Search NASA⌕ Search

SEARCH · Search NASA

Results for “Resource scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,045 records · Page 58

Review of the WECC EDT phase 2 EIM benefits analysis and results report.

A region-wide Energy Imbalance Market (EIM) was recently proposed by the Western Electricity Coordinating Council (WECC). In order for the Western Area Power Administration (Western) to make more informed decisions regarding its involvement in the EIM, Western asked Argonne National Laboratory (Argonne) to review the EIM benefits study (the October 2011 revision) performed by Energy and Environmental Economics, Inc. (E3). Key components of the E3 analysis made use of results from a study conducted by the National Renewable Energy Laboratory (NREL); therefore, we also reviewed the NREL work. This report examines E3 and NREL methods and models used in the EIM study. Estimating EIM benefits is very challenging because of the complex nature of the Western Interconnection (WI), the variability and uncertainty of renewable energy resources, and the complex decisions and potentially strategic bidding of market participants. Furthermore, methodologies used for some of the more challenging aspects of the EIM have not yet matured. This review is complimentary of several components of the EIM study. Analysts and modelers clearly took great care when conducting detailed simulations of the WI using well-established industry tools under stringent time and budget constraints. However, it is our opinion that the following aspects of the study and the interpretation of model results could be improved upon in future analyses. The hurdle rate methodology used to estimate current market inefficiencies does not directly model the underlying causes of sub-optimal dispatch and power flows. It assumes that differences between historical flows and modeled flows can be attributed solely to market inefficiencies. However, flow differences between model results and historical data can be attributed to numerous simplifying assumptions used in the model and in the input data. We suggest that alternative approaches be explored in order to better estimate the benefits of introducing market structures like the EIM. In addition to more efficient energy transactions in the WI, the EIM would reduce the amount of flexibility reserves needed to accommodate forecast errors associated with variable production from wind and solar energy resources. The modeling approach takes full advantage of variable resource diversity over the entire market footprint, but the projected reduction in flexibility reserves may be overly optimistic. While some reduction would undoubtedly occur, the EIM is only an energy market and would therefore not realize the same reduction in reserves as an ancillary services market. In our opinion the methodology does not adequately capture the impact of transmission constraints on the deployment of flexibility reserves. Estimates of flexibility reserves assume that forecast errors follow a normal distribution. Improved estimates could be obtained by using other probability distributions to estimate up and down reserves to capture the underlying uncertainty of these resources under specific operating conditions. Also, the use of a persistence forecast method for solar is questionable, because solar insolation follows a deterministic pattern dictated by the sun's path through the sky. We suggest a more rigorous method for forecasting solar insolation using the sun's relatively predictable daily pattern at specific locations. The EIM study considered only one scenario for hydropower resources. While this scenario is within the normal range over the WI footprint, it represents a severe drought condition in the Colorado River Basin from which Western schedules power. Given hydropower's prominent role in the WI, we recommend simulating a range of hydropower conditions since the relationship between water availability and WI dispatch costs is nonlinear. Also, the representation of specific operational constraints faced by hydropower operators in the WI needs improvements. The model used in the study cannot fully capture all of the EIM impacts and complexities of power system operations. In particular, a primary benefit of the EIM is a shorter dispatch interval; namely, 5 minutes. However, the model simulates the dispatch hourly. Therefore it cannot adequately measure the benefits of a more frequent dispatch. A tool with a finer time resolution would significantly improve simulation accuracy. When the study was conducted, the rules for the EIM were not clearly defined and it was appropriate to estimate societal benefits of the EIM assuming a perfect market without a detailed specification of the market design. However, incorporating a more complete description of market rules will allow for better estimates of EIM benefits. Furthermore, performing analyses using specific market rules can identify potential design flaws that may be difficult and expensive to correct after the market is established. Estimated cost savings from a more efficient dispatch are less than one percent of the total cost of electricity production.

