Search NASA⌕ Search

SEARCH · Search NASA

Results for “integrated deployment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,045 records · Page 58

Microreactor Economic Performance & Market Analysis

This presentation was prepared for the Microreactor Program Stakeholders Workshop on May 12-13, 2021. It supports understanding the market and economic potential for microreactors in the U.S. and internationally by providing: a techno-economic basis for support to industrial microreactor deployment and operation; uncovering emerging market opportunities, informing R&D opportunities, and integrating the research performed by the INL [Boise State/Energy Policy Institute], and the U Alaska Anchorage, U Wisconsin-Madison, and Nuclear Alternatives Project in Puerto Rico.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Integrating the Value of Resilience into Energy Decisions

The value of resilience can be quantified and integrated into decision making to help inform economic, resilient, and sustainable energy deployment decisions using tools and analysis. Traditionally, distributed energy deployment decisions have often been based on how much energy, or how much money, a system can save. More and more, building owners and communities are recognizing that these systems can also provide a resilience value by sustaining critical loads during an outage. In order to consider the value of resilience in investment decisions, we must quantify how much resilience a system provides, assign a value to that resilience, and monetize that value through grid services, incentives, or other methods. This presentation discusses methods, tools, advantages, and challenges inherent to the process.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Island Power Systems With High Levels of Inverter-Based Resources: Stability and Reliability Challenges

As many island power systems seek to integrate high levels of renewable energy, they face new challenges on top of the existing difficulties of operating an isolated grid. With their drastically declining cost, variable renewables, such as wind and photovoltaics (PVs), are increasingly being integrated into island grids to reduce the use of imported fuels. These deployments of renewable energy are dominated by PV and wind generators, which bring unique challenges of their own.

IBRs↗

Synroc Waste Treatment Facility for Fission-based Molybdenum-99 Production - 19335

ANSTO is building a nuclear waste treatment plant that represents a significant step change in the treatment of intermediate-level waste (ILW) from Molybdenum-99 nuclear medicine production. This industrial scale facility shall deploy ANSTO Synroc technologies; a wasteform tailored for immobilizing fission products, an integrated process line for converting liquid waste into free-flowing powder, automated canister filling and sealing, and a hot isostatic pressing (HIP) system designed for remote operation. The HIP represents the last processing step to consolidate the wasteform into a final durable solid compact with the required performance characteristics. This paper shall outline the various phases of development in realising the final plant design as well as timelines to progress through cold- and hot-commissioning. Further, plans for storage and final disposal of the HIPed canister product will be discussed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Grid and Wind Transient Ride Through Assessment of Type-5 Synchronous Wind Turbine

The integration of the inverter-based renewable energy resources is increasing and replacing conventional synchronous generators in the evolving bulk power system (BPS), impacting the system inertia along the way. Also, the limited over-current capability of power electronic converters continues to deteriorate the grid strength of the evolving power systems. Type-5 wind turbines have the potential to mitigate these problems because this configuration interfaces with the grid through a synchronous generator; hence, its operation and consequent grid impacts might mimic the conventional synchronous generator. The drivetrain of this type of turbines, however, is different from the more common Type-3 and Type-4 turbines. A hydraulic torque converter and gearbox with torque limiting feature are integral parts of a Type-5 wind turbine drivetrain, to isolate the wind speed variations at the wind turbine rotor from the grid connected generator side. This supports the synchronous operation of the generator. However, high fidelity models of Type-5 wind turbine drivetrain including these core components are not openly and widely available for grid integration and transient stability studies. Moreover, Type-5 turbines are not commonly deployed and hence its power generation and frequency stability characteristics are not widely publicized. This hinders appropriate assessment of Type-5 wind power plant's contribution to bulk grid resilience. This work provides transient stability assessment of a standalone Type-5 wind turbine. Normal operation and grid transient studies are performed to see the step load change and wind speed disturbance impacts on the Type-5 drivetrain and generation dispatch. Preliminary results show that Type-5 wind turbines can support load changes of between 0.6 p.u to 1.15 p.u. Beyond this point, the synchronization of the generator starts to deviate from its set point.

