Search NASA⌕ Search

SEARCH · Search NASA

Results for “building technologies program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,027 records · Page 57

Refueling infrastructure planning in intercity networks considering route choice and travel time delay for mixed fleet of electric and conventional vehicles

The range anxiety has been a major factor that affects the market acceptance of electric vehicles. Even with the recent development of battery technologies, a lack of charging stations and range anxiety are still significant concerns, specifically for intercity trips. This calls for more investments in building charging stations and advancing battery technologies to increase the market share of electric vehicles and improve sustainability. This study suggests a configuration for plug-in electric vehicle charging infrastructure to support long-distance intercity trips of electric vehicles at the network level. A model is proposed to minimize the total system cost including infrastructure investment (building charging stations/spots) and travel time delays (charging time, waiting time in the queue, and detour time to access charging stations). This study fills existing gaps in the literature by capturing realistic patterns of travel demand and considering flow-dependent charging delays at charging stations. Furthermore, the proposed model, which is formulated as a mixed-integer program with nonlinear constraints, solves the optimization problem at the network level. At the network level, impacts of charging station locations on the traffic assignment problem with a mixed fleet of electric and conventional vehicles need to be considered. To this end, a traffic assignment module is integrated with a simulated annealing algorithm. The numerical experiments show a satisfactory application of the model for a full-scale case study (intercity network in Michigan). The solution quality and efficiency of the proposed solution algorithm are evaluated against those of an enumeration approach for a small case study. The results suggest that even for the current market share and charging stations’ setting, a significant investment is needed to support intercity trips without range anxiety issues and with acceptable delays. Additionally, through sensitivity analyses, the required infrastructure and battery investments to support intercity trips with acceptable delays are established for hypothetical increased market shares and battery size in the future.

42 ENGINEERING↗

Energy information systems (EIS): Technology costs, benefit, and best practice uses

Energy information systems are the web-based software, data acquisition hardware, and communication systems used to store, analyze, and display building energy data. They often include analysis methods such as baselining, benchmarking, load profiling, and energy anomaly detection. This report documents a large-scale assessment of energy information system (EIS) uses, costs, and energy benefits, based on a series of focused case study investigations that are synthesized into generalizable findings. The overall objective is to provide organizational decision makers with the information they need to make informed choices as to whether or not to invest in an EIS--a promising technology that can enable up to 20 percent site energy savings, quick payback, and persistent low-energy performance when implemented as part of best-practice energy management programs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Certification and Rating of Attachments for Fenestration Technologies

In the U.S., windows still represent a significant energy savings opportunity in residential and commercial buildings, and for decades the United States Department of Energy (DOE) has funded fenestration software tools, analysis, studies, and the National Fenestration Rating Council (NFRC). Despite significant developments in window technology and recognition of efficient products, studies conducted by the U.S. Energy Information Administration and Pacific Northwest National Laboratory (PNNL) found that approximately 64% of U.S. homes currently have inefficient windows. Window attachments (interior and exterior blinds, shades, storm windows, awnings, shutters, etc.) can offer a more cost-effective option to improve the energy performance of residential and commercial windows. In previous years, the window attachment industry attempted to work with the NFRC to generate a window attachment rating program, but was unable to access funding or technical resources necessary to address window attachments, which added many levels of complexity on top of NFRC’s scope of windows and glazing. Starting in 2014, the DOE Office of Energy Efficiency and Renewable Energy (EERE) funded the Window Coverings Manufacturing Association (WCMA) to develop the Attachments Energy Rating Council (AERC) along with policies and procedures to deliver an unbiased, credible, comparable, relevant, and cost-effective window attachment energy rating program for the residential and commercial sectors over a four-year period. This project was created because there were no consistent and credible performance rating mechanisms for assessing the energy performance of window attachments. Without a standardized approach, consumers found it difficult to make informed and comparative decisions about the energy performance of window attachments, and utilities faced challenges offering incentives for energy-efficient attachments. The goal of this project was two-fold: to develop procedures to rate and certify the energy performance of window attachments and to create an educational, consumer-facing Certified Products Website (CPW) to help consumers and other stakeholders make more informed window attachments purchasing decisions.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Evolution of Energy Efficiency Programs Over Time: The Case of Standby Power

