Search NASA⌕ Search

SEARCH · Search NASA

Results for “ventilators”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,027 records · Page 57

Guia de Edificios Saludables para Pequenas Empresas: Una Referencia Rapida para Mejorar la Calidad del Aire Interior (Restaurantes Excluidos)

Indoor air pollutant concentrations can be higher than those outdoors, putting occupants at risk. These pollutants come from a variety of sources: materials used to build and furnish indoor spaces, retail products and services, and occupants themselves. Ventilation, temperature, and humidity also affect indoor air quality. It is important to consider the documented benefits of healthy indoor environments at any time - not just during a public health crisis - and it is key to consider the indoor air quality where we do business as well as at home. Small businesses vary in size, services, products, ownership style, and building mechanical systems, yet all benefit from healthy indoor spaces for employees and customers. This guide provides steps, in conjunction with public health guidance, that small businesses can take to improve and maintain indoor air quality. Small businesses often have unique ownership structures - the building owner and business owner can be different parties - so this guide addresses both building and business owner action items. There are many ways to pursue healthy indoor air, including eliminating, minimizing, and/or controlling the contaminants we bring in, and removing or diluting any existing contaminants through ventilation, filtration, air cleaning, and/or disinfection. Best results are achieved through a comprehensive approach combining various strategies, including those discussed in this guide.

air filtration↗

Fluor Hanford ALARA Center is a D and D Resource

The mission at the Hanford Nuclear Reservation changed when the last reactor plant was shut down in 1989 and work was started to place all the facilities in a safe condition and begin decontamination, deactivation, decommissioning, and demolition (D and D). These facilities consisted of old shutdown reactor plants, spent fuel pools, processing facilities, and 177 underground tanks containing 53 million gallons of highly radioactive and toxic liquids and sludge. New skills were needed by the workforce to accomplish this mission. By 1995, workers were in the process of getting the facilities in a safe condition and it became obvious improvements were needed in their tools, equipment and work practices. The Hanford ALARA Program looked good on paper, but did little to help contractors that were working in the field. The Radiological Control Director decided that the ALARA program needed to be upgraded and a significant improvement could be made if workers had a place they could visit that had samples of the latest technology and could talk to experienced personnel who have had success doing D and D work. Two senior health physics personnel who had many years experience in doing radiological work were chosen to obtain tools and equipment from vendors and find a location centrally located on the Hanford site. Vendors were asked to loan their latest tools and equipment for display. Most vendors responded and the Hanford ALARA Center of Technology opened on October 1, 1996. Today, the ALARA Center includes a classroom for conducting training and a mockup area with gloveboxes. Two large rooms have a containment tent, several glove bags, samples of fixatives/expandable foam, coating displays, protective clothing, heat stress technology, cutting tools, HEPA filtered vacuums, ventilation units, pumps, hydraulic wrenches, communications equipment, shears, nibblers, shrouded tooling, and several examples of innovative tools developed by the Hanford facilities. See Figures I and II. The ALARA Center staff routinely researches and tests new technology, sponsor vendor demonstrations, and redistribute tools, equipment and temporary shielding that may not be needed at one facility to another facility that needs it. The ALARA Center staff learns about new technology in several ways. This includes past radiological work experience, interaction with vendors, lessons learned, networking with other DOE sites, visits to the Hanford Technical Library, attendance at off-site conferences and ALARA Workshops. Personnel that contact the ALARA Center for assistance report positive results when they implement the tools, equipment and work practices recommended by the ALARA Center staff. This has translated to reduced exposure for workers and reduced the risk of contamination spread. For example: using a hydraulic shear on one job saved 16 Rem of exposure that would have been received if workers had used saws-all tools to cut piping in twenty-nine locations. Currently, the ALARA Center staff is emphasizing D and D techniques on size-reducing materials, decontamination techniques, use of remote tools/video equipment, capture ventilation, fixatives, using containments and how to find lessons learned. The ALARA Center staff issues a weekly report that discusses their interaction with the workforce and any new work practices, tools and equipment being used by the Hanford contractors. Distribution of this weekly report is to about 130 personnel on site and 90 personnel off site. This effectively spreads the word about ALARA throughout the DOE Complex. DOE EM-23, in conjunction with the D and D and Environmental Restoration work group of the Energy Facility Contractors Organization (EFCOG) established the Hanford ALARA Center as the D and D Hotline for companies who have questions about how D and D work is accomplished. The ALARA Center has become a resource to the nuclear industry and routinely helps contractors at other DOE Sites, power reactors, DOD sites, and sites in England, Europe and Indonesia. Other ALARA Centers are located at the Savannah River Site and Los Alamos National Lab.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Remote Decommissioning of the Plutonium Experimental Extraction Facility, Sellafield - 17031