17 - WIND ENERGY↗

New Parallel computing framework for radiation transport codes

A new parallel computing framework has been developed to use with general-purpose radiation transport codes. The framework was implemented as a C++ module that uses MPI for message passing. The module is significantly independent of radiation transport codes it can be used with, and is connected to the codes by means of a number of interface functions. The framework was integrated with the MARS15 code, and an effort is under way to deploy it in PHITS. Besides the parallel computing functionality, the framework offers a checkpoint facility that allows restarting calculations with a saved checkpoint file. The checkpoint facility can be used in single process calculations as well as in the parallel regime. Several checkpoint files can be merged into one thus combining results of several calculations. The framework also corrects some of the known problems with the scheduling and load balancing found in the original implementations of the parallel computing functionality in MARS15 and PHITS. The framework can be used efficiently on homogeneous systems and networks of workstations, where the interference from the other users is possible.

43 PARTICLE ACCELERATORS↗

Model-Based Diagnosis and Prognosis of a Water Recycling System

A water recycling system (WRS) deployed at NASA Ames Research Center s Sustainability Base (an energy efficient office building that integrates some novel technologies developed for space applications) will serve as a testbed for long duration testing of next generation spacecraft water recycling systems for future human spaceflight missions. This system cleans graywater (waste water collected from sinks and showers) and recycles it into clean water. Like all engineered systems, the WRS is prone to standard degradation due to regular use, as well as other faults. Diagnostic and prognostic applications will be deployed on the WRS to ensure its safe, efficient, and correct operation. The diagnostic and prognostic results can be used to enable condition-based maintenance to avoid unplanned outages, and perhaps extend the useful life of the WRS. Diagnosis involves detecting when a fault occurs, isolating the root cause of the fault, and identifying the extent of damage. Prognosis involves predicting when the system will reach its end of life irrespective of whether an abnormal condition is present or not. In this paper, first, we develop a physics model of both nominal and faulty system behavior of the WRS. Then, we apply an integrated model-based diagnosis and prognosis framework to the simulation model of the WRS for several different fault scenarios to detect, isolate, and identify faults, and predict the end of life in each fault scenario, and present the experimental results.

Roychoudhury, Indranil↗

An open control sequence specification to scale building demand flexibility via analytics software

For over two decades, researchers and practitioners have showcased the ability of large commercial buildings to provide grid services by shedding or shifting load. Various utility demand response (DR) and virtual power plant (VPP) programs throughout the United States are presently utilizing these demand-side resources. However, growth of these programs have been limited, in part due to the high cost necessary to integrate the DR control strategies into the building automation system (BAS). Implementing these strategies involves adjusting control sequences, necessitating dozens of hours of customized programming per building, limiting their adoption to large organizations and progressive owners. Recent efforts by researchers and industry have demonstrated the capability of energy management and information systems (EMIS), originally designed for fault detection and diagnostics, to interface with existing BAS and perform supervisory control to optimize building operations. While these approaches are quickly being adopted by industry, demand flexibility (DF) control strategies remain limited in product offerings. One of the challenges is the lack of documented best-practice DF sequences, despite the rich literature on field implementations. This paper develops a new open-specification for a zone-based temperature adjustment shed strategy for commercial building HVAC systems, describing the specification’s implementation in two EMIS tools in both experimental and field settings. Both implementations successfully reduced electric load by at least 40% on average during the called event, while maintaining temperature limits. This study’s detailed process from specification to deployment shows the potential for scalability as well as highlights challenges related to integration with heterogeneous BAS products.

Granderson, Jessica↗

Integration of Advanced Structures and Materials Technologies for a Robust Lunar Habitat

NASA’s Artemis program plans to have a sustainable lunar base deployed on the Moon by 2028. The base calls for a foundation surface habitat that can support a crew of four members for a minimum mission duration of 28-days. The lack of a magnetic field and significant lunar atmosphere extends the lifetime of secondary radiation emitted from metallic structures, which is a health hazard for exposed astronauts. Integration of non-metallic structural materials into surface habitat design may alleviate some of these concerns. Additionally, it is favorable for the structure to be collapsible for transportation to optimize payload volume, mass efficiency, and monetary constraints. As a result, inflatable structures are being investigated due to their improved packing efficiency at launch, optimal mass-to-volume ratio, and large surface area that can efficiently disperse structural loads and heat. Currently, only two inflatable airlocks have been deployed in space. Thus, there is a significant need to advance technologies associated with inflatable structures to provide greater options for future missions, i.e., Artemis and beyond. This study focused on the inflatable lunar habitat applications of emerging NASA Langley Research Center (LaRC) technologies and their required development steps to become space qualified. The Bowling Habitat architecture was generated from 13 of these NASA LaRC technologies, five of which were deemed critical, five determined as enhancing technologies, and three were classified as transformational technologies for the Artemis program. To address the payload constraints, the study also considered a tentative timeline that aligned with the current Artemis schedule for transporting the Bowling Habitat to the Moon. Ultimately, the Bowling Habitat mainly addressed the structural needs of an inflatable lunar habitat, meaning that major areas pertaining to the life-style aspects of the habitat must be improved. Areas include, but are not limited to, hard connection points, the monitoring of human health, and extra radiation protection for solar proton events.

