Search NASA⌕ Search

SEARCH · Search NASA

Results for “COMMISSION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,045 records · Page 58

Materials-Enabled High-Efficiency (MEHE) Heavy-Duty Diesel Engines

The purpose of this Cooperative Research and Development Agreement (CRADA) between UTBattelle, Inc. and Caterpillar, Inc. was to improve diesel engine efficiency by incorporating advanced materials to enable higher combustion pressures and temperatures necessary for improved combustion. The project scope also included novel materials for use in advanced components and designs associated with waste-heat recovery and other concepts for improved thermal efficiency. Caterpillar initially provided ORNL with a 2004 Tier 2 C15 ACERT diesel engine (designed for on-highway use) and two 600 hp motoring dynamometers. The first year of the CRADA effort was focused on establishing a heavy-duty experimental engine research cell. First year activities included procuring, installing and commissioning the cell infrastructure. Infrastructure components consisted of intake air handling system, water tower, exhaust handling system, and cell air conditioning. Other necessary infrastructure items included the fuel delivery system and bottled gas handling to support the analytical instrumentation. The second year of the CRADA focused on commissioning the dynamometer system to enable engine experimentation. In addition to the requirements associated with the dynamometer controller, the electrical system needed a power factor correction system to maintain continuity with the electrical grid. During the second year the engine was instrumented and baseline operated to confirm performance and commission the dynamometer. The engine performance was mapped and modeled according to requirements provided by Caterpillar. This activity was further supported by a Work-for-Others project from Caterpillar to evaluate a proprietary modeling system. A second Work-for-Others activity was performed to evaluate a novel turbocharger design. This project was highly successful and may lead to new turbocharger designs for Caterpillar heavy-duty diesel engines. During the third (and final) year of the CRADA, a novel valve material was evaluated to assess high temperature performance and durability. A series of prototype valves, composed of a unique nickel-alloy was placed in the engine head. The engine was aggressively operated using a transient test cycle for 200 hours. The valve recession was periodically measured to determine valve performance. Upon completion of the test the valves were removed and returned to Caterpillar for additional assessment. Industrial in-kind support was available throughout the project period. Review of the status and research results were carried out on a regular basis (meetings and telecons) which included direction for future work activities. A significant portion of the industrial support was in the form of information exchange and technical consultation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

SERVER DEVELOPMENT FOR NSLS-II PHYSICS APPLICATIONS AND PERFORMANCE ANALYSIS

The beam commissioning software framework of NSLS-II project adopts a client/server based architecture to replace the more traditional monolithic high level application approach. The server software under development is available via an open source sourceforge project named epics-pvdata, which consists of modules pvData, pvAccess, pvIOC, and pvService. Examples of two services that already exist in the pvService module are itemFinder, and gather. Each service uses pvData to store in-memory transient data, pvService to transfer data over the network, and pvIOC as the service engine. The performance benchmarking for pvAccess and both gather service and item finder service are presented in this paper. The performance comparison between pvAccess and Channel Access are presented also. For an ultra low emittance synchrotron radiation light source like NSLS II, the control system requirements, especially for beam control are tight. To control and manipulate the beam effectively, a use case study has been performed to satisfy the requirement and theoretical evaluation has been performed. The analysis shows that model based control is indispensable for beam commissioning and routine operation. However, there are many challenges such as how to re-use a design model for on-line model based control, and how to combine the numerical methods for modeling of a realistic lattice with the analytical techniques for analysis of its properties. To satisfy the requirements and challenges, adequate system architecture for the software framework for beam commissioning and operation is critical. The existing traditional approaches are self-consistent, and monolithic. Some of them have adopted a concept of middle layer to separate low level hardware processing from numerical algorithm computing, physics modelling, data manipulating and plotting, and error handling. However, none of the existing approaches can satisfy the requirement. A new design has been proposed by introducing service oriented architecture technology, and client interface is undergoing. The design and implementation adopted a new EPICS implementation, namely epics-pvdata [9], which is under active development. The implementation of this project under Java is close to stable, and binding to other language such as C++ and/or Python is undergoing. In this paper, we focus on the performance benchmarking and comparison for pvAccess and Channel Access, the performance evaluation for 2 services, gather and item finder respectively.