A redundant suite of gloveboxes formerly used for an experimental plutonium extraction process required decommissioning to avoid further degradation and a risk to other users of the Analytical Services building on Sellafield site. Following a full option selection process, remote techniques were chosen as the most appropriate (i.e. ALARP) decommissioning method. A nearby ventilation system from a previous project was re-engineered to ventilate the laboratory. Gloveboxes in neighbouring labs were cleared to create space to install a personnel access facility. The containment was reinforced where necessary to provide adequate protection from the remote machinery. Following a campaign of manual waste removal, including approximately 21 tonnes of lead chevron bricks released as exempt waste, a Brokk{sup R} 90 remotely-operated vehicle (ROV) was deployed to perform remote size reduction of the glovebox suite. The resulting plutonium-contaminated material (PCM) was delivered to a Kraft Raptor manipulator for sorting and consignment to an on-site store in 200-litre drums. Despite indications from pre-decommissioning surveys of the presence of ILW in the shielded section, none was found. Following the successful removal of the glovebox suite, and the emergence during the project of additional redundant gloveboxes within the Analytical Services building, the Remediation team has taken the opportunity to retain the decommissioning infrastructure as a remote glovebox breakdown facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

D and D of a Large Waste Treatment Plant in Germany - 18458

With its 40 years of nuclear experience, GNS, the world leading supplier of casks for spent fuel, ILW and HLW, also offers services for conditioning and management of all types of radioactive waste, especially for the German NPP. Since 1985, GNS treats and packages ILW and LLW from the operations and phase-out of German NPP in its Duisburg plant. To enable its permanent safe final disposal, solid wastes are compacted and dried before being shipped to an interim storage facility or - later - the Konrad repository. The total premises cover 20.000 m{sup 2} (215.000 sq ft), of which 9000 m{sup 2} (97.000 sq ft) is controlled area. The Duisburg Plant has three large industrial warehouses (each 25 m x 136 m or 82 ft x 446 ft) with a total capacity of 10.200 m{sup 2} or 110.000 sqft. For the treatment of open contaminated waste, six enclosures were built. These enclosures have a special ventilation system including a specific filtration plant. In one enclosure a high compaction plant was used, in another enclosures a drying facility for drums was in operation. During peak periods, more than 900 tonne of waste were treated annually. One enclosure was mainly used for maintenance, restoration and extension of mobile facilities, which were normally used for campaigns in NPP. Due to the decreasing amount of operational waste during the nuclear phase out in Germany, GNS has decided to close the Duisburg Plant. In the first half-year of 2017, the last waste packages were treated but around 80 20'-containers are still located on site. The D and D started in January 2017. The presentation will show the first experience of decommission processes of the first three enclosures. The following steps including the techniques used will be explained in detail: - Dismantling and removal of the high compaction facility; - Dismantling and removal of the drying facility; - Cleaning and wipe tests of the empty enclosures; - Removal of the stainless steel plates of the floor; - Investigations of the lower floor parts for contamination; - Removal of contaminated underground drainpipes; - Decontamination of the concrete floor; - Dismantling of the ventilation system in three enclosures; - Dismantling of the steel constructions. An important aim during the dismantling is to reduce the amount of nuclear waste and maximize the fraction material for free release. Next to the first three enclosures, in one of the enclosure IV - VI, a 150 tons scrap shear had been installed before the construction of the enclosure building. The scrap shear has to be dismantled and handled by heavy duty lifting equipment. Only afterwards is it possible to start the decommissioning of the last three enclosures. Our goal is to transfer this very large controlled area and the whole plant to the site owner, the Duisburg Port company, after 2 years and 5 months and doing so in a way so that the industrial warehouses can be used again for all possible types of industries. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Understanding and Controlling Cesium Loading on Crystalline Silicotitanate - 19601

