Search NASA⌕ Search

SEARCH · Search NASA

Results for “Operating Systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,045 records · Page 58

A Framework for Adaptable Operating and Runtime Systems

The emergence of new classes of HPC systems where performance improvement is enabled by Moore’s Law for technology is manifest through multi-core-based architectures including specialized GPU structures. Operating systems were originally designed for control of uniprocessor systems. By the 1980s multiprogramming, virtual memory, and network interconnection were integral services incorporated as part of most modern computers. HPC operating systems were primarily derivatives of the Unix model with Linux dominating the Top-500 list. The use of Linux for commodity clusters was first pioneered by the NASA Beowulf Project. However, the rapid increase in number of cores to achieve performance gain through technology advances has exposed the limitations of POSIX general-purpose operating systems in scaling and efficiency. This project was undertaken through the leadership of Sandia National Laboratories and in partnership of the University of New Mexico to investigate the alternative of composable lightweight kernels on scalable HPC architectures to achieve superior performance for a wide range of applications. The use of composable operating systems is intended to provide a minimalist set of services specifically required by a given application to preclude overheads and operational uncertainties (“OS noise”) that have been demonstrated to degrade efficiency and operational consistency. This project was undertaken as an exploration to investigate possible strategies and methods for composable lightweight kernel operating systems towards support for extreme scale systems.

97 MATHEMATICS AND COMPUTING↗

Baseline and Target Values for PV Forecasts: Toward Improved Solar Power Forecasting

Accurate solar power forecasting allows utilities to get the most out of the solar resources on their systems. To truly measure the improvements that any new solar forecasting methods can provide, it is important to first develop (or determine) baseline and target solar forecasting at different spatial and temporal scales. This paper aims to develop baseline and target values for solar forecasting metrics. These were informed by close collaboration with utility and independent system operator partners. The baseline values are established based on state-of-the-art numerical weather prediction models and persistence models. The target values are determined based on the reduction in the amount of reserves that must be held to accommodate the uncertainty of solar power output.

14 SOLAR ENERGY↗

NASA Centennial Challenge: 3D Printed Habitat, Phase 3 Final Results

NASA's Centennial Challenges program uses prize competitions with the goal of accelerating innovation in the aerospace industry. Competitions in the Centennial Challenges portfolio have previously focused on advancements in space robotics, regolith excavation, bio-printing, astronaut suit design, small satellites, and solar-powered vehicles. NASA's Three Dimensional (3D) Printed Habitat Centennial Challenge represents a partnership between NASA and the non-profit partner: Bradley University, with co-sponsors Caterpillar, Bechtel, Brick and Mortar Ventures, the American Concrete Institute, and the United States Army Corps of Engineers (USACE) Engineer Research and Development Center (ERDC) to spur development in automated additive construction technologies. The challenge asks teams to design and construct a scaled and simulated Martian habitat using indigenous materials and large scale 3D automated printing systems. Phase 1 of the competition, held in 2015, was an architectural design competition for habitat concepts that could be 3D printed. Phase 2, completed in 2017, asked teams to develop feedstocks from indigenous materials and hydrocarbon polymer recyclables, and demonstrate automated printing systems to manufacture these feedstocks into test specimens to assess mechanical strength. This paper will discuss the Phase 3 competition, focusing on technology outcomes that can potentially be infused into both terrestrial and planetary construction applications. The Phase 3 competition was divided into two sub-competitions: 1) virtual construction, where teams created a high fidelity building information model (BIM) of their 3D-printed habitat design and 2) the construction competition, which required teams to 3D print a structural foundation and subject materials samples to freeze/thaw testing and impact testing (level 1), produce a habitat element and complete a hydrostatic test (level 2), and additively manufacture a 1:3 scale habitat onsite in a head to head competition at Caterpillar, inc.'s Edwards Demonstration & Learning Center near Peoria, Illinois over the course of three days (level 3). While the Phase 2 competition focused primarily on the development of novel feedstocks and robotic printing systems, Phase 3 emphasized the scale-up of these systems and autonomous operation (demonstrating the capability to operate systems on precursor missions prior to the arrival of crew, or terrestrially in field operation settings where human tending of a manufacturing system may be limited). The Phase 3 virtual construction levels yielded a number of novel habitat designs, including both modular habitats and vertically-oriented habitat concepts. The Phase 3 construction competition also challenged teams to autonomously place penetrations and interfacing elements in additively manufactured structures. The paper will emphasize potential applications for the new materials and technologies developed under the umbrella of the competition within NASA's portfolio and in Earth-based applications such as disaster response and infrastructure improvement.

