Search NASA⌕ Search

SEARCH · Search NASA

Results for “layout”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,045 records · Page 58

Scripts and raw/processed precipitation NRCS network data, Upper Colorado, 2008-2017

This data package consists of scripts and data that were used to generate all the results and figures for Mital et al., 2020 (https://doi.org/10.3389/frwa.2020.00020). The purpose of the study was to develop a new algorithm to impute (or gap-fill) missing daily precipitation data. Study area was the Upper Colorado Water Resources Region (UCWRR), over a time period of 2008-2017. In terms of data, the package consists of raw precipitation measurements from Natural Resources Conservation Service (NRCS) network. These raw measurements are compiled into a single csv file (NRCS_dates_2008_2017.csv). The corresponding metadata are compiled in Metadata_processed.csv. The package also consists of outputs generated during Baseline and Sequential imputation runs as documented in Mital et al., 2020. Scripts used to generate all the results and figures for Mital et al., 2020 are also uploaded. A readme file documenting the layout of the data archive is also uploaded, and a KML file shows the geographic range for the data.

54 ENVIRONMENTAL SCIENCES↗

An Integrated View of Hydraulic Induced Fracture Geometry in Hydraulic Fracture Test Site 2

Until relatively recently, most of our understanding about the geometry of hydraulically induced fractures in unconventional reservoirs has been inferred by patterns observed via microseismic monitoring. Important information, such as fracture-azimuth, fracture-length, height-growth and other geometric data has been determined from microseismic “event clouds”, which in turn has been used to interpret a stimulated reservoir volume (SRV). It is important to note that relatively limited microseismic results have been acquired in conjunction with other diagnostics and validated in a consistent manner. The Hydraulic Fracture Test Site 2 (HFTS2) in the Permian Delaware Basin provides a unique opportunity to compare the frac geometry interpretations derived from multiple frac diagnostic tools and at multiple scales. The integrated view that emerges from all the frac diagnostic tools is that in HFTS2 the geometries of hydraulically induced fractures are not random and with a highly complex branching architecture. In fact, the fracs are mostly vertical, parallel plana domains, and both vertically and horizontally asymmetrical. The hydraulically induced fractures have a very consistent azimuth with a strike that matches SHmax. At the distance corresponding to the spacing between nearby wells in HFTS2, ~ 660 ft, the pattern of strain interceptions observed from Low Frequency Distributed Acoustic Sensing (LF-DAS) shows far-field dimensions that are consistent with the stage length dimensions at the stimulated well. In general, larger stages with higher number of clusters create larger number of interceptions and wider stimulated intervals than that of shorter stages with the same cluster to cluster spacing and fewer clusters. The hydraulically induced fractures also show a clear tendency to preferentially grow upwards as shown by the microseismic data, by the relative lower number of LF-DAS interceptions in nearby deeper wells and finally by the observed LF-DAS strain patterns in the vertical observation well. In the near field, the geometries of the fracture domains are also consistent. As shown by the distributed strain measurements obtained during production via the monitoring of Rayleigh Frequency Shift (RFS), each cluster has a separate, non-overlapping, frac-zone-domain that are generally centered around the locations of each perforation cluster. Overall, the hydraulically induced fractures in HFTS2 are interpreted as occurring in swarms associated with individual clusters, each with its own unique geometry but with similar predictable geometric and propagation tendencies. The comprehensive frac diagnostic program in HFTS2, the well-pad layout that permits the investigation of the Downloaded from http://onepetro.org/URTECONF/proceedings-pdf/21URTC/1-21URTC/D011S018R003/2477511/urtec-2021-5396-ms.pdf/1 by Carol Worster on 28 February 2022 URTeC 5396 2 impact that nearby producing wells has on frac geometry, together with an innovative Design of Experiment (DofE) that includes sequential-fracing, consistent cluster-to-cluster distances and few single-perforation cluster stages, has allowed us to gain a unique perspective about the geometry of the induced hydraulic fractures on this pad. Finally, the HFTS2 dataset has also provided us with a better understanding of the applicability and limitations of the different diagnostic tools.