Savannah River Remediation (SRR) contracted with Westinghouse Electric Corporation (WEC), Columbia Energy and Environmental Services (CEES), to build and deliver a modular ion exchange process that will be used to remove radioactive cesium from dissolved salt solution contained in Tank 10 at the Savannah River Site (SRS). The resulting decontaminated salt solution will be sent to Tank 11 and then to Tank 50 for final disposition in grout at the Saltstone facility. At the end of processing, the loaded ion exchange (IX) columns are drained, rinsed, and dried. The IX columns are removed from the modular unit and stored at Interim Safe Storage (ISS). This ion exchange process is called the Tank Closure Cesium Removal (TCCR) system. The TCCR system consists of several unit operations and process monitoring capability housed within three modular units. The first modular unit contains the process control computer, the second modular unit contains the main process equipment (two prefilters, four IX columns, and resin trap (post filtration)), and the third modular unit is the ventilation system. The main unit operations of the TCCR system are filtration, ion exchange, and ventilation. The ion exchange media utilized is a form of inorganic Crystalline Silicotitanate (CST), IONSIV{sup TM} R9120-B supplied by UOP Honeywell. CST has a high selectivity for cesium (Cs) and has some affinity for other Group IA alkali metals on the periodic chart (hydrogen, lithium, sodium, potassium, rubidium, and francium). CST has also been shown to have affinity for strontium and actinides. Cesium loading on the CST is dependent on many factors including chemical composition (cations and anions), temperature, and pH of the salt solution. The actual amount of Cs loaded onto an IX column is dependent on the factors above along with the salt solution volume fed to the IX column. Because of CST's high selectivity for Cs, the Cs-137 equilibrium loading can contribute enough decay heat to result in an ion exchange column boiling event under no flow conditions in the IX column. The boiling event under no flow is a safety concern that must be prevented from occurring. To prevent boiling of the column under no flow conditions, the Cs-137 equilibrium loading must be determined and understood. Several methodologies were evaluated for performing the Cs-137 equilibrium loading determination for CST. After review of available research and development (R and D), batch equilibrium contact test data, and Zheng Anthony Miller (ZAM) model predictions for the salt solution chemistry in Tank 10, a methodology for determining the Cs-137 equilibrium loading on CST was selected. The methodology selected involves an in-tank batch equilibrium contact test performed in duplicate that considers additional corrections to account for anticipated operational evolutions. The in-tank batch equilibrium contact test utilizes ∼0.1 grams of CST secured in a slotted sample vial. The slotted sample vial design allows for salt solution to be in contact with the CST. The slotted sample vials containing the CST are submerged in Tank 10 and exposed to the salt solution for ten days. After ten days, the samples are retrieved and sent to the Savannah River National Laboratory (SRNL) for analysis of the Cs-137 equilibrium loading. Additional corrections are then made to the Cs-137 results to account for anticipated operational evolutions. Anticipated operational evolutions include external additions (water/caustic) to Tank 10 that result in a change to its chemical composition, tank temperature effects, departures from the laboratory testing (mixed vs. stagnant tank conditions), and IX column flushes. A description of the methodologies considered, feasibility of methodology deployment, and the down select process (benefits vs. risks) is discussed in this paper. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Primary Pump Motor Area - Transfer Fan Replacement PLC Design

My poster is about a project that I have worked on in my time at ATR as an intern. The Heating and Ventilation Control Panel (HVB-1) controls thirty-five heating and ventilation fans within the Advanced Test Reactor. This control panel needs replacement, as many of the components inside the existing panel are becoming old and degrading. In preparation for this replacement effort, concepts and component identification for the new control panel needed to be developed. Instead of replacing the new panel with replacement mechanical components, a Programmable Logic Controller (PLC) is proposed as a solution. Although multiple fans are associated with this panel, my poster focuses on the replacement design for the Primary Pump Motor Area Transfer Fan. This will provide an example of how the entire cabinet may be upgraded.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Numerical Investigation of High Delta T Sensible Storage Integrated CO2 Heat Pump: Preprint