Construction↗

Nasa Centennial Challenge: Three Dimensional (3d) Printed Habitat, Phase 3

NASA's Centennial Challenges program uses prize competitions with the goal of accelerating innovation in the aerospace industry. Competitions in the Centennial Challenges portfolio have previously focused on advancements in space robotics, regolith excavation, bio-printing, astronaut suit design, small satellites, and solar-powered vehicles. NASA's Three Dimensional (3D) Printed Habitat Centennial Challenge represents a partnership between NASA and the non-profit partner: Bradley University, with co-sponsors Caterpillar, Bechtel, Brick and Mortar Ventures, the American Concrete Institute, and the United States Army Corps of Engineers (USACE) Engineer Research and Development Center (ERDC) to spur development in automated additive construction technologies. The challenge asks teams to design and construct a scaled and simulated Martian habitat using indigenous materials and large scale 3D automated printing systems. Phase 1 of the competition, held in 2015, was an architectural design competition for habitat concepts that could be 3D printed. Phase 2, completed in 2017, asked teams to develop feedstocks from indigenous materials and hydrocarbon polymer recyclables, and demonstrate automated printing systems to manufacture these feedstocks into test specimens to assess mechanical strength. This paper will discuss the Phase 3 competition, focusing on technology outcomes that can potentially be infused into both terrestrial and planetary construction applications. The Phase 3 competition was divided into two sub-competitions: 1) virtual construction, where teams created a high fidelity building information model (BIM) of their 3D-printed habitat design and 2) the construction competition, which required teams to 3D print a structural foundation and subject materials samples to freeze/thaw testing and impact testing (level 1), produce a habitat element and complete a hydrostatic test (level 2), and additively manufacture a 1:3 scale habitat onsite in a head to head competition at Caterpillar, inc.'s Edwards Demonstration & Learning Center near Peoria, Illinois over the course of three days (level 3). While the Phase 2 competition focused primarily on the development of novel feedstocks and robotic printing systems, Phase 3 emphasized the scale-up of these systems and autonomous operation (demonstrating the capability to operate systems on precursor missions prior to the arrival of crew, or terrestrially in field operation settings where human tending of a manufacturing system may be limited). The Phase 3 virtual construction levels yielded a number of novel habitat designs, including both modular habitats and vertically-oriented habitat concepts. The Phase 3 construction competition also challenged teams to autonomously place penetrations and interfacing elements in additively manufactured structures. The paper will emphasize potential applications for the new materials and technologies developed under the umbrella of the competition within NASA's portfolio and in Earth-based applications such as disaster response and infrastructure improvement.

Centennial challenge↗

Reviewing Consensus HFE Standards for NRC Use: A Case Study using the IEEE Standard for Computerized Operating Procedure Systems