58 GEOSCIENCES↗

Geomatchd

Geomatchd is a software tool to assist non-experts in the rapid conceptual design of geothermal district heating systems. This tool comprises three main parts: user-side heating and cooling demand profiles, district heating and cooling (DHC) network models for sizing and optimal layout selection, and geothermal system models for heat extraction calculation and cost comparison. The architecture of Geomatchd is opensource and is intended to simplify efforts by other coders to improve on existing functions, to add functions and to leverage available existing code and data – to improve the tool for public use. Geomatchd and the material supporting its development may provide a more intuitive window on district heating and the use of local shallow geothermal resources.

AS↗

Update on the JLEIC Electron Collider Ring Design

We present an update on the lattice design of the electron ring of the Jefferson Lab Electron-Ion Collider (JLEIC). The electron and ion collider rings feature a unique figure-8 layout providing optimal conditions for preservation of beam polarization. The rings include two arcs and two intersecting long straight sections containing a low-beta interaction region (IR) with special optics for detector polarimetry, electron beam spin rotator sections, ion beam cooling sections, and RF-cavity sections. Recent development of the electron ring lattice has been focused on minimizing the beam emittance while providing an efficient non-linear chromaticity correction and large dynamic aperture. We describe and compare three lattice designs, from which we determine the best option.

Nosochkov, Y.↗

Nano-engineering of Nb3Sn Thin Films to Improve Wire Performance and Reduce Cost

State-of-the-art Nb3Sn wires have plateaued in the performance of the critical current density Jc. Chemical and geometrical optimization of the wire layout have produced Nb3Sn wires with average Jc(4.2K, 16T) ~ 1,300 A/mm2. A future high energy hadron collider that is being considered to follow the LHC would need larger Jc and be cost effective. The approach to improving the performance of Nb3Sn conductor would be to introduce enhanced flux pinning mechanisms with nano-engineering techniques.

43 PARTICLE ACCELERATORS↗

Synchrotron Radiation Beam Diagnostics for the Integrable Optics Test Accelerator

The Integrable Optics Test Accelerator (IOTA) is a research electron and proton storage ring currently being commissioned at Fermilab's Accelerator Science and Technology (FAST) facility. An extensive beam physics research program is planned, including tests of novel techniques for improving beam intensity, stability, and emittance. A key part of IOTA beam diagnostics suite are synchrotron light beam monitors, mounted onto each dipole. In this paper, we present the hardware and software design of this system. Mechanical layout and actuator control electronics are described. High throughput image acquisition and analysis architecture is outlined, and its preliminary performance is explored. Integration of the system within accelerator control network and possible user applications, such as camera auto-focusing, are discussed.

43 PARTICLE ACCELERATORS↗

Design concept for the second interaction region for electron-ion collider

The possibility of two interaction regions (IRs) is a design requirement for Electron-Ion Collider (EIC). There is also a significant interest from the nuclear physics community to have a 2nd IR with measurement capabilities complementary to those of the 1st IR. While the 2nd IR will be in operation over the entire energy range of ~20GeV to ~140GeV center of mass (CM). The 2nd IR can also provide an acceptance coverage complementary to that of the 1st. In this paper, we present a brief overview and the current progress of the 2nd IR design in terms of the parameters, magnet layout, and beam dynamics.

Gamage, B. R.↗

ACCELERATOR CHALLENGES OF THE LHeC PROJECT

The LHeC project studies the design of a future electron-proton collider at CERN that will run in parallel to the standard LHC operation. For this purpose, the existing LHC storage ring will be combined with an Energy Recovery Linac (ERL), to accelerate electrons up to kinetic energy of 50 GeV. This concept - also applicable to the FCC-eh collider and studied at the PERLE project as prototype version - allows a peak luminosity of 10³⁴ cm⁻² s⁻¹. A sophisticated design of the RF structures, linacs, arcs, and interaction region is required. The electrons are accelerated and, after the interaction point, their energy is recovered through the same RF structures. While this energy recovery concept is a very promising approach, severe challenges are set by the layout of the interaction region, the beam separation concept and the design of the linac and arc lattice for the highest possible momentum acceptance. Emittance control and beam-beam effect of both, electron and proton beams, have been studied in front-to-end simulations and will be presented. We summarise the design principles of the ERL, the optimization of the arc lattice, and the main parameters of the project.