14 SOLAR ENERGY↗

NASA RECON: Course development, administration, and evaluation. A research and development proposal

This proposal addresses the development, administration, and evaluation of a set of transportable, college-level courses to educate science and engineering students in the effective use of automated scientific and technical information storage and retrieval systems, and, in particular, in the use of the NASA RECON system. Chapter 1 presents a brief introduction. Chapter 2 identifies general and specific objectives, i.e., needs analysis, course development, course administration, and course evaluation. Chapter 3 proposes the methodology to be used in successfully accomplishing these objectives. Chapter 4 highlights expected results and product deliverables, and Chapter 5 presents the project evaluation plan to be followed. Chapter 6 is a brief overview of the institutional resources available at the proposing institutions, i.e., at the University of Southwestern Louisiana and at Southern University to support the project. Chapter 7 proposes a budget, time schedule, and management plan. Chapter 8 is a summary of the foregoing.

Dominick, Wayne D.↗

Learning to Control Advanced Life Support Systems

Advanced life support systems have many interacting processes and limited resources. Controlling and optimizing advanced life support systems presents unique challenges. In particular, advanced life support systems are nonlinear coupled dynamical systems and it is difficult for humans to take all interactions into account to design an effective control strategy. In this project. we developed several reinforcement learning controllers that actively explore the space of possible control strategies, guided by rewards from a user specified long term objective function. We evaluated these controllers using a discrete event simulation of an advanced life support system. This simulation, called BioSim, designed by Nasa scientists David Kortenkamp and Scott Bell has multiple, interacting life support modules including crew, food production, air revitalization, water recovery, solid waste incineration and power. They are implemented in a consumer/producer relationship in which certain modules produce resources that are consumed by other modules. Stores hold resources between modules. Control of this simulation is via adjusting flows of resources between modules and into/out of stores. We developed adaptive algorithms that control the flow of resources in BioSim. Our learning algorithms discovered several ingenious strategies for maximizing mission length by controlling the air and water recycling systems as well as crop planting schedules. By exploiting non-linearities in the overall system dynamics, the learned controllers easily out- performed controllers written by human experts. In sum, we accomplished three goals. We (1) developed foundations for learning models of coupled dynamical systems by active exploration of the state space, (2) developed and tested algorithms that learn to efficiently control air and water recycling processes as well as crop scheduling in Biosim, and (3) developed an understanding of the role machine learning in designing control systems for advanced life support.

Subramanian, Devika↗

Onboard autonomy on the Three Corner Sat mission

In 2003, the student-built three satellite constellation Three Corner Sat (3CS) Mission will demonstrate onboard autonomy including: science data validation and prioritization, mission re-planning, and robust execution. Future observations will be planned onboard based on the quality of aquired science, available memory and power, and anticipated downlinks. These capabilities will allow 3CS to aquire additional science data if resources are available and to return only the highest quality science data.

Planning scheduling autonomy↗

Optimal Integration of Departures and Arrivals in Terminal Airspace

Coordination of operations with spatially and temporally shared resources, such as route segments, fixes, and runways, improves the efficiency of terminal airspace management. Problems in this category are, in general, computationally difficult compared to conventional scheduling problems. This paper presents a fast time algorithm formulation using a non-dominated sorting genetic algorithm (NSGA). It was first applied to a test problem introduced in existing literature. An experiment with a test problem showed that new methods can solve the 20 aircraft problem in fast time with a 65% or 440 second delay reduction using shared departure fixes. In order to test its application in a more realistic and complicated problem, the NSGA algorithm was applied to a problem in LAX terminal airspace, where interactions between 28% of LAX arrivals and 10% of LAX departures are resolved by spatial separation in current operations, which may introduce unnecessary delays. In this work, three types of separations - spatial, temporal, and hybrid separations - were formulated using the new algorithm. The hybrid separation combines both temporal and spatial separations. Results showed that although temporal separation achieved less delay than spatial separation with a small uncertainty buffer, spatial separation outperformed temporal separation when the uncertainty buffer was increased. Hybrid separation introduced much less delay than both spatial and temporal approaches. For a total of 15 interacting departures and arrivals, when compared to spatial separation, the delay reduction of hybrid separation varied between 11% or 3.1 minutes and 64% or 10.7 minutes corresponding to an uncertainty buffer from 0 to 60 seconds. Furthermore, as a comparison with the NSGA algorithm, a First-Come-First-Serve based heuristic method was implemented for the hybrid separation. Experiments showed that the results from the NSGA algorithm have 9% to 42% less delay than the heuristic method with varied uncertainty buffer sizes.