Inflatable Habitat↗

The Design, Verification and Performance of the James Webb Space Telescope

The James Webb Space Telescope (JWST) is NASA’s flagship mission successor to the highly successful Hubble Space Telescope. It is an infrared observatory featuring a cryogenic 6.6 m aperture, deployable Optical Telescope Element (OTE) with a payload of four science instruments (SIs) assembled into an Integrated Science Instrument Module (ISIM) that provide imagery and spectroscopy in the near-infrared band between 0.6 and 5 μm and in the mid-infrared band between 5 and 28.1 μm. JWST was successfully launched on 2021 December 25 aboard an Ariane 5 launch vehicle. All 50 major deployments were successfully completed on 2022 January 8. The observatory performed all midcourse correction maneuvers and achieved its operational mission orbit around the Sun–Earth second Lagrange point (L2). All commissioning and calibration activities have been completed, and JWST has begun its science mission. This paper will provide a description of the driving requirements and their technical challenges, the engineering processes involved in the design formulation, the resulting observatory design, the verification programs that proved it to be flightworthy, and the measured on-orbit performance of the observatory. Since companion papers will describe the details of the OTE and SIs, this paper will concentrate on describing the key features of the observatory architecture that accommodates these elements, particularly those features and capabilities associated with accommodating the radiometric and image-quality performance.

Galaxy evolution↗

Sim2Real Autonomous Robotic Exploration [Poster]

Autonomous robots offer promising solutions for exploration in environments that are inaccessible or hazardous to humans. Despite this, physical training of such robots is often constrained by safety risks, high cost or limited accessibility. This project presents an end-to-end simulation to reality pipeline leveraging Nvidia Isaac Sim and Boston Dynamics' Spot to enable autonomous navigation in indoor environments. A reinforcement learning policy is first trained using Nvidia Isaac Lab to establish Spot's locomotion pattern. Virtual LiDAR sensors are then integrated to perform SLAM-based navigation using simulated odometry. Finally, the simulated navigation scheme is transferred to a physical Spot robot to inspect and record images of a real-world room by repeating the learnt trajectory. The proposed framework highlights the potential of scalable training in simulation and reliable deployment in physical environments. Future directions include dynamic trajectory generation in unseen and challenging environments and integration of environmental sensing like temperature, radiation or humidity via sensor and material simulation.

97 - MATHEMATICS AND COMPUTING↗

NASA Integrated Space Communications Network

The NASA Integrated Network for Space Communications and Navigation (SCaN) has been in the definition phase since 2010. It is intended to integrate NASA s three existing network elements, i.e., the Space Network, Near Earth Network, and Deep Space Network, into a single network. In addition to the technical merits, the primary purpose of the Integrated Network is to achieve a level of operating cost efficiency significantly higher than it is today. Salient features of the Integrated Network include (a) a central system element that performs service management functions and user mission interfaces for service requests; (b) a set of common service execution equipment deployed at the all stations that provides return, forward, and radiometric data processing and delivery capabilities; (c) the network monitor and control operations for the entire integrated network are conducted remotely and centrally at a prime-shift site and rotating among three sites globally (a follow-the-sun approach); (d) the common network monitor and control software deployed at all three network elements that supports the follow-the-sun operations.