43 PARTICLE ACCELERATORS↗

FACET: The New User Facility at SLAC

FACET (Facility for Advanced Accelerator and Experimental Tests) is a new User Facility at SLAC National Accelerator Laboratory. Its high power electron and positron beams make it a unique facility, ideal for beam-driven Plasma Wakefield Acceleration studies. The first 2 km of the SLAC linac produce 23 GeV, 3.2 nC electron and positron beams with short bunch lengths of 20 {mu}m. A final focusing system can produce beam spots 10 {mu}m wide. User-aided Commissioning took place in summer 2011 and FACET will formally come online in early 2012. We present the User Facility, the current features, planned upgrades and the opportunities for further experiments. Accelerators are our primary tool for discovering the fundamental laws to the universe. Each new frontier we probe requires a new, more powerful method. Accelerators are therefore increasing in size and cost. The future of this field requires new accelerating techniques that can reach the high energies required over shorter distances. New concepts for high gradient acceleration include utilizing the wakes in plasma and dielectric and metallic structures. FACET was built to provide a test bed for novel accelerating concepts with its high charge and highly compressed beams. As a test facility unlike any other, it has also attracted groups interested in beam diagnostic techniques and terahertz studies. The first phase of the construction was completed in May 2011. Beam commissioning began in June and was interleaved with the installation of five experiments. Users were invited to aid with the commissioning for the month of August during which time experimental hardware and software were checked out and some first measurements were taken. FACET is currently in the process of becoming a Department of Energy User Facility for High Energy Physics.

43 PARTICLE ACCELERATORS↗

Results from Plasma Wakefield Experiments at FACET

We report initial results of the Plasma Wakefield Acceleration (PWFA) Experiments performed at FACET - Facility for Advanced aCcelertor Experimental Tests at SLAC National Accelerator Laboratory. At FACET a 23 GeV electron beam with 1.8 x 10{sup 10} electrons is compressed to 20 {mu}m longitudinally and focused down to 10 {mu}m x 10 {mu}m transverse spot size for user driven experiments. Construction of the FACET facility completed in May 2011 with a first run of user assisted commissioning throughout the summer. The first PWFA experiments will use single electron bunches combined with a high density lithium plasma to produce accelerating gradients > 10 GeV/m benchmarking the FACET beam and the newly installed experimental hardware. Future plans for further study of plasma wakefield acceleration will be reviewed. The experimental hardware and operation of the plasma heat-pipe oven have been successfully commissioned. Plasma wakefield acceleration was not observed because the electron bunch density was insufficient to ionize the lithium vapor. The remaining commissioning time in summer 2011 will be dedicated to delivering the FACET design parameters for the experimental programs which will begin in early 2012. PWFA experiments require the shorter bunches and smaller transverse sizes to create the plasma and drive large amplitude wakefields. Low emittance and high energy will minimize head erosion which was found to be a limiting factor in acceleration distance and energy gain. We will run the PWFA experiments with the design single bunch conditions in early 2012. Future PWFA experiments at FACET are discussed in [5][6] and include drive and witness bunch production for high energy beam manipulation, ramped bunch to optimize tranformer ratio, field-ionized cesium plasma, preionized plasmas, positron acceleration, etc.. We will install a notch collimator for two-bunch operation as well as new beam diagnostics such as the X-band TCAV [7] to resolve the two bunches. With these new instruments and desired beam parameters in place next year, we will be able to complete the studies of plasma wakefield acceleration in the next few years.

