Search NASA⌕ Search

SEARCH · Search NASA

Results for “Power Control”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,045 records · Page 58

Radioisotope Power System Cask Trailer Chiller Low Heat Load Study

This report documents the study of the Radioisotope Thermoelectric Generator Transport System (RTGTS) chillers capability to transport a Radioisotope Power System (RPS) with low heat loads in the cask. Tests of the RTGTS chillers included setting the glycol/water (coolant) temperature to a control set point of 40° and 60°F while applying heat loads ranging from 2500 to 0 W heat load. The tests performed showed that the chiller systems could handle the entire range of heat loads. However, a noise/vibration started to occur when the set point was 60°F with low heat loads. Three recommended changes to the RTGTS chillers are recommended with varying implementation windows. The first is an operational change that can be implemented immediately. The RTGTS chillers should have a set point of 40°F when transporting an RPS less than 1500 W. The second is a short-term change (within the next two years) augmenting RPS heat by utilizing one RTGTS onboard heater (2500 W) while transporting an RPS with less than 1500 W which will also require a change to the Instrument and Data Acquisition System (IDAS) to allow monitoring and possible control of power to the onboard heaters. However, if the heater does fail during transport, no emergency actions or immediate repairs will be required due to the chillers’ ability to handle low heat loads. Running a 2500 W heater when transporting low heat loads aids in prolonging the life of the chillers. The remaining recommended long-term change is to replace the current chillers with a new portable or permanently installed chiller system in the next five to ten years. This time frame takes advantage of the proven reliability and durability of the current chillers while the new chillers are phased in and proven to the RPS program.

42 ENGINEERING↗

Dynamic Model of a supercritical CO2 10MW Recompression Closed Brayton Cycle

This model of the 10MW recompression closed Brayton cycle (RCBC) was developed in conjunction with the DOE’s Supercritical Transformational Electric Power (STEP) project. A high-fidelity dynamic model was used extensively to study the dynamic characteristics of the cycle and develop the process control architecture and strategies for start-up and shutdown procedures. This version of the model has been simplified from the original version to be more accessible for a variety of applications and research. The controllers developed for the original model have been maintained for this version and tuned to give a similar performance to the original model. This model can be used to perform similar studies as those performed in Liese et al (2020). The overall cycle performance will not be identical but will perform similarly.

Controls,Power Cycles,Process Systems Engineering,↗

Evaluation of the mean excitation energy of liquid argon

Current and future experiments need to know the stopping power of liquid argon. It is used directly in calibration, where commonly the minimum-ionizing portion of muon tracks is used as a standard candle. Similarly, muon range is used as a measure of muon energy. More broadly, the stopping power figures into the simulation of all charged particles, and so uncertainty propagates widely throughout data analysis of all sorts. The main parameter that controls stopping power is the mean excitation energy, or I-value. Experimental information for argon's I-value come primarily from measurements of gaseous argon, with a very limited amount of information from solid argon, and none from liquid argon. These measurements are reviewed, along with a discussion of the difference in central value and uncertainty incurred by the difference of phase. The values newly recommended by this note are $(188 \pm 6)$ eV for gaseous argon and $(197 \pm 8)$ eV for liquid argon (68% C.L. in each case).

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Distributed Cooperative Control of Hybrid AC/DC Microgrid

This paper presents a distributed cooperative control-based (DCC) power management algorithm for a hybrid AC/DC microgrid. The proposed algorithm for a hybrid microgrid system controls the power flow through the interface converter between the AC and DC microgrids. This algorithm allows power sharing between the distributed generators in the microgrid according to their power ratings. Moreover, it enables the fixed scheduled power delivery through the interface converters in both directions at different operating conditions while maintaining voltage regulation and improving the frequency profile.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Free piston linear motor compressor and associated systems of operation

A linear motor compressor including a compressor housing and a cylinder housing having a plurality of opposing compression chambers. A piston freely reciprocates within the cylinder housing using a linear electric motor. A piston position feedback control system provides adaptive current output as a function of position feedback and/or velocity feedback from the piston and/or the electric motor, to directly power and control the electric motor, wherein the piston reciprocates without assistance from a mechanical spring or other equivalent centering force.