To assist building heating electrification, this paper numerically investigates a load flexible heat pump system for commercial buildings. The system consists of a CO2 vapor compression cycle, a sensible thermal storage tank, and an air handling unit. The thermal storage medium is inexpensive, non-toxic and stable anti-freeze solution (30% potassium acetate). The air handing unit has an indoor coil and a ventilation coil. The system can be used to manage building electric load. During peak hours, the heat pump is off and the hot solution water is discharged from the tank to heat up the indoor air and ventilation air. During the hour of charge, the heat pump delivers hot solution water to the tank and to the air. The tank can also stand by while the heat pump provides space heating directly. We selected a medium sized office building located in Minnesota as the representative building and used EnergyPlus to obtain its 24 hour load data. We designed three storage tank volumes assuming 50 degrees C, 65 degrees C and 80 degrees C tank temperatures to independently provide the building load for 4 hours in the morning. The higher the tank temperature, the smaller the required volume, and thus higher energy density. The effective energy density is 78 with an 80 degrees C tank, and 40 kWhth/m3 with 50 degrees C. We simulated the tank integrated heat pump performance subjected to the 24-hour building load profile and ambient data. The baseline is the same system without storage tank. There was a trade-off between the storage energy density and the charging COP. The charge hour COP was 2.77 to charge the tank to 80 degrees C, and 3.01 to 50 degrees C. The proposed system could shift building load from the peak hours (8:00 - 12:00) to off-business hour (23:00 - 7:00+1). It eliminated 100% compressor electricity use during the peak hours, and avoided a peak electric power of 34 kW. The 65 degrees C tank saved 9.5 kWhe (4%) considering all day operation, which was the best balance between energy density and the system operation efficiency among the three options.

CO2 heat pump↗

Dynamic Simulation Modeling and Control of a Desiccant Assisted Direct-expansion Air Handling Unit

Desirable built environments demand simultaneous regulation of thermal comfort and indoor air quality (IAQ) with energy-efficient operation of heating, ventilation and air conditioning (HV AC) systems, which involves controls of temperature, humidity and airborne contaminants simultaneously. This paper presents the efforts of dynamic modeling and initial development control strategy for a desiccant-assisted multi-functional air handling unit (AHU) coupled with a direct-expansion rooftop unit (RTU) system, which aims to achieve multiple functions for indoor environment conditioning with energy efficient control. The RTU-AHU system includes a desiccant wheel for dehumidification and a conceptual direct air capture (DAC) filtering device for CO2 regulation. A Modelica-based dynamic model is developed for this conceptual system, and a simple decentralized control strategy is designed, which combines a differential-enthalpy based AHU return-air ratio control, a demand-controlled ventilation, and supply-air temperature humidity control via the RTU and DW controls. The proposed control method is evaluated with the Modelica simulation model for a selected set of scenarios

Pan, Chao↗

Indoor Pollutants Emitted by Electronic Office Equipment

The last few decades have seen major changes in how people collect and process information at work and in their homes. More people are spending significant amounts of time in close proximity to computers, video display units, printers, fax machines and photocopiers. At the same time, efforts to improve energy efficiency in buildings by reducing leaks in building envelopes are resulting in tighter (i.e., less ventilated) indoor environments. Therefore, it is critical to understand pollutant emission rates for office equipment because even low emissions in areas that are under-ventilated or where individuals are in close proximity to the pollutant source can result in important indoor exposures. We reviewed existing literature reports on pollutant emission by office equipment, and measured emission factors of equipment with significant market share in California. We determined emission factors for a range of chemical classes including volatile and semivolatile organic compounds (VOCs and SVOCs), ozone and particulates. The measured SVOCs include phthalate esters, brominated and organophosphate flame retardants and polycyclic aromatic hydrocarbons. Measurements were carried out in large and small exposure chambers for several different categories of office equipment. Screening experiments using specific duty cycles in a large test chamber ({approx}20 m{sup 3}) allowed for the assessment of emissions for a range of pollutants. Results from the screening experiments identified pollutants and conditions that were relevant for each category of office equipment. In the second phase of the study, we used a smaller test chamber ({approx}1 m{sup 3}) to measure pollutant specific emission factors for individual devices and explored the influence of a range of environmental and operational factors on emission rates. The measured emission factors provide a data set for estimating indoor pollutant concentrations and for exploring the importance of user proximity when estimating exposure concentrations.