43 PARTICLE ACCELERATORS↗

Final Focus Test Facility ATF2 Status

ATF2 is a final-focus test beam line which aims to focus the low emittance beam from the ATF damping ring to a vertical size of about 37 nm and to demonstrate nanometre level beam stability. Several advanced beam diagnostics and feedback tools are used. In December 2008, construction and installation were completed and beam commissioning started, supported by an international team of Asian, European and American scientists. In this paper, the present status and performance of the recently deployed ATF2 systems are briefly described, based on the first experience with beam measurements and tuning during winter, spring and early autumn of 2009. The near and longer term plans are outlined as well. The ATF collaboration has completed the construction of ATF2 and has started its commissioning. Important experience operating the new cavity BPM and BSM instrumentation in real conditions has been gained and first beam measurements have been performed in a magnetic configuration with reduced optical demagnification. Both horizontal and vertical emittances were successfully tuned and measured in the extraction line, with values approaching the design values of 2 nm and 12 pm, respectively. First checks of the first order optics along the beam line and at the IP were also done. Hardware developments for the second ATF2 goal are being pursued in parallel with the present commissioning work for the first goal. The collaboration is also preparing several near and long terms plans for ATF2. In the next few years, information very valuable for any future collider with local chromaticity correction and tuning of very low emittance beams can be expected. In the previous experience at the FFTB, the smallest vertical beam sizes which were achieved were about 70 nanometers. The work described here continues to address this largely unexplored regime in a systematic way.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Sharing Experiences within AREVA D and D Project Portfolio: Four Illustrations - 13049

Over the past ten years, AREVA has performed D and D operations on a wide range of nuclear sites, such as Marcoule and La Hague recycling plants, to Cadarache MOX fuel fabrication plant or Veurey and Annecy metallic Uranium machining plants. Each site is different from the other but some lessons can be shared through this D and D portfolio. In that respect, knowledge management is one of AREVA D and D Technical Department main missions. Four illustrations demonstrate the interest of knowledge share. Waste management is one of the key activities in D and D; It requires a specific characterization methodology, adapted logistics, and optimized waste channels, all of which have been developed over the years by AREVA teams on the site of Marcoule while they are rather new to La Hague, whose main activity remains fuel reprocessing despite the launch of UP2 400 D and D program. The transfer of know how has thus been organized over the past two years. Plasma cutting has been used extensively in Marcoule for years, while prohibited on the site of La Hague following questions raised about the risks associated wit Ruthenium sublimation. La Hague Technical Department has thus developed an experimental protocol to quantify and contain the Ruthenium risk, the result of which will then be applied to Marcoule where the Ruthenium issue has appeared in recent operations. Commissioning and operating fission products evaporators is a rather standard activity on UP2 800 and UP3, while the associated experience has been decreasing in Marcoule following final shutdown in 1998. When the French atomic Energy commission decided to build and operate a new evaporator to concentrate rinsing effluents prior to vitrification in 2009, AREVA La Hague operators were mobilized to test and commission the new equipment, and train local operators. Concrete scabbling is the final stage prior to the free release of a nuclear facility. In the context of Veurey and Annecy final cleanup and declassification, large scale concrete scabbling operations were conducted, and lead to the industrialization of the process and qualification of a new process, NiThrow{sup TM} scabbling technology, developed by AREVA. This experience has now been injected into La Hague D and D scenario and has allowed a significant gain in time and cost for scabbling operations. In short, the variety of experiences and sites under the responsibility of AREVA D and D teams present significant challenges, and yet provide a unique opportunity to innovate and qualify new tools and methods which can then be shared throughout the sites. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

The Full Scale Seal Experiment - A Seal Industrial Prototype for Cigeo - 13106

The Full Scale Seal (FSS) Experiment is one of various experiments implemented by Andra, within the frame of the Cigeo (the French Deep Geological Repository) Project development, to demonstrate the technical construction feasibility and performance of seals to be constructed, at time of Repository components (shafts, ramps, drifts, disposal vaults) progressive closure. FSS is built inside a drift model fabricated on surface for the purpose. Prior to the scale 1:1 seal construction test, various design tasks are scheduled. They include the engineering work on the drift model to make it fit with the experimental needs, on the various work sequences anticipated for the swelling clay core emplacement and the concrete containment plugs construction, on the specialized handling tools (and installation equipment) manufactured and delivered for the purpose, and of course on the various swelling clay materials and low pH (below 11) concrete formulations developed for the application. The engineering of the 'seal-as-built' commissioning means (tools and methodology) must also be dealt with. The FSS construction experiment is a technological demonstrator, thus it is not focused on the phenomenological survey (and by consequence, on the performance and behaviour forecast). As such, no hydration (forced or natural) is planned. However, the FSS implementation (in particular via the construction and commissioning activities carried out) is a key milestone in view of comforting phenomenological extrapolation in time and scale. The FSS experiment also allows for qualifying the commissioning methods of a real sealing system in the Repository, as built, at time of industrial operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