Stair, Jason↗

Physical properties of RF magnetron sputtered GaN/n-Si thin film: impacts of RF power

GaN thin film was successfully produced on n-Si(100) substrate by RF magnetron sputter under different RF power. Experimental measurement techniques such as UV/Vis spectroscopy, field emission scanning electron microscopy (FE-SEM), X-ray diffraction (XRD), atomic force microscopy (AFM), and Micro-Raman Spectroscopy were used to research effects of Radio Frequency power on physical properties of produced thin film. It has been found that produced thin film was polycrystalline structure with (100) and (110) planes of hexagonal GaN from X-ray diffraction measurement result. It also proved that increasing RF power gives rise to deterioration in crystal quality of GaN thin film. Reason of this deterioration was discussed. It has been achieved that increasing RF power has resulted in decreasing optical band gap energy of GaN thin film. Reasons for these changes in optical band gap energy were explained. It was seen that some thin films were grown as layer-plus-island mode (Stranski–Krastanov growth mode) and others were grown as layer-by-layer growth mode (Frank van der Merwe mode) from AFM analysis. It has been found that increasing RF power has resulted in improvement of surface morphology of thin film from field emission scanning electron microscopy analysis. However, reaching RF power to 125 W leads to start to deteriorate of surface of GaN thin film. The reasons for this have been discussed. E{sub 1}(TO) transverse optical phonon mode of hexagonal GaN with different intensity was detected from Micro-Raman Spectroscopy measurement. The reasons for this difference have been discussed. It was concluded that RF power has played a significant role in growing high quality GaN thin film. Morphological, structural, and optical properties of GaN thin film were enhanced by controlling RF power, making them a potential candidate for LED, solar cell, diode application.

77 NANOSCIENCE AND NANOTECHNOLOGY↗

Precision redshift-space galaxy power spectra using Zel'dovich control variates

Numerical simulations in cosmology require trade-offs between volume, resolution and run-time that limit the volume of the Universe that can be simulated, leading to sample variance in predictions of ensemble-average quantities such as the power spectrum or correlation function(s). Sample variance is particularly acute at large scales, which is also where analytic techniques can be highly reliable. This provides an opportunity to combine analytic and numerical techniques in a principled way to improve the dynamic range and reliability of predictions for clustering statistics. In this paper we extend the technique of Zel'dovich control variates, previously demonstrated for 2-point functions in real space, to reduce the sample variance in measurements of 2-point statistics of biased tracers in redshift space. We demonstrate that with this technique, we can reduce the sample variance of these statistics down to their shot-noise limit out to k ~ 0.2 h Mpc -1 . This allows a better matching with perturbative models and improved predictions for the clustering of e.g. quasars, galaxies and neutral Hydrogen measured in spectroscopic redshift surveys at very modest computational expense. We discuss the implementation of ZCV, give some examples and provide forecasts for the efficacy of the method under various conditions.

79 ASTRONOMY AND ASTROPHYSICS↗

Operating Experience Data Analysis for Digital Instrumentation and Control System Reliability and Risk Assessment in Nuclear Power Plants

The implementation of advanced digital instrumentation and control (DI&C) systems in U.S. nuclear power plants (NPPs) can bring significant advancements in reliability, monitoring, and control capabilities. However, these systems also introduce new challenges, particularly in assessing risks such as common-cause failures (CCFs) and establishing robust reliability estimates for DI&C components. Addressing these challenges is critical for ensuring the safe and efficient operation of NPPs. Recently, Idaho National Laboratory was tasked by the U.S. Nuclear Regulatory Commission (NRC) to conduct a DI&C reliability study using operating experience data from the nuclear industry. The two operating experience data sources for the study are the Institute of Nuclear Power Operations’ Industry Reporting and Information System (IRIS) and the NRC’s Licensee Event Report database which is hosted at Idaho National Laboratory at https://lersearch.inl.gov/LERSearchCriteria.aspx. This report provides a comprehensive examination of DI&C systems, including their architecture, operational advantages, and associated challenges. It reviews existing industry DI&C studies and failure mode taxonomies, along with reliability data from various industries. Through a detailed analysis of these databases, the study provides insights into DI&C system performance. Considerations should be given to incorporate DI&C failure data into the NRC's Integrated Data Collection and Coding System and updating the Reliability and Availability Data System to support ongoing DI&C reliability studies. Recommendations are also provided for modeling DI&C reliability and CCF in probabilistic risk assessment, thereby supporting risk-informed decision-making and enhancing the reliability and safety of NPPs.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Advanced Distributed Wind Turbine Controls Series: Part 4-Wind Energy in Microgrids – Microgrids, Infrastructure Resilience, and Advanced Controls Launchpad (MIRACL)

