Search NASA⌕ Search

SEARCH · Search NASA

Results for “certification testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,027 records · Page 57

Pressure Effects on the Self-Extinguishment Limits of Aerospace Materials

The Orion Crew Exploration Vehicle Module (CM) is being designed to operate in an atmosphere of up to 30% oxygen at a pressure of 10.2 psia for lunar missions. Spacecraft materials selection is based on an upward flammability test conducted in a closed chamber under the worst expected conditions of pressure and oxygen concentration. Material flammability depends on both oxygen concentration and pressure but, since oxygen concentration is the primary driver, all materials are certified in the 30% oxygen, 10.2 psia environment. Extensive data exist from the Shuttle Program at this condition which used relatively the same test methodology as currently used in the Constellation Program. When the CM returns to Earth, a snorkel device will be activated after splashdown to provide outside air to the crew; however, for operational reasons, it is desirable to maximize the time the crew is able to breathe cabin air before the snorkel device is activated. To maximize this time, it has been proposed to raise the partial pressure of oxygen in the CM immediately before reentry while maintaining the total cabin pressure at 14.7 psia. In addition, it has been proposed to leak-test the Orion CM with ambient air at a maximum pressure of 17.3 psia. No data exist to assess how high the cabin oxygen concentration can be at 14.7 psia or 17.3 psia. One is to re-test a large number of materials at these pressures at a significant cost. However, since the maximum oxygen concentration (MOC) at which a material will self-extinguish has been determined for a variety of spacecraft materials as a function of pressure, a second alternative is to use existing data to estimate the MOC at 14.7 psia and 17.3 psia. This data will be examined in this paper and an analysis presented to determine the oxygen concentrations at the increased pressures that will result in self-extinguishment of a material. This analysis showed that the oxygen concentration for the Orion CM at 14.7 psia cannot be set higher than 25.6% without potentially invalidating the materials flammability certification in 30% oxygen at 10.2 psia for some materials. Materials certified under these conditions would still be self-extinguishing in ambient air at 17.3 psia. alternative

Hirsch, David B.↗

Impact of Advanced Synoptics and Simplified Checklists During Aircraft Systems Failures

Abstract—Natural human capacities are becoming increasingly mismatched to the enormous data volumes, processing capabilities, and decision speeds demanded in today’s aviation environment. Increasingly Autonomous Systems (IAS) are uniquely suited to solve this problem. NASA is conducting research and development of IAS - hardware and software systems, utilizing machine learning algorithms, seamlessly integrated with humans whereby task performance of the combined system is significantly greater than the individual components. IAS offer the potential for significantly improved levels of performance and safety that are superior to either human or automation alone. A human-in-the-loop test was conducted in NASA Langley’s Integration Flight Deck B-737-800 simulator to evaluate advanced synoptic pages with simplified interactive electronic checklists as an IAS for routine air carrier flight operations and in response to aircraft system failures. Twelve U.S. airline crews flew various normal and non-normal procedures and their actions and performance were recorded in response to failures. These data are fundamental to and critical for the design and development of future increasingly autonomous systems that can better support the human in the cockpit. Synoptic pages and electronic checklists significantly improved pilot responses to non-normal scenarios, but implementation of these aids and other intelligent assistants have barriers to implementation (e.g., certification cost) that must overcome.

Etherington, Timothy J.↗

Developing Approaches for Certification of Uninspectable Fracture Critical AM Components

Introduction - Human-rated spaceflight hardware is subject to the Fracture Control requirements in NASA-STD5019, which are intended to control the risk of component failure due to undetected cracks or defects. - All hardware in this mission class is classified for Fracture Control – Exempt, Non-fracture Critical, or Fracture Critical - Fracture Critical: A classification that identifies a part where failure due to the presence of a crack is a catastrophic hazard ➔ Pressure vessels, engine components, primary structure, etc. - Axiom 1: Material and manufacturing process produce structures and components with cracks or defects. - Axiom 2: The presence of a crack or defect of sufficient size reduces the strength and life of the structure. - Damage Tolerance: demonstration that a component can survive the service life (with a safety factor) in the presence of an undetected flaw or damage. - Components are manufactured from aerospace quality materials using controlled processes. - Components are inspected for damage (cracks, flaws, defects, etc.). - Components are shown by test or analysis to be tolerant to undetected flaws.

