Search NASA⌕ Search

SEARCH · Search NASA

Results for “Operational Risk”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,045 records · Page 58

Green Propellant Loading Demonstration at U.S. Range

The Green Propellant Loading Demonstration (GPLD) was conducted December 2015 at Wallops Flight Facility (WFF), leveraging work performed over recent years to bring lower toxicity hydrazine replacement green propellants to flight missions. The objective of this collaboration between NASA Goddard Space Flight Center (GSFC), WFF, the Swedish National Space Board (SNSB), and Ecological Advanced Propulsion Systems (ECAPS) was to successfully accept LMP-103S propellant at a U.S. Range, store the propellant, and perform a simulated flight vehicle propellant loading. NASA GSFC Propulsion (Code 597) managed all aspects of the operation, handling logistics, preparing the procedures, and implementing the demonstration. In addition to the partnership described above, Moog Inc. developed an LMP-103S propellant-compatible titanium rolling diaphragm flight development tank and loaned it to GSFC to act as the GPLD flight vessel. The flight development tank offered the GPLD an additional level of flight-like propellant handling process and procedures. Moog Inc. also provided a compatible latching isolation valve for remote propellant expulsion. The GPLD operation, in concert with Moog Inc. executed a flight development tank expulsion efficiency performance test using LMP-103S propellant. As part of the demonstration work, GSFC and WFF documented Range safety analyses and practices including all elements of shipping, storage, handling, operations, decontamination, and disposal. LMP-103S has not been previously handled at a U.S. Launch Range. Requisite for this activity was an LMP-103S Risk Analysis Report and Ground Safety Plan. GSFC and WFF safety offices jointly developed safety documentation for application into the GPLD operation. The GPLD along with the GSFC Propulsion historical hydrazine loading experiences offer direct comparison between handling green propellant versus safety intensive, highly toxic hydrazine propellant. These described motives initiated the GPLD operation in order to investigate the handling and process safety variances in project resources between LMP-103S and typical in-space propellants. The GPLD risk reduction operation proved successful for many reasons including handling the green propellant at a U.S. Range, loading and pressurizing a flight-like tank, expelling the propellant, measuring the tank expulsion efficiency, and most significantly, GSFC propulsion personnel's new insight into the LMP-103S propellant handling details.

Green Propellant↗

H-Canyon Jumper Gasket Sealing Evaluation

H-Canyon Documented Safety Analysis approved December 2019 credits the leak integrity of H-Canyon (HCA) process tanks, piping, and jumpers in preventing the release of radioactive material in a post seismic environment. Demonstration of leak tightness capability for this equipment was achieved through substantial analytical effort. However, one potential weak point that affects leak integrity exists at the gasketed joint between Hanford Connectors (HC) and nozzles. Review of the HCA Crane Log over a three-year period indicates the HCs periodically leak. Savannah River National Laboratory (SRNL) was requested to perform gasket compression tests that evaluate gasket relaxation characteristics, i.e., creep, and provide improvements to the HC installation process that can reduce or eliminate the frequency of leaks at HCs. A HC torque value of 312 ft-lbf is the target value used because it is the minimum torque value, with 95% confidence, when an unlubricated HC is impacted for standard sealing period of 9 seconds. In the HCA pipe-jumper connections are installed remotely by using HCs. HCs inherently add to the uncertainty of a gasketed joint because a calibrated torque value cannot be applied. The gasket material is a special material made of asbestos-fiber impregnated with Teflon. This material has been used for decades and generally performs well but does leak intermittently as gaskets creep and preloaded torque is lost. Gasket types are either snap-ring (SR) or lampshade (LS). Both gasket types cover the same seating area. The SR gasket is designed to remain with the jumper when the jumper is removed leaving the nozzle faces clean of any debris. SR gaskets are initially installed when the jumper is fabricated. Changing gaskets is time consuming and the radioactive environment presents risks to personnel. When jumpers are removed LS gaskets could be used to better seal the connection to reduce down time and ALARA concerns. That is, an LS gasket would be remotely positioned over the nozzle and the HC reinstalled. Testing also included two situations not typical of plant operation. One situation was the use of the non-standard double-layered gaskets (DG), and the other situation was the use of a LS without removal of the installed SR gasket. The DG was used when the supply of LS gaskets ended, so that testing could continue. It was of interest to demonstrate this gasket’s creep response because the DG, which was two gaskets glued together, was thicker than the LS gasket and the thicker material was expected to elicit a greater creep characteristics. The second situation of using two gaskets together by installing an LS gasket without removing the installed gasket is not allowed by the ASME Codes. However, by demonstrating the creep history of such a gasket arrangement it could be considered as an option that could possibly seal a connection while significantly reducing operational down time and personnel risk. Forty tests were conducted, and the overall results demonstrate the initial applied force and how the gasket changes with time. The change in sealing force, in terms of torque, was then measured to obtain a force history as the gaskets creep. This report documents the results of those tests as well as the method used to perform the tests.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Expert system decision support for low-cost launch vehicle operations