2020 Vision for Tank Waste Cleanup (One System Integration) - 12506

The mission of the Department of Energy's Office of River Protection (ORP) is to safely retrieve and treat the 56 million gallons of Hanford's tank waste and close the Tank Farms to protect the Columbia River. The millions of gallons of waste are a by-product of decades of plutonium production. After irradiated fuel rods were taken from the nuclear reactors to the processing facilities at Hanford they were exposed to a series of chemicals designed to dissolve away the rod, which enabled workers to retrieve the plutonium. Once those chemicals were exposed to the fuel rods they became radioactive and extremely hot. They also couldn't be used in this process more than once. Because the chemicals are caustic and extremely hazardous to humans and the environment, underground storage tanks were built to hold these chemicals until a more permanent solution could be found. The Cleanup of Hanford's 56 million gallons of radioactive and chemical waste stored in 177 large underground tanks represents the Department's largest and most complex environmental remediation project. Sixty percent by volume of the nation's high-level radioactive waste is stored in the underground tanks grouped into 18 'tank farms' on Hanford's central plateau. Hanford's mission to safely remove, treat and dispose of this waste includes the construction of a first-of-its-kind Waste Treatment Plant (WTP), ongoing retrieval of waste from single-shell tanks, and building or upgrading the waste feed delivery infrastructure that will deliver the waste to and support operations of the WTP beginning in 2019. Our discussion of the 2020 Vision for Hanford tank waste cleanup will address the significant progress made to date and ongoing activities to manage the operations of the tank farms and WTP as a single system capable of retrieving, delivering, treating and disposing Hanford's tank waste. The initiation of hot operations and subsequent full operations of the WTP are not only dependent upon the successful design and construction of the WTP, but also on appropriately preparing the tank farms and waste feed delivery infrastructure to reliably and consistently deliver waste feed to the WTP for many decades. The key components of the 2020 vision are: all WTP facilities are commissioned, turned-over and operational, achieving the earliest possible hot operations of completed WTP facilities, and supplying low-activity waste (LAW) feed directly to the LAW Facility using in-tank/near tank supplemental treatment technologies. A One System Integrated Project Team (IPT) was recently formed to focus on developing and executing the programs that will be critical to successful waste feed delivery and WTP startup. The team is comprised of members from Bechtel National, Inc. (BNI), Washington River Protection Solutions LLC (WRPS), and DOE-ORP and DOE-WTP. The IPT will combine WTP and WRPS capabilities in a mission-focused model that is clearly defined, empowered and cost efficient. The genesis for this new team and much of the 2020 vision is based on the work of an earlier team that was tasked with identifying the optimum approach to startup, commissioning, and turnover of WTP facilities for operations. This team worked backwards from 2020 - a date when the project will be completed and steady-state operations will be underway - and identified success criteria to achieving safe and efficient operations of the WTP. The team was not constrained by any existing contract work scope, labor, or funding parameters. Several essential strategies were identified to effectively realize the one-system model of integrated feed stream delivery, WTP operations, and product delivery, and to accomplish the team's vision of hot operations beginning in 2016: - Use a phased startup and turnover approach that will allow WTP facilities to be transitioned to an operational state on as short a timeline as credible. - Align Tank Farm (TF) and WTP objectives such that feed can be supplied to the WTP when it is required for hot operations. - Ensure immobilized waste and waste recycle streams can be received by the TF when required to support 2016 production of immobilized low-activity waste (ILAW). - Ensure the required baseline and additional funding is provided beginning in fiscal year 2011. - Modify TF and WTP contracts to adequately address this vision. The 2020 Vision provides a summary of strategies and key actions that optimize the approach to startup, commissioning, and turnover of WTP facilities. This vision focuses on the legally enforceable requirement to achieve the Consent Decree milestones of starting radioactive operations in 2019, and achieving initial WTP operations in 2022. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Challenges for the CMS computing model in the first year