In recent years, the technical capabilities and requirements for distributed wind turbines to provide ancillary services beyond maximum energy production has increased. Ancillary services, leveraged through advanced wind turbine controls, can support grid stability, reliability, and resilience. In the context of a microgrid, wind turbines can provide ancillary services that are useful in both islanded and grid-connected modes, as demonstrated in previous parts of this report series. This report focuses on how wind turbines with advanced controls and power electronics can support the stability of the microgrid during transitions from grid-connected to island mode, and back. This report documents simulation results from a model of the National Renewable Energy Laboratory (NREL) Flatirons Campus containing NREL's 600-kilowatt Controls Advanced Research Turbine. Using this turbine, we demonstrate through desktop simulation how a wind turbine can support the voltage and frequency of a microgrid during transitions - from making planned transitions seamless to keeping all loads online during some unplanned transitions to supporting black start in the event of an open transition (blackout).

17 WIND ENERGY↗

Model Predictive Voltage Control of Large-Scale PV or Hybrid PV-BESS Plants

Increased penetration level of inverter-based resources (IBRs) and renewable energy in the power grid has called for more requirements from the control of IBRs. In this paper, the voltage-reactive power control of a photovoltaic (PV) power plant or hybrid PV-battery energy storage system (BESS) plant connected to a bulk power grid, whilst meeting the grid requirements, is studied. In this paper, a continuous-set model predictive control (MPC) formulation is proposed for voltage-reactive power control. For the same, an aggregated dynamic PV plant model is developed based on the recursive system equivalencing method. The formulation is then implemented in PSCAD simulation on a 125 MW PV plant or hybrid PV-BESS plant. The MPC implementation achieves 10.13% voltage improvement based on PSCAD simulation results in a balanced fault case study. Simulation results further demonstrate that MPC provides improved voltage support over the conventional proportional-integral (PI) controller post-fault occurrence.

Abu rub, Omar↗

2.1.3.404 - WEC Array Power Management and Output Simulation Tool

An array of wave energy converter (WEC) devices has variations in power output due to the chaotic nature of the waves. Eliminating or mitigating the power fluctuations is important for reducing the integration impacts of WEC plants in both distribution and transmission grids, and in standalone isolated power systems. Reduced variability of WEC-generated power in combination with energy storage or power management control at each WEC and at the array level will help increasing hosting capacity of distribution feeders for this type of variable renewable generation, and minimization of electric losses. To reduce risks and risk perception, gain key stakeholder acceptance, and enable developers to design effective and compatible energy plants with arrays of WEC devices, it requires the use of modeling tools to simulate the resource environment, device dynamics, utility power system response, as well as the development of an interface for an array controller. The project will create a publicly accessible numerical modeling framework to empower the wave energy sector to design projects of various scales (kW-100s MW), which are optimized on a plant performance basis and are compatible with different power systems and wave conditions. The framework will integrate with WEC-Sim, a wave environment model (SWAN-FUNWAVE), as well as established relevant electrical analysis tools, to model the grid system and interconnection, and optimize power output and power management for the WEC array.

POWER TRANSMISSION AND DISTRIBUTION,TIDAL AND WAVE↗

Irradiation campaign in the EOLE critical facility of fiber optic Bragg gratings dedicated to the online temperature measurement in zero power research reactors

The control of temperature during operation of zero power research reactors participates to the overall control of experimentation conditions and reveals itself of a major importance more especially when measuring small multiplication factor variations. Within the framework of the refurbishment of the MASURCA facility, the development of a new temperature measurement system based on the optical fiber Bragg grating (FBG) technology is under consideration. In a first step, a series of FBGs is irradiated in the EOLE critical facility with the aim to select the most appropriate. Online temperature measurements are performed during a set of irradiations that should allow reaching a fast neutron fluence of some 10{sup 14} n.cm{sup -2}. The results obtained, more especially the Bragg wavelength shifts during the irradiation campaign, are discussed in this paper and compared to data from standard PT100 temperature sensors to highlight possible radiation effects on sensor performances. Work to be conducted during the second step of the project, aiming to a feasibility demonstration using a MASURCA assembly, is also presented. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