Will Tilson↗

Carbondale Community Geothermal Coalition – Replicable Models for Decarbonizing Mixed-Use Rural Communities

The Carbondale Community Geothermal Coalition (CCGC) set out to prove that a fifth-generation geothermal district heating & cooling (5G GDHC) network can be technically feasible, cost-effective, and socially equitable for a small, mixed-use rural community. During Budget Period 1 (Planning & Design) the team: ● Completed a 449 ft thermal-response test confirming excellent ground conductivity (k = 1.69 Btu ft -1 hr -1 °F -1 ) and a benign 56.3 °F undisturbed temperature. Page 1 Final Technical Report for Award Number: DE-EE0010663 ● Built a fully calibrated digital twin (URBANopt → Modelica) for 240 k ft 2 of existing + future buildings. ● Designed a 75-borehole ambient-temperature loop (ATL) augmented by 75 solar-thermal panels, supplying 44 % of district heating and 100 % cooling in Stage-1. ● Produced retrofit bid-ready drawings for the Third Street Center and Second Street Townhomes. ● Reached > 200 community stakeholders and exceeded equity targets (46 % Hispanic/Latinx participation). ● Drafted a multi-tiered workforce plan aligned with Colorado Mountain College (Hispanic Serving Institution) and IGSHPA certifications.

15 GEOTHERMAL ENERGY↗

Safety Analysis Report for Packaging, Y-12 National Security Complex, Model ES-3100 Package with Bulk HEU Contents

This safety analysis report for packaging (SARP) presents the results of the safety analysis prepared in support of the Consolidated Nuclear Security, LLC (CNS) request for licensing of the Model ES-3100 package with bulk highly enriched uranium (HEU) contents and issuance of a Type B(U) Fissile Material Certificate of Compliance. This SARP, published in the format specified in the U.S. Nuclear Regulatory Commission (NRC) Regulatory Guide 7.9 and using information provided in UCID-21218 and NRC Regulatory Guide 7.10, demonstrates that the Y-12 National Security Complex (Y-12) ES-3100 package with bulk HEU contents meets the established NRC regulations for packaging, preparation for shipment, and transportation of radioactive materials given in Title 10, Part 71, of the Code of Federal Regulations (CFR) [10 CFR 71] as well as U.S. Department of Transportation (DOT) regulations for packaging and shipment of hazardous materials given in Title 49 CFR. To protect the health and safety of the public, shipments of radioactive materials are made in packaging that is designed, fabricated, assembled, tested, procured, used, maintained, and repaired in accordance with the provisions cited above. Safety requirements addressed by the regulations that must be met when transporting radioactive materials are containment of radioactive materials, radiation shielding, and assurance of nuclear subcriticality.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

NASA's Space Launch Transitions: From Design to Production

NASA's Space Launch System (SLS) successfully completed its Critical Design Review (CDR) in 2015, a major milestone on the journey to an unprecedented era of exploration for humanity. CDR formally marked the program's transition from design to production phase just four years after the program's inception and the first such milestone for a human launch vehicle in 40 years. While challenges typical of a complex development program lie ahead, CDR evaluators concluded that the design is technically and programmatically sound and ready to press forward to Design Certification Review (DCR) and readiness for launch of Exploration Mission 1 (EM-1) in the 2018 timeframe. SLS is prudently based on existing propulsion systems, infrastructure and knowledge with a clear, evolutionary path as required by mission needs. In its initial configuration, designated Block I, SLS will a minimum of 70 metric tons (t) of payload to low Earth orbit (LEO). It can evolve to a 130 t payload capacity by upgrading its engines, boosters, and upper stage, dramatically increasing the mass and volume of human and robotic exploration while decreasing mission risk, increasing safety, and simplifying ground and mission operations. CDR was the central programmatic accomplishment among many technical accomplishments that will be described in this paper. The government/industry SLS team successfully test fired a flight-like five-segment solid rocket motor, as well as seven hotfire development tests of the RS-25 core stage engine. The majority of the major test article and flight barrels, rings, and domes for the core stage liquid oxygen, liquid hydrogen, engine section, intertank, and forward skirt were manufactured at NASA's Michoud Assembly Facility. Renovations to the B-2 test stand for stage green run testing were completed at NASA Stennis Space Center. Core stage test stands are rising at NASA Marshall Space Flight Center. The modified Pegasus barge for core stage transportation from manufacturing to testing and launch sites was delivered. The Interim Cryogenic Propulsion System test article was also completed. This paper will discuss these and other technical and programmatic successes and challenges over the past year and provide a preview of work ahead before the first flight of this new capability.