terminal airspace↗

Evapotranspiration-Based Irrigation Scheduling in Salinas Valley Vegetable Crops

Crop evapotranspiration (ETc) monitoring may support improved irrigation water management in California's Central Coast agricultural region. The CropManage (CM) web-application, developed and operated by the University of California, informs irrigation and nitrogen scheduling decisions made by growers and crop consultants. Daily weather conditions are accounted for by use of grass reference ET data imported from the California Dept. Water Resources. Satellite observations of crop development from NASA's Satellite Irrigation Management Support can be imported and used by CM to adjust crop phenology. A replicated irrigation trial was performed July-October 2018 to investigate yield response of drip-irrigated celery (Apium graveolens) to applied water volume, and to further calibrate CM for use in that crop. Water was uniformly applied by sprinklers to establish the crop, and CM was then used to guide surface drip irrigation treatments applied three times weekly at 50%, 75%, 100%, 125% and 150% of ETc replacement level. Nitrogen fertilizer totaling 380 kg/ha was applied through the drip system generally once per week. Treatments were evaluated for commercial yield 85 and 93 days after transplanting (DAT). The 100% ETc treatment yielded 83 Mg/ha 93 DAT, which was 10 Mg/ha higher than the reported regional average yield in 2017. The 100% treatment received a seasonal total of 34 cm of water, compared with reported grower average exceeding 48 cm. Higher yields of 102 and 108 Mg/ha were observed in the 125% and 150% ETc treatments, respectively. Regarding crop quality, however, the 150% ETc treatment suffered greater incidence of pith breakdown and basal rot than the 100% treatment. Yields from the 50% and 75% treatments were below regional average. Aboveground biomass was evaluated 87 DAT. Fresh and dry biomass accumulations were positively related to applied water volume. Additional findings will be presented for a cauliflower trial conducted spring/summer 2019.

Johnson, Lee F.↗

InSight/MarCO Opportunistic Multiple Spacecraft Per Antenna (OMSPA) demonstration

Opportunistic Multiple Spacecraft Per Antenna(OMSPA),maybe particularly suited to smallsats. In the concept for this technique, smallsats within the scheduled ground antenna beam of some other spacecraft, make opportunistic use of that spacecraft’s beam by transmitting “open-loop” to a recorder associated with the antenna. These transmissions get captured on the recorder and can be later retrieved, demodulated, and decoded so that the smallsats can recover their data – all without them having to schedule the antenna itself and compete with larger missions for antenna time. Widespread use of such a technique could lead to more efficient use of receiver antenna resources and result in a dramatic increase in downlink throughput. An opportunity to demonstrate the technique occurred in May 2018, when the Mars CubeSat One (MarCO) mission, consisting of two nanospacecraft (MarCO-A & B) launched alongside InSight, a NASA Mars lander mission.

Conner, Charles D.↗

SatCORPS Global Cloud Composite (GCC): the Design and Delivery of A High Quality, High Resolution, Global Cloud Product Available in Near-Real Time