Tai, Wallace↗

NASA Integrated Space Communications Network

The NASA Integrated Network for Space Communications and Navigation (SCaN) has been in the definition phase since 2010. It is intended to integrate NASA’s three existing network elements, i.e., the Space Network, Near Earth Network, and Deep Space Network, into a single network. In addition to the technical merits, the primary purpose of the Integrated Network is to achieve a level of operating cost efficiency significantly higher than it is today. Salient features of the Integrated Network include (a) a central system element that performs service management functions and user mission interfaces for service requests; (b) a set of common service execution equipment deployed at the all stations that provides return, forward, and radiometric data processing and delivery capabilities; (c) the network monitor and control operations for the entire integrated network are conducted remotely and centrally at a prime-shift site and rotating among three sites globally (a follow-the-sun approach); (d) the common network monitor and control software deployed at all three network elements that supports the follow-the-sun operations.

Bhasin, Kul↗

Dashboard for Marine Energy Site Assessment and Monitoring

The marine energy (ME) industry presently relies upon fragmented site assessment solutions that require high resource expenditure for deployment at each site and do not leverage the wealth of readily available tools and information. A wave energy resource assessment dashboard, currently in development, will substantially improve siting, permitting, operations, and maintenance of ME projects by providing an integrated solution that is a one-stop-shop for a developer’s needs. The Site Energy Assessment and MOnitoring Dashboard (SEAMOD) will be of commercial interest to anyone seeking to deploy an ME project and is easily expandable to include tidal and wind energy site assessments. The integrated dashboard is being developed using state-of-the-art database and cloud computing methods and data-assimilative modeling tools that can be coupled with low-cost, rapidly deployable wave buoys and environmental sensing hardware. The combined software and hardware dashboard will reduce wave energy site characterization and wave climate monitoring costs by more than 60 percent and provide assessments that meet international industry standards. To realize a thriving global ME industry, the physical environment at a potential deployment site must be understood, not only for resource characterization, but also for optimization of device and power conversion performance. SEAMOD directly addresses these needs with a commercially marketable product. SEAMOD is a low-cost solution that provides comprehensive ME resource assessments, baseline environmental monitoring, and offshore characterizations required for successful ME development. The key technical objectives for Phase I were a series of software development goals, which when implemented with monitoring solutions, produced an initial proof-of-concept low-cost wave energy resources dashboard. In Phase II, the development of the prototype SEAMOD continued. The basic framework employed was the development of a revised dashboard and monitoring tool customized for ME applications by focusing on IEC site assessment and method requirements. Development was focused on the integration of full hindcast metocean products to provide hindcast resource characterization and environmental information. The final integrated dashboard provides a low-cost solution that delivers comprehensive, scalable, industry-standard energy resource assessments and offshore characterizations required for successful ME development. The integrated dashboard offers visibility of the most recent site modeling, measurements, and historical data. The application and integration of consensus-based standards for wave energy resource assessment, as determined by the International Electrotechnical Commission (IEC), are crucial for the impact and value of SEAMOD. SEAMOD includes monthly, seasonal, and yearly statistics, as well as the total 30-year record, offering temporal resolution of the IEC parameters to aid potential developers in determining the available wave energy resources in their area of interest.

16 TIDAL AND WAVE POWER↗

Integrating Concentrating Solar Power Technologies into the Hybrid Optimization and Performance Platform (HOPP)

As the world increases renewable energy deployment, there is an increasing interest in hybridizing various generation and storage technologies to maximize net benefit to the developer and/or off-taker. A particularly interesting combination of renewable technologies is concentrating solar power (CSP) with thermal energy storage (TES), photovoltaics (PV), and electrochemical battery energy storage (BESS). Due to the system complexity of CSP technology, it is difficult to evaluate the technological and financial performance of a CSP-PV hybrid system without detailed modeling of annual operations. To address this challenge, we have developed a modeling framework for evaluating the performance and financial viability of CSP systems hybridized with PV and battery technologies. This modeling effort incorporates CSP tower and trough systems into an existing modeling tool recently developed by NREL referred to as the Hybrid Optimization and Performance Platform (HOPP). This report outlines the modeling methodology as well as preliminary results from example case studies conducted using the model. The methodology describes: (i) the integration of CSP tower and troughs into HOPP using python interfaces to access System Advisor Model (SAM) underlining technology models, (ii) the mathematical formulation of the mixed integer linear program dispatch optimization model which optimizes operations of storage asset to either maximize system revenue or minimize operating cost while load following, (iii) the design analysis methods implemented within HOPP, and (iv) simulation clustering for the purposes of reducing computational expense. We exercise the model using a case study of a future scenario where we assume (i) CSP and PV technologies achieve the 2030 cost targets provided by the Solar Energy Technologies Office (SETO), (ii) battery costs reduce to the 2030 mid cost projection presented by NREL. Lastly, (iii) electricity prices for southern California in 2030 are provided by NREL's Cambium database, and (iv) a capacity payment of $150/kW-yr based on the system capacity factor during the to 100 net-load hours.