The U.S. Nuclear Regulatory Commission’s (NRC’s) endorsement of consensus standards provides a cost-effective means of enhancing the staff’s ability to review state-of-the-art designs. Although the NRC endorsed consensus standards in many technical disciplines, it yet has to do so in human factors engineering (HFE). The purpose of our study was to develop a standardized methodology whereby to evaluate a consensus HFE standard to determine its appropriateness to, and adequacy for using in licensing reviews. The high-level objective of the methodology is to ensure that the guidance meets the NRC’s requirements on scientific- and engineering-rigor that they use in developing their own guidance. We propose four criteria for endorsing a consensus standard: (1) It should meet an existing need for NRC’s licensing and safety reviews; (2) it should be based on sound HFE principles; (3) it should be thoroughly peer-reviewed; and, (4) it should address human performance issues identified in the literature. Our methodology offers a means to assess these four criteria. We used it to evaluate an Institute of Electrical and Electronics Engineers’ (IEEE) draft standard on computerized operating procedure systems. We concluded that the IEEE standard generally met the established criteria, although several areas were identified that needed further clarification. Our evaluation methodology particularly was useful for identifying issues to be resolved, and for providing a basis for judging whether the staff should consider endorsing the standard. The methodology also helped recognize criteria in the proposed standard that may benefit from additional scrutiny by the staff. The evaluation methodology developed is applicable generally to reviewing other HFE standards that the NRC is considering for use or endorsement.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Computational Experiment Design for Operations Model Simulation

Computer simulations that demonstrate the value of novel approaches are crucial to developing more flexible and robust power systems operations with high penetrations of renewable energy at multiple geographic and temporal scales. However, optimization-based simulations that depend on forecast data often face challenges in evaluating performance, reproducing results, and testing under realistic simulation scenarios. In this paper, we develop scientific computing best-practices for the validation and reproduction of power systems operational models. We then employ two case studies to demonstrate the proposed validation and reproduction framework.

MATHEMATICS AND COMPUTING,POWER TRANSMISSION AND D↗

Payload operation television system

The TV system assembled is intended for laboratory experimentation which would develop operational techniques and lead to the design of space-borne TV equipment whose purpose would be to assist the astronaut-operator aboard a space station to load payload components. The TV system assembled for this program is a black and white, monocular, high performance system. The equipment consists principally of a good quality TV camera capable of high resolving power; a TV monitor; a sync generator for driving camera and monitor; and two pan/tilt units which are remotely controlled by the operator. One pan/tilt unit provides control of the pointing of the camera, the other similarly controls the position of a simulated payload.

Source record↗

An Overview of ANN Application in the Power Industry

The paper presents a survey on the development and experience with artificial neural net (ANN) applications for electric power systems, with emphasis on operational systems. The organization and constraints of electric utilities are reviewed, motivations for investigating ANN are identified, and a current assessment is given from the experience of 2400 projects using ANN for load forecasting, alarm processing, fault detection, component fault diagnosis, static and dynamic security analysis, system planning, and operation planning.

artificial neural networks ANN electric power syst↗

Machine Learning Based Network Parameter Estimation Using AMI Data

The expansion of distribution power system and the growing penetration of distributed energy resources present new challenges for situational awareness. Calibrating the extended system model with sensor measurements and maintaining the usability is critical for utilities. This paper presents a distribution network parameter estimation (DNPE) approach using machine learning (ML) and metering data that improve the quality of extended distribution power system modeling. The reliability model can improve the ability of endpoint data to be translated into network-level situational awareness in real time and help distribution system operators (DSOs) solve branch flow and voltage problems. In addition, a data analytic and automate processing scheme is proposed to improve the sensor data quality and prevent misleading information. The effectiveness of the proposed method is verified with actual advanced metering infrastructure (AMI) data on a real utility feeder model, while considering the higher penetration of photovoltaic power generation. The test of DNPE and study results are demonstrated in this paper.

