Search NASA⌕ Search

SEARCH · Search NASA

Results for “grid interconnection”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,027 records · Page 57

Improving Solar and Solar+Storage Screening Techniques to Reduce Utility Interconnection Time and Costs (Final Technical Report)

Residential PV installations have increased rapidly over the last decade, and the increased application volume has caused permitting delays and lower overall adoption rates. In this project, we developed and evaluated whether data-driven secondary modeling and screening techniques can help utilities assess customer applications more accurately than traditional screening shortcuts. Secondary topologies are predicted using decision trees and commonly available information, such as service transformer, customer, and street locations. Conductors were predicted using a logistic regression method based on real world object (RWO) types, service transformer ratings, conductor length, and distance to transformer. After developing the combined primary and secondary distribution network model, hosting capacity results were used to train a random forest model to predict the pass/fail likelihood of a customer application. Powerflow based models with predicted secondaries and data-driven methods both increased the screening success rate, relative to common utility heuristics, by as much as 55 percentage points. Data-driven screening techniques were described by one utility as a "right-sized" approach for residential customers given the low-risk of small errors and the high-cost of accurate modeling.

14 SOLAR ENERGY↗

Performance of a Dynamically Controlled Inverter in a Photovoltaic System Interconnected with a Secondary Network Distribution System

In 2008, a 300 kW{sub peak} photovoltaic (PV) system was installed on the rooftop of the Colorado Convention Center (CCC). The installation was unique for the electric utility, Xcel Energy, as it had not previously permitted a PV system to be interconnected on a building served by the local secondary network distribution system (network). The PV system was installed with several provisions; one to prevent reverse power flow, another called a dynamically controlled inverter (DCI), that curtails the output of the PV inverters to maintain an amount of load supplied by Xcel Energy at the CCC. The DCI system utilizes current transformers (CTs) to sense power flow to insure that a minimum threshold is maintained from Xcel Energy through the network transformers. The inverters are set to track the load on each of the three phases and curtail power from the PV system when the generated PV system current reaches 95% of the current on any phase. This is achieved by the DCI, which gathers inputs from current transformers measuring the current from the PV array, Xcel, and the spot network load. Preventing reverse power flow is a critical technical requirement for the spot network which serve this part of the CCC. The PV system was designed with the expectation that the DCI system would not curtail the PV system, as the expected minimum load consumption was historically higher than the designed PV system size. However, the DCI system has operated many days during the course of a year, and the performance has been excellent. The DCI system at the CCC was installed as a secondary measure to insure that a minimum level of power flows to the CCC from the Xcel Energy network. While this DCI system was intended for localized control, the system could also reduce output percent if an external smart grid control signal was employed. This paper specifically focuses on the performance of the innovative design at this installation; however, the DCI system could also be used for new s- art grid-enabled distribution systems where renewables power contributions at certain conditions or times may need to be curtailed.

14 SOLAR ENERGY↗

Data Diodes in Support of Trustworthy Cyber Infrastructure

Interconnections between process control networks and en- terprise networks has resulted in the proliferation of stan- dard communication protocols in industrial control systems which exposes instrumentation, control systems, and the critical infrastructure components they operate to a variety of cyber attacks. Various standards and technologies have been proposed to protect industrial control systems against cyber attacks and to provide them with confidentiality, in- tegrity, and availability. Among these technologies, data diodes provide protection of critical systems by the means of physically enforcing traffic direction on the network. In order to deploy data diodes effectively, it is imperative to un- derstand the protection they provide, the protection they do not provide, their limitations, and their place in the larger security infrastructure. In this work, we briefly review the security challenges in an industrial control system, study data diodes, their functionalities and limitations, and pro- pose a scheme for their effective deployment in trusted pro- cess control networks (TPCNs.)

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Land-Based Wind Market Report: 2021 Edition

The U.S. Department of Energy's 2021 edition of its land-based wind market report provides an overview of key trends in the U.S. wind power market, with a focus on 2020. You can find a report, data file and presentation on the Files tab, below. Additionally, several data visualizations are available on the Visualizations tab. Highlights of this year’s update include: -Wind comprises a growing share of electricity supply: U.S. wind power capacity grew at a record pace in 2020, with 25 billion dollars invested in 16.8 GW of capacity. Wind energy output rose to account for more than 8% of the entire nation’s electricity supply, and is more than 20% in 10 states. At least 209 GW of wind are seeking transmission interconnection; 61 GW of this capacity are offshore wind and 13 GW are hybrid plants that pair wind with storage or PV. -Wind project performance has increased over time: The average capacity factor among recently built projects was over 40%, considerably higher than projects built earlier. The highest capacity factors are seen in the interior ‘wind belt’ of the country. -Turbines continue to get larger: Improved plant performance has been driven by larger turbines mounted on taller towers and featuring longer blades. In 2010, no turbines employed blades that were 115 meters in diameter or larger, but in 2020, 91% of newly installed turbines featured such rotors. Proposed projects indicate that total turbine height will continue to rise. -Low wind turbine pricing has pushed down installed project costs over the last decade: Wind turbine prices are averaging 775–850 dollars/kW. The average installed cost of wind projects in 2020 was 1,460 dollars/kW, down more than 40% since the peak in 2010, though stable for the last three years. The lowest costs were found in Texas and the (non-ISO) West. -Wind energy prices remain low, around 20 dollars/MWh in the interior of the country: After topping out at 70 dollars/MWh for power purchase agreements (PPAs) executed in 2009, the national average price of wind PPAs has dropped. In the interior ‘wind belt’ of the country, recent pricing is around 20 dollars/MWh. In the West and East, prices tend to average 30 dollars/MWh or more. These prices, which are possible in part due to federal tax support, fall below the projected future fuel costs of gas-fired generation. -Wind PPA prices are often attractive compared to wind’s grid-system market value: The value of wind in wholesale power markets is affected by the location of wind plants, their hourly output profiles, and how those characteristics correlate with real-time electricity prices and capacity markets. The market value of wind declined in 2020, following natural gas prices lower and averaging under 15 dolalrs/MWh in ERCOT, MISO, NYISO and SPP; higher values were seen in CAISO, ISO-NE and PJM. -The average levelized cost of wind energy is down to 33 dollars/MWh: Levelized costs, which exclude the impacts of federal tax incentives, vary across time and geography, but the national average stood at 33 dollars/MWh in 2020—down substantially historically, though consistent with the previous two years. Levelized costs were lowest in ERCOT, SPP, and the (non-ISO) West. -The health and climate benefits of wind in 2020 were larger than its grid-system value, and the combination of all three far exceeds the current levelized cost of wind: Wind generation reduces power-sector emissions of carbon dioxide, nitrogen oxides, and sulfur dioxide. These reductions, in turn, provide public health and climate benefits that vary regionally, but together are economically valued at an average of 76 dollars/MWh-wind nationwide in 2020. -The domestic supply chain for wind equipment is diverse: For wind projects recently installed in the U.S., domestically manufactured content is highest for nacelle assembly (>85%), towers (60-75%), and blades and hubs (30-50%), but is much lower for most components internal to the nacelle.