Askins, Bruce↗

Summary and analysis of performance and stability characteristics of the refan JT8D-109 engine

The refan JT8D-109 performance and stability characteristics are reported as determined from sea level testing, altitude testing, and DC-9 flight testing. The test results are summarized as follows: (1) TSFC at SLS achieved design goal of 12.66 percent reduction. (2) TSFC at altitude average cruise power 0.5 percent higher than design goal, (3) TSFC at altitude maximum cruise power 1.7-3.7 percent higher than design goal, (4) ground starting consistent with JT8D-9 base engine, (5) successful flight starts without starter assist, (6) transient surge margin equivalent to JT8D-9, (7) stable engine operation with inlet distortion, and (8) stable engine operation during snap acceleration and deceleration. A flight idle setting is required for acceptable aborted-landing go-around acceleration time due to increase in low-rotor moment of inertia, and a performance improvement program should be conducted as part of any future certification program.

Sanberg, K. G.↗

Drop Analysis of a Department of Energy Standard Canister Containing Fort Saint Vrain SNF– 24138

DOE manages over 300 types of SNF, many of which are located at the INL site. Managing this large variety of SNF for storage, transportation, and disposal poses a challenge to DOE. The Idaho Cleanup Project and INL are collaborating on the DOE SNF Road-Ready Demonstration (“Road-Ready Demonstration”), which will develop and demonstrate the designs, technology, processes, and regulatory framework for packaging DOE-managed SNF for “road-ready dry storage.” Road-ready dry storage (RRDS) is an SNF management concept in which SNF is packaged into dry, sealed canisters that are then placed in on-site storage in anticipation of later transport and disposition. The forward-looking goal of the Road-Ready Demonstration is to establish the foundation for a large-scale RRDS program at the INL site. One critical aspect of RRDS is the ability to certify the DOE Standard Canister and its associated transportation package in accordance with 10 CFR 71 for offsite transportation. Depending on the SNF type and transportation strategy, DOE Standard Canisters may be required to maintain structural integrity under hypothetical accident scenarios (e.g., drop events). The DOE Standard Canisters have been tested and analyzed under various SNF loading configurations and accident drop events in support of the Idaho Spent Fuel Facility and other DOE programs; however, no analysis has yet been completed in support of the recently initiated Road-Ready Demonstration. This paper presents preliminary results from a finite element analysis of the Ø45.7 cm × 4.6 m (Ø18 in. × 15 ft) DOE Standard Canister under the 9 m drop at 80 degrees off-vertical drop scenario considered in previous INL tests and analyses. It considers the Fort St. Vrain spent nuclear fuel loading configuration proposed for the Road-Ready Demonstration, uses updated material properties, and applies the strain-based acceptance criteria established in ASME Boiler and Pressure Vessel Code’s Section III, Division 3 rules for storage and transportation spent nuclear fuel containments. This updated analysis is compared to previous DOE Standard Canister drop analyses. Preliminary results from the updated analysis show that certain regions of the containment exceed the allowable limits during the accidental drop event. However, these regions are limited to components performing a non-structural function. While further work on this analysis will be pursued, this analysis serves as the foundation for formal calculations used to support applicable certification efforts of the RRDS system at INL.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Comparison of Staggered Grid Finite Difference Schemes for Ultrasound Simulation in Curving Composites

