Search NASA⌕ Search

SEARCH · Search NASA

Results for “probabilistic analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,027 records · Page 57

Exploring the potential of using L-Band InSAR for the mapping of flooded vegetation in tropical wetlands

Wetlands play a critical role in global water and carbon cycles, yet monitoring their water extent remains difficult, particularly beneath dense vegetation. SAR-based techniques such as backscatter thresholding are limited by complex scattering mechanisms, while fully polarimetric SAR (PolSAR) data capable of detecting doublebounce scattering remain scarce. To address these challenges, this study evaluates the potential of Interferometric SAR (InSAR) for mapping water surfaces beneath vegetation, termed flooded vegetation, using the Atrato floodplain in Colombia as a case study. We develop an automated workflow combining InSAR fringe detection with local phase homogeneity analysis and random sampling of processing parameters to generate probabilistic flooded vegetation maps. Applied to ALOS PALSAR-1 L-band image pairs from 2007–2011, the workflow captures seasonal fluctuations in flooded extent ranging from 500 to 1,500 km2. Compared to other L-band SAR inundation products, the InSAR-based maps identify broader flooded areas, with ~70% agreement in pairwise comparisons. Around 84% of detections align with existing wetland inventories and seasonal changes correspond with regional hydrological indicators, including terrestrial water storage anomalies and water gauge measurements. PolSAR analysis shows that InSAR complements backscatter-based methods by detecting inundation in areas with weak double-bounce signals. These findings suggest that combining InSAR with backscatter-based methods can improve detection of flooded vegetation, which is especially relevant for the upcoming NISAR mission that will offer frequent global L-band observations.

Coastal inundation↗

Seismic fragility analysis for lateral supports of HTR-PM RPV - 18521

Since Fukushima accident, there has been increasing interest in China to study the risks of nuclear power plants under seismic events that are beyond the design basis. Two methodologies are commonly being adopted for this purpose, namely the seismic probabilistic risk assessment (SPRA) and the seismic margin assessment (SMA). Fragility analysis plays an important role as it not only provides fragility curves as input for the SPRA, but also can deduce HCLPF values for the SMA. In this paper, seismic fragilities of the lateral supports of the HTR-PM reactor pressure vessel (RPV) are studied. The lateral supports are crucial to the safety of HTR-PM RPV under seismic events. As they are located at a high elevation in the reactor building, it is expected they are one of the major contributors to the seismic risk of HTR-PM. The lateral supports are first briefly introduced in terms of structural features, load conditions and stress acceptance criteria in the engineering design. Their fragilities are then analyzed by identifying basic fragility analysis variables and determining values in terms of the median and standard deviations. The associated fragility curves are finally calculated and a HCLPF value is reported. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Reliable algorithms for power system analysis in the presence of data uncertainties

A robust and reliable power flow analysis represents an essential requirement for many power systems applications as far as network optimization, voltage control, state estimation, and service restoration are concerned. The most common power flow approach, referred to here as a deterministic power flow (PLF), requires precise or 'crisp' values chosen by the analyst for each input variable. The solution provides precise network voltages and flows through each line. The specified values rest upon assumptions about the operating condition derived from historical measurements or predictions about future conditions and thus, cannot be considered accurate. Even in the case where the inputs are based on measurements, inaccuracies arise from time-skew problems, three-phase unbalance, static modeling approximations of dynamic components (e.g., transformer tap changers), variations in line parameters, and so on. The advent of deregulation and competitive power markets will only exacerbate this problem as well-known generation patterns change, loading becomes less predictable and the transmission paths grow more diverse. Conventional methodologies proposed in literature address tolerance analysis of power flow solution by means of detailed probabilistic methods, accounting for the variability and stochastic nature of the input data, and sampling based approaches. In particular uncertainty propagation using sampling based methods, such as the Monte Carlo, requires several model runs that sample various combinations of input values. Since the number of model runs can sometimes be very large, the required computer resources can sometimes be prohibitively expensive resulting in substantial computational demands. As far as probabilistic methods are concerned, they represent a useful tool, especially for planning studies, but, as evidenced by the many discussions reported in literature, they could reveal some shortcomings principally arising from: (1) the non-normal distribution and the statistical dependence of the input data; and (2) the difficulty arising in accurately identifying probability distributions for some input data, such as the power generated by wind or photovoltaic generators. All these could result in time consuming computations with several limitations in practical applications especially in power flow analysis of complex power networks. In order to try and overcome some of these limitations, obtaining thereby comprehensive power flow solution tolerance analysis at adequate computational costs, self validated computation could play a crucial role. Armed with such a vision, this chapter will analyze two advanced techniques for power flow analysis in the presence of data uncertainty namely the boundary power flow and the affine arithmetic power flow.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Rethinking Sensitivity Analysis of Nuclear Simulations with Topology