Progress in assessing the feasibility, benefits, and risks associated with AI expert systems applied to low cost expendable launch vehicle systems is described. Part one identified potential application areas in vehicle operations and on-board functions, assessed measures of cost benefit, and identified key technologies to aid in the implementation of decision support systems in this environment. Part two of the program began the development of prototypes to demonstrate real-time vehicle checkout with controller and diagnostic/analysis intelligent systems and to gather true measures of cost savings vs. conventional software, verification and validation requirements, and maintainability improvement. The main objective of the expert advanced development projects was to provide a robust intelligent system for control/analysis that must be performed within a specified real-time window in order to meet the demands of the given application. The efforts to develop the two prototypes are described. Prime emphasis was on a controller expert system to show real-time performance in a cryogenic propellant loading application and safety validation implementation of this system experimentally, using commercial-off-the-shelf software tools and object oriented programming techniques. This smart ground support equipment prototype is based in C with imbedded expert system rules written in the CLIPS protocol. The relational database, ORACLE, provides non-real-time data support. The second demonstration develops the vehicle/ground intelligent automation concept, from phase one, to show cooperation between multiple expert systems. This automated test conductor (ATC) prototype utilizes a knowledge-bus approach for intelligent information processing by use of virtual sensors and blackboards to solve complex problems. It incorporates distributed processing of real-time data and object-oriented techniques for command, configuration control, and auto-code generation.

Szatkowski, G. P.↗

Constraint and Flight Rule Management for Space Mission Operations

The exploration of space is one of the most fascinating domains to study from a human factors perspective. Like other complex work domains such as aviation (Pritchett and Kim, 2008), air traffic management (Durso and Manning, 2008), health care (Morrow, North, and Wickens, 2006), homeland security (Cooke and Winner, 2008), and vehicle control (Lee, 2006), space exploration is a large-scale sociotechnical work domain characterized by complexity, dynamism, uncertainty, and risk in real-time operational contexts (Perrow, 1999; Woods et al, 1994). Nearly the entire gamut of human factors issues - for example, human-automation interaction (Sheridan and Parasuraman, 2006), telerobotics, display and control design (Smith, Bennett, and Stone, 2006), usability, anthropometry (Chaffin, 2008), biomechanics (Marras and Radwin, 2006), safety engineering, emergency operations, maintenance human factors, situation awareness (Tenney and Pew, 2006), crew resource management (Salas et al., 2006), methods for cognitive work analysis (Bisantz and Roth, 2008) and the like -- are applicable to astronauts, mission control, operational medicine, Space Shuttle manufacturing and assembly operations, and space suit designers as they are in other work domains (e.g., Bloomberg, 2003; Bos et al, 2006; Brooks and Ince, 1992; Casler and Cook, 1999; Jones, 1994; McCurdy et al, 2006; Neerincx et aI., 2006; Olofinboba and Dorneich, 2005; Patterson, Watts-Perotti and Woods, 1999; Patterson and Woods, 2001; Seagull et ai, 2007; Sierhuis, Clancey and Sims, 2002). The human exploration of space also has unique challenges of particular interest to human factors research and practice. This chapter provides an overview of those issues and reports on some of the latest research results as well as the latest challenges still facing the field.