17 WIND ENERGY↗

Fast Determination of Distribution-Connected PV Impacts Using a Variable-Time-Step Quasi-Static Time-Series Approach

The increasing deployment of distribution-connected photovoltaic (DPV) systems requires utilities to complete ever more complex interconnection studies. Relatively simple interconnection study methods worked well for low penetrations of photovoltaic systems, but more complicated quasistatic time-series (QSTS) analysis is required to make better interconnection decisions as DPV penetration levels increase. Tools and methods must be developed to support this type of complex analysis to enable efficient completion of PV impact studies. This paper presents a variable-time-step solver for QSTS analysis that significantly shortens the computational time and effort to complete a detailed analysis of the operation of a distribution circuit with many DPV systems. Specifically, it demonstrates that the proposed variable-time-step solver can reduce the required computational time by as much as 84% without introducing any important errors to metrics, such as the number of voltage regulator tap operations and highest and lowest voltage occurring on the distribution circuit during a 1-yr simulation period. Further improvement in computational speed is possible with the introduction of only modest errors in these metrics, such as a 91% reduction with less than 5% error when predicting voltage regulator operations. Furthermore, an alternate variable time-step method is also shown to perform adequately and shows promise of even greater reductions in simulation runtime.

14 SOLAR ENERGY↗

IRES Microgrid Energy Integration Report Version 1.0

This report presents technical information and guidance for the planned Integrated Renewable Energy System (IRES) microgrid project. This deployment of the microgrid and its associated assets was initiated in the beginning of 2022 at the Marine and Coastal Research Laboratory (MCRL) facility of Pacific Northwest National Laboratory (PNNL)-Sequim, Washington. The information in the report is organized under two main focus areas: electrical power interface, or interconnection, information of planned IRES assets; and communication and control interface, or interoperability, information of the planned IRES assets. The information will provide technical input for the development of the IRES microgrid controller technical specification, and also provide input for PNNL’s evaluation of adequacy of the electrical service infrastructure at MCRL to support the IRES project and help identify any gaps that will require facility-based upgrades. From an R&D aspect, this study and report will build on PNNL’s research and development work relating to energy storage (ES) codes and standards (C&Ss), including hybrid systems, performed on behalf of the Department of Energy (DOE) Office of Electricity (OE) ES. The current state of C&Ss for advanced technologies and their application, including microgrid-based technology is limited. For cases where formal standards issued by recognized Standards Developing Organizations do not yet exist, guidance is provided based on emerging best practices, including industry-group references that can be leveraged for microgrid technology which is in its early stages of development and use.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Energy Storage for Variable Renewable Energy Resource Integration - A Regional Assessment for the Northwest Power Pool (NWPP)

This paper addresses the following key questions in the discussion on the integration of renewable energy resources in the Pacific Northwest power grid: a) what will be the future balancing requirement to accommodate a simulated expansion of wind energy resources from 3.3 GW in 2008 to 14.4 GW in 2019 in the Northwest Power Pool (NWPP), and b) what are the most cost effective technological solutions for meeting the balancing requirements in the Northwest Power Pool (NWPP). A life-cycle analysis was performed to assess the least-cost technology option for meeting the new balancing requirement. The technologies considered in this study include conventional turbines (CT), sodium sulfur (NaS) batteries, lithium ion (Li-ion) batteries, pumped hydro energy storage (PH), and demand response (DR). Hybrid concepts that combine 2 or more of the technologies above are also evaluated. This analysis was performed with collaboration by the Bonneville Power Administration and funded by the Energy Storage Systems Program of the U.S. Department of Energy.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Land-Based Wind Market Report: 2022 Edition