The optimization of ultrasonic nondestructive evaluation (NDE) simulation tools for composites has the potential to reduce both individual part inspection time and overall certification time for composite parts and structures. Inspection guidance based on simulation provides increased confidence in the veracity of inspection results in addition to time reductions. This paper outlines ongoing work targeted to advance this objective through the use of finite difference (FD) simulation techniques formulated for composite structures with realistic geometries. Two staggered grid explicit FD schemes which show promise for this purpose are assessed: the Lebedev FD scheme and the rotated staggered grid (RSG) FD scheme. Algorithmic points which provide challenges for complex geometries are addressed, in particular handling of traction free surfaces and bi-material interfaces present at lamina boundaries. Code execution time estimates are performed as well to guide feasible domain sizes relative to algorithm choice and available hardware. Three test cases are simulated: a delaminated plate, a cylinder, and a triclinic lamina. These tests demonstrate that the Lebedev FD scheme needs additional work to handle inter-laminar interfaces and traction free boundaries in the presence of stair-stepping approximations. In contrast, the simple structure of the RSG unit cell makes it more straightforward to construct a 3D simulation technique for curved composite laminates.

Frankforter, Erik↗

Understanding Workforce Agility at NASA Kennedy Space Center

NASA leads the world in space research and provides other government agencies, educational institutions, and companies opportunities to explore, launch, and conduct research in and around space. NASA has 11 formal locations based around the United States, and each has different goals and objectives to help NASA meet its overall mission. 2004, President George Bush announced a new vision for the Space Exploration program. During his grand announcement, he discussed that the Space Shuttles would retire due to the 2003 Space Shuttle Columbia accident, where the crew and the space vehicle were lost. The Kennedy Space Center (KSC) would no longer manage the day-to-day operations of maintaining the US Space Shuttle fleet. Our NASA teams would continue working to finish the Space Shuttle program's mission to build the International Space Station. Afterward, NASA would transition to develop and test a new spacecraft, the Crew Exploration Vehicle. The third goal was to return to the moon by 2020 as the launching point for missions beyond, to get humans from lower Earth orbit to the moon and Mars. (Secretary, 2004) The KSC engineering workforce had to prepare to transition from Operational support of the Space Shuttle program to the design and development of over 50 subsystems for the future SLS and Orion Launch Systems at the Kennedy Space Center. These subsystems developed at the Kennedy Space Center Engineering Directorate followed a comprehensive design process that required several different product deliverables during various phases for each subsystem. (Schafer et al., 2013) What allowed these systems to be successful? What enabled NASA KSC to complete over 130 Artemis 1 Design Certification and System Acceptance Reviews, closing over 21,656 Requirements to deem the Artemis 1 rocket ready for launch? Little is known about the NASA engineering workforce agility characteristics that enabled the organization to transition from the Space Shuttle program that ended in 2011 and launch the Artemis Program's SLS rocket on November 16, 2022.

