Search NASA⌕ Search

SEARCH · Search NASA

Results for “basic operational controller”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

1,010 records · Page 57

Technical Performance and Cost Optimization of Unobtrusive Multi-static Serial LiDAR Imager (UMSLI) for Wide-area Surveillance and Identification of Marine Life at Marine Energy Installations

Florida Atlantic University developed an underwater optical monitoring system prototype - Unobtrusive Multi-static Serial LiDAR Imager (UMSLI) - suitable for marine energy full project lifecycle observation (baseline, commissioning, and decommissioning), with an automated real-time classification of marine animals. With precursor 2014 DOE funding (award DE-EE0006787), a prototype UMSLI was demonstrated in a controlled laboratory environment and achieved a TRL 6. This EERE DE-EE0007828 award aimed to both increase the TRL of the UMSLI by improving the technology performance (e.g., increase distance of marine animal target detection capability, add additional species classification capabilities, improve the system performance during the day, etc.) and reduce the cost. The UMSLI presents a novel application of underwater distributed Light Detection And Ranging (LiDAR), an advanced remote sensing method that uses light in the form of laser pulses for an application, this paired with an algorithm provides 360 degrees underwater detection, imaging, and classification of marine life. This solution for underwater monitoring of biota preserves the advantages of traditional optical and acoustic solutions while overcoming many associated disadvantages for marine energy site environmental monitoring, such as difficulties in species detection and classification in low light or night and turbid environments. This new approach is a purposefully designed, reconfigurable adaptation of an existing class 3B laser technology into one UMSLI instrument that can be easily mounted on or around different classes of marine energy equipment, such as devices to capture ocean current energy or wave energy. The system uses relatively low average power, utilizes far-red (> 635nm) laser illumination to be invisible and eye-safe to marine animals, is compact, and cost-effective. The equipment is designed for long-term, maintenance-free operations (i.e., current design is targeting more than 7 days continuous operation), to inherently generate a sparse primary dataset that only includes detected anomalies, and to allow robust real-time automated animal classification and identification with a low data bandwidth requirement. The technology’s overarching goal for application, is a system that can be deployed to collect pre-installation baseline species observations at a proposed marine energy deployment site with minimal post-processing overhead. The envisioned system will also produce high-resolution imagery of marine animals through a wide range of conditions and support automated tracking and notification of the presence of managed animals within established perimeters of marine energy equipment to satisfy deployed marine energy projects’ endangered and threatened species monitoring requirements. Through the current project, we demonstrated the UMSLI prototype in an operational environment and increased the UMSLI’s Technology Readiness Level from 6 to 7. The project resulted in many novel technologies, including: 1) an eye-safe red laser based, low-cost LiDAR system that can detect targets up to 10 meters distance; 2) the GAN-based machine learning underwater LiDAR image enhancement technique (this is the first known application of GAN technique in underwater LiDAR); 3) LiDAR-based real-time automated detection capabilities; and 4) a template matching based automated classification tool. These technologies build a solid foundation for future efforts to develop an extended range electro-optical monitoring system suitable for marine energy deployments. In addition to technology development, a key lesson learned is that addressing regulatory and safety requirements must be front and center in any marine energy monitoring applications.

16 TIDAL AND WAVE POWER↗

Remote Technology to Retrieve Waste Below the 324 Building at the Hanford Site - 19622

The Waste Technology Engineering Laboratory (324 Building) is a Category 2 Nuclear Facility at Hanford. The 324 Building Disposition Project is responsible for the removal and remedial actions under CERCLA. Additionally, there are RCRA Dangerous Waste Management Units which the CERCLA actions are presumed to satisfy. The Radiochemical Engineering Complex (REC) is a group of four hot cells (A, B, C and D Cells) with an interconnecting airlock inside of the 324 Building. Underneath the REC B-Cell are contaminated soils that have an estimated 12,793 R/Hr dose rate and remediation is under CERCLA 300-FF-2 Operable Unit. The current action consists of debris removal from the floor of B-Cell, B-Cell floor removal, and excavation of the soils beneath the floor to a depth of up to twelve feet with four Remote Excavator Arms (REA). This paper provides insight into the preparation and performance of high tolerance core drilling into a hot cell complex. Installation of the REA Through Support (REA TS) mechanism through the 4'-6' concrete shield walls is a complex series of tasks with demanding tolerances at each of four locations around the perimeter of B-Cell. The use of training mock ups was included in the completion of this work. The REA TS is two 11 inch diameter high strength steel sleeves that have expandable collars at each end allowing the interstitial space between the outside of the sleeve and inside of the core drill to be grouted to form a substantial structural connection, and a 10 inch pipe with hydraulic hoses to power the REA. There are three cores required for each REA location. The REAs themselves are customized excavator arms, mounted on support columns to be used in the excavation and transfer of the contaminated soil into storage facilities. The tasks for the installation of the REA TSs are: 1) Characterization of B-Cell Cubicles. 2) Embedded Pipe Fill. 3) Interference Removal. a. Internal Walls, b. External Walls. 4) Core Drilling. 5) Go/No-Go gauge, and video inspection. 6) Installation of REA Through Support Assembly. The 324 Building REC Hot Cells have internal, external, and embedded utilities throughout the shield walls in conflict with the REA TS locations. Some of the embedded utilities have connection points inside of the B-Cell Cubicles. There were two separate issues at the conflicted locations. The first issue was the core drill cooling water would flow along the embedded utility potentially spreading legacy chemical and radiological contamination to areas of the facility that was unwanted. The second issue was that the REA TS required a substantial structural connection to the B-Cell wall, the cored diameter is larger than the REA TS and these interstitial areas required a full grouted connection. The embedded utilities posed a hazard that if unfilled, the interstitial grout would flow into the embedded utility and destabilize the required grouted structural connection. The B-Cell Cubicles had not been opened in over 10 years. A mockup was completed to install a glovebag over the cubicle opening and then to verify functionality and port requirements. The embedded utility pipe connections in the cubicles were then opened inside a glovebag to verify the correct connection points, connection method for future embedded pipe fill material delivery system, radiological characterization, and air flow to show that the embedded utility pipes were not blocked and would not pressurize. The embedded pipe fill material and grout system was mocked up and run several times to verify methodology and functionality. The B-Cell Cubicles were then reentered and the embedded utility pipe fill was completed using a hand pump. External interferences at the core drill locations were removed using standard interference removal techniques. Internal interferences at the core drill locations were removed using a remote cutting tool that was controlled through the use of the B-Cell crane, remote cameras and remote lighting. The core drilling was mocked up two separate times, the project's purpose built 'Mock Up Facility' was core drilled to verify tolerances and methodology prior to subcontract award, the core drill subcontractor built a 'dummy wall' to train and practice on achieving the demanding tolerances, coordinated alignments between the cores, short term and long term dose shielding techniques, and contamination control techniques. A core drill template, and additional anchoring techniques were used to maximize accuracy and precision of the REA TS core drills. A 'Go/No-Go' gauge was built and installed at each of the four REA TS locations to verify that the core drill met tolerances. The core drill locations were visually inspected using a boroscope. The REA TS installation was mocked up at the projects 'Mock Up Facility' beginning with basic hazard controls, then with intermediate hazard controls, and finally with full occupational safety, industrial hygiene, and radiological controls. The REA TSs were installed and grouted into place. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