The U.S. Department of Energy's 2022 edition of its Land-Based Wind Market Report provides an overview of key trends in the U.S. wind power market, with a focus on 2021. You can find a report, data file and presentation on the Files tab, below. Additionally, several data visualizations are available on the Visualizations tab. Despite ongoing supply chain challenges, wind energy in 2021 continued to see strong growth, technology improvements, and low prices in the U.S. Key highlights include: Wind comprises a growing share of electricity supply: U.S. wind power capacity grew at a strong pace in 2021, with the 13.4 GW of new additions representing a $\$20$ billion investment and 32% of all newly added U.S. generation capacity. Wind energy output rose to account for more than 9% of the entire nation’s electricity supply. At least 247 GW of wind are seeking transmission interconnection; 77 GW of this capacity are offshore wind and 19 GW are hybrid plants that pair wind with storage or solar PV. Wind project performance has increased over the decades: The average capacity factor among recently built projects was nearly 40%, considerably higher than projects built earlier. The highest capacity factors are seen in the interior ‘wind belt’ of the country. Turbines continue to get larger: Improved plant performance has been driven by larger turbines mounted on taller towers and featuring longer blades. In 2011, no turbines employed blades that were 115 meters in diameter or larger, but in 2021, 89% of newly installed turbines featured such rotors. Proposed projects indicate that total turbine height will continue to rise. Low wind turbine pricing has pushed down installed project costs over the last decade: Wind turbine prices averaged $\$800$–$\$950$/kW in 2021, a 5% to 10% increase from the year prior but substantially lower than in 2010. The average installed cost of wind projects in 2021 was $\$1,500$/kW, down more than 40% since the peak in 2010, though relatively stable in recent years. The lowest costs were found in Texas and the (non-ISO) West. Wind energy prices are on the rise, but generally remain low, around $\$20$/MWh in the interior of the country with higher prices in the West and East. After topping out above $\$75$/MWh for power purchase agreements (PPAs) executed in 2009, the national average price of wind PPAs has dropped—though supply-chain pressures have resulted in increased prices in recent years. In the interior ‘wind belt’ of the country, recent pricing is around $\$20$/MWh. In the West and East, prices tend to average above $\$30$/MWh. These prices, which are possible in part due to federal tax support, fall below the projected future fuel costs of gas-fired generation. Wind PPA prices are often attractive compared to wind’s grid-system market value: The value of wind in wholesale power markets is affected by the location of wind plants, their hourly output profiles, and how those characteristics correlate with real-time electricity prices and capacity markets. The market value of wind increased in 2021, averaging $\$16$/MWh in MISO, $\$19$/MWh in SPP, $\$23$/MWh in NYISO, $\$31$/MWh in ERCOT, $\$33$/MWh in PJM, $\$44$/MWh in ISO-NE, and $\$48$/MWh in CAISO. The average levelized cost of wind energy was $\$32$/MWh for plants built in 2021: Levelized costs, which exclude the impacts of federal tax incentives, vary across time and geography. The national average stood at $\$32$/MWh in 2021—down substantially historically, though relatively stable in recent years. Levelized costs were lowest in ERCOT, SPP, and the (non-ISO) West. The health and climate benefits of wind in 2021 were larger than its grid-system value, and the combination of all three far exceeds the current levelized cost of wind: Wind generation reduces power-sector emissions of carbon dioxide, nitrogen oxides, and sulfur dioxide. These reductions, in turn, provide public health and climate benefits that vary regionally, but together are economically valued at an average of over $\$90$/MWh-wind for plants built in 2021.

17 WIND ENERGY↗

A First Look at the Impact of Electric Vehicle Charging on the Electric Grid in the EV Project

ECOtality was awarded a grant from the U.S. Department of Energy to lead a large-scale electric vehicle charging infrastructure demonstration, called The EV Project. ECOtality has partnered with Nissan North America, General Motors, the Idaho National Laboratory, and others to deploy and collect data from over 5,000 Nissan LEAFsTM and Chevrolet Volts and over 10,000 charging systems in 18 regions across the United States. This paper summarizes usage of residential charging units in The EV Project, based on data collected through the end of 2011. This information is provided to help analysts assess the impact on the electric grid of early adopter charging of grid-connected electric drive vehicles. A method of data aggregation was developed to summarize charging unit usage by the means of two metrics: charging availability and charging demand. Charging availability is plotted to show the percentage of charging units connected to a vehicle over time. Charging demand is plotted to show charging demand on the electric gird over time. Charging availability for residential charging units is similar in each EV Project region. It is low during the day, steadily increases in evening, and remains high at night. Charging demand, however, varies by region. Two EV Project regions were examined to identify regional differences. In Nashville, where EV Project participants do not have time-of-use electricity rates, demand increases each evening as charging availability increases, starting at about 16:00. Demand peaks in the 20:00 hour on weekdays. In San Francisco, where the majority of EV Project participants have the option of choosing a time-of-use rate plan from their electric utility, demand spikes at 00:00. This coincides with the beginning of the off-peak electricity rate period. Demand peaks at 01:00.

33 ADVANCED PROPULSION SYSTEMS↗

Multiscale Effects Masked the Impact of the COVID-19 Pandemic on Electricity Demand in the United States

Shelter-in-place orders and business closures related to COVID-19 changed the hourly profile of electricity demand and created an unprecedented source of uncertainty for the grid. The potential for continued shifts in electricity profiles has implications for electricity sector investment and operating decisions that maintain reserve margins and provide grid reliability. This study reveals that understanding this uncertainty requires an understanding of the underlying drivers at the customer-class scale. This paper utilizes three datasets to compare the impacts of COVID-19 on electricity consumption across a range of spatiotemporal and customer scales. At the utility/customer-class scale, COVID-19-induced shutdowns in the spring of 2020 shifted weekday residential load profiles to resemble weekend profiles from previous years. Total commercial loads declined, but the commercial diurnal load profile was unchanged. With only total loads available at the balancing authority scale, the apparent impact of COVID-19 was smaller during the summer due in part to phased re-opening and spatial variability in re-opening, but there were still clear variations once total loads were broken down zonally. Monthly data at the state scale showed an increase in state-level residential electricity sales, a decrease in commercial sales, and a small net decrease in total sales in most states from April-August 2020. Analyses that focus on total load or a single scale may miss important changes that become apparent when the load is broken down regionally or by customer class.