Issued in 2001, Presidential Executive Order 13221 directed federal agencies to purchase products with low standby power, with the goal of 1) reducing energy consumption in federal facilities, and 2) drawing attention to the problem of high standby power consumption, with guidance provided by the Federal Energy Management Program (FEMP). At that time, standby power was newly recognized as an increasing building energy load. Since then, procurement of products with low standby power have been set in place in acquisition processes, and the purchasing power of the federal government continues to influence manufacturers design decisions related to standby power. In recent years, FEMP has shifted effort from direct manufacturer outreach for data collection, to integrating low standby requirement into broader acquisition programs including Energy Star and Electronic Product Environmental Assessment Tool (EPEAT). Another milestone has been the labeling of low standby products on the GSA Advantage website to simplify and enhance compliance. Looking forward into the program?s future, this question arises How do we design programs over time to reflect market and technology changes, by adjusting programmatic requirements while maintaining effectiveness? This paper discusses that question for the case of standby power, which transitioned from covering a single to multiple environmental attributes, both in the context of the program's past and future.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Evolution of Energy Efficiency Programs Over Time: The Case of Standby Power

Issued in 2001, Presidential Executive Order 13221 directed federal agencies to purchase products with low standby power, with the goal of 1) reducing energy consumption in federal facilities, and 2) drawing attention to the problem of high standby power consumption, with guidance provided by the Federal Energy Management Program (FEMP). At that time, standby power was newly recognized as an increasing building energy load. Since then, procurement of products with low standby power have been set in place in acquisition processes, and the purchasing power of the federal government continues to influence manufacturers’ design decisions related to standby power. In recent years, FEMP has shifted effort from direct manufacturer outreach for data collection, to integrating low standby requirement into broader acquisition programs including Energy Star and Electronic Product Environmental Assessment Tool (EPEAT). Another milestone has been the labeling of low standby products on the GSA Advantage website to simplify and enhance compliance. Looking forward into the program’s future, this question arises “How do we design programs over time to reflect market and technology changes, by adjusting programmatic requirements while maintaining effectiveness?” This paper discusses that question for the case of standby power, which transitioned from covering a single to multiple environmental attributes, both in the context of the program’s past and future.

Payne, CT↗

Contactless Position Measurement System for Remote Alignment of Highly Reflective Objects

The Contactless Position Measurement System (CPMS) permits automatic alignment of highly-reflecting components that cannot or should not be touched by human hands, such as those used in SRF cavities. CPMS also has application during maintenance of fusion reactors, when the components in the reactor are radioactive. The length of time for which humans can handle the components in order to carry out maintenance or repairs is limited. We would like to measure the relative positions of such objects so we can bring them into alignment with motorized stages, thus eliminating the need for human contact. The CPMS is a computer vision system that measures the location of highly reflective components to within a fraction of a millimeter by finding the edges of silhouette images. This is done by placing a uniform, infrared backlight behind the components, and viewing each component with two low-aberration, infrared cameras. Each of these stereoscopic cameras are located within a coordinate system we set up with reference platforms, light sources, and survey cameras distributed around the perimeter of the string assembly room, or fusion reactor. We obtain stereoscopic silhouette images of each component, and we use these to determine the position of the component within our string assembly coordinate system. The CPMS combines the silhouette images with knowledge of the dimensions of the objects to obtain the relative positions of components in its field of view. These position measurements then allow us to mechanically maneuver the components into contact. Once we know where they are, we can move the components to where they are supposed to be with motorized stages or other mechanical means, check they are in the right place, and bolt them together. In Phase I, we built a prototype infrared backlights and cameras, tested it, wrote an analysis program to fit the images. At a range of 50 cm, we are able to measure the relative positions of two stainless steel flanges with an accuracy of 150 μm rms. The next steps are to test the analysis program with motorized stages, build a full-size prototype, and implement it in an cleanroom with SRF cavity assembly. This can be done in a cost effective way given the materials with which the system is designed. As Open Source Instruments achieved more in Phase I than anticipated, despite not receiving a Phase II SBIR grant, we hope to move forward with product development and sales with a testing partner.