Parameter estimation, machine learning, power dist↗

Democratizing Authority in the Built Environment

Operating systems and applications in the built environment have relied upon central authorization and management mechanisms which restrict their scalability, especially with respect to administrative overhead. We propose a new set of primitives encompassing syndication, security, and service execution that unifies the management of applications and services across the built environment, while enabling participants to individually delegate privilege across multiple administrative domains with no loss of security or manageability. We show how to leverage a decentralized authorization syndication platform to extend the design of building operating systems beyond the single administrative domain of a building. The authorization system leveraged is based on blockchain smart contracts to permit decentralized and democratized delegation of authorization without central trust. Upon this, a publish/subscribe syndication tier and a containerized service execution environment are constructed. Combined, these mechanisms solve problems of delegation, federation, device protection and service execution that arise throughout the built environment. We leverage a high-fidelity city-scale emulation to verify the scalability of the authorization tier, and briefly describe a prototypical democratized operating system for the built environment using this foundation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

What Is the Value of Alternative Methods for Estimating Ramping Needs?

Power system operators procure and deploy flexibility reserves or ramping products to address balancing needs caused by uncertainty and variability of load and generation. Existing methods estimate ramping needs using calendar information and historical forecast errors. Novel methods investigate if real-time weather information could inform ramping and other balancing requirements. This paper compares estimation methods for ramping requirements in theory and practice. The theoretical framework indicates when an alternative method could yield improved economic or reliability performance than existing methods by requiring lower or higher levels of ramping products. Preliminary simulations on a 118-bus test system for 4 days in May 2019 illustrate how system performance improves or deteriorates when ramping requirements are weather-informed (alternative) instead of calendar-based (baseline). Preliminary results suggest high variability in change of performance and underline the impact of additional factors, such as system conditions, on the realized performance change.

41 EE - Solar Energy Technologies Office (EE-4S)↗

Peer-to-Peer Energy Trading under Network Constraints Based on Generalized Fast Dual Ascent

We report the wide deployment of renewable energy resources, combined with a more proactive demand-side management, is inducing a new paradigm in both power system operation and electricity market trading, which especially boosts the emergence of the peer-to-peer (P2P) market. A more flexible local market mechanism is highly desirable in response to fast changes in renewable power generation at the distribution network level. Moreover, large-scale implementation of P2P energy trading inevitably affects the secure and economic operation of the distribution network. This paper presents a new P2P electricity trading framework with distribution network security constraints considered using the generalized fast dual ascent method. First, an event-driven local P2P market framework is presented to facilitate short-term or immediate local energy transactions. Then, the sensitivity analysis of nodal voltage and network loss with respect to nodal power injections is used to evaluate the impacts of P2P transactions on the distribution network, which ensures the secure operation of the distribution system. Thereby, the external operational constraints are internalized, and the cost of P2P energy trading can be appropriately allocated in an endogenous way. Moreover, a generalized fast dual ascent method is employed to implement distributed market-clearing efficiently. Finally, numerical results indicate that the proposed model could guarantee secure operation of the distribution system with P2P energy trading, and the solution method enjoys good convergence performance.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Program For Parallel Discrete-Event Simulation

User does not have to add any special logic to aid in synchronization. Time Warp Operating System (TWOS) computer program is special-purpose operating system designed to support parallel discrete-event simulation. Complete implementation of Time Warp mechanism. Supports only simulations and other computations designed for virtual time. Time Warp Simulator (TWSIM) subdirectory contains sequential simulation engine interface-compatible with TWOS. TWOS and TWSIM written in, and support simulations in, C programming language.