COVID-19, electricity demand, multiscale, Commonwe↗

Evaluation of Hydrogen Production Feasibility for a Light Water Reactor in the Midwest

Increased electricity production from renewable energy resources coupled with low natural gas prices has caused existing light-water reactor (LWRs) to experience ever diminishing returns from the electricity market. Via partnership among Idaho National Laboratory (INL), The National Renewable Energy Laboratory (NREL), Argonne National Laboratory (ANL), Exelon, and Fuel Cell Energy a techno-economic analysis on the viability of retrofitting existing pressurized water reactors (PWRs) to produce hydrogen (H2) via high temperature steam electrolysis (HTSE) has been conducted. Such integration would allow nuclear facilities to expand into additional markets that may be more profitable in the long-term. To accommodate such an integration, a detailed analysis of HTSE process operation, requirements, and flexibility was conducted. Technical analysis includes proposed nuclear system control scheme modifications to allow dynamic operation of the HTSE via both thermal and electrical connection to the nuclear plant. High fidelity Modelica simulations showcase the viability of such control schemes. However, due to limited knowledge of solid oxide fuel cell (SOFC) stack degradation due to thermal gradients; thermal cycling of the HTSE was not included. Therefore, the control schemes proposed are only utilized to re-distribute steam at startup and only the portion of electricity utilized in the electrolyzers is cycled. From the detailed analysis of the nuclear integration and the HTSE process design, a comprehensive cost estimation was conducted in the APEA and H2A models to elucidate capital and operational costs associated with the production, compression, and distribution of hydrogen from a nuclear facility. Alongside this costing analysis, market analyses were conducted by NREL and ANL on the electric and hydrogen markets respectively in the PJM interconnect. Utilizing the electricity data market projections in the PJM interconnect from NREL and hydrogen demand/pricing projections from ANL a five variable sweep over component capacities, discount rates, and hydrogen pricing was completed using the stochastic framework RAVEN (Risk Analysis Virtual ENVironment) through its resource dispatch plugin HERON (Heuristic Energy Resource Optimization Network). Each combination of variables was evaluated stochastically four times over a seventeen year timespan from 2026-2042 (inclusive) to determine the most economically advantageous solution. Following the five variable sweep an optimization was conducted about the best sweep point to determine optimal component sizing and setpoints. Results suggest positive gain is achievable at all projected hydrogen market pricing levels and at all discount rates. However, exact component sizing and net returns vary based on these values and if incorrect sizing is selected; major net losses can occur. The optimal result occurred with set points as follows: high hydrogen prices, the largest possible HTSE unit in the sweep set at 7.47 kg/sec [645.4 tpd], a contractual hydrogen market agreement 7.29 kg/sec [629.8 tpd], and a hydrogen storage size 115,188 kg. The analysis suggested that with a discount rate of 8%, a ΔNPV = 1.2 billion over the seventeen year span can be achieved. The results illuminate that by operating in multiple markets the nuclear facility is capable of avoiding sale of electricity during times of low electricity market pricing, while maintaining the ability to capitalize on the high electricity market pricing. It should be noted that the analysis conducted in this report is a differential cash flow analysis and as such does not present profit levels. Instead it highlights the net benefit between building and competing in the hydrogen market utilizing nuclear facilities and conducting business as usual in the electricity markets. Additionally, results presented in this report exhibit conservatism due to four key assumptions: Given the limited knowledge on SOFC stack degradation due to thermal gradients the high temperature steam electrolysis plant is not allowed to thermally cycle. This limitation decreases electricity generation capacity in the nuclear plant, reducing capacity payments and the maximum output to the electrical grid. This analysis considers building a separate hydrogen pipeline for use in the nuclear facility. Research is currently being conducted to determine if existing natural gas pipelines can accommodate direct hydrogen injection. If hydrogen can be integrated into existing natural gas pipelines then a capital savings of ~$19,000,000 per kg/sec [1 kg/sec = 86.4 tpd] of installed HTSE capacity could be realized. Fast transients in the electric grid are typically served by flywheels and electric batteries. With electrolysis only operation the nuclear plant can flex its electricity just as quickly. However, for this analysis, the ancillary services market has been neglected. Should the nuclear plant have the ability to operate in the ancillary services market during periods when it is producing hydrogen, an additional substantial income stream that would increase overall system profitability could be considered. Subsidies for non-emitting generation technologies are not introduced in the cash flow analysis, but instead are completed assuming zero subsidies. Profitability is based solely on electricity pricing. Electric pricing is assumed to never go negative. Instead, it is assumed overall system curtailment by the Independent System Operator (ISO) will occur in such a manner that pricing remains at or above zero. This assumption inflates the “business as usual” scenario, thus decreasing the ΔNPV calculated. If negative pricing scenarios continue to occur as they do today, one would expect a further increase in ΔNPV. Overall, results advocate that, through market diversification, nuclear power plants have the potential to substantially increase current profit margins, increase market penetration, and ultimately solidify their place as a mainstay in energy production.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Demonstration of μCHP in Light Commercial Hot Water Applications