In nuclear engineering, understanding the safety margins of the nuclear reactor via simulations is arguably of paramount importance in predicting and preventing nuclear accidents. It is therefore crucial to perform sensitivity analysis to understand how changes in the model inputs affect the outputs. Modern nuclear simulation tools rely on numerical representations of the sensitivity information -- inherently lacking in visual encodings -- offering limited effectiveness in communicating and exploring the generated data. In this paper, we design a framework for sensitivity analysis and visualization of multidimensional nuclear simulation data using partition-based, topology-inspired regression models and report on its efficacy. We rely on the established Morse-Smale regression technique, which allows us to partition the domain into monotonic regions where easily interpretable linear models can be used to assess the influence of inputs on the output variability. The underlying computation is augmented with an intuitive and interactive visual design to effectively communicate sensitivity information to the nuclear scientists. Our framework is being deployed into the multi-purpose probabilistic risk assessment and uncertainty quantification framework RAVEN (Reactor Analysis and Virtual Control Environment). We evaluate our framework using an simulation dataset studying nuclear fuel performance.

computational topology↗

Probabilistic Prediction of Lifetimes of Ceramic Parts

ANSYS/CARES/PDS is a software system that combines the ANSYS Probabilistic Design System (PDS) software with a modified version of the Ceramics Analysis and Reliability Evaluation of Structures Life (CARES/Life) Version 6.0 software. [A prior version of CARES/Life was reported in Program for Evaluation of Reliability of Ceramic Parts (LEW-16018), NASA Tech Briefs, Vol. 20, No. 3 (March 1996), page 28.] CARES/Life models effects of stochastic strength, slow crack growth, and stress distribution on the overall reliability of a ceramic component. The essence of the enhancement in CARES/Life 6.0 is the capability to predict the probability of failure using results from transient finite-element analysis. ANSYS PDS models the effects of uncertainty in material properties, dimensions, and loading on the stress distribution and deformation. ANSYS/CARES/PDS accounts for the effects of probabilistic strength, probabilistic loads, probabilistic material properties, and probabilistic tolerances on the lifetime and reliability of the component. Even failure probability becomes a stochastic quantity that can be tracked as a response variable. ANSYS/CARES/PDS enables tracking of all stochastic quantities in the design space, thereby enabling more precise probabilistic prediction of lifetimes of ceramic components.

Nemeth, Noel N.↗

Probabilistic evaluation of on-line checks in fault-tolerant multiprocessor systems

The analysis of fault-tolerant multiprocessor systems that use concurrent error detection (CED) schemes is much more difficult than the analysis of conventional fault-tolerant architectures. Various analytical techniques have been proposed to evaluate CED schemes deterministically. However, these approaches are based on worst-case assumptions related to the failure of system components. Often, the evaluation results do not reflect the actual fault tolerance capabilities of the system. A probabilistic approach to evaluate the fault detecting and locating capabilities of on-line checks in a system is developed. The various probabilities associated with the checking schemes are identified and used in the framework of the matrix-based model. Based on these probabilistic matrices, estimates for the fault tolerance capabilities of various systems are derived analytically.