43 PARTICLE ACCELERATORS↗

Device Architecture Simplification of Laser Pattering in High-Volume Crystalline Silicon Solar Cell Fabrication using Intensive Computation for Design and Optimization

Prices of Si based solar modules have been continuously declining in recent years. Goodrich is pointing out that a significant portion of these cost reductions have come about due to ‘economies of scale’ benefits, but there is a point of diminishing returns when trying to lower cost by simply expanding production capacity. Developing innovative high volume production technologies resulting in an increase of conversion efficiency without adding significant production cost will be necessary to continue the projected cost reductions. The Foundational Program to Advance Cell Efficiency (FPACE) is seeking to achieve this by closing the PV efficiency gap between theoretical achievable maximum conversion efficiency - 29% for c-Si - and the current typical production - 18.5% for a typical full area back contact c-Si Solar cell – while targeting a module cost of $0.50/Watt . The research conducted by SolarWorldUSA and it’s partners within the FPACE framework focused on the development of a Hybrid metal-wrap-through (MWT) and laser-ablated PERC solar cell design employing a extrusion metallization scheme to achieve >20% efficient devices. The project team was able to simulate, develop and demonstrate the technologies necessary to build p-type MWT PERC cells with extruded front contacts. Conversion efficiencies approaching 20% were demonstrated and a path for further efficiency improvements identified. A detailed cost of ownership calculation for such a device was based on a NREL cost model and is predicting a $/Watt cost below 85 cents on a 180 micron substrate.

14 SOLAR ENERGY↗

Evaluation of Additively Manufactured Materials for Nuclear Plant Components

Powder bed fusion Direct Metal Laser Melting (DMLM) is an evolving additive manufacturing (AM) fabrication technology that is providing high performance parts to many industries. This technology has significant promise for use in building components for nuclear power plants. Implementation of materials produced using this and similar processes offer a potential step change in efficiency for complex parts production and hence a potential for innovative design as well as cost savings for components in the future. Properties of AM Type 316L have been reported in previous work, showing properties that match wrought properties. The fine grain structure may even lead to better environmental resistance. However, there is a need to confirm the behavior of these innovative materials after exposure to radiation if this innovative technology is to be used in current and future nuclear applications. This paper discusses new efforts being explored via a joint program between GE Hitachi (GEH) and INL (Idaho National laboratory) aimed at developing corresponding un-irradiated and irradiated data for AM materials. This paper will present data for both Type 316L stainless steel, a single-phase alloy, and Ni-base Alloy 718, a precipitation hardened alloy, manufactured using AM. This paper, serving as a progress report, will present the mechanical property and microstructural data for both Type 316L and 718 AM alloys to assess their correspondence to wrought alloy data and establish a baseline for future comparison to irradiated properties. The paper will end by discussing the requirements for using these and other additively manufactured materials in future reactor component applications where irradiated data is not available.

316 Stainless Steel↗

Novel Gas-Driven Fuel Cell HVAC and Dehumidification Prototype

Performance of a novel gas-driven, electricity-producing heating, ventilation, and air conditioning (HVAC) system with no vapor compression and no hydrofluorocarbon (HFC) refrigerant shall be discussed in the paper. The prototype was evaluated at ORNL under a Small Business Voucher (SBV) Cooperative Research and Development (CRADA) program. The target market is commercial buildings in the United States. The goal is to mitigate or eliminate grid-power for building air conditioning, coincident peak demand and associated spinning reserves, aiding in flattening of the “duck curve”. The technical goal is to transform the common packaged rooftop unit into a cost-effective distributed energy resource, opening a new range of small applications and broad markets for micro-combined cycle cooling, heating, and power with integral thermal energy storage. The test results indicate the prototype would be competitive with natural gas distributed power plants with average electrical production ranging from 45% to 60% natural gas to electricity conversion efficiency. The technology has a Primary Energy Savings Potential of 4.4 Quads, higher than any other air conditioning and heating technology.