CMS is in the process of commissioning a complex detector and a globally distributed computing infrastructure simultaneously. This represents a unique challenge. Even at the beginning there is not sufficient analysis or organized processing resources at CERN alone. In this presentation we discuss the unique computing challenges CMS expects to face during the first year of running and how they influence the baseline computing model decisions. During the early accelerator commissioning periods, CMS will attempt to collect as many events as possible when the beam is on in order to provide adequate early commissioning data. Some of these plans involve overdriving the Tier-0 infrastructure during data collection with recovery when the beam is off. In addition to the larger number of triggered events, there will be pressure in the first year to collect and analyze more complete data formats as the summarized formats mature. The large event formats impact the required storage, bandwidth, and processing capacity across all the computing centers. While the understanding of the detector and the event selections is being improved, there will likely be a larger number of reconstruction passes and skims performed by both central operations and individual users. We discuss how these additional stresses impact the allocation of resources and the changes from the baseline computing model.

99 GENERAL AND MISCELLANEOUS↗

Technical results from the surface run of the LUX dark matter experiment

We present the results of the three-month above-ground commissioning run of the Large Underground Xenon (LUX) experiment at the Sanford Underground Research Facility located in Lead, South Dakota, USA. LUX is a 370 kg liquid xenon detector that will search for cold dark matter in the form of Weakly Interacting Massive Particles (WIMPs). The commissioning run, conducted with the detector immersed in a water tank, validated the integration of the various sub-systems in preparation of the underground deployment. Using the data collected, we report excellent light collection properties, achieving 8.4 photoelectrons per keV for 662 keV electron recoils without an applied electric field, measured in the center of the WIMP target. Here, we also find good energy and position resolution in relatively high-energy interactions from a variety of internal and external sources. Finally, we have used the commissioning data to tune the optical properties of our simulation and report updated sensitivity projections for spin-independent WIMP-nucleon scattering.

79 ASTRONOMY AND ASTROPHYSICS↗

Development of the multi-purpose Cologne Compact Differential Plunger (CoCoDiff) for the measurement of nuclear level lifetimes with the Recoil Distance Doppler-shift method

Here, a new 3-foil plunger device, the Cologne Compact Differential (CoCoDiff) plunger has been built and commissioned. Due to its compact size, it can be used together with many different spectrometers and auxiliary detectors. As a commissioning experiment, level lifetimes of the $2^{+}_{1}$ and the $4^{+}_{1}$ excited states of 50 Cr have been measured, using the Differential Decay Curve method (DDCM). A derivation is given on how this method can be applied to a differential plunger measurement, in order to measure distances for lifetimes from two different regions of sensitivity at the same time. The commissioning experiment took place at the Cologne FN tandem accelerator, using the reaction 24 Mg( 32 S,4p2n) 50 Cr. Lifetimes, deduced from this measurement, agree well with literature values from earlier measurements.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Performance and results of the LBNE 35 ton membrane cryostat prototype