Nair, V. S. S.↗

Human Performance Modeling for Dynamic Human Reliability Analysis

Part of the U.S. Department of Energy’s (DOE’s) Light Water Reac- tor Sustainability (LWRS) Program, the Risk-Informed Safety Margin Charac- terization (RISMC) Pathway develops approaches to estimating and managing safety margins. RISMC simulations pair deterministic plant physics models with probabilistic risk models. As human interactions are an essential element of plant risk, it is necessary to integrate human actions into the RISMC risk framework. In this paper, we review simulation based and non simulation based human reliability analysis (HRA) methods. This paper summarizes the founda- tional information needed to develop a feasible approach to modeling human in- teractions in RISMC simulations.

human reliability analysis↗

Analysis of Loss-of-Offsite-Power Events 1998–2012

Loss of offsite power (LOOP) can have a major negative impact on a power plant’s ability to achieve and maintain safe shutdown conditions. Risk analyses performed loss of all alternating current power contributes over 70% of the overall risk at some U.S. nuclear plants. LOOP event and subsequent restoration of offsite power are important inputs to plant probabilistic risk assessments. This report presents a statistical and engineering analysis of LOOP frequencies and durations at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience from fiscal year 1998 through 2012. Frequencies and durations were determined for four event categories: plant-centered, switchyard-centered, grid-related, and weather-related. The EDG failure modes considered are failure to start, failure to load and run, and failure to run more than 1 hour. The component reliability estimates and the reliability data are trended for the most recent 10-year period while yearly estimates for reliability are provided for the entire active period. A statistically significant increase in industry performance was identified for plant-centered and switchyard-centered LOOP frequencies. There is no statistically significant trend in LOOP durations.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Analysis of the Space Propulsion System Problem Using RAVEN

This paper presents the solution of the space propulsion problem using a PRA code currently under development at Idaho National Laboratory (INL). RAVEN (Reactor Analysis and Virtual control ENviroment) is a multi-purpose Probabilistic Risk Assessment (PRA) software framework that allows dispatching different functionalities. It is designed to derive and actuate the control logic required to simulate the plant control system and operator actions (guided procedures) and to perform both Monte- Carlo sampling of random distributed events and Event Tree based analysis. In order to facilitate the input/output handling, a Graphical User Interface (GUI) and a post-processing data-mining module are available. RAVEN allows also to interface with several numerical codes such as RELAP5 and RELAP-7 and ad-hoc system simulators. For the space propulsion system problem, an ad-hoc simulator has been developed and written in python language and then interfaced to RAVEN. Such simulator fully models both deterministic (e.g., system dynamics and interactions between system components) and stochastic behaviors (i.e., failures of components/systems such as distribution lines and thrusters). Stochastic analysis is performed using random sampling based methodologies (i.e., Monte-Carlo). Such analysis is accomplished to determine both the reliability of the space propulsion system and to propagate the uncertainties associated to a specific set of parameters. As also indicated in the scope of the benchmark problem, the results generated by the stochastic analysis are used to generate risk-informed insights such as conditions under witch different strategy can be followed.

97 MATHEMATICS AND COMPUTING↗

Analysis of Loss-of-Offsite-Power Events 1998–2013

Loss of offsite power (LOOP) can have a major negative impact on a power plant’s ability to achieve and maintain safe shutdown conditions. Risk analyses suggest that loss of all alternating current power contributes over 70% of the overall risk at some U.S. nuclear plants. LOOP event and subsequent restoration of offsite power are important inputs to plant probabilistic risk assessments. This report presents a statistical and engineering analysis of LOOP frequencies and durations at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience during calendar years 1997 through 2013. Frequencies and durations were determined for four event categories: plant-centered, switchyard-centered, grid-related, and weather-related. The emergency diesel generator failure modes considered are failure to start, failure to load and run, and failure to run more than 1 hour. The component reliability estimates and the reliability data are trended for the most recent 10-year period while yearly estimates for reliability are provided for the entire active period. No statistically significant trends in LOOP frequencies over the 1997–2013 period are identified. There is a possibility that a significant trend in grid-related LOOP frequency exists that is not easily detected by a simple analysis. Statistically significant increases in recovery times after grid- and switchyard-related LOOPs are identified.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Application of Multivariate Data Analysis Techniques for the Portable Isotopic Neutron Spectroscopy system