Workforce Agility↗

NASA's Space Launch System Transitions From Design To Production

NASA's Space Launch System (SLS) successfully completed its Critical Design Review (CDR) in 2015, a major milestone on the journey to an unprecedented era of exploration for humanity. CDR formally marked the program's transition from design to production phase just four years after the program's inception and the first such milestone for a human launch vehicle in 40 years. While challenges typical of a complex development program lie ahead, CDR evaluators concluded that the design is technically and programmatically sound and ready to press forward to Design Certification Review (DCR) and readiness for launch of Exploration Mission 1 (EM-1) in the 2018 timeframe. SLS is prudently based on existing propulsion systems, infrastructure and knowledge with a clear, evolutionary path as required by mission needs. In its initial configuration, designated Block 1, SLS will a minimum of 70 metric tons (t) (154,324 pounds) of payload to low Earth orbit (LEO). It will evolve to a 130 t (286,601 pound) payload capacity by upgrading its engines, boosters, and upper stage, dramatically increasing the mass and volume of human and robotic exploration while decreasing mission risk, increasing safety, and simplifying ground and mission operations. CDR was the central programmatic accomplishment among many technical accomplishments that will be described in this paper. The government/industry SLS team successfully test-fired a flight-like five-segment solid rocket motor, as well as seven hotfire development tests of the RS-25 core stage engine. The majority of the major test article and flight barrels, rings, and domes for the core stage liquid oxygen, liquid hydrogen, engine section, intertank, and forward skirt were manufactured at NASA's Michoud Assembly Facility in New Orleans, Louisiana. Renovations to the B-2 test stand for stage green run testing were completed at NASA's Stennis Space Center (SSC), near Bay St. Louis, Mississippi. Core stage test stands are reaching completion at NASA's Marshall Space Flight Center in Huntsville, Alabama. The modified Pegasus barge for core stage transportation from manufacturing to testing and launch sites was delivered to SSC. The Interim Cryogenic Propulsion System test article was also completed. This paper will discuss these and other technical and programmatic successes and challenges over the past year and provide a preview of work ahead before the first flight of this new capability.

Askins, Bruce R.↗

Standards development for modules in high temperature micro-environments

Photovoltaic (PV) module qualification standards, IEC 61215 and IEC 61730, were designed to apply to “general open-air climates” and IEC 61730 specifically indicated applicability of ambient air temperature of 40°C. Additionally, these standards provided allowances for so-called “open rack mounted PV modules” without a clear definition of “open-rack.” These implied restrictions and allowances meant that hotter climates or thermally restrictive installation methods may not be covered by these often customer-mandated certification standards. This is particularly salient for the significant growth regions of the Middle East and India that would be expected to operate at significantly higher temperatures. The applicability of these documents raised issues over the definition of “open rack” and the fact that the geographic location is just as important as the mounting configuration in assessing the impact of the micro-environment of a PV module. This work summarizes the scientific background for IEC Technical Specification 63126:2020 ED1, titled “Guidelines for qualifying PV modules components and materials for operation at high temperatures.” This standard was recently published by the IEC and is the first step in a systematic effort to rework these standards to address the question of temperature more directly. Instead of specifying a mounting condition, we specify different suites of tests suitable for a system (PV module, mounting style, and location) defined by the 98th percentile cell temperature. With a defined temperature regime to work from, this allowed us to use existing literature research combined with additional modeling work to determine, which tests would need to be modified. This resulted in suggested changes to material thermal indices, thermal cycling temperatures, hot spot testing, ultraviolet testing, and bypass diode testing among other tests and characteristics described in this study.

14 SOLAR ENERGY↗

Space Shuttle Systems Engineering Processes for Liftoff Debris Risk Mitigation

This slide presentation reviews the systems engineering process designed to reduce the risk from debris during Space Shuttle Launching. This process begins the day of launch from the tanking to the vehicle tower clearance. Other debris risks (i.e., Ascent, and micrometeoroid orbital debit) are mentioned) but are not the subject of this presentation. The Liftoff debris systems engineering process and an example of how it works are reviewed (i.e.,STS-119 revealed a bolt liberation trend on the Fixed Service Structure (FSS) 275 level elevator room). The process includes preparation of a Certification of Flight Readiness (CoFR) that includes (1) Lift-off debris from previous mission dispositioned, (2) Flight acceptance rationale has been provided for Lift-off debris sources/causes (3) Lift-off debris mission support documentation, processes and tools are in place for the up-coming mission. The process includes a liftoff debris data collection that occurs after each launch. This includes a post launch walkdown, that records each liftoff debris, and the entry of the debris into a database, it also includes a review of the imagery from the launch, and a review of the instrumentation data. There is also a review of the debris transport analysis process, that includes temporal and spatial framework and a computational fluid dynamics (CFD) analysis. which incorporates a debris transport analyses (DTA), debris materials and impact tests, and impact analyses.