54 ENVIRONMENTAL SCIENCES↗

Hydronic rooftop cooling systems

A roof top cooling unit has an evaporative cooling section that includes at least one evaporative module that pre-cools ventilation air and water; a condenser; a water reservoir and pump that captures and re-circulates water within the evaporative modules; a fan that exhausts air from the building and the evaporative modules and systems that refill and drain the water reservoir. The cooling unit also has a refrigerant section that includes a compressor, an expansion device, evaporator and condenser heat exchangers, and connecting refrigerant piping. Supply air components include a blower, an air filter, a cooling and/or heating coil to condition air for supply to the building, and optional dampers that, in designs that supply less than 100% outdoor air to the building, control the mixture of return and ventilation air.

42 ENGINEERING↗

A Prototype Roof Deck Designed to Self-Regulate Deck Temperature and Reduce Heat Transfer

A prototype roof and attic assembly exploits the use of radiation, convection and insulation controls to reduce the heat transfer penetrating its roof deck by almost 85% of the heat transfer crossing a conventional roof and attic assembly. The assembly exhibited attic air temperatures that did not exceed the peak day outdoor ambient temperature. The design includes a passive ventilation scheme that pulls air from the soffit and attic into an inclined air space above the deck. The design complies with fire protection codes because the air intake is internal and closed to the elements. Field data were benchmarked against an attic computer tool and simulations made for new and retrofit home constructions in hot, moderate and cold climates to access economics for the assembly.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Benefits and Costs of Improved IEQ in U.S. Offices

This paper estimates some of the benefits and costs of implementing scenarios that improve indoor environmental quality (IEQ) in the stock of U.S. office buildings. The scenarios include increasing ventilation rates when they are below 10 or 15 L/s per person, adding outdoor-air economizers and controls when absent, eliminating winter indoor temperatures greater than 23 oC, and reducing dampness and mold problems. The estimated benefits of the scenarios analyzed are substantial in magnitude, including increased work performance, reduced sick building syndrome symptoms, reduced absence, and improved thermal comfort for millions of office workers. The combined potential annual economic benefit of a set ofnon-overlapping scenarios is approximately $20 billion. While the quantitative estimates have a high uncertainty, the opportunity for substantial benefits is clear. Some IEQ improvement measures will save energy while improving health or productivity, and implementing these measures should be the highest priority.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Bringing Automated Fault Detection and Diagnostics Tools for HVAC&R Into the Mainstream

Heating, ventilation, and air-conditioning (HVAC) systems consume over 5 quads of energy annually, representing 30% of energy consumption in the U.S. commercial buildings. Additionally, commercial refrigeration (R) systems add about 1 quad to commercial buildings energy consumption. Most HVAC systems operate with one or more faults that result in increased energy consumption. Fault detection and diagnostics (FDD) tools have been developed to address this national issue, and many tools are commercially available. FDD tools have the potential to save considerable energy for an existing commercial rooftop unit (RTU) and refrigeration systems. These devices can be used for both retro commissioning and, when faults are addressed, continuous commissioning. However, there appears to be multiple market barriers for this technology. Although there are efforts to develop FDD tool standards, currently there are no standards and methods to define functions, capabilities, accuracy, and reliability of FDD tools in the field. Moreover, most of the commercial FDD tools have not been verified in the field independently. This paper presents a comprehensive approach for bringing HVAC FDD tools into the mainstream. The approach involves demonstrating ten commercially available FDD tools installed at ten different sites, independent testing and evaluation of the FDD tools, communication with various stakeholders, identifying and assessing market barriers, creating a process evaluation methodology, and assisting utility companies in developing incentive programs. Furthermore, the preliminary baseline results from the case study demonstrate how the use of an independent monitoring system (IMS) can be used for ground-truth in evaluating FDD tools in the field.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Strategy Guideline: Transitioning HVAC Companies to Whole House Performance Contractors