Barreiro, J.↗

Abstract for CRADA between NETL and West Virginia University Research Corporation

The National Energy Technology Lab (NETL) will collaborate with West Virginia University to develop and demonstrate a dynamically operated modular, microwave-enhanced catalytic process for the co-production of ammonia and olefins. Ammonia and olefins (e.g., ethylene) are the most widely produced chemicals in the U.S. by volume, but their processes are also the most carbon and energy intensive as they rely on fossil-based feedstocks and combustion of fossil fuels for heating. The project will leverage the unique ability of microwaves to intensify process heating by providing pulsed, targeted energy to active sites of a mixed catalyst bed to convert a mixture of CH 4 /N 2 into ethylene and ammonia. The collaboration will facilitate the development of microwave technology that has the potential to utilize distributed waste resources like shale gas or biogas as well as renewable electricity to produce these valuable chemicals. It is expected that the results will decarbonize chemical production by using renewable energy and waste feedstocks, improve efficiency by reducing unit operations (H 2 production), and de-risk microwave technology for chemical production by demonstrating long-term and dynamic operability. This project was funded by an award from the Department of Energy’s EERE IEDO.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Safely Enabling UAS Operations in Low-Altitude Airspace

Flexibility where possible, and structure where necessary. Consider the needs of national security, safe airspace operations, economic opportunities, and emerging technologies. Risk-based approach based on population density, assets on the ground, density of operations, etc. Digital, virtual, dynamic, and as needed UTM services to manage operations.

UTM↗

Lunar Explorer Instrument for space biology Applications (LEIA): An overview of planned science concept of operations

Radiation and reduced gravity pose biological risks to crewed deep space exploration. To better understand deep space radiation biology, the LEIA mission will measure charged particles and fast neutrons as well as yeast growth, metabolic rate, and bioengineered production of carotenoids at the lunar surface. LEIA will be delivered to the south polar region of the Moon by the Commercial Lunar Payload Services (CLPS) program. The LEIA science concept of operations was developed to isolate radiation and partial gravity from other environmental conditions experienced by the payload. Due to CLPS integration requirements, there will be at least eight months from loading yeast into the payload until activation on the lunar surface. Replicate yeast strains will be loaded in a randomized complete block design to minimize batch differences in desiccation tolerance and positional effects in the microfluidics culture system. Temperature and relative humidity will be controlled throughout integration and flight to maintain yeast viability and to enable measurement of yeast growth parameters within the lunar surface operations timeframe, with the ground control matching environmental conditions where possible. LEIA is co-manifested with the European Space Agency’s PROSPECT mission, which will be operating a drill during yeast growth. Vibration translated through the lunar lander will be mitigated and quantified to account for potential impacts on LEIA optical measurements and yeast growth rate. Total space radiation dose, including the transit exposure from Earth to the Moon, will be measured to obtain more accurate charged particle and fast neutron dose rates on the lunar surface. These radiation data will also yield ground truth radiation dose experienced by the yeast during the mission. Quantifying these environmental factors impacting the LEIA payload will allow more accurate ground control experiments to better isolate the biological responses to radiation and reduced gravity at the lunar surface.

Lunar Surface Mission↗

Development of a Macro-Batch Qualification Strategy for the Hanford Tank Waste Treatment and Immobilization Plant