Internal combustion engine driven combined heat and power (CHP) systems produce power while the waste heat is recovered and used for another purpose. For µCHP systems (less than 50kWe output) overall efficiencies can reach over 90% for products currently on the market throughout the world. On a fuel basis this offers an advantage over using grid-based power and another fuel for heat. Additionally, the cost of natural gas on an energy unit basis is significantly less expensive than electric power. This difference can lead to substantial savings for the end user of a CHP system. In some parts of the world, particularly Germany and Japan, µCHP has become a common part of the heat and distributed generation equipment mix. Market analysis conducted in 2012 showed that in North America there is potential of a 5,300 units per year market for µCHP, resulting in an annual energy savings of approximately 13.5 TBtu and more than $84 million in annual customer savings. However, µCHP still has not seen much market penetration in North America. This study helps to identify some of the reasons why, address roadblocks that still need to be overcome and provide experience to established best practices. Nine commercial sites were initially identified (fitness club, surgical center, senior community, resort and spa, commercial laundry, two multi-family housing, restaurant and manufacturing facility). Systems from two different manufacturers were installed at five sites total, but due to unforeseen circumstances, only three of those sites were finally commissioned: test data were collected by Oak Ridge National Laboratory. While not all systems were installed as intended, the project resulted in the following key findings: Micro combined heat and power is an unfamiliar technology for building owners and plumbing and electrical contractors that serve the buildings most suited for µCHP. Manufacturers will need to be aggressive in providing training and providing broad support to successfully bring the technology to market.; The proper integration of µCHP into other building systems is the most critical part of a successful installation. Manufacturers will need to be able to provide the expertise to train, advise and support the mechanical contractors during the design and installation of the heat integration system.; Regulations governing µCHP varies across the country. There are a few UL standards (UL 2200 and UL 1741) that apply nationally. Emissions are governed by EPA except in California where the California Air Resources Board (CARB) has established their own standard. Requirements that dictate installation and interconnection are dependent on local building codes and local utility processes and requirements. Some out of date building codes do not offer clear guidance for these requirements, leading to confusion. This makes developing training and determining broadly applicable best practices difficult.; Installation costs of µCHP are a key factor in making an installation successful. It is critical that these costs and all national, state and local regulations be understood and accounted for by all parties involved in the installation before a project is undertaken.; A robust customer service organization is important to meet the needs of the customers. These systems require annual maintenance and service and local capability is needed to keep costs inline.

03 NATURAL GAS↗

The Potosi Reservoir Model 2013

As a part of a larger project co-funded by the United States Department of Energy (US DOE) to evaluate the potential of formations within the Cambro-Ordovician strata above the Mt. Simon as potential targets for carbon sequestration in the Illinois and Michigan Basins, the Illinois Clean Coal Institute (ICCI) requested Schlumberger to evaluate the potential injectivity and carbon dioxide (CO2) plume size of the Cambrian Potosi Formation. The evaluation of this formation was accomplished using wireline data, core data, pressure data, and seismic data from the US DOE-funded Illinois Basin–Decatur Project (IBDP) being conducted by the Midwest Geological Sequestration Consortium in Macon County, Illinois. In 2010, technical performance evaluations on the Cambrian Potosi Formation were performed through reservoir modeling. The data included formation tops from mud logs, well logs from the VW1 and the CCS1 wells, structural and stratigraphic formation from three dimensional (3D) seismic data, and field data from several waste water injection wells for Potosi Formation. Intention was for two million tons per annum (MTPA) of CO2 to be injected for 20 years. In the preceding, the 2010 Potosi heterogeneous model (referred to as the "Potosi Dynamic Model 2010" in this topical report) was re-run using a new injection scenario; 3.2 MTPA for 30 years. The extent of the Potosi Dynamic Model 2010, however, appeared too small for the new injection target. It was not sufficiently large enough to accommodate the evolution of the plume. The new model, Potosi Dynamic Model 2013a, was built by extending the Potosi Dynamic Model 2010 grid to 30 miles x 30 miles (48.3km x48.3km), while preserving all property modeling workflows and layering. This model was retained as the base case of Potosi Dynamic Model 2013a. The Potosi reservoir model was updated to take into account the new data from the verification well VW2 which was drilled in 2012. The new porosity and permeability modeling was performed to take into account the log data from the new well. Revisions of the 2010 modeling assumptions were also done on relative permeability, capillary pressures, formation water salinity, and the maximum allowable well bottomhole pressure. Dynamic simulations were run using the injection target of 3.2 MTPA for 30 years. This new dynamic model was named Potosi Dynamic Model 2013b. Due to the major uncertainties on the vugs permeability, two models were built; the Pessimistic and Optimistic Cases. The Optimistic Case assumes vugs permeability of 9,000 mD, which is analog to the vugs permeability identified in the pressure fall off test of a waste water injector in the Tuscola site, approx. 40 miles (64.4km) away from the IBDP area. The Pessimistic Case assumes that the vugs permeability is equal to the log data, which does not take into account the permeability from secondary porosity. The probability of such case is deemed low and could be treated as the worst case scenario, since the contribution of secondary porosity to the permeability is neglected and the loss circulation events might correspond to a much higher permeability. It is considered important, however, to identify the range of possible reservoir performance since there are no rigorous data available for the vugs permeability. The Optimistic Case gives an average CO2 injection rate of 0.8 MTPA and cumulative injection of 26 MT in 30 years, which corresponds to 27% of the injection target. The injection rate is approx. 3.2 MTPA in the first year as the well is injecting into the surrounding vugs, and declines rapidly to 0.8 MTPA in year 4 once the surrounding vugs are full and the CO2 start to reach the matrix. This implies that according to this preliminary model, a minimum of four (4) wells could be required to achieve the injection target. This result is lower than the injectivity estimated in the Potosi Dynamic Model 2013a (43 MT in 30 years), since the permeability model applied in the Potosi Dynamic Model 2013b is more conservative. This revision was deemed necessary to treat the uncertainty in a more appropriate manner. As the CO2 follows the paths where vugs interconnection exists, a reasonably large and irregular plume extent was created. For the Optimistic Case, the plume extends 17 miles (27.4km) in E-W and 14 miles (22.5km) in N-S directions after 30 years. After injection is completed, the plume continues to migrate laterally, mainly driven by the remaining pressure gradient. After 100 years post injection, the plume extends 20 miles (32.2km) in E-W and 15.5 miles (24.9km) in N-S directions. Should the targeted cumulative injection of 96 MT be achieved; a much larger plume extent could be expected. For the Optimistic Case, the increase of reservoir pressure at the end of injection is approximately 1200 psia (8,274 kPa) around the injector and gradually decreases away from the well. The reservoir pressure increase is less than 30 psia (206.8 kPa) beyond 14 miles (22.5km) away from injector. Should the targeted cumulative injection of 96 MT be achieved; a much larger areal pressure increase could be expected. The initial reservoir pressure is nearly restored after approximately 100 years post injection. The presence of matrix slows down the pressure dissipations. The Pessimistic Case gives an average CO2 injection rate of 0.2 MTPA and cumulative injection of 7 MT in 30 years, which corresponds to 7% of the injection target. This implies that in the worst case scenario, a minimum of sixteen (16) wells could be required to achieve the injection target. The present evaluation is mainly associated with uncertainty on the vugs permeability, distribution, and interconnectivity. The different results indicated by the Optimistic and Pessimistic Cases signify the importance of vugs permeability characterization. Therefore, injection test and pressure interference test among the wells could be considered to evaluate the local vugs permeability, extent, and interconnectivity. Porosity mapping derived from the seismic inversion could also be used in the succeeding task to characterize the lateral porosity distribution within the reservoir. With or without seismic inversion porosity mapping, it is worth exploring whether increased lateral heterogeneity plays a significant role in Potosi injectivity. Investigations on vugular, dolomitic outcrops suggest that there may be significantly greater lateral heterogeneity than what has been modeled here. Facies modeling within the Potosi has yet to be thoroughly addressed. The carbonates during the time of deposition are believed to be regionally extensive. However, it may be worth delineating the reservoir with other regional wells or modern day analogues to understand the extent of the Potosi. More specifically, the model could incorporate lateral changes or trends if deemed necessary to represent facies transition. Data acquisitions to characterize the fracture pressure gradient, the formation water properties, the relative permeability, and the capillary pressure could also be considered in order to allow a more rigorous evaluation of the Potosi storage performance. A simulation using several injectors could also be considered to determine the required number of wells to achieve the injection target while taking into account the pressure interference.