Beckman, Brian C.↗

Intermittent Renewable Management Pilot Phase 2

The Intermittent Renewable Management Pilot - Phase 2 (IRM2) was designed to study the feasibility of demand-side resources to participate into the California Independent System Operator (CAISO) wholesale market as proxy demand resources (PDR). The pilot study focused on understanding the issues related with direct participation of third-parties and customers including customer acceptance; market transformation challenges (wholesale market, technology); technical and operational feasibility; and value to the rate payers, DR resource owners and the utility on providing an enabling mechanism for DR resources into the wholesale markets. The customer had the option of committing to either three contiguous hour blocks for 24 days or six contiguous hours for 12 days a month with day-ahead notification that aligned with the CAISO integrated forward market. As a result of their being available, the customer was paid $10/ kilowatt (kW)-month for capacity in addition to CAISO energy settlements. The participants were limited to no more than a 2 megawatt (MW) capacity with a six-month commitment. Four participants successfully engaged in the pilot. In this report, we provide the description of the pilot, participant performance results, costs and value to participants as well as outline some of the issues encountered through the pilot. Results show that participants chose to participate with storage and the value of CAISO settlements were significantly lower than the capacity payments provided by the utility as incentive payments. In addition, this pilot revealed issues both on the participant side and system operations side. These issues are summarized in the report.The Intermittent Renewable Management Pilot - Phase 2 (IRM2) was designed to study the feasibility of demand-side resources to participate into the California Independent System Operator (CAISO) wholesale market as proxy demand resources (PDR). The pilot study focused on understanding the issues related with direct participation of third-parties and customers including customer acceptance; market transformation challenges (wholesale market, technology); technical and operational feasibility; and value to the rate payers, DR resource owners and the utility on providing an enabling mechanism for DR resources into the wholesale markets.

99 GENERAL AND MISCELLANEOUS↗

Queueing Network Models for Parallel Processing of Task Systems: an Operational Approach

Computer performance modeling of possibly complex computations running on highly concurrent systems is considered. Earlier works in this area either dealt with a very simple program structure or resulted in methods with exponential complexity. An efficient procedure is developed to compute the performance measures for series-parallel-reducible task systems using queueing network models. The procedure is based on the concept of hierarchical decomposition and a new operational approach. Numerical results for three test cases are presented and compared to those of simulations.

Mak, Victor W. K.↗

Fish Friendly Water Rules' Impact On the Power Grid with High VRE Levels

Columbia River basin multipurpose reservoirs are operated for hydropower production and many other purposes considering the aquatic habitat of the river basin. Specifically, the river basin fish population is a vital element for the tribal community of the river basin. When conventional thermal power plants are retired, hydropower flexibility balances the wind and solar variability of the power grid and provides grid services to maximize the high renewable power absorption. On the other hand, over-reliance on hydropower could harm the river basin fish habitat. For example, water release pulses during peak electricity demand hours and shorter-term water release variation could harm the fish population. Power grid planners, environmentalists, Columbia Basin tribes, hydro regulators, and water resource planners work together to understand the impacts of Columbia River basin operation in a fish-friendly way in the current power grid and power grid with higher renewable power share. We examine different levels of renewable share in the Western Interconnection to understand the multiple weather years and future climate projection and operating scenario impact on the power grid and water system. We measure power grid impacts for various water resources planning scenarios in terms of total system operating cost, system reliability indicators, changes in wind and solar generation and curtailments, local marginal prices, and revenue for hydropower producers. The study results inform reservoir operating rules decisions from hydropower power producers, system operators, other water users, tribes, environmentalists, and other stakeholders.

environmental↗

Designing Mission Operations for the Gravity Recovery and Interior Laboratory Mission

NASA's Gravity Recovery and Interior Laboratory (GRAIL) mission, to understand the internal structure and thermal evolution of the Moon, offered unique challenges to mission operations. From launch through end of mission, the twin GRAIL orbiters had to be operated in parallel. The journey to the Moon and into the low science orbit involved numerous maneuvers, planned on tight timelines, to ultimately place the orbiters into the required formation-flying configuration necessary. The baseline GRAIL mission is short, only 9 months in duration, but progressed quickly through seven very unique mission phases. Compressed into this short mission timeline, operations activities and maneuvers for both orbiters had to be planned and coordinated carefully. To prepare for these challenges, development of the GRAIL Mission Operations System began in 2008. Based on high heritage multi-mission operations developed by NASA's Jet Propulsion Laboratory and Lockheed Martin, the GRAIL mission operations system was adapted to meet the unique challenges posed by the GRAIL mission design. This paper describes GRAIL's system engineering development process for defining GRAIL's operations scenarios and generating requirements, tracing the evolution from operations concept through final design, implementation, and validation.

MOS↗