Betts, Daniel↗

Use of Modern Chemical Protein Synthesis and Advanced Fluorescent Assay Techniques to Experimentally Validate the Functional Annotation of Microbial Genomes

The objective of this research program was to prototype methods for the chemical synthesis of predicted protein molecules in annotated microbial genomes. High throughput chemical methods were to be used to make large numbers of predicted proteins and protein domains, based on microbial genome sequences. Microscale chemical synthesis methods for the parallel preparation of peptide-thioester building blocks were developed; these peptide segments are used for the parallel chemical synthesis of proteins and protein domains. Ultimately, it is envisaged that these synthetic molecules would be ‘printed’ in spatially addressable arrays. The unique ability of total synthesis to precision label protein molecules with dyes and with chemical or biochemical ‘tags’ can be used to facilitate novel assay technologies adapted from state-of-the art single molecule fluorescence detection techniques. In the future, in conjunction with modern laboratory automation this integrated set of techniques will enable high throughput experimental validation of the functional annotation of microbial genomes.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Development and Test of a 1,000 Level 3C Fiber Optic Borehole Seismic Receiver Array Applied to Carbon Sequestration

To address the critical site characterization and monitoring needs for CCS programs, US Department of Energy (DOE) awarded Paulsson, Inc. in 2010 a contract to design, build and test a fiber optic based ultra-large bandwidth clamped borehole seismic vector array capable of deploying up to one thousand 3C sensor pods suitable for deployment into high temperature and high pressure boreholes. Paulsson, Inc. has completed a design or a unique borehole seismic system consisting of a novel drill pipe based deployment system that includes a hydraulic clamping mechanism for the sensor pods, a new sensor pod design and most important – a unique fiber optic seismic vector sensor with technical specifications and capabilities that far exceed the state of the art seismic sensor technologies. These novel technologies were all applied to the new borehole seismic system. In combination these technologies will allow for the deployment of up to 1,000 3C sensor pods in vertical, deviated or horizontal wells. Laboratory tests of the fiber optic seismic vector sensors developed during this project have shown that the new borehole seismic sensor technology is capable of generating outstanding high vector fidelity data with extremely large bandwidth: 0.01 – 6,000 Hz. Field tests have shown that the system can record events at magnitudes much smaller than M-2.3 at frequencies up to 2,000 Hz. The sensors have also proved to be about 100 times more sensitive than the regular coil geophones that are used in borehole seismic systems today. The fiber optic seismic sensors have furthermore been qualified to operate at temperatures over 300°C (572°F). The fibers used for the seismic sensors in the system are used to record Distributed Temperature Sensor (DTS) data allowing additional value added data to be recorded simultaneously with the seismic vector sensor data.

01 COAL, LIGNITE, AND PEAT↗

Los Alamos National Laboratory Release of Cesium-137 Corrective Action Plan

This Corrective Action Plan (CAP) was developed by a team chartered by John Sarrao, Deputy Director for Science, Technology, and Engineering (DDSTE), to review and respond to the findings of the Joint National Nuclear Security Administration/Triad National Security (NNSA/Triad) Investigation Team (JIT) Joint Investigation Report for the “Sealed Source Recovery at the University of Washington Harborview Training and Research Facility Results in Release of Cesium-137 on May 2, 2019,” dated March 30, 2020. On May 2, 2019, International Isotopes, Inc. (INIS), a subcontractor to Triad National Security, LLC, inadvertently breached a sealed cesium-137 source at the University of Washington (UW), Harborview Medical Center Research and Training (HRT) building in downtown Seattle while attempting to recover the source for the National Nuclear Security Administration (NNSA) Off-Site Source Recovery Program (OSRP). The source breach resulted in contamination of personnel and the HRT building, as well as a release of radioactive material to the environment

07 ISOTOPE AND RADIATION SOURCES↗

Comparison of Second Wind Triton Data with Meteorological Tower Measurements

With the increased interest in remote sensing of wind information in recent years, it is important to determine the reliability and accuracy of new wind measurement technologies if they are to replace or supplement conventional tower-based measurements. In this study, we present the results of an analysis characterizing the measurement performance of a state-of-the-art SOund Detection And Ranging (sodar) device when compared to a high-quality tower measurement program. Second Wind Inc. (Somerville, MA, USA) provided NREL with more than six months of data from a measurement program conducted near an operating wind farm in western Texas.