The NASA Satellite ClOud and Radiation Property retrieval System (SatCORPS) supports the development of an analysis ready and cloud-optimized data transformation pipeline and geospatial service enablement of a global cloud composite (GCC) product derived from global geostationary satellite imagery. This geospatial service will be available at high temporal and spatial resolution via the SatCORPS web mapping application for visualization and analysis as well as direct ingestion to common geospatial software and custom programming. The resulting global cloud composite products from the processing pipeline can then be geospatially-service enabled as ArcGIS Image Services and Open Geospatial Consortium (OGC) Web Mapping/Coverage Services for visualization and analysis via a web mapping application and common geospatial software. Near real time global observations are created through the composition of five geostationary satellites that provides modelling and forecasting communities with the capability to provide high quality and timely information to start the projection process. The Global Cloud Composite product combines information from geostationary satellites, GOES-16, GOES-17, Himawari-8, Meteosat-11 and Meteosat-9 to create a single global composite netcdf file and images using the different products within the netcdf file. The SatCORPS team, though our Global Cloud Composite (GCC) product and web-based visualization tools including Geographical Information System (GIS) services provide near real time global cloud product information to both automated processes and traditional web users that is timely and high quality derived from geostationary satellites. The Global Cloud Composite product takes advantage of the scalable processing resources provided by the AWS batch service to provide new composites every thirty minutes. Because information from each of the low earth orbiting satellites is available on schedules tuned to the specific satellite, the processing algorithm temporally composites the final dataset as each satellite’s information becomes available. The SatCORPS team has leveraged our experience using Amazon Web Services (AWS) to build a low latency high availability tool that allows end users both human and automated to acquire high quality and high-resolution Geostationary Earth Orbiting (GEO) information at zero cost to the end user. This presentation will describe how we architected and implemented the service as well as lessons learned based on our experiences both developing and operating the system. The lessons learned include how we integrated multiple services including Amazon Batch, Amazon S3 and Amazon Lambda service to create a low cost but high-performance processing system that is capable of identifying and processing the most appropriate satellite overpass information into global cloud composites. We will also describe our web-based tools including our Geographic Information System that can be used for visualization and analysis. The products from the processing can be geospatially-service enabled as ArcGIS Image Services and Open Geospatial Consortium (OGC) Web Mapping/Coverage Services for visualization and analysis via a web mapping application and common geospatial software. The SatCORPS Global Composite Cloud product provides sophisticated global composited cloud research products with very low latency that we see that as filling a rapidly growing need in the research and modelling community with no up-front nor ongoing costs associated with downloading or using the information.

AWS AMCE SMCE GCC SATCORPS GLOBAL CLOUD COMPOSITE ↗

The International Space Station human life sciences experiment implementation process

The selection, definition, and development phases of a Life Sciences flight research experiment has been consistent throughout the past decade. The implementation process, however, has changed significantly within the past two years. This change is driven primarily by the shift from highly integrated, dedicated research missions on platforms with well defined processes to self contained experiments with stand alone operations on platforms which are being concurrently designed. For experiments manifested on the International Space Station (ISS) and/or on short duration missions, the more modular, streamlined, and independent the individual experiment is, the more likely it is to be successfully implemented before the ISS assembly is completed. During the assembly phase of the ISS, science operations are lower in priority than the construction of the station. After the station has been completed, it is expected that more resources will be available to perform research. The complexity of implementing investigations increases with the logistics needed to perform the experiment. Examples of logistics issues include- hardware unique to the experiment; large up and down mass and volume needs; access to crew and hardware during the ascent or descent phases; maintenance of hardware and supplies with a limited shelf life,- baseline data collection schedules with lengthy sessions or sessions close to the launch or landing; onboard stowage availability, particularly cold stowage; and extensive training where highly proficient skills must be maintained. As the ISS processes become better defined, experiment implementation will meet new challenges due to distributed management, on-orbit resource sharing, and adjustments to crew availability pre- and post-increment. c 2001. Elsevier Science Ltd. All rights reserved.