The Portable Isotopic Neutron Spectroscopy (PINS) is a commercialized system developed by Idaho National Laboratory (INL) to examine chemical compounds non-destructively, utilizing Prompt Gamma Neutron Activation Analysis (PGNAA) techniques. The PINS systems have been successfully deployed around the world to identify chemical munitions and containers. The PINS system takes advantage of a high-resolution gamma-ray spectrum from a high-purity germanium (HPGe) detector, and gamma-ray peak analysis provides input to its chemical identification logic with the probabilistic decision tree (PDT). Gamma-ray peak analyses, however, require knowledge of pre-selected gamma-ray peaks whose energies, intensities, and origins are well studied, and some peaks might be excluded from the decision making processes due to lack of current nuclear data. In contrast, Multivariate Analysis (MVA) treats a whole gamma-ray spectrum as a collection of multiple variables or a pattern. The effectiveness of chemical identification algorithm is determined by the availability of a wide range of data to train an algorithm to identify chemical fills with accuracy. INL has a collection of gamma-ray spectra of various chemical-fills from the field-deployed PINS systems over the years, and it was envisaged to combine such a database with the principle of multivariate statistics. Therefore, in parallel with the current decision tree algorithm, an MVA-based chemical identification algorithm was developed as an independent verification of the current results. The Principal Component Analysis (PCA) method was adopted to build an MVA-based identification algorithm, using the collected field data to refine and validate the algorithm. A benchmarking study of the MVA-based algorithm’s performance was conducted alongside the current algorithm, with the results presented and discussed in this study.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Decision analysis with approximate probabilities

This paper concerns decisions under uncertainty in which the probabilities of the states of nature are only approximately known. Decision problems involving three states of nature are studied. This is due to the fact that some key issues do not arise in two-state problems, while probability spaces with more than three states of nature are essentially impossible to graph. The primary focus is on two levels of probabilistic information. In one level, the three probabilities are separately rounded to the nearest tenth. This can lead to sets of rounded probabilities which add up to 0.9, 1.0, or 1.1. In the other level, probabilities are rounded to the nearest tenth in such a way that the rounded probabilities are forced to sum to 1.0. For comparison, six additional levels of probabilistic information, previously analyzed, were also included in the present analysis. A simulation experiment compared four criteria for decisionmaking using linearly constrained probabilities (Maximin, Midpoint, Standard Laplace, and Extended Laplace) under the eight different levels of information about probability. The Extended Laplace criterion, which uses a second order maximum entropy principle, performed best overall.

Whalen, Thomas↗

Performance Assessment of a Generic Nuclear Waste Repository in Shale - 18392

A performance assessment (PA) is an important component of a comprehensive safety analysis for a nuclear waste repository. In a PA, probabilistic simulations of the total repository system are performed, and results are evaluated against performance metrics. Uncertainty and sensitivity analyses help prioritize additional research and model development. The United States Department of Energy (DOE) has been developing a state of the art PA simulation software tool-kit, Geologic Disposal Safety Assessment (GDSA) Framework, that couples increasingly higher fidelity models of subsystem processes into total system PA simulations. Over the past several years, PAs of generic repositories in three geologic media (salt, shale, and crystalline rock) have demonstrated ongoing developments in capability. The current PA of a nuclear waste repository in a generic shale formation showcases GDSA Framework, including capabilities in domain discretization (Cubit), multi-physics simulations (PFLOTRAN), uncertainty and sensitivity analysis (Dakota), and visualization (Paraview). The generic shale reference case considers the disposal of 22,000 metric tons heavy metal of commercial spent nuclear fuel (SNF) in a generic shale formation. PA simulations account for the thermal load and radionuclide inventory of the waste form, components of the engineered barrier system including waste package and buffer, and components of the natural barrier system including the host rock shale and underlying and overlying stratigraphic units. Two repository layouts are considered, one for emplacement of waste packages containing 12 pressurized water reactor (PWR) assemblies, and one for 4-PWR waste package emplacement. Model domains are half-symmetry and contain between 7 and 22 million grid cells. Grid refinement captures the detail of individual waste packages, emplacement drifts, access drifts, and shafts. Simulations are run in a high-performance computing (HPC) environment on 512 or 2048 processes. The governing equations describing coupled heat and fluid flow and reactive transport are solved with PFLOTRAN, an open-source, massively parallel multiphase flow and reactive transport code. Additional simulated processes include waste package degradation; waste form dissolution; radioactive decay and ingrowth in aqueous, solid, and adsorbed phases; and a simple biosphere based on a pumping well. Simulations are run to 106 y; dose and radionuclide concentrations are observed within aquifers at a point approximately 5 km downgradient of the repository. Dakota is used to sample likely ranges of input parameters including waste form and waste package degradation rates and properties of engineered and natural materials to quantify uncertainty in predicted concentrations and sensitivity to input parameters. Given the assumptions of the reference case, results of 12-PWR and 4-PWR simulations are very similar. Dose at the pumping well 5-km downgradient of the repository does not exceed 10-9 Sv/y. I-129 is the largest contributor to dose. The dose due to Cl-36, the next largest contributor, is orders of magnitude smaller. At the pumping well, the concentration of I-129 5-km downgradient does not exceed 10-14 mol/L. Rank correlation coefficients indicate that the maximum concentration of I-129 within the aquifer is sensitive to shale (repository host rock) porosity and aquifer permeability. These results affirm that HPC-capable codes can be used to simulate important multi-physics couplings directly in a total system performance assessment of a geologic repository, and can be used in prioritization of future research and model development. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An Analysis of the Johnson-Lindenstrauss Lemma with the Bivariate Gamma Distribution

