Search NASA⌕ Search

SEARCH · Search NASA

Results for “load Balancing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,045 records · Page 58

Fluid and Electrolyte Balance model (FEB)

The effects of various oral input water loads on solute and water distribution throughout the body are presented in the form of a model. The model was a three compartment model; the three compartments being plasma, interstitial fluid and cellular fluid. Sodium, potassium, chloride and urea were the only major solutes considered explicitly. The control of body water and electrolyte distribution was affected via drinking and hormone levels.

Fitzjerrell, D. G.↗

A Robust Infrastructure Design for Gas Centrifuge Enrichment Plant Unattended Online Enrichment Monitoring

An online enrichment monitor (OLEM) is being developed to continuously measure the relative isotopic composition of UF6 in the unit header pipes of a gas centrifuge enrichment plant (GCEP). From a safeguards perspective, OLEM will provide early detection of a facility being misused for production of highly enriched uranium. OLEM may also reduce the number of samples collected for destructive assay and if coupled with load cell monitoring can provide isotope mass balance verification. The OLEM design includes power and network connections for continuous monitoring of the UF6 enrichment and state of health of the instrument. Monitoring the enrichment on all header pipes at a typical GCEP could require OLEM detectors on each of the product, tails, and feed header pipes. If there are eight process units, up to 24 detectors may be required at a modern GCEP. Distant locations, harsh industrial environments, and safeguards continuity of knowledge requirements all place certain demands on the network robustness and power reliability. This paper describes the infrastructure and architecture of an OLEM system based on OLEM collection nodes on the unit header pipes and power and network support nodes for groupings of the collection nodes. A redundant, self-healing communications network, distributed backup power, and a secure communications methodology. Two candidate technologies being considered for secure communications are the Object Linking and Embedding for Process Control Unified Architecture cross-platform, service-oriented architecture model for process control communications and the emerging IAEA Real-time And INtegrated STream-Oriented Remote Monitoring (RAINSTORM) framework to provide the common secure communication infrastructure for remote, unattended monitoring systems. The proposed infrastructure design offers modular, commercial components, plug-and-play extensibility for GCEP deployments, and is intended to meet the guidelines and requirements for unattended and remotely monitored safeguards systems.

On Line Enrichment Monitor GCEP↗

LBNF 1.2 MW TARGET: CONCEPTUAL DESIGN & FABRICATION

Fermilab’s Long-Baseline Neutrino Facility (LBNF) will utilize a modified design based on the NuMI low energy target that is reconfigured to accommodate beam operation at 1.2 MW. Achieving this power with a graphite target material and ancillary systems originally rated for 400 kW requires several design changes and R&D efforts related to material bonding and electrical isolation. Target cooling, structural design, and fabrication techniques must address higher stresses and heat loads that will be present during 1.2 MW operation, as the assembly will be subject to cyclic loads and thermal expansion. Mitigations must be balanced against compromises in neutrino yield. Beam monitoring and subsystem instrumentation will be updated and added to ensure confidence in target positioning and monitoring. Remote connection to the target hall support structure must provide for the eventual upgrade to a 2.4 MW target design, without producing excessive radioactive waste or unreasonable exposure to technicians during reconfiguration. Current designs and assembly layouts will be presented, in addition to current findings on processes and possibilities for prototype and final assembly fabrication.

43 PARTICLE ACCELERATORS↗

LBNF 1.2 MW Target: Conceptual Design & Fabrication

Fermilab’s Long-Baseline Neutrino Facility (LBNF) will utilize a modified design based on the NuMI low energy target that is reconfigured to accommodate beam operation at 1.2 MW. Achieving this power with a graphite target material and ancillary systems originally rated for 400 kW requires several design changes and R&D efforts related to material bonding and electrical isolation. Target cooling, structural design, and fabrication techniques must address higher stresses and heat loads that will be present during 1.2 MW operation, as the assembly will be subject to cyclic loads and thermal expansion. Mitigations must be balanced against compromises in neutrino yield. Beam monitoring and subsystem instrumentation will be updated and added to ensure confidence in target positioning and monitoring. Remote connection to the target hall support structure must provide for the eventual upgrade to a 2.4 MW target design, without producing excessive radioactive waste or unreasonable exposure to technicians during reconfiguration. Current designs and assembly layouts will be presented, in addition to current findings on processes and possibilities for prototype and final assembly fabrication.