Research↗

Tool for Generating Realistic Residential Hot Water Event Schedules: Preprint

The installed energy savings for advanced residential hot water systems can depend greatly on detailed occupant use patterns. Quantifying these patterns is essential for analyzing measures such as tankless water heaters, solar hot water systems with demand-side heat exchangers, distribution system improvements, and recirculation loops. This paper describes the development of an advanced spreadsheet tool that can generate a series of year-long hot water event schedules consistent with realistic probability distributions of start time, duration and flow rate variability, clustering, fixture assignment, vacation periods, and seasonality. This paper also presents the application of the hot water event schedules in the context of an integral-collector-storage solar water heating system in a moderate climate.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Using Iterative Repair to Increase the Responsiveness of Planning and Scheduling for Autonomous Spacecraft

An autonomous spacecraft must balance long-term and short-term considerations. It must perform purposeful activities that ensure long-term science and engineering goals are achieved and ensure that it maintains positive resource margins. This requires planning in advance to avoid a series of shortsighted decisions that can lead to failure, However, it must also respond in a timely fashion to a somewhat dynamic and unpredictable environment. Thus, spacecraft plans must often be modified due to fortuitous events such as early completion of observations and setbacks such as failure to acquire a guidestar for a science observation. This paper describes the use of iterative repair to support continuous modification and updating of a current working plan in light of changing operating context.

Chien, Steve↗

Historic Significance and Current Condition Assessment of Building 06-CP-10, Device Assembly Building, Area 6, Nevada National Security Site, Nye County, Nevada

This report was produced in partial fulfillment of the mitigation of adverse effects to Building 06-CP-10, the first device assembly building on the Nevada National Security Site (NNSS), and is intended to comply with the 2021 Memorandum of Agreement DE-GM58-21NA25543 Between the U.S. Department of Energy and the Nevada State Historic Preservation Officer Regarding Demolition of Fourteen Buildings and Structures in Area 6 of the Nevada National Security Site, Nye County (hereafter referred to as the MOA). This MOA was executed to resolve adverse effects from the U.S. Department of Energy (DOE) plan to demolish 14 architectural resources at the Control Point and in the vicinity in Area 6 of the NNSS. The management and operations contractor for the NNSS identified these 14 architectural resources as environmental hazards unsafe for human occupation due to deterioration and rodent infestation. Building 06-CP-10 and two small magazine bunkers (06-CP-10A and 06-CP-805) associated with Building 06-CP-10 are scheduled for demolition as part of this undertaking. Building 06-CP-10 was originally recorded in 2003 during a historical evaluation of four buildings in Area 6. In consultation with the Nevada State Historic Preservation Office, the building was determined individually eligible for inclusion in the NRHP under the Secretary of the Interior’s Significance Criterion A because of its association with nuclear testing and under Significance Criterion C as a distinct type of construction associated with the nuclear industry. Building 06-CP-10A, a munitions magazine, and 06- CP-805, a cap-and-fuse bunker, have been recorded as contributing accessory resources to 06-CP-10. Pursuant to Stipulation III.C.3 of the MOA, this report provides a summary of the historic significance of Building 06-CP-10 and a description of its current condition and accessory resources. In addition, an updated Architectural Resource Assessment (ARA) form with new information and photographs is included in the appendix in fulfillment of Stipulation III.C.2.

54 ENVIRONMENTAL SCIENCES↗

A simulation‐based integrated virtual testbed for dynamic optimization in smart manufacturing systems

Abstract In a manufacturing system, production control‐related decision‐making activities occur at different levels. At the process level, one of the main control activities is to tune the parameters of individual manufacturing equipment. At the system level, the main activity is to coordinate production resources and to route parts to appropriate workstations based on their processing requirement, priority indices, and control policy. At the factory level, the goal is to plan and schedule the processing of parts at different operations for the entire system in order to optimize certain objectives. Note that the results of such activities at different levels are closely coupled and affect the overall performance of the manufacturing system as a whole. Therefore, it is important to systematically integrate these control and optimization activities into one unified platform to ensure the goal of each individual activity is aligned with the overall performance of the system. In this paper, we develop a simulation‐based virtual testbed that implements dynamic optimization, automatic information exchange, and decision‐making from the process‐level, system‐level, and factory‐level of a manufacturing system into an integrated computation environment. This is demonstrated by connecting a Python‐based numerical computation program, discrete‐event simulation software (Simul8), and an optimization solver (CPLEX) via a third‐party master program. The application of this simulation‐based virtual testbed is illustrated by a case study in a machining shop.