Probabilistic proofs of the Johnson-Lindenstrauss lemma imply that random projection can reduce the dimension of a data set and approximately preserve pairwise distances. If a distance being approximately preserved is called a success, and the complement of this event is called a failure, then such a random projection likely results in no failures. Assuming a Gaussian random projection, the lemma is proved by showing that the no-failure probability is positive using a combination of Bonferroni's inequality and Markov's inequality. This paper modifies this proof in two ways to obtain a greater lower bound on the no-failure probability. First, Bonferroni's inequality is applied to pairs of failures instead of individual failures. Second, since a pair of projection errors has a bivariate gamma distribution, this probability of a pair of successes is bounded using an inequality from [Jensen, 1969]. If n is the number of points to be embedded and μ is the probability of success, then this leads to an increase in the lower bound on the no-failure probability of $\frac{1}{2}$ ($\genfrac{}{}{0pt}{}{n}{2}$) (1- μ ) 2 is ($\genfrac{}{}{0pt}{}{n}{2}$) is even and $\frac{1}{2}$ (($\genfrac{}{}{0pt}{}{n}{2}$)-1) (1- μ ) 2 if ($\genfrac{}{}{0pt}{}{n}{2}$) is odd. For example, if n =10 5 points are to be embedded in k =10 4 dimensions with a tolerance of ϵ=0.1, then the improvement in the lower bound is on the order of 10 -14 . We also show that further improvement is possible if the inequality in [Jensen, 1969] extends to three successes, though we do not have a proof of this result.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

RAVEN as Control Logic and Probabilistic Risk Assessment Driver for RELAP-7

The Next Generation of System Analysis Code (NGSAC) [1] aims to model and simulate the Nuclear Power Plant (NPP) thermo-hydraulic behavior with high level of accuracy. In this respect, Idaho National Laboratory (INL) is developing a NGSAC (known as RELAP-7) which will allow to model NPP responses for a set of accident scenarios (e.g., loss of off-site power).

99 GENERAL AND MISCELLANEOUS↗

NONPARAMETRIC BAYESIAN ESTIMATION OF PERIODIC LIGHT CURVES

Many astronomical phenomena exhibit patterns that have periodic behavior. An important step when analyzing data from such processes is the problem of identifying the period: estimating the period of a periodic function based on noisy observations made at irregularly spaced time points. This problem is still a difficult challenge despite extensive study in different disciplines. This paper makes several contributions toward solving this problem. First, we present a nonparametric Bayesian model for period finding, based on Gaussian Processes (GPs), that does not make assumptions on the shape of the periodic function. As our experiments demonstrate, the new model leads to significantly better results in period estimation especially when the light curve does not exhibit sinusoidal shape. Second, we develop a new algorithm for parameter optimization for GP which is useful when the likelihood function is very sensitive to the parameters with numerous local minima, as in the case of period estimation. The algorithm combines gradient optimization with grid search and incorporates several mechanisms to overcome the high computational complexity of GP. Third, we develop a novel approach for using domain knowledge, in the form of a probabilistic generative model, and incorporate it into the period estimation algorithm. Experimental results validate our approach showing significant improvement over existing methods.