Adushita, Yasmin↗

The Potosi Reservoir Model 2013c, Property Modeling Update

As part of a larger project co-funded by the United States Department of Energy (US DOE) to evaluate the potential of formations within the Cambro-Ordovician strata above the Mt. Simon as potential targets for carbon sequestration in the Illinois and Michigan Basins, the Illinois Clean Coal Institute (ICCI) requested Schlumberger to evaluate the potential injectivity and carbon dioxide (CO2) plume size of the Cambrian Potosi Formation. The evaluation of this formation was accomplished using wireline data, core data, pressure data, and seismic data from this project as well as two other separately funded projects: the US DOE-funded Illinois Basin–Decatur Project (IBDP) being conducted by the Midwest Geological Sequestration Consortium (MGSC) in Macon County, Illinois, and the Illinois Industrial Carbon Capture and Sequestration (ICCS) project funded through the American Recovery and Reinvestment Act. In 2010, technical performance evaluations on the Cambrian Potosi Formation were performed through reservoir modeling. The data included formation tops from mud logs, well logs from the Verification Well #1 (VW1) and the Injection Well (CCS1), structural and stratigraphic formation from three dimensional (3D) seismic data, and field data from several waste water injection wells for Potosi Formation. The intention was for 2.2 million tons per annum (2 million tonnes per annum [MTPA]) of CO2 to be injected for 20 years. In the Task Error! Reference source not found., the 2010 Potosi heterogeneous model (referred to as the "Potosi Dynamic Model 2010") was re-run using a new injection scenario of 3.5 million tons per annum (3.2 MTPA) for 30 years. The extent of the Potosi Dynamic Model 2010, however, appeared too small for the new injection target. The models size was insufficient to accommodate the evolution of the plume. The new model, Potosi Dynamic Model 2013a, was built by extending the Potosi Dynamic Model 2010 grid to 30 by 30 mi (48 by 48 km), while preserving all property modeling workflows and layering. This model was retained as the base case. In the preceding Task [1], the Potosi reservoir model was updated to take into account the new data from the Verification Well #2 (VW2) which was drilled in 2012. The porosity and permeability modeling was revised to take into account the log data from the new well. Revisions of the 2010 modeling assumptions were also done on relative permeability, capillary pressures, formation water salinity, and the maximum allowable well bottomhole pressure. Dynamic simulations were run using the injection target of 3.5 million tons per annum (3.2 MTPA) for 30 years. This dynamic model was named Potosi Dynamic Model 2013b. In this Task, a new property modeling workflow was applied, where seismic inversion data guided the porosity mapping and geobody extraction. The static reservoir model was fully guided by PorosityCube interpretations and derivations coupled with petrophysical logs from three wells. The two main assumptions are: porosity features in the PorosityCube that correlate with lost circulation zones represent vugular zones, and that these vugular zones are laterally continuous. Extrapolation was done carefully to populate the vugular facies and their corresponding properties outside the seismic footprint up to the boundary of the 30 by 30 mi (48 by 48 km) model. Dynamic simulations were also run using the injection target of 3.5 million tons per annum (3.2 MTPA) for 30 years. This new dynamic model was named Potosi Dynamic Model 2013c. Reservoir simulation with the latest model gives a cumulative injection of 43 million tons (39 MT) in 30 years with a single well, which corresponds to 40% of the injection target. The injection rate is approx. 3.2 MTPA in the first six months as the well is injecting into the surrounding vugs, and declines rapidly to 1.8 million tons per annum (1.6 MTPA) in year 3 once the surrounding vugs are full and the CO2 start to reach the matrix. After, the injection rate declines gradually to 1.2 million tons per annum (1.1 MTPA) in year 18 and stays constant. This implies that a minimum of three (3) wells could be required in the Potosi to reach the injection target. The injectivity evaluated in this Task was higher compared to the preceding Task, since the current facies modeling (guided by the porosity map from the seismic inversion) indicated a higher density of vugs within the vugular zones. 5 As the CO2 follows the paths where vugs interconnection exists, a reasonably large and irregular plume extent was created. After 30 years of injection, the plume extends 13.7 mi (22 km) in E-W and 9.7 mi (16 km) in N-S directions. After injection finishes, the plume continues to migrate laterally, mainly driven by the remaining pressure gradient. After 60 years post-injection, the plume extends 14.2 mi (22.8 km) in E-W and 10 mi (16 km) in N-S directions, and remains constant as the remaining pressure gradient has become very low. Should the targeted cumulative injection of 106 million tons (96 MT) be achieved; a much larger plume extent could be expected. The increase of reservoir pressure at the end of injection is approximately 1,200 psia (8,274 kPa) around the injector and gradually decreases away from the well. The reservoir pressure increase is less than 10 psia (69 kPa) beyond 14 mi (23 km) away from injector. Should the targeted cumulative injection of 106 million tons (96 MT) be achieved; a much larger areal pressure increase could be expected. The reservoir pressure declines rapidly during the first 30 years post injection and the initial reservoir pressure is nearly restored after 100 years post-injection. The present evaluation is mainly associated with uncertainty on the vugs permeability and interconnectivity. The use of porosity mapping from seismic inversion might have reduced the uncertainty on the lateral vugs body distributions. However, major uncertainties on the Potosi vugs permeability remains. Therefore, injection test and pressure interference test among the wells could be considered to evaluate the local vugs permeability, extent, and interconnectivity. Facies modeling within the Potosi has yet to be thoroughly addressed. The carbonates during the time of deposition are believed to be regionally extensive. However, it may be worth delineating the reservoir with other regional wells or modern day analogues to understand the extent of the Potosi. More specifically, the model could incorporate lateral changes or trends if deemed necessary to represent facies transition. Data acquisitions to characterize the fracture pressure gradient, the formation water properties, the relative permeability, and the capillary pressure could also be considered in order to allow a more rigorous evaluation of the Potosi storage performance. A simulation using several injectors could also be considered to determine the required number of wells and appropriate spacing to achieve the injection target while taking into account the pressure interference.

