Humboldt Bay Power Plant Decommissioning Progress Update - 16358
Decommissioning of the Pacific Gas and Electric (PG and E) Company Humboldt Bay Power Plant (HBPP) Unit 3 nuclear facility achieved several significant milestones in the summer and fall of 2015 when the RPV Segmentation Project completed, the Caisson Removal project began and the Unit 3 Refueling building (RFB) and Main Plant Ventilation system were released for Open Air Demolition (OAD). At the end of 2014 the Civil Works prime contractor Chicago Bridge and Iron (CB and I) was also awarded the contract to complete the RPV Segmentation. This work scope continued to use the First of a Kind (FOAK) segmentation equipment that was designed and fabricated for the HBPP Reactor Project. The preparation for RFB OAD was part of the original Civil Works contract scope. It was important that this work and the segmentation of the reactor shell be finished to allow a portion of the Refueling building to be demolished to continue the installation of the perimeter water cutoff wall and the caisson Support of Excavation (SOE) shoring system. The CB and I Civil Works contract endorsed the October 2012 HBPP Caisson Removal Feasibility Study approach to install a perimeter cutoff wall intended to stop movement of groundwater by installation of cement-bentonite (CB) backfill in a slurry wall trench excavated to a depth of 53 meters and tied into the Unit F clay layer. The CB and I on-site project manager and principal engineer from their home office re-evaluated the design approach outlined in their proposal and awarded contract. As CB and I further developed design plans, an option to complete the perimeter wall with Cutter Soil Mixing (CSM) technology was developed. CB and I described the CSM process as a modified trench cutter technique, to be used for both perimeter groundwater cutoff, and for caisson demolition SOE. CSM technology blends slurry while mixing soil on the down stroke, and injects cement into the blended soil cuttings on the upstroke to create a cemented 'cutoff wall'. CB and I proposed several variations for three key support elements: the perimeter cutoff wall; the dewatering well system; and the caisson SOE shoring system. The proposed alternatives brought many enhancements in the design and integration of the work to be executed. CB and I personnel were persistent in seeing their vision through that resulted in a significant benefit in worker safety and schedule enhancement (early finish by 5 months). (authors)