14 SOLAR ENERGY↗

Contact-dependent growth inhibition (CDI) systems deploy a large family of polymorphic ionophoric toxins for inter-bacterial competition

Contact-dependent growth inhibition (CDI) is a widespread form of inter-bacterial competition mediated by CdiA effector proteins. CdiA is presented on the inhibitor cell surface and delivers its toxic C-terminal region (CdiA-CT) into neighboring bacteria upon contact. Inhibitor cells also produce CdiI immunity proteins, which neutralize CdiA-CT toxins to prevent auto-inhibition. Here, we describe a diverse group of CDI ionophore toxins that dissipate the transmembrane potential in target bacteria. These CdiA-CT toxins are composed of two distinct domains based on AlphaFold2 modeling. The C-terminal ionophore domains are all predicted to form five-helix bundles capable of spanning the cell membrane. The N-terminal "entry" domains are variable in structure and appear to hijack different integral membrane proteins to promote toxin assembly into the lipid bilayer. The CDI ionophores deployed by E. coli isolates partition into six major groups based on their entry domain structures. Comparative sequence analyses led to the identification of receptor proteins for ionophore toxins from groups 1 & 3 (AcrB), group 2 (SecY) and groups 4 (YciB). Using forward genetic approaches, we identify novel receptors for the group 5 and 6 ionophores. Group 5 exploits homologous putrescine import proteins encoded by puuP and plaP, and group 6 toxins recognize di/tripeptide transporters encoded by paralogous dtpA and dtpB genes. Finally, we find that the ionophore domains exhibit significant intra-group sequence variation, particularly at positions that are predicted to interact with CdiI. Accordingly, the corresponding immunity proteins are also highly polymorphic, typically sharing only ~30% sequence identity with members of the same group. Competition experiments confirm that the immunity proteins are specific for their cognate ionophores and provide no protection against other toxins from the same group. The specificity of this protein interaction network provides a mechanism for self/nonself discrimination between E. coli isolates.

59 BASIC BIOLOGICAL SCIENCES↗

Deployment and Evaluation of SciStream on OLCF's Advanced Computing Ecosystem (ACE)

The growing demand for real-time analysis, experimental steering, and decision-making in scientific workflows has created a need for tightly coupled integrations between experimental facilities and high-performance computing (HPC) systems. The Department of Energy’s Integrated Research Infrastructure (IRI) initiative highlights data streaming as a key capability for enabling memory-to-memory data transfers, bypassing the limitations of traditional store-and-forward models. SciStream is a toolkit developed by researchers at Argonne National Laboratory (ANL) to support such streaming by addressing cross-domain security, delegated authentication, and application transparency. We deployed and evaluated SciStream on the Oak Ridge Leadership Computing Facility’s (OLCF) Advanced Computing Ecosystem (ACE) infrastructure, leveraging the Olivine OpenShift cluster and its high-bandwidth Data Streaming Nodes (DSNs) as gateway nodes. Our evaluation included synthetic streaming workloads derived from IRI science workflows, a streaming simulator, and integration with RabbitMQ to handle low-level messaging. This report documents the deployment process, performance evaluation, and challenges encountered, along with opportunities for future improvements.

97 MATHEMATICS AND COMPUTING↗

Maintaining Grid Reliability: Lessons From Renewable Integration Studies

The U.S. Department of Energy (DOE) and other organizations have sponsored numerous research studies over the last two decades to examine the effect of increased wind and solar deployment on grid reliability, including a number of studies that examine grids deriving more than 50% of annual energy from wind and solar. In this report, we discuss key findings from both the research body of knowledge and real-world practice related to grid reliability, and we demonstrate how to plan for and achieve continued reliability in the future as wind and solar deployment increase.

24 POWER TRANSMISSION AND DISTRIBUTION↗