The Savannah River National Laboratory (SRNL) has evaluated the existing waste feed qualification strategy for the Hanford Tank Waste Treatment and Immobilization Plant (WTP) based on experience from the Savannah River Site (SRS) Defense Waste Processing Facility (DWPF) waste qualification program. The current waste qualification programs for each of the sites are discussed in the report to provide a baseline for comparison. Recommendations on strategies are then provided that could be implemented at Hanford based on the successful Macrobatch qualification strategy utilized at SRS to reduce the risk of processing upsets or the production of a staged waste campaign that does not meet the processing requirements of the WTP. Considerations included the baseline WTP process, as well as options involving Direct High Level Waste (HLW) and Low Activity Waste (LAW) processing, and the potential use of a Tank Waste Characterization and Staging Facility (TWCSF). The main objectives of the Hanford waste feed qualification program are to demonstrate compliance with the Waste Acceptance Criteria (WAC), determine waste processability, and demonstrate unit operations at a laboratory scale. Risks to acceptability and successful implementation of this program, as compared to the DWPF Macro-Batch qualification strategy, include: Limitations of mixing/blending capability of the Hanford Tank Farm; The complexity of unit operations (i.e., multiple chemical and mechanical separations processes) involved in the WTP pretreatment qualification process; The need to account for effects of blending of LAW and HLW streams, as well as a recycle stream, within the PT unit operations; and The reliance on only a single set of unit operations demonstrations with the radioactive qualification sample. This later limitation is further complicated because of the 180-day completion requirement for all of the necessary waste feed qualification steps. The primary recommendations/changes include the following: Collection and characterization of samples for relevant process analytes from the tanks to be blended during the staging process; Initiation of qualification activities earlier in the staging process to optimize the campaign composition through evaluation from both a processing and glass composition perspective; Definition of the parameters that are important for processing in the WTP facilities (unit operations) across the anticipated range of wastes and as they relate to qualification-scale equipment; Performance of limited testing with simulants ahead of the waste feed qualification sample demonstration as needed to determine the available processing window for that campaign; and Demonstration of sufficient mixing in the staging tank to show that the waste qualification sample chemical and physical properties are representative of the transfers to be made to WTP. Potential flowcharts for derivatives of the Hanford waste feed qualification process are also provided in this report. While these recommendations are an extension of the existing WTP waste qualification program, they are more in line with the processes currently performed for SRS. The implementation of these processes at SRS has been shown to offer flexibility for processing, having identified potential processing issues ahead of the qualification or facility processing, and having provided opportunity to optimize waste loading and throughput in the DWPF.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Optimization of well design and CO 2 injection strategy for risk reduction in Class VI geological carbon sequestration wells

The safety and durability of Class VI wells are critical for geological carbon sequestration (GCS). However, current GCS operations face unique challenges: unlike traditional Class II wells, Class VI CO 2 injection wells operate at rates up to 100 times higher, dramatically increasing the risk of wellbore leakage and structural compromise due to severe temperature drops and associated mechanical stresses. Despite existing guidelines on material selection, there remains a substantial gap in understanding how rapid CO 2 injection rates, low surface temperatures, and variable reservoir conditions interact to threaten long-term well integrity. This study presents a comprehensive, original workflow integrating advanced analytical and numerical models for both well flow and well integrity analysis. By systematically simulating a wide range of field-relevant scenarios—including variations in injection rate, CO 2 temperature, and reservoir pressure—this work provides the first cross-validated assessment of cooling effects on wellbore. The results reveal that extreme temperature drops, up to 60 °C, can occur under high injection rates, particularly in depleted reservoirs, significantly increasing the risk of cement failure. Building on these insights, the study proposes innovative, practical well design and operational strategies, including ductile cement formulations, pre-stressing techniques, advanced insulation coatings, and proactive management of injection rates. The safety of Class VI well extends beyond simply using CO 2 resistant materials. Cement materials should possess optimal thermo-hydraulic-mechanical-chemical properties for effective performance. This work provides a scientific basis for optimizing Class VI well designs, with direct benefits for minimizing environmental risk, lowering operational costs, and enhancing the long-term reliability of GCS.

25 ENERGY STORAGE↗

Linking and Combining Distributed Operations Facilities using NASA's "GMSEC" Systems Architectures

NASA's Goddard Mission Services Evolution Center (GMSEC) ground system architecture has been in development since late 2001, has successfully supported eight orbiting satellites and is being applied to many of NASA's future missions. GMSEC can be considered an event-driven service-oriented architecture built around a publish/subscribe message bus middleware. This paper briefly discusses the GMSEC technical approaches which have led to significant cost savings and risk reduction for NASA missions operated at the Goddard Space Flight Center (GSFC). The paper then focuses on the development and operational impacts of extending the architecture across multiple mission operations facilities.

Smith, Danford↗

Near-Earth Object Exploration and Marco Polo-R

A major goal for NASA's human spaceflight program is to send astronauts to near-Earth asteroids (NEAs) in the coming decades. Missions to NEAs would undoubtedly provide a great deal of technical and engineering data on spacecraft operations for future human space exploration while conducting in-depth scientific examinations of these primitive objects. However, prior to sending human explorers to NEAs, robotic investigations of these bodies would be required in order to maximize operational efficiency and reduce mission risk. These precursor missions to NEAs would fill crucial strategic knowledge gaps concerning their physical characteristics that are relevant for human exploration of these relatively unknown destinations. Therefore robotic investigations of NEAs, such as ESA's Marco Polo-R sample return mission to 2008 EV5, would allow NASA and its international partners to gain critical operational experience in performing complex tasks (e.g., close proximity operations, surface sample collection, etc.) under microgravity conditions at or near the surface of a potential human destination. This would provide an important synergy between the worldwide Science and Exploration communities, which will be crucial for development of future international deep space exploration architectures and has potential benefits for future exploration of other destinations beyond low-Earth orbit.