79 ASTRONOMY AND ASTROPHYSICS↗

Quantitative Risk Management - Risk Informed Decision Making on High-Risk Waste Remediation Projects - 19022

For every $1 billion invested in projects, $97 million is wasted due to poor project performance. That means 9.7% of money spent on projects is wasted due to poor risk and uncertainty management. High-risk projects, similar to those in waste remediation, have the most to lose. A solid quantitative risk management program is one of the keys to increasing the likelihood that a project will succeed. A quantitative risk program solves two major problems that challenge the effective management of risk and uncertainty: 1. Risks arise at all levels of an organization; however, not all organizational levels have an effective way to identify and resolve them. This can lead to risks that, even if identified, are not reported. 2. Decision-makers are often forced to operate solely on intuition when implementing mitigation strategies, not fully understanding the effects that certain decisions have on the program's cost and schedule. A quantitative risk program uses a risk register and builds it into the project/program integrated schedule to assess the impact of these risks, typically at the 80% confidence contingency level for specific milestones and/or project completion. Implementing a quantitative risk program drives a forward-thinking, proactive mentality to problem solving into all levels of the organization. A healthy risk program for regular reporting and communication ensures that all members of an organization are thinking about risks and using their communication channels to resolve them. It gives a method of communication and incentive for all levels in the organization and helps to ensure that risks will be reported and resolved. Pacific Northwest National Laboratory (PNNL) has developed tools and methods that provide a level of realism for analyzing different scenarios and estimating contingency that does not exist in the standard industry risk tool kit. These tools and methods provide decision-makers with actionable, quantitatively based information to guide their decision making. The first tool is a probabilistic branching risk model for mitigation strategies. Current quantitative risk analysis tools in the industry simulate two cases: fully mitigated and un-mitigated. In the fully mitigated case, the user assumes that every planned mitigation activity is successful. In the un-mitigated case, the user assumes that none are successful. The truth lies between these two extremes. The PNNL team has developed a probabilistic risk model for mitigation scenarios that includes a probability that a mitigation activity will succeed and a probability that a mitigation action will be funded. These probabilities are elicited from subject matter experts and ensure that the contingency calculations at the specified confidence are approaching reality. The second tool developed at PNNL is the Risk Box, which is a tool that integrates with different scenarios in the risk register. For example, say the user is faced with two different and mutually exclusive mitigation actions to reduce a risk. The Risk Box methodology performs the contingency calculations and then displays them on a time-phased graph that shows how each scenario reduces the risk contingency needed on the project/program. This graph then provides quantitative information to show decision-makers which mitigation action provides the greatest reduction (cost and schedule) in risk contingency for the program. Implementing these and other tools within a structured risk program increases the likelihood that a project will come in on schedule and budget, ensures that all personnel are proactively thinking about problems and resolutions, creates communication channels for all members to submit and resolve potential problems, produces a prioritized list of risk rankings to focus leadership on issues that may cause the biggest problems, and implements processes that drive updates to the risk program as the risk profile changes. PNNL has been developing these methods and using them on projects for over 20 years. They have been successfully applied on waste management projects, high-tech research and development projects, and construction projects, and they continue to be used on a number of U.S. Department of Energy projects today. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Feasibility and Safety Assessment for Advanced Reactor Concepts Using Vented Fuel

Recent interest in fast reactor technology has led to renewed analysis of past reactor concepts such as Gas Fast Reactors and Sodium Fast Reactors. In an effort to make these reactors more economic, the fuel is required to stay in the reactor for extended periods of time; the longer the fuel stays within the core, the more fertile material is converted into usable fissile material. However, as burnup of the fuel-rod increases, so does the internal pressure buildup due to gaseous fission products. In order to reach the 30 year lifetime requirements of some reactor designs, the fuel pins must have a vented-type design to allow the buildup of fission products to escape. The present work aims to progress the understanding of the feasibility and safety issues related to gas reactors that incorporate vented fuel. The work was separated into three different work-scopes: 1. Quantitatively determine fission gas release from uranium carbide in a representative helium cooled fast reactor; 2. Model the fission gas behavior, transport, and collection in a Fission Product Vent System; and, 3. Perform a safety analysis of the Fission Product Vent System. Each task relied on results from the previous task, culminating in a limited scope Probabilistic Risk Assessment (PRA) of the Fission Product Vent System. Within each task, many key parameters lack the fidelity needed for comprehensive or accurate analysis. In the process of completing each task, the data or methods that were lacking were identified and compiled in a Gap Analysis included at the end of the report.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