Mitchell, Michael↗

Nearfield Summary and Analysis of the Third AIAA Sonic Boom Prediction Workshop C608 Low Boom Demonstrator

A summary and statistical analysis of the nearfield Computational Fluid Dynamics (CFD)submissions for the Third AIAA Sonic Boom Prediction Workshop is provided with a focus onthe C608 Low Boom Flight Test Demonstrator. The C608 is more complex in terms of geometryand propulsion boundary conditions than previous workshop cases and is more representativeof vehicles with lower ground loudness and the potential for lower annoyance. The nearfieldsignatures submitted by the participants are propagated to the ground to compute statisticsof loudness measures over the vehicle sonic boom carpet. Principle component analysis isused to extract the primary variation modes. Context from previous sonic boom workshopsindicates that this workshop has the lowest variation even though the case is more challengingbecause it is quieter and more complex. The results documented in this summary indicate thatthe international state-of-the-art for nearfield CFD has a variation that is small enough formeaningful low-boom design and analysis. Low-boom configuration analysis methods with lowvariation are important tools to develop certification processes for addressing the prohibitionon overland supersonic commercial flight.

sonic boom CFD workshop c608↗

Lunar Limb Observatory: An Incremental Plan for the Utilization, Exploration, and Settlement of the Moon

This paper proposes a comprehensive incremental program, Lunar Limb Observatory (LLO), for a return to the Moon, beginning with robotic missions and ending with a permanent lunar settlement. Several recent technological developments make such a program both affordable and scientifically valuable: robotic telescopes, the Internet, light-weight telescopes, shared- autonomy/predictive graphics telerobotic devices, and optical interferometry systems. Reasons for focussing new NASA programs on the Moon include public interest, Moon-based astronomy, renewed lunar exploration, lunar resources (especially helium-3), technological stimulus, accessibility of the Moon (compared to any planet), and dispersal of the human species to counter predictable natural catastrophes, asteroidal or cometary impacts in particular. The proposed Lunar Limb Observatory would be located in the crater Riccioli, with auxiliary robotic telescopes in M. Smythii and at the North and South Poles. The first phase of the program, after site certification, would be a series of 5 Delta-launched telerobotic missions to Riccioli (or Grimaldi if Riccioli proves unsuitable), emplacing robotic telescopes and carrying out surface exploration. The next phase would be 7 Delta-launched telerobotic missions to M. Smythii (2 missions), the South Pole (3 missions), and the North Pole (2 missions), emplacing robotic telescopes to provide continuous all-sky coverage. Lunar base establishment would begin with two unmanned Shuttle/Fitan-Centaur missions to Riccioli, for shelter emplacement, followed by the first manned return, also using the Shuttle/Fitan-Centaur mode. The main LLO at Riccioli would then be permanently or periodically inhabited, for surface exploration, telerobotic rover and telescope operation and maintenance, and support of Earth-based student projects. The LLO would evolve into a permanent human settlement, serving, among other functions, as a test area and staging base for the exploration, settlement, and terraforming of Mars.

Lowman, Paul. D., Jr.↗

V and V of ISHM Software for Space Exploration

NASA has established a far-reaching and long-term program for robotic and manned exploration of the solar system, beginning with missions to the moon and Mars. The Crew Transportation System (CTS), a key system for space exploration, imposes four requirements' that ISHM addresses. These requirements have a wide range of implications for V&V and certification of ISHM. There is a range of time-criticality for ISHM actions, from prognostication, which is often (but not always) non-time-critical, to time-critical state estimation and system management under off-nominal emergency conditions. These are externally imposed requirements on ISHM that are subject to V&V. - In addition, a range of techniques are needed to implement an ISHM. The approaches to ISHM are described elsewhere. These approaches range from well-understood algorithms for low-level data analysis, validation and reporting, to AI techniques for state estimation and planning. The range of techniques, and specifically the use of AI techniques such as reasoning under uncertainty and mission planning (and re-planning), implies that several V&V approaches may be required. Depending on the ISHM architecture, traditional testing approaches may be adequate for some ISHM functionality. The AI-based approaches to reasoning under uncertainty, model-based reasoning, and planning share characteristics typical of other complex software systems, but they also have characteristics that set them apart and challenge standard V&V techniques. The range of possible solutions to the overall ISHM problem impose internal challenges to V&V. The V&V challenges increase when hard real-time constraints are imposed for time-critical functionality. For example, there is an external requirement that impending catastrophic failure of the Launch Vehicle (LV) at launch time be detected and life-saving action be taken within two seconds. In this paper we outline the challenges for ISHM V&V, existing approaches and analogs in other software application areas, and possible new approaches to the V&V challenges for space exploration ISHM.