17 WIND ENERGY↗

CW SRF Systems with Ingot Niobium and their Applications

CW SRF Systems with Ingot Niobium* and Their Applications Ganapati Myneni ISOHIM/University of Virginia/JLab Continuous wave superconducting radio frequency (SRF) accelerator systems are needed not only for discovery science programs through out the world but they are also expected to find applications in a wide variety of programs including advanced reactor cycles using thorium as nuclear fuel, commercial and university compact linacs and FEL?s. However, these state of the art particle accelerator systems are very expensive to build and consume significant power in their operations. In the present world economic, energy sustainability and global warming concerns, we must improve the efficiency of the CW SRF accelerator systems considerably and in a cost effective manner. In this presentation I will review the current status of the CW SRF systems including the recent advances in improving the quality factor of the SRF cavities at very much reduced costs and possible R&D avenues. *Companhia Brasileira de Metalurgia e Mineração (CBMM) - Jefferson Laboratory Technology

Myneni, Ganapati↗

Development of a 300°C 3C Fiber Optic Downhole Seismic Receiver Array for Surveying and Monitoring of Geothermal Reservoirs

To address the critical site characterization and monitoring needs for Enhance Geothermal Systems (EGS) programs, US Department of Energy (DOE) awarded Paulsson, Inc. in 2011 a contract to design, build and test a high temperature fiber optic based ultra-large bandwidth clamped borehole seismic vector array capable of deploying a large number of 3C sensor pods suitable for deployment into high temperature and high pressure boreholes. Paulsson, Inc. has completed a design or a unique borehole seismic system consisting of a novel drill pipe based deployment system that includes a hydraulic clamping mechanism for the sensor pods, a new sensor pod design and most important – a unique fiber optic seismic vector sensor with technical specifications and capabilities that far exceed the state of the art seismic sensor technologies. These novel technologies were all applied to the new borehole seismic system. In combination these technologies will allow for the deployment of up to 1,000 3C sensor pods in vertical, deviated or horizontal wells. Laboratory tests of the fiber optic seismic vector sensors developed during this project have shown that the new borehole seismic sensor technology is capable of generating outstanding high vector fidelity data with extremely large bandwidth: 0.01 – 6,000 Hz. Field tests have shown that the system can record events at magnitudes much smaller than M-4.0 at frequencies over 2,000 Hz. The sensors have also proved to be about 100 times more sensitive than the regular coil geophones that are used in borehole seismic systems today. The fiber optic seismic sensors have furthermore been qualified to operate at temperatures over 300°C (572°F). The data telemetry fibers used for the seismic vector sensors in the system are also used to simultaneously record Distributed Temperature Sensor (DTS) and Distributed Acoustic Sensor (DAS) data allowing additional value added data to be recorded simultaneously with the seismic vector sensor data.

02 PETROLEUM↗

U.S. Department of Energy Solar Decathlon

The U.S. Department of Energy (DOE) Solar Decathlon® Design Challenge is a collegiate competition that challenges student teams to design high-performance buildings that push the boundaries of the industry. In the 2020 Design Challenge, DOE piloted the Design Partners Program, a low-risk opportunity for builders and building owners to harness student innovation and explore zero energy design for current or upcoming projects. Design Partners provide a student team of architects and engineers with project requirements. By the end of the Design Challenge, Design Partners receive a zero-energy design alternative and cost estimate for their project. The collaboration allows Design Partners to incorporate innovative concepts such as grid-interactivity, resilience, and low embodied carbon in a low-risk environment. It also provides the future generation of engineers and architects with invaluable experience designing a building for a client under real-world circumstances. This article summarizes the current policy, technology, health, and economic trends that make zero energy buildings desirable and feasible, and presents the value of the Solar Decathlon to industry. We highlight innovative solutions 2020 Design Partner pilot projects are bringing to the building industry.