Adushita, Yasmin↗

Grid-Ready Energy Analytics Training with Data (“GREAT with Data”)

GridEd is a collaborative educational initiative consisting of the Electric Power Research Institute (EPRI), 5 Partner Universities (Stony Brook University, The University of Texas at Austin, University of California – Riverside, Virginia Tech, Washington State University), and participating industry sponsors. This educational initiative focuses on developing and training the next generation of power engineers so they can help shape the electric grid of the future by anticipating and fulfilling the needs of changing electric industry requirements. GridEd is leveraging electric industry research to educate a future electric grid workforce by empowering new and continuing education students, not only to become competent and well-informed engineers, but also to participate and influence major technological, social, and policy decisions that address critical global challenges. GridEd’s activities are centered around four core pillars: Enhancement of university power systems engineering curricula; Professional development and training for a diverse electric industry workforce; Stimulating students to join the movement for the next generation of power engineers, and; Improve workforce development efforts in the electric utility industry. Major accomplishments over the course of the project were: Over 50 unique professional short courses were delivered by more than 30 instructors across the GridEd network; Over 3,600 unique learners, many who took multiple courses, received more than 27,000 professional development hours (PDH) and over 1,000 certificates of completion; Approximately 2,900 unique learners undertook a course that was offered LIVE online or in-person; Approximately 700 unique learners undertook a course that was offered as computer-based training (CBT); Over 35 unique university courses were delivered by more than 30 instructors to 1,500 university students across the GridEd network; One-hundred-and-fifty-seven (157) students were funded to completed 43 student projects in topics of power systems and data science, and; Six (6) Historically Black Colleges and Universities (HBCUs) recruited as Affiliate Universities via Utility Partners. The professional training initiative and workforce development activities launched by this project will be sustained through EPRI’s collaborative business model with industry. Stimulating students to join the power engineering workforce of the future and the enhancement of tertiary training may continue to need government support.

14 SOLAR ENERGY↗

Restoration Hydro: A Watershed Approach to Standard Modular New Hydropower

The objectives of FOA DE- FOA-0001836- “Standard Modular Hydropower” included designing a standardized, modular, and environmentally compatible hydropower schematic for implementation in greenfield sites that generate up to 10 MW of capacity. Utilizing funds competitively awarded under DOE’s Water Power Technologies Office, the Natel Energy team developed a concept for modular new stream reach (NSR) hydropower that incorporates multi species upstream and downstream fish passage, improved river channel connectivity, and recreational modules. The in-stream design of the collective modules minimized site specific design and maximized the opportunities for modularity. Financial data was also presented using actual costs from regional suppliers, with figures provided in 2022 dollars. While the project team did not address potential permitting process improvements, the site selection criteria did consider established barriers to hydropower development such as tribal and preserved lands, interconnection proximity, and endangered species to exclude or deprioritize. The project’s design schematic met the objectives of the FOA, and presented a unique solution that targets alluvial pockets as natural features for sustainable development. Natel’s concept also incorporated the company's fish-safe Restoration Hydro Turbine for safe downstream passage, while featuring a rock arch that integrates fish passage, water, recreation, and grade control modules (including sediment). Alignment with the Department of Energy Office of Energy Efficiency and Renewable Energy (EERE) “Innovative Design Concepts for Standard Modular Hydropower and Pumped-Storage Hydropower” Program: According to the Hydropower Vision (DOE, 2016), approximately 16 GW of hydropower growth is possible with the development of technology solutions that balance efficiency, economics, and environmental sustainability. The desired outcome of the SMH program is transformational innovation specifically in the site identification, conceptual, and detailed design phases of technology development lifecycles (DOE, 2018). In developing the SMH design schematic, the team aimed to address the opportunities outlined in the Vision through an inverted design philosophy; rather than singularly prioritizing efficiency and power production, the team focused on integrating hydropower with restoration of degraded streams to optimal ecosystem function and provision of exceptional recreation value as design criteria. To achieve this, Restoration Hydro incorporates the principles of nature-based engineering (WWAP, 2018) and biomimicry (Biomimicry NL.) to strategically deploy complementary combinations of permanent, semi-permanent, and ephemeral low-head structures - such as natural and engineered log jams - that harness geomorphological and hydrological processes at the landscape-scale. Primary applications of Restoration Hydro include: 1) restoration of degraded watersheds’ natural ecological function and enhancement of hydrological connectivity; and 2) creation of associated co-benefits to hydro production, including increased groundwater recharge, improved sediment transport and management, improved water security and water quality. Restoration Hydro projects build upon proven watershed restoration engineering techniques by integrating hydropower turbines into low-head structures using innovative and evolving civil works concepts that facilitate fish and sediment passage, and in some cases create additional revenue-generating recreational opportunities. Powering low-head structures creates a directly monetizable layer of economic value in the form of flexible, reliable, renewable energy on top of the already high-value water, environmental and recreational benefits of watershed and river restoration. The approach aims to create a virtuous, self-reinforcing cycle whereby Restoration Hydro projects support the scaling of ecosystem restoration activities, creating a water-energy-carbon multiplier effect that, through the principles of adaptive change management: 1) improves the resilience of landscapes and downstream population centers for changing hydrological cycles; 2) creates a reliable energy resource that facilitates the integration of intermittent renewable power sources into grids; and 3) supports climate change mitigation through grid decarbonization and enhanced ecosystem carbon capture and retention.