This Strategy Guideline describes the findings from research that the U.S. Department of Energy’s Building America team IBACOS conducted related to heating, ventilation, and air conditioning (HVAC) companies that have made the decision to transition to whole house performance contracting (WHPC). By utilizing a house-as-a-system approach, the WHPC contractor can evaluate the total energy performance of the entire house and make upgrades on a prioritized basis, according to the energy benefit. IBACOS believes that an HVAC contractor is well suited to take on the tasks of whole house energy upgrades and to advance large-scale energy efficiency in the residential market. Because the HVAC contractor already works on one of the most technically complex systems in the house, they have already overcome the barrier of training to the complex HVAC system and can reduce the time required to transition to delivering whole house energy upgrades on a wide scale. Providing contractors with new technical skills and a revised business approach is one way to achieve change on a large scale and to help the United States meet its goals regarding job creation and energy independence. However, HVAC companies need guidance on how to transition successfully from their traditional business approach to one that includes WHPC. Research for this Strategy Guideline included a literature search of periodicals, industry trade publications, and reports available to the general public on the topic of WHPC. IBACOS created an outline of a successfully integrated HVAC company with a WHPC business and presented the outline to a group of experts currently working in the industry. The feedback received from the experts was used to identify the key areas in which guidance would be most useful to WHPC contractors, and eight of these areas were expanded for guidance. The appendices included with this Strategy Guideline present information a transitioning contractor may find useful and were collected from published periodicals, along with short and concise Fact Sheets.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A Prototype Roof Deck Designed to Self-Regulate Deck Temperature and Reduce Heat Transfer

A prototype roof and attic assembly exploits the use of radiation, convection and insulation controls to reduce its peak day heat transfer by almost 85 percent of the heat transfer crossing a conventional roof and attic assembly. The assembly exhibits attic air temperatures that do not exceed the maximum daily outdoor ambient temperature. The design includes a passive ventilation scheme that pulls air from the soffit and attic into an inclined air space above the roof deck. The design complies with fire protection codes because the air intake is internal and closed to the elements. Field data were benchmarked against an attic computer tool and simulations made for new and retrofit constructions in hot, moderate and cold climates to gauge the cost of energy savings and potential payback.

above deck ventilation↗

Recent Developments of the Modelica"Buildings" Library for Building Energy and Control Systems

At the Modelica 2009 conference, we introduced the Buildings library, a freely available Modelica library for building energy and control systems. This paper reports the updates of the library and presents example applications for a range of heating, ventilation and air conditioning (HVAC) systems. Over the past two years, the library has been further developed. The number of HVAC components models has been doubled and various components have been revised to increase numerical robustness.The paper starts with an overview of the library architecture and a description of the main packages. To demonstrate the features of the Buildings library, applications that include multizone airflow simulation as well as supervisory and local loop control of a variable air volume (VAV) system are briefly described. The paper closes with a discussion of the current development.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Renewable Energy Planning: Multiparametric Cost Optimization; Preprint

This paper describes a method for determining the combination of renewable energy technologies that minimize life-cycle cost at a facility, often with a specified goal regarding percent of energy use from renewable sources. Technologies include: photovoltaics (PV); wind; solar thermal heat and electric; solar ventilation air preheating; solar water heating; biomass heat and electric (combustion, gasification, pyrolysis, anaerobic digestion); and daylighting. The method rests upon the National Renewable Energy Laboratory's (NREL's) capabilities in characterization of technology cost and performance, geographic information systems (GIS) resource assessment, and life-cycle cost analysis. The paper discusses how to account for the way candidate technologies interact with each other, and the solver routine used to determine the combination that minimizes life-cycle cost. Results include optimal sizes of each technology, initial cost, operating cost, and life-cycle cost, including incentives from utilities or governments. Results inform early planning to identify and prioritize projects at a site for subsequent engineering and economic feasibility study.

09 BIOMASS FUELS↗

Evaluating the Performance and Economics of Transpired Solar Collectors for Commercial Applications: Preprint

Using transpired solar collectors to preheat ventilation air has recently become recognized as an economic alternative for integrating renewable energy into commercial buildings in heating climates. The collectors have relatively low installed costs and operate on simple principles. Theory and performance testing have shown that solar collection efficiency can exceed 70% of incident solar. However, implementation and current absorber designs have adversely affected the efficiency and associated economics from this initial analysis. The National Renewable Energy Laboratory has actively studied this technology and monitored performance at several installations. A calibrated model that uses typical meteorological weather data to determine absorber plate efficiency resulted from this work. With this model, an economic analysis across heating climates was done to show the effects of collector size, tilt, azimuth, and absorptivity. The analysis relates the internal rate of return of a system based on the cost of the installed absorber area. In general, colder and higher latitude climates return a higher rate of return because the heating season extends into months with good solar resource.

14 SOLAR ENERGY↗