30 DIRECT ENERGY CONVERSION↗

Y-12 Site-Sustainability Plan 2010

The accomplishments to date and the long-range planning of the Y-12 National Security Complex Energy Management program support the Department of Energy (DOE) and the National Nuclear Security Administration (NNSA) vision for a commitment to energy efficiency and sustainability and to achievement of the guiding principles. The site is diligently working toward establishing and prioritizing projects to reach the goals that Executive Orders 13514 and 13423 set forth. Y-12 is working to communicate its sustainment vision through procedural, engineering, operational, and management practices. The site will make informed decisions that are based on the application of the fi ve guiding principles for High Performance Sustainable Buildings (HPSBs) to the maximum extent possible. Current limitations in achievement of the goals lie in the existing Future Years National Security Program funding profiles. Y-12 will continue to execute energy projects as funding becomes available or as they can be accomplished incrementally within existing funding profiles. All efforts will be made to integrate energy initiatives with ongoing site mission objectives. Figures ES.1-ES.4 show some examples of sustainability activities at the Y-12 Complex.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

CESR Conversion Damping Ring Studies of Electron Cloud Instabilities (CESR-TA)

In the International Linear Collider, two linear accelerators will accelerate bunches of positrons and electrons to over a hundred billion electron volts and collide them in a central detector. In order to obtain useful collision rates, the bunches, each containing twenty billion particles, must be compressed to a cross section of a few nanometers by a few hundred nanometers. In order to prepare these ultra high density bunches, damping rings (DRs) are employed before the linear accelerators. The DRs take the high emittance bunches that are provided by the electron and positron sources and, through the process of radiation damping, squeeze them into ultra low emittance beams that are ready for the main linear accelerators. In the damping rings, a number of effects can prevent the successful preparation of the beams. In the electron ring, an effect known as the fast ion instability can lead to beam growth and, in the positron ring, the build-up of an electron cloud (EC), which interacts with the circulating bunches, can produce the same effect. EC build-up and the subsequent interaction of the cloud with the positron beam in the DR have been identified as major risks for the successful construction of a linear collider. The CESRTA research program at the Cornell Electron Storage Ring (CESR) was developed in order to study the build-up of the EC, the details of its impact on ultra low emittance beams, as well as methods to mitigate the impact of the cloud. In the DR, the EC forms when synchrotron photons radiated from the circulating beam strike the walls of the vacuum chamber, resulting in the emission of photoelectrons. These low energy electrons can be accelerated across the vacuum chamber by the electric field of the beam, and strike the walls, causing the emission of secondary electrons. The secondary electrons are subsequently accelerated into the walls yet again via the same mechanism. The result is that the EC can rapidly begin to fill the vacuum chamber. In an electron DR, the EC build-up is limited by the Coulomb repulsion. But in a positron ring, the electrons are pulled into the potential well of the beam. The resulting interaction of the circulating bunches of positrons with the EC that ultimately limits DR performance. Typically we store long trains of closely space bunches in the damping ring. The interaction of stored beam and the EC that is generated by the long train is manifested by different mechanisms: (1) The cloud focuses the beam, which causes a tune shift that increases along the bunch train as the cloud density increases. (2) The cloud electrons couple the motion of bunches along a train. Transverse motion of a leading bunch is transferred to the cloud, and subsequently to a trailing bunch which can result in a multi-bunch instability. (3) The cloud couples the positrons in the head of the bunch to those in the tail of the same bunch, which can excite a 'head-tail' instability. (4) The nonlinear fields of the EC can lead to emittance growth before the onset of instabilities. The CESRTA collaboration, which includes researchers from Cornell University's Laboratory for Elementary-Particle Physics as well as more than 50 senior staff members from over a dozen accelerator laboratories and universities around the world, has operated CESR as a damping ring for the past three years to study these EC effects. A range of specialized instrumentation has been deployed to study the local build-up of the cloud in the vacuum chambers as well as the complicated dynamics exhibited when the beam and the EC interact. The program has significantly advanced our understanding of these issues and has helped identify the most promising methods to mitigate the impact of the EC on the DR beams. It has pointed the way towards a DR design that can meet the stringent specifications of the ILC.

43 PARTICLE ACCELERATORS↗