Holzer, B. J.↗

Design concept for a second interaction region for the Electron-Ion Collider

In addition to the day-one primary Interaction Region (IR), the design of the Electron Ion Collider (EIC) must support operation of a 2nd IR potentially added later. The 2nd IR is envisioned in an existing experimental hall at RHIC IP8, compatible with the same beam energy combinations as the 1st IR over the full center of mass energy range of ~20 GeV to ~140 GeV. The 2nd IR is designed to be complementary to the 1st IR. In particular, a secondary focus is added in the forward ion direction of the 2nd IR hadron beamline to optimize its capability in detecting particles with magnetic rigidities close to those of the ion beam. We provide the current design status of the 2nd IR in terms of parameters, magnet layout and beam dynamics.

Gamage, B. R.↗

OPTICS FOR STRONG HADRON COOLING IN EIC HSR-I

Insertion Region 2 (IR2) of the Relativistic Heavy Ion Collider will be modified to accommodate a Strong Hadron Cooling facility in the Hadron Storage Ring (HSR) of the Electron-Ion Collider (EIC). This paper describes the current proof-of-principle design of HSR-IR2 - layout, optical performance, design methodology, and engineering requirements. It also describes the challenges and opportunities in the future development of the HSR-IR2 design, in order to further optimize Strong Hadron Cooling performance.

Peggs, S.↗

Electron-Ion Collider Design Status

The Electron-Ion Collider (EIC) is being designed for construction at Brookhaven National Laboratory. Activities have been focused on beam-beam simulations, polarization studies, and beam dynamics, as well as on maturing the layout and lattice design of the constituent accelerators and the interaction region. The latest design advances will be presented.

43 PARTICLE ACCELERATORS↗

Magnetic design of the commutational magnet and quadrupoles for PERLE accelerator

ER@CEBAF is an effort to demonstrate multi-GeV multipass energy recovery with a low beam current in CEBAF. The CEBAF race-track-shaped geometry allows its linacs to accommodate multiple energy beams simultaneously. However, five energy recovery passes complicate the beamline optics design process. Individual recirculating arcs each transport one beam energy, and are shared between accelerating/decelerating beams. This paper presents a CEBAF optics redesign to accommodate the ER@CEBAF multi-pass ER scheme. Isochronous arcs were retuned to match into optics solutions for optimized 10-pass linacs. In this paper, we discuss the optics re-design process for ER@CEBAF based on the existing CEBAF layout.

Neththikumara, I.↗

STATUS OF THE SECOND INTERACTION REGION DESIGN FOR ELECTRON-ION COLLIDER

Provisions are being made in the Electron Ion Collider (EIC) design for future installation of a second Interaction Region (IR), in addition to the day-one primary IR. The envisioned location for the second IR is the existing experi- mental hall at RHIC IP8. It is designed to work with the same beam energy combinations as the first IR, covering a full range of the center-of-mass energy of ?20 GeV to ?140 GeV. The goal of the second IR is to complement the first IR, and to improve the detection of scattered particles with magnetic rigidities similar to those of the ion beam. To achieve this, the second IR hadron beamline features a secondary focus in the forward ion direction. The design of the second IR is still evolving. This paper reports the current status of its pa- rameters, magnet layout, and beam dynamics and discusses the ongoing improvements being made to ensure its optimal performance.