Abell, Paul↗

On the Language of Reliability: A System Engineer Perspective

In its classical definition, risk is defined by three elements: what can go wrong, what are its consequences, and how likely is it to occur? While this definition makes sense in a regulatory-based framework where for the current fleet of operating light water reactors (LWRs), the risks associated with nuclear power plants typically are characterized in terms of core damage and large early release frequency (LERF), this approach does not provide a useful snapshot of the health of the plant from a broader perspective. This is due to the very narrow context in which the term “risk” typically is defined as nuclear safety aspects that have the potential to impact public health. In this paper, we take the viewpoint of nuclear safety that is reflective of the current fleet of operating LWRs for which core damage frequency and LERF are appropriate metrics. For other advanced reactor designs, other more applicable technology neutral metrics of reactor safety metrics would be specified. A possible alternate path would start by redefining the word risk with a broader meaning that better reflects the needs of a system health and asset management decision-making process. Rather than asking how likely an event could occur (in probabilistic terms), we can ask how far this event is from occurring. Our approach starts by defining and quantifying component and system health in terms of a “distance” between its actual and limiting conditions, i.e., determination of the margin that exists between the current state/condition and the state where the component/system is no longer capable of achieving its intended function. A margin is a measure that is more reflective of the current state or performance of a component, and therefore more closely tied to decisions that are made on an ongoing basis. Further, we will show how, given the data available from plant equipment reliability and monitoring (e.g., pump vibration data) and prognostic (e.g., component remaining useful life estimation) data, a margin can be described and determined for all types of maintenance approaches (e.g., corrective or predictive maintenance). We show how classical reliability models (e.g., fault trees) can be used to quantify the system margin provided component margin values. In the approach described in this paper, the propagation of margin values through classical reliability models are not performed using classical probabilistic calculations applied to sets (as performed in a typical plant probabilistic risk assessment). Instead, we show how it is possible to propagate margin values through Boolean logic gates (i.e., AND and OR operators) through distance-based operations.

97 MATHEMATICS AND COMPUTING↗

Measurement of DC Arc-Flash Incident Energy in Large-Scale Photovoltaic Plants: A Basis for Standardization

The deployment of high-power dc equipment is increasing in solar photovoltaic (PV) plants, but very few studies have quantified dc arc-flash risks. Currently, PV plant owners and operators rely on theoretical, simplified models, such as those in NFPA-70E and other publications, for the assessment of risk associated with dc arc-flash. Here, this article presents an overview of arc-flash risks in a PV system based on a series of field experiments based on IEEE-1584 in two large-scale ground-mounted PV plants. The experiments include various high-power dc equipment of a PV plant, such as central inverters, combiner boxes, recombiner boxes, string inverters, and multiple configurations of electrodes in a 20-in calibration cube. The study reveals that none of the available dc arc-flash models are applicable for a PV plant. This work is an important first step toward developing an improved model that more accurately assesses dc arc-flash risk in a PV plant.

14 SOLAR ENERGY↗

Project: Advanced Oxy-Combustion Technology Development and Scale Up for New and Existing Coal-Fired Power Plants (Phase II) (Final Report)

