the existing TDRSS Multiple Access (MA) subsystem, with its phased array antenna, could be used to implement true demand access services without modification to either the TDRSS satellites or the user transponder, thereby introducing operational and performance benefits to both the user community and the Space Network. In this paper, candidate implementations of demand access service via the TDRSS MA subsystem are examined in detail. Both forward and return link services are addressed and a combination of qualitative and quantitative assessments are provided. The paper also identifies further areas for investigation in this ongoing activity that is being conducted by GSFC/Code 531 under the NASA Code O Advanced Systems Program.

Zillig, David↗

Performance as Promised: How the Chandra X-ray Observatory Accomplished One of Nasa's Most Challenging Missions for Billions of Dollars Less than Originally Planned

As the nation looks toward bold new ventures in space, the Chandra X-ray Observatory program offers an example of how billion-dollar missions can be successfully developed within tightening fiscal constraints. Chandra experienced many of challenges facing bold space programs (state-of-the-art technical requirements and budget-induced slips and restructurings), and yet the Chandra team achieved nearly all the originally envisioned performance for dramatically lower cost. This was accomplished by a combination of team- work, systems engineering, advanced technology insertion, and effective approaches for program implementation. A thorough tradeoff of science utility vs. cost led to the selection of a highly elliptical orbit with uncrewed robotic delivery, deployment, and maintenance. Progressive, focused technology demonstrations were accomplished prior to commitment of major resources to critical elements of the system design, such as the high resolution mirror assembly (HRMA). Pathfinder hardware was developed to reduce risks. A variety of schedule risk reduction measures were implemented and resulted in the X-ray calibration taking place exactly within five days of its originally planned date after after five years of development. The team worked together in an effective manner to contain requirements creep. reductions such as the ACIS-2 chip device. It is estimated that the above combination of measures achieved the avoidance of over $4B in costs, while enabling a highly successful mission.

Davidson, Greg↗

Developing a Business Intelligence Process for a Training Module in SharePoint 2010

Prior to this project, training information for the employees of the National Center for Critical Processing and Storage (NCCIPS) was stored in an array of unrelated spreadsheets and SharePoint lists that had to be manually updated. By developing a content management system through a web application platform named SharePoint, this training system is now highly automated and provides a much less intensive method of storing training data and scheduling training courses. This system was developed by using SharePoint Designer and laying out the data structure for the interaction between different lists of data about the employees. The automation of data population inside of the lists was accomplished by implementing SharePoint workflows which essentially lay out the logic for how data is connected and calculated between certain lists. The resulting training system is constructed from a combination of five lists of data with a single list acting as the user-friendly interface. This interface is populated with the courses required for each employee and includes past and future information about course requirements. The employees of NCCIPS now have the ability to view, log, and schedule their training information and courses with much more ease. This system will relieve a significant amount of manual input and serve as a powerful informational resource for the employees of NCCIPS in the future.

Schmidtchen, Bryce↗

Parallel Asynchronous Distributed-Memory Maximal Independent Set Algorithm with Work Ordering

The maximal independent set (MIS) graph problem arises in many applications such as computer vision, information theory, molecular biology, and process scheduling. The growing scale of graph data suggests the use of distributed memory hardware as a cost-effective approach to providing necessary compute and memory resources. Existing distributed memory parallel MIS algorithms rely on synchronous communication and use techniques such as subgraph computations. In this paper, we present an asynchronous distributed-memory parallel graph algorithm that relies on a virtual directed acyclic graph (DAG) that is created during the algorithm execution. We introduce two additional algorithms that save computations by ordering generated work. The first algorithm applies ordering globally to reduce computations, and the second algorithm applies ordering locally at the level of threads to minimize the synchronization overhead. We use two different implementations of Luby’s algorithm variants as baseline to compare the performance of the presented algorithms: (1) vertex-centric Luby A and Luby B implementations, and (2) the CombBLAS linear-algebra Luby A implementation. Results show that proposed algorithms outperform both implementations of Luby algorithms, especially in distributed execution. Furthermore, we show that for low-diameter graphs the algorithm that applies global ordering scales better than other algorithms and for high diameter graphs the original asynchronous algorithm and thread-level ordering algorithm show better performance.