We report on the performance and commissioning of the first membrane cryostat to be used for scientific application. The Long Baseline Neutrino Experiment (LBNE) has designed and fabricated a membrane cryostat prototype in collaboration with Ishikawajima-Harima Heavy Industries Co., Ltd. (IHI). LBNE has designed and fabricated the supporting cryogenic system infrastructure and successfully commissioned and operated the first membrane cryostat. Original goals of the prototype are: to demonstrate the membrane cryostat technology in terms of thermal performance, feasibility for liquid argon and leak tightness; to demonstrate that we can remove all the impurities from the vessel and achieve the purity requirements in a membrane cryostat without evacuation; to demonstrate that we can achieve and maintain the purity requirements of the liquid argon using mol sieve and copper filters. The purity requirements of a large liquid argon detector such as LBNE are contaminants below 200 parts per trillion (ppt) oxygen equivalent. LBNE is planning the design and construction of a large liquid argon detector. This presentation will present requirements, design and construction of the LBNE 35 ton membrane cryostat prototype, and detail the commissioning and performance. The experience and results of this prototype are extremely important for the development of the LBNE detector.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Deuteron injector for Peking University Neutron Imaging Facility project

The deuteron injector developed for the PKUNIFTY (Peking University Neutron Imaging Facility) has been installed and commissioned at Peking University (PKU). The injector system must transfer 50 keV 50 mA of D{sup +} ion beam to the entrance of the 2 MeV radio frequency quadrupole (RFQ) with 10% duty factor (1 ms, 100 Hz). A compact 2.45 GHz permanent magnet electron cyclotron resonance (PMECR) ion source and a 1.36 m long low energy beam transport (LEBT) line using two solenoids was developed as the deuteron injector. A {phi}5 mm four-quadrant diaphragm was used to simulate the entrance of RFQ electrodes. The beam parameters are measured after this core with an emittance measurement unit (EMU) and a bending magnet for ion fraction analysis at the end of injector. During the commissioning, 77 mA of total deuteron beam was extracted from PMECR and 56 mA of pure D{sup +} beam that passed through the {phi}5 mm four-quadrant diaphragm was obtained at the position of RFQ entrance with the measured normalized rms emittance 0.12-0.16{pi} mm mrad. Ion species analysis results show that the deuteron fraction is as high as 99.5%. All of the parameters satisfy PKUNIFTY's requirements. In this paper, we will describe the deuteron injector design and report the commissioning results as well as the initial operation.

43 PARTICLE ACCELERATORS↗

The neutron imaging diagnostic at NIF (invited)

A neutron imaging diagnostic has recently been commissioned at the National Ignition Facility (NIF). This new system is an important diagnostic tool for inertial fusion studies at the NIF for measuring the size and shape of the burning DT plasma during the ignition stage of Inertial Confinement Fusion (ICF) implosions. The imaging technique utilizes a pinhole neutron aperture, placed between the neutron source and a neutron detector. The detection system measures the two dimensional distribution of neutrons passing through the pinhole. This diagnostic has been designed to collect two images at two times. The long flight path for this diagnostic, 28 m, results in a chromatic separation of the neutrons, allowing the independently timed images to measure the source distribution for two neutron energies. Typically the first image measures the distribution of the 14 MeV neutrons and the second image of the 6-12 MeV neutrons. The combination of these two images has provided data on the size and shape of the burning plasma within the compressed capsule, as well as a measure of the quantity and spatial distribution of the cold fuel surrounding this core.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Measurement of carbon condensates using small-angle x-ray scattering during detonation of the high explosive hexanitrostilbene

The dynamics of carbon condensation in detonating high explosives remains controversial. Detonation model validation requires data for processes occurring at nanometer length scales on time scales ranging from nanoseconds to microseconds. A new detonation endstation has been commissioned to acquire and provide time-resolved small-angle x-ray scattering (SAXS) from detonating explosives. Hexanitrostilbene (HNS) was selected as the first to investigate due to its ease of initiation using exploding foils and flyers, vacuum compatibility, high thermal stability, and stoichiometric carbon abundance that produces high carbon condensate yields. The SAXS data during detonation, collected with 300 ns time resolution, provide unprecedented signal fidelity over a broad q-range. This fidelity permits the first analysis of both the Guinier and Porod/power-law regions of the scattering profile during detonation, which contains information about the size and morphology of the resultant carbon condensate nanoparticles. To bolster confidence in these data, the scattering angle and intensity were additionally cross-referenced with a separate, highly calibrated SAXS beamline. The data show that HNS produces carbon particles with a radius of gyration of 2.7 nm in less than 400 ns after the detonation front has passed, and this size and morphology are constant over the next several microseconds. These data directly contradict previous pioneering work on RDX/TNT mixtures and TATB, where observations indicate significant particle growth (50% or more) continues over several microseconds. The power-law slope is about −3, which is consistent with a complex disordered, irregular, or folded sp{sup 2} sub-arrangement within a relatively monodisperse structure possessing radius of gyration of 2.7 nm after the detonation of HNS.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Variation of annual effective dose due to radon level in indoor air in Marwar region of Rajasthan, India