The objective of this project was to develop an advanced Oxy-Combustion Pressurized Fluidized Bed Combustor (Oxy-PFBC) technology and mature it to TRL 6 through pilot testing. Performance goals included demonstrating capture of 90% or greater of the produced carbon dioxide, with no more than a 35% increase in the cost of electricity. A 1 MWth pilot scale plant was designed, built and operated at CanmetENERGY in Ottawa. Extensive support work was carried out on component testing, analysis and commercial planning. The team members included GTI, Linde, Natural Resources Canada (CanmetENERGY), Pennsylvania State University, Electric Power Research Institute (EPRI), and General Electric. Additional research was provided by the University of Ottawa. Funding was provided by the US Department of Energy, Alberta Innovates and each of the team members. The total funding for Phase II was $\$$18.537M with $\$$12.058M. The period of performance for Phase II was from July 1, 2014 through December 31, 2018. Component testing conducted in preparation for pilot testing included cold flow testing at atmospheric and pressurized conditions, and coal and limestone reactivity tests at elevated temperatures and pressures. These tests validated in-bed heat exchanger heat transfer capability, bed stability, and coal particle residence time predictions. They also quantified coal and limestone reactivity at the expected combustor temperatures and pressures. The 1 MWth pilot testing achieved all performance goals with the exception of carbon conversion. The combustor achieved oxy-combustion at the full target pressure of 8 bar. Two key combustor performance goals that were achieved include exceeding the target sulfur capture in the combustor as well as exceeding the acid dewpoint target at full operating pressure. This validates assumptions about the pressures that can be achieved without acid gas condensation and the associated corrosion risks. The ability to achieve target operating pressures supports combustor cost assumptions. In addition, the CO 2 processing unit (CPU), demonstrated a new technology, the deoxidation (DeOxo) reactor. The CPU achieved all of its performance targets, while the DeOxo reactor demonstrated the ability to achieve 100 ppm or less of oxygen in the flue gas stream to meet CO 2 pipeline specs. The pilot combustor was damaged during testing and an incident investigation was conducted. The primary cause of the hardware damage was due to anomalous temperature readings, caused by sensors buried and insulated in bed particles trapped by heat exchanger tubes near the wall. This led to higher gas velocities than intended, which then caused lower fuel residence time, lower carbon conversion, freeboard burning, and undetected excess temperatures in the combustor. As a result, the TRL 6 goal was not achieved. Updated technoeconomic analysis predicts that the Oxy-PFBC can achieve the goal of <35% increase in COE with 90% CO 2 capture if the carbon conversion performance target can be demonstrated in future testing.

20 FOSSIL-FUELED POWER PLANTS↗

Power System Wildfire Risks and Potential Solutions: A Literature Review & Proposed Metric

Several fire risk evaluation, fire tracking, and fire response resources are available. The risk metrics and fire response programs are sometimes modified to include a power system context. The risk metrics often evaluate the risk of fires causing power system faults or outages, especially on transmission systems. The response programs are modified to ensure the safety of power system equipment and first responders as well as to coordinate power system outages to both ensure safety during an active fire and prevent fire ignition during high risk periods. Although some aspects of wildfire responses have been adapted to include power system concerns, adaptations to power system operations and maintenance to include wildfire risks and responses are still nascent. In particular, a risk metric that evaluates the potential for power system components to ignite wildfires is needed to help guide power system upgrade efforts and power system fire safety measures. This document serves as a brief literature review of wildfire risk metrics and response programs and how they relate to power systems. It also includes a proposed risk metric and structure for describing the risk of a power system component igniting a fire.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Advanced Transmission Technologies (ATTs) Supplier Cohort Workshops Cohort Summary [Slides]

This Summary slide deck summarizes the key outcomes of the Advanced Transmission Technologies (ATTs) supplier cohort, part of Idaho National Laboratory’s (INL) Technical Assistance for Digital Assurance (TADA) program. The program aimed to strengthen grid resilience through cybersecurity controls, supply-chain security, and Cyber-Informed Engineering (CIE) for advanced transmission technologies. The cohort brought together vendors representing the full range of Grid-Enhancing Technologies (GETs), including providers of Dynamic Line Ratings (DLR), Advanced Power Flow Control (APFC), Transmission Topology Optimization (TTO), and High-Performance Conductors (HPCs). Discussions focused on institutional, integration, and operational barriers limiting GET adoption; cybersecurity risks at EMS/SCADA, cloud, and network integration points; and supply-chain transparency issues such as semiconductor dependence and SBOM/HBOM expectations. Participants also addressed operator trust, human-in-the-loop requirements, and challenges with utility adoption, while exploring how CIE can support secure deployment of GETs. This deck represents a consolidated summary of challenges and risks identified by vendors, cross-cutting themes and technology-specific insights from three cohort workshops, and actionable mitigations to guide utilities, vendors, and the Department of Energy in advancing secure, trusted deployment of GETs.

24 - POWER TRANSMISSION AND DISTRIBUTION↗