Gamage, B.↗

Progress in the design of the future circular collider FCC-ee interaction region

In this paper we discuss the latest developments for the FCC-ee interaction region layout, which represents one of the key ingredients to establish the feasibility of the FCC-ee. The collider has to achieve extremely high luminosities over a wide range of center-of-mass energies with two or four interaction points. The complex final focus hosted in the detector region has to be carefully designed, and the impact of beam losses and of any type of synchrotron radiation generated in the interaction region, including beamstrahlung, have to be evaluated in detail with simulations. We give an overview of the progress of the whole machine-detector-interface-related studies, among which are the updated mechanical model of the interaction region, the plans for a novel R&D activity of a IR mockup which is just starting, the collimation scheme and evaluation of beam induced backgrounds in the detectors, evaluation of radiation dose in the experimental area, and MDI integration with the detector.

43 PARTICLE ACCELERATORS↗

Selected advances in the accelerator design of the Future Circular Electron-Positron Collider (FCC-ee)

In autumn 2023, the FCC Feasibility Study underwent a crucial “mid-term review”. We describe some accelerator performance risks for the proposed future circular electron-positron collider, FCC-ee, identified for, and during, the mid-term review. For the collider rings, these are the collective effects when running on the Z resonance – especially resistive wall, beam-beam, and electron cloud –, the beam lifetime, dynamic aperture, alignment tolerances, and beam-based alignment. For the booster, the primary concern is the vacuum system, with regard to impedance and effects of the residual gas. For the injector, the layout and the linac repetition rate are primary considerations. We discuss the various issues and report the planned mitigations.

43 PARTICLE ACCELERATORS↗

FFA BEAM TRANSPORT DEMONSTRATION DEVELOPMENT FOR THE CEBAF 22 GeV UPGRADE

Jefferson Lab is planning an upgrade of the Continuous Electron Beam Accelerator Facility (CEBAF) to deliver highly polarized electron beams up to 22 GeV using Fixed- Field Alternating-gradient (FFA) magnets. As the application of FFA technology in the 10–22 GeV energy range is unprecedented, experimental validation is required prior to full-scale implementation. To support this effort, a dedicated FFA test insert is proposed within the existing CEBAF infrastructure, with candidate locations in the Beam Switchyard (BSY) dump line or the Hall C beamline. The testbed will consist of a half or full FFA cell using combined-function permanent magnets and will enable systematic studies of beam transport, field quality, alignment, and magnet performance under realistic conditions. Operation with polarized beams in the 5–11 GeV range will closely replicate the energy scaling of the full upgrade. This paper presents the current design status and layout options for the proposed FFA beam transport test line.

Ogur, S. [Thomas Jefferson National Accelerator Fa↗

Extraction and Injection in the Electron Injector for the Electron-Ion Collider

The electron injector for the Electron-Ion Collider (EIC) consists of a linear accelerator, a beam accumulation ring, and the Rapid Cycling Synchrotron (RCS) before the electrons are injected into the Electron Storage Ring (ESR) and collided. Extraction out of the RCS is complicated by limited space and the nominal beam pipe aperture, while injection into the ESR is complicated due to the limitation of kicker strength, so that the kickers will not impact the proton beam in the adjacent Hadron Storage Ring (HSR); additionally, the ESR kickers must also provide enough kick to the stored bunch for the swap-out scheme. This paper covers the injection into and extraction out of the RCS, as well as injection into the ESR, detailing layout, optics, and anticipated parameters of the septa and different kickers.

Deitrick, K. [Thomas Jefferson National Accelerato↗

Linac to BAR/RCS transfer line design for EIC electron injection system

A transfer line has been designed for the Electron-Ion Collider (EIC) to transport electron bunches from the linac to the Rapid Cycling Synchrotron (RCS). In its initial operational stage, the line accommodates 1 nC electron bunches directly from the linac. To support a future upgrade involving a Beam Accumulator Ring (BAR), which will stack individual bunches to form high-charge 28 nC bunches, the design incorporates two switching dipoles enabling injection into and extraction from the BAR. Additionally, a beam dump has been included for operational flexibility and safety. The final segment of the line interfaces with the RCS through a modified Penner bend, preserving beam quality while satisfying geometric constraints. This layout ensures compatibility with both current and future operational modes of the EIC injection system.

Accelerator Physics↗