In the present work, indoor radon and thoron measurements have been carried out from different locations of Jodhpur and Nagaur districts of Northern Rajasthan, India using RAD7, a solid state alpha detector. The radon and thoron concentration in indoor air varies from 8.75 to 61.25 Bq m{sup −3} and 32.7 to 147.2 Bq m{sup −3} with the mean value of 32 and 73 Bq m{sup −3} respectively. The observed indoor radon concentration values are well below the action level recommended by International Commission on Radiological Protection (200-300 Bq m{sup −3}) and Environmental Protection Agency (148 Bq m{sup −3}). The survey reveals that the thoron concentration values in the indoor air are well within the International Commission on Radiological Protection (2005). The calculated total annual effective dose due to radon level in indoor air varies from 0.22 to 1.54 mSv y{sup −1} with the mean value of 0.81 mSv y{sup −1} which is less than even the lower limit of action level 3-10 mSv y{sup −1} recommended by International Commission on Radiological Protection (2005)

54 ENVIRONMENTAL SCIENCES↗

Fast and efficient charge breeding of the Californium rare isotope breeder upgrade electron beam ion source

The Electron Beam Ion Source (EBIS), developed to breed Californium Rare Isotope Breeder Upgrade (CARIBU) radioactive beams at Argonne Tandem Linac Accelerator System (ATLAS), is being tested off-line. A unique property of the EBIS is a combination of short breeding times, high repetition rates, and a large acceptance. Overall, we have implemented many innovative features during the design and construction of the CARIBU EBIS as compared to the existing EBIS breeders. The off-line charge breeding tests are being performed using a surface ionization source that produces singly charged cesium ions. The main goal of the off-line commissioning is to demonstrate stable operation of the EBIS at a 10 Hz repetition rate and a breeding efficiency into single charge state higher than 15%. These goals have been successfully achieved and exceeded. We have measured (20% ± 0.7%) breeding efficiency into the single charge state of 28+ cesium ions with the breeding time of 28 ms. In general, the current CARIBU EBIS operational parameters can provide charge breeding of any ions in the full mass range of periodic table with high efficiency, short breeding times, and sufficiently low charge-to-mass ratio, 1/6.3 for the heaviest masses, for further acceleration in ATLAS. In this study, we discuss the parameters of the EBIS and the charge breeding results in a pulsed injection mode with repetition rates up to 10 Hz.

43 PARTICLE ACCELERATORS↗

Status of the Majorana Demonstrator

The MAJORANA Collaboration is constructing the MAJORANA DEMONSTRATOR, an ultra-low background, modular, HPGe detector array with a mass of 44-kg (29 kg {sup 76}Ge and 15 kg {sup nat}Ge) to search for neutrinoless double beta decay in {sup 76}Ge. The next generation of tonne-scale Ge-based neutrinoless double beta decay searches will probe the neutrino mass scale in the inverted-hierarchy region. The MAJORANA DEMONSTRATOR is envisioned to demonstrate a path forward to achieve a background rate at or below 1 count/tonne/year in the 4 keV region of interest around the Q-value of 2039 keV. The MAJORANA DEMONSTRATOR follows a modular implementation to be easily scalable to the next generation experiment. First, the prototype module was assembled; it has been continuously taking data from July 2014 to June 2015. Second, Module 1 with more than half of the total enriched detectors and some natural detectors has been assembled and it is being commissioned. Finally, the assembly of Module 2, which will complete MAJORANA DEMONSTRATOR, is already in progress.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