maximal independent set (MIS), distributed memory ↗

Advance Network Reservation and Provisioning for Science

We are witnessing a new era that offers new opportunities to conduct scientific research with the help of recent advancements in computational and storage technologies. Computational intensive science spans multiple scientific domains, such as particle physics, climate modeling, and bio-informatics simulations. These large-scale applications necessitate collaborators to access very large data sets resulting from simulations performed in geographically distributed institutions. Furthermore, often scientific experimental facilities generate massive data sets that need to be transferred to validate the simulation data in remote collaborating sites. A major component needed to support these needs is the communication infrastructure which enables high performance visualization, large volume data analysis, and also provides access to computational resources. In order to provide high-speed on-demand data access between collaborating institutions, national governments support next generation research networks such as Internet 2 and ESnet (Energy Sciences Network). Delivering network-as-a-service that provides predictable performance, efficient resource utilization and better coordination between compute and storage resources is highly desirable. In this paper, we study network provisioning and advanced bandwidth reservation in ESnet for on-demand high performance data transfers. We present a novel approach for path finding in time-dependent transport networks with bandwidth guarantees. We plan to improve the current ESnet advance network reservation system, OSCARS [3], by presenting to the clients, the possible reservation options and alternatives for earliest completion time and shortest transfer duration. The Energy Sciences Network (ESnet) provides high bandwidth connections between research laboratories and academic institutions for data sharing and video/voice communication. The ESnet On-Demand Secure Circuits and Advance Reservation System (OSCARS) establishes guaranteed bandwidth of secure virtual circuits at a certain time, for a certain bandwidth and length of time. Though OSCARS operates within the ESnet, it also supplies end-to-end provisioning between multiple autonomous network domains. OSCARS gets reservation requests through a standard web service interface, and conducts a Quality-of-service (QoS) path for bandwidth guarantees. Multi-protocol Label Switching (MPLS) and the Resource Reservation Protocol (RSVP) enable to create a virtual circuit using Label Switched Paths (LSP's). It contains three main components: a reservation manager, a bandwidth scheduler, and a path setup subsystem. The bandwidth scheduler needs to have information about the current and future states of the network topology in order to accomplish end-to-end bandwidth guaranteed paths.

97 MATHEMATICS AND COMPUTING↗

Distributed Generation Cost-Benefit and Ratemaking Considerations for Idaho

This memo was completed through the Grid Modernization Laboratory Consortium (GMLC), a strategic partnership between the U.S. Department of Energy (DOE) and the national laboratories to bring together leading experts, technologies, and resources to collaborate on the goal of modernizing the nation’s grid. The GMLC was established as part of the DOE Grid Modernization Initiative to accelerate the development of technology, modeling analysis, tools, and frameworks to help enable grid modernization. Special thanks to DOE project leads, Larry Mansueti and Elaine Ulrich, and the laboratory project lead for this effort, Peter Cappers from Lawrence Berkeley National Laboratory (LBNL). The Idaho Public Utility Commission (IPUC) Staff requested this technical assistance to improve their understanding of the emerging, complex, and consequential issues around distributed energy resource (DER) rate design to help the staff achieve its goal of making a fair, just, and reasonable rate design recommendation with respect to Order 34147 under Case No. IPC-E-17-13. 2 PNNL-28285 In Case No. IPC-E-17-13, Idaho Power requested authorization from the IPUC to establish new rate schedules for residential and small general service customers with on-site generation. The IPUC’s Order No. 34046 of May 9, 2018 authorized Idaho Power to (IPUC 2018a): Close Schedule 84 and create Schedule 6 for residential on-site generators and Schedule 8 for small general service on-site generators; Acknowledge smart inverter technology; Make proposed revisions to interconnection Schedule 72; Open an Idaho Power-specific docket to “to comprehensively study the costs and benefits of on-site generation on Idaho Power’s system, as well as proper rates and rate design, transitional rates, and related issues of compensation for net excess energy provided as a resource” to Idaho Power; File a study with the IPUC “exploring fixed-cost recovery in basic charges and other rate design options prior to its next general rate case.”