13 HYDRO ENERGY↗

Potential State Regulatory Pathways to Facilitate Low-Carbon Fuels

States and the federal government are increasingly engaged in the challenges around decarbonizing the electric grid. In particular, regulators, consumers, stakeholders, and utilities recognize the need to carefully consider the role natural gas will play in a decarbonized future. A variety of technology and policy options to reduce greenhouse gas emissions associated with natural gas use are available, including energy efficiency programs, demand reduction tools, strategic electrification, and strategies to reduce emissions from natural gas production, transportation, and consumption. Low-carbon fuels – mainly renewable natural gas (RNG) and clean hydrogen – are being considered an important component of decarbonization goals. RNG and hydrogen may be able to meaningfully reduce emissions from processes independent of geologic natural gas, displacing emissions of methane, a powerful greenhouse gas. Although RNG and hydrogen are not cost-competitive today with geologic natural gas and are smaller in scale and potential than other decarbonization options, they can be explored as potential critical tools to decarbonize sectors that are difficult to electrify or shift off of natural gas entirely, such as air travel, industrial processes, maritime transport, long-distance trucking, space heating on cold days, and railroads (Nadel, 2022). The role of this report is to provide informational context for state utility regulators to understand the impacts of and challenges associated with broader integration of low-carbon fuels, followed by examples of state regulatory actions taken to date to facilitate the development of low-carbon fuels. Setting clear guidance to calculate the environmental benefits of low-carbon fuels and continuing federal and state investments in research and development to reduce costs relative to fossil fuels will be important steps to take to signal the desire to grow the market for these fuels. State public utility commissions may play a key role in setting regulatory frameworks for low-carbon fuels and ensuring that ratepayer funds, if utilized, are done so to further the public interest. This report is intended to summarize decisions that states have made to date on low-carbon fuels. In the spirit of understanding the current market and sharing information, this report provides success stories, and lessons learned across states as regulators implement varying strategies to achieve decarbonization objectives while maintaining their focus on affordability, safety, and reliability of the energy system. The report begins with an introduction of the role of natural gas in the U.S. economy (Section I) and background information on natural gas use, decarbonization, and low-carbon fuels (Section II). Next, the report describes the current market by discussing the scale of current production, emissions intensity, resource potential, and costs of low-carbon fuels compared to geologic natural gas (Section III). Following these sections, the report describes four strategies states have employed to facilitate low-carbon fuels: opening exploratory dockets, approving voluntary tariffs for customers, approving interconnection tariffs for producers, and considering portfolio-wide procurement targets (Section IV). This section lists states that have taken actions in each category, citing utility filings, commission decisions, stakeholder comments, and other relevant sources. Finally, the report concludes with suggested questions regulators may wish to consider regarding low-carbon fuels, in the interest of preparing to make decisions in the future (Section V). These questions include: Are there existing regulatory or technical barriers to voluntary purchases of low-carbon fuels? Can customers work with utilities to procure low-carbon fuels; are producers able to interconnect projects without significant barriers to entry? Should the infrastructure and/or commodity costs of low-carbon fuels be socialized among all ratepayers, or borne solely by the large commercial and industrial (C&I) customers currently driving the market? Should regulated natural gas and/or electric utilities own and operate low-carbon fuel production? How should regulators consider the unique decarbonization potential of low-carbon fuels, particularly for hard-to-abate sectors, in decision-making? Is additional direction or clarity from state policymakers needed? What no-regrets approaches can help facilitate both near-term RNG development and long-term development of hydrogen and other zero-carbon fuels? We collectively wish to express our gratitude to the U.S. Department of Energy, Office of Fossil Energy and Carbon Management, for supporting this report and other technical assistance resources for state regulators on natural gas topics. State regulators operate under a variety of policy environments, and states have vastly different types of energy resources, infrastructure, and customers. While there is no optimal regulatory, policy, or technological solution that will be successful in every state, state regulators can benefit by exchanging lessons learned with their peers across the country. We look forward to continued engagement with our fellow commissioners, commission staff, NARUC, the U.S. Department of Energy, and other stakeholders to develop sound regulation in the public interest.

03 NATURAL GAS↗