Sun, Yuting↗

IRIS Reimagined: Advancements in Intelligent Runtime System for Task-Based Programming

Task-based programming models are gaining traction in scientific computing. IRIS is a portable runtime system that exploits multiple heterogeneous programming systems and can discover available resources and manage multiple diverse programming systems (e.g., CUDA, Hexagon, HIP, Level Zero, OpenCL, and OpenMP) simultaneously. It accounts for the constraints of task dependencies and provides customizable scheduling policies to map those tasks to heterogeneous devices. In this paper, we present new capabilities added to IRIS to improve its portability for heterogeneous programming, build-friendliness, and performance efficiency. The new additions include vendor-specific kernel support, a runtime system with a foreign function interface to eliminate writing wrapper or boilerplate code for heterogeneous kernels, an easy-to-use and configurable CMake-based build environment, automatic and efficient data transfers and orchestration, and the Hunter and DAGGER toolchains to evaluate IRIS’s task scheduling algorithms.

Miniskar, Narasinga Rao↗

Mission considerations for multidiscipline applications payloads

Special considerations in the planning of Space Shuttle missions for multidiscipline applications are summarized. Selection of orbits and launch times, the optimum operations schedule and viewing opportunities for a given mission are discussed. Trade-offs between the limitations of a mission-peculiar sensor mount and time requirements for sensor retraction/deployment operations in the planning of the payload mounting design are considered. It is suggested that payloads which are largely automated or whose operation is not orbit-time sensitive be considered as possible 'fill-ins' between opportunity-constrained operations. Sequential scheduling of payload operations and delayed real-time data transmission may be means of avoiding RF interference between payloads and with Orbiter communications links, and of maintaining resource demands within manageable levels.

Macdonald, J. M.↗

Analysis of information systems for hydropower operations: Executive summary

An analysis was performed of the operations of hydropower systems, with emphasis on water resource management, to determine how aerospace derived information system technologies can effectively increase energy output. Better utilization of water resources was sought through improved reservoir inflow forecasting based on use of hydrometeorologic information systems with new or improved sensors, satellite data relay systems, and use of advanced scheduling techniques for water release. Specific mechanisms for increased energy output were determined, principally the use of more timely and accurate short term (0-7 days) inflow information to reduce spillage caused by unanticipated dynamic high inflow events. The hydrometeorologic models used in predicting inflows were examined in detail to determine the sensitivity of inflow prediction accuracy to the many variables employed in the models, and the results were used to establish information system requirements. Sensor and data handling system capabilities were reviewed and compared to the requirements, and an improved information system concept was outlined.

Sohn, R. L.↗

Analysis of information systems for hydropower operations

The operations of hydropower systems were analyzed with emphasis on water resource management, to determine how aerospace derived information system technologies can increase energy output. Better utilization of water resources was sought through improved reservoir inflow forecasting based on use of hydrometeorologic information systems with new or improved sensors, satellite data relay systems, and use of advanced scheduling techniques for water release. Specific mechanisms for increased energy output were determined, principally the use of more timely and accurate short term (0-7 days) inflow information to reduce spillage caused by unanticipated dynamic high inflow events. The hydrometeorologic models used in predicting inflows were examined to determine the sensitivity of inflow prediction accuracy to the many variables employed in the models, and the results used to establish information system requirements. Sensor and data handling system capabilities were reviewed and compared to the requirements, and an improved information system concept outlined.

Sohn, R. L.↗

DSN radio science system, Mark III-78

Mark III-78, is one of eight DSN Data Systems which provide major data types and functional capabilities to flight projects. It includes the equipment, software, personnel, documentation, procedures, and resources necessary to deliver the required data to flight projects. A system definition is given along with key characteristics, functional description, system configuration, testing, implementation status, and system schedule.

Berman, A. L.↗