24 POWER TRANSMISSION AND DISTRIBUTION↗

IMPACT, a Tool Suite for Crew Health and Performance System Trade Analyses and Decision Support - Status of Development

Mission planners, systems engineers, and clinicians that support crew health and performance face very difficult choices on upcoming exploration missions. Given that there will be a heavily constrained mass and volume allocation for a medical system on these missions, what medical capability should be manifested to minimize both medical risk and mission risk? Given that not all promising research and technology proposals can be funded, how can proposals be prioritized so that those funded research investments produce the maximum benefit in reducing overall medical risk? The Informing Mission Planning via Analysis of Complex Tradespaces (IMPACT) project seeks to answer these kinds of questions and others to support upcoming exploration missions. IMPACT enables risk-informed and evidence-based trade space analysis for future space vehicles, missions, and systems. This presentation will discuss the long-term HRP and ExMC vision for the larger ecosystem of tools, which include an updated medical database, consisting of an Evidence Library for medical conditions and a medical item database (MedID) for medical resources, dynamic Probabilistic Risk Assessment (PRA) capabilities, System Modeling Language (SysML) models, and contextual data visualizations of output data. IMPACT is the result of a multi-center collaborative effort. The trade space analyses performed by IMPACT can directly inform mission, vehicle, and habitat development by quantifying medical risk, given a design reference mission, crew attributes and a set of medical capabilities. This presentation will update the audience on the development status of the tool suite as it nears its System Acceptance Review (SAR). It will review IMPACT’s constituent parts, briefly discuss typical outputs and outline the plans for transitioning to operations, currently scheduled for later in FY23. Recent development successes on the IMPACT project include the integration of the Medical Extensible Dynamic Probabilistic Risk Assessment Tool (MEDPRAT) v2.0 to accommodate segmented missions with multiple carriers and medical systems, full onboarding of the IMPACT Medical Database (IMPACT-MD), clustering medical resources and skills into medical capabilities and mutually-dependent bundles, and the ability to perform trade analyses on different medical sets, different design reference missions (DRM), with different crew complements and extra-vehicular activity (EVA) schedule.

IMPACT↗

Mission Operations, Cubed: NASA Marshall Operations Support for SmallSats

SmallSats have come a long way since the Huntsville Operations Support Center (HOSC) at NASA’s Marshall Space Flight Center supported its first “minisatellite” mission in 2010. And just as SmallSats themselves have evolved in those 12 years, so too has the HOSC’s mission support for SmallSats. Marshall Space Flight Center has a long history with payload and mission operations, including support for the Apollo missions to the moon, the Space Shuttle program, and 21 years of continuous around-the-clock science operations support for research aboard the International Space Station. Today, the HOSC is a multi-tenant facility, supporting not only ISS, but also NASA’s Commercial Crew program, the Space Launch System, the Hubble and Chandra observatories and others – including multiple SmallSat missions. Two SmallSat solar sail missions will be among those taking advantage of the HOSC’s resources for planning, training for and executing mission operations – the Near Earth Asteroid (NEA) Scout and Solar Cruiser missions. One of 10 6U CubeSats manifest on the Artemis I launch of NASA’s Space Launch System rocket this year, NEA Scout’s three-year mission will be supported through a more traditional operations concept, with a dedicated Flight Controller staff operating within the HOSC. Scheduled to launch as part of the Interstellar Mapping and Acceleration Probe (IMAP) in February 2025, Solar Cruiser’s 11-month mission will take a next-generation approach to operations by utilizing a multi-mission flight controller concept, as well as Marshall’s Telescience Resource Kit (TreK). TreK provides a suite of software applications and libraries that allow the Mission Operations Center to serve as an in-house ground system which incorporates remote and automation capability options for engineers and scientists. This presentation will compare the approaches the HOSC will use to support these two missions as a way of demonstrating the array of options NASA MSFC offers for operations support for CubeSat and SmallSat missions.

Darren S Wallace↗

Distributed-Memory Fast Maximal Independent Set

The Maximal Independent Set (MIS) graph problem arises in many applications such as computer vision, information theory, molecular biology, and process scheduling. The growing scale of MIS problems suggests the use of distributed-memory hardware as a cost-effective approach to providing necessary compute and memory resources. Luby proposed four randomized algorithms to solve the MIS problem. All those algorithms are designed focusing on shared-memory machines and are analyzed using the PRAM model. These algorithms do not have direct efficient distributed-memory implementations. In this paper, we extend two of Luby’s seminal MIS algorithms, “Luby(A)” and “Luby(B),” to distributed-memory execution, and we evaluate their performance. We compare our results with the “Filtered MIS” implementation in the Combinatorial BLAS library for two types of synthetic graph inputs.

distributed memory parallel↗