Markosian, Lawrence↗

Offset-Stoichiometric Reflowable Composite Bonding Method with Adhesive for Mitigating Strict Faying Surface Tolerances

Inherent susceptibility of adhesive bonds to miniscule quantities of contamination can cause undetectable weakened bonds. For this reason, the Federal Aviation Administration (FAA) places strict regulations on adhesively bonded joints in primary aircraft structures. To meet certification requirements aircraft manufactures resort to redundant load paths in the form of fasteners which inherently add weight to the structure and increase manufacturing time. In prior work, a secondary bonding technique called AERoBOND was developed, which utilized off-stoichiometric epoxymatrix resins to facilitate reflow and diffusion of the resin within the joint interface during a secondary bonding/cure process, thus achieving a bond similar to a co-cured joint. However, the AERoBOND process required tight spatial tolerances between the two parts being joined. This study examined the utilization of conventional adhesive with the AERoBOND method to act as a filler in the joint line, effectively reducing the need for tight tolerances on the joining parts and serving as a flexible alternative for existing manufacturing processes. Ultrasonic inspection, optical microscopy, and ASTM International standard tests were performed to analyze the joints for defects and to quantify the mode-I and mode-II interlaminar fracture toughness and short beam strength of the proposed methodology with varying manufacturing parameters. The comprehensive results indicate that the AERoBOND+ method with and without surface preparation performs comparably to co-cured and conventional, adhesively bonded joints when secondary cured in an autoclave with 791 kPa of pressure. As an example, the AERoBOND+ panel without surface preparation bonded with 791 kPa of pressure (referred to as AB+3 throughout paper) had a mode-I fracture toughness (G Ic ) of 0.643 kJ/m 2 and a mode-II fracture toughness (G IIc ) of 4.000 kJ/m 2 in the non-precracked condition and 4.218 kJ/m 2 in the precracked condition at the adhesive-to-prepreg interface. These results were 96%, 142%, and 217%, respectively, of a co-cured baseline panel (referred to as C1 throughout paper).

Composites↗

Thermal Protection Materials Technology for NASA's Exploration Systems Mission Directorate

To fulfill the President s Vision for Space Exploration - successful human and robotic missions between the Earth and other solar system bodies in order to explore their atmospheres and surfaces - NASA must reduce trip time, cost, and vehicle weight so that payload and scientific experiment capabilities are maximized. As a collaboration among NASA Centers, this project will generate products that will enable greater fidelity in mission/vehicle design trade studies, support risk reduction for material selections, assist in optimization of vehicle weights, and provide the material and process templates for development of human-rated qualification and certification Thermal Protection System (TPS) plans. Missions performing aerocapture, aerobraking, or direct aeroentry rely on technologies that reduce vehicle weight by minimizing the need for propellant. These missions use the destination planet s atmosphere to slow the spacecraft. Such mission profiles induce heating environments on the spacecraft that demand thermal protection heatshields. This program offers NASA essential advanced thermal management technologies needed to develop new lightweight nonmetallic TPS materials for critical thermal protection heatshields for future spacecraft. Discussion of this new program (a December 2004 new start) will include both initial progress made and a presentation of the work to be preformed over the four-year life of the program. Additionally, the relevant missions and environments expected for Exploration Systems vehicles will be presented, along with discussion of the candidate materials to be considered and of the types of testing to be performed (material property tests, space environmental effects tests, and Earth and Mars gases arc jet tests).

Valentine, Peter G.↗