43 PARTICLE ACCELERATORS↗

Protecting Lake Ontario - Treating Wastewater from the Remediated Low-Level Radioactive Waste Management Facility - 13227

The Port Granby Project is part of the larger Port Hope Area Initiative, a community-based program for the development and implementation of a safe, local, long-term management solution for historic low level radioactive waste (LLRW) and marginally contaminated soils (MCS). The Port Granby Project involves the relocation and remediation of up to 0.45 million cubic metres of such waste from the current Port Granby Waste Management Facility located in the Municipality of Clarington, Ontario, adjacent to the shoreline of Lake Ontario. The waste material will be transferred to a new suitably engineered Long-Term Waste Management Facility (LTWMF) to be located inland approximately 700 m from the existing site. The development of the LTWMF will include construction and commissioning of a new Wastewater Treatment Plant (WWTP) designed to treat wastewater consisting of contaminated surface run off and leachate generated during the site remediation process at the Port Granby Waste Management Facility as well as long-term leachate generated at the new LTWMF. Numerous factors will influence the variable wastewater flow rates and influent loads to the new WWTP during remediation. The treatment processes will be comprised of equalization to minimize impacts from hydraulic peaks, fine screening, membrane bioreactor technology, and reverse osmosis. The residuals treatment will comprise of lime precipitation, thickening, dewatering, evaporation and drying. The distribution of the concentration of uranium and radium - 226 over the various process streams in the WWTP was estimated. This information was used to assess potential worker exposure to radioactivity in the various process areas. A mass balance approach was used to assess the distribution of uranium and radium - 226, by applying individual contaminant removal rates for each process element of the WTP, based on pilot scale results and experience-based assumptions. The mass balance calculations were repeated for various flow and load scenarios. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Distributed Automatic Load-Frequency Control with Optimality in Power Systems

With the increasing penetration of renewable energy resources, power systems face new challenges in balancing power supply and demand and maintaining the nominal frequency. This paper studies load control to handle these challenges. In particular, a fully distributed automatic load control algorithm, which only needs local measurement and local communication, is proposed. We prove that the control algorithm globally converges to an optimal operating point which minimizes the total disutility of users, restores the nominal frequency and the scheduled tie-line power flows, and respects the thermal constraints of transmission lines. It is also shown that the convergence still holds even when inaccurate system parameters are used in the control algorithm. Lastly, the effectiveness, optimality, and robustness of the proposed algorithm are demonstrated via numerical simulations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Cascade anchoring strategy for general mass production of high-loading single-atomic metal-nitrogen catalysts

Although single-atomically dispersed metal-Nx on carbon support (M-NC) has great potential in heterogeneous catalysis, the scalable synthesis of such single-atom catalysts (SACs) with high-loading metal-N x is greatly challenging since the loading and single-atomic dispersion have to be balanced at high temperature for forming metal-N x . Herein, we develop a general cascade anchoring strategy for the mass production of a series of M-NC SACs with a metal loading up to 12.1 wt%. Systematic investigation reveals that the chelation of metal ions, physical isolation of chelate complex upon high loading, and the binding with N-species at elevated temperature are essential to achieving high-loading M-NC SACs. As a demonstration, high-loading Fe-NC SAC shows superior electrocatalytic performance for O 2 reduction and Ni-NC SAC exhibits high electrocatalytic activity for CO 2 reduction. The strategy paves a universal way to produce stable M-NC SAC with high-density metal-N x sites for diverse high-performance applications.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Analysis, testing, and operation of the MAGI thermal control system

The Aerospace Corporation has completed the development of the Mineral and Gas Identifier (MAGI) sensor - an airborne multi-spectral infrared instrument that is designed to discriminate surface composition and to detect gas emissions from the environment. Sensor performance was demonstrated in a series of flights aboard a Twin Otter aircraft in December 2011 as a stepping stone to a future satellite sensor design. To meet sensor performance requirements the thermal control system was designed to operate the HgCdTe focal plane array (FPA) at 50 K with a 1.79 W heat rejection load to a 44.7 K sink and the optical assembly at 100 K with a 7.5 W heat load to a 82.3 K sink. Two commercial off-theshelf (COTS) Sunpower Stirling cryocoolers were used to meet the instrument’s cooling requirements. A thermal model constructed in Thermal Desktop was used to run parametric studies that guided the mechanical design and sized the two cryocoolers. This paper discusses the development, validation, and operation of the MAGI thermal control system. Detailed energy balances and temperature predictions are presented for various test cases to demonstrate the utility and accuracy of the thermal model. Model inputs included measured values of heat lift as a function of input power and cold tip temperature for the two cryocoolers. These measurements were also used to make predictions of the cool-down behavior from ambient conditions. Advanced heater software was developed to meet unique requirements for both sensor cool-down rate and stability at the set point temperatures.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Lidar-Enhanced Wind Turbine Control: Past, Present, and Future

The main challenges in harvesting energy from the wind arise from the unknown incoming turbulent wind field. Balancing the competing interests of reduction in structural loads and increasing energy production is the goal of a wind turbine controller to reduce the cost of producing wind energy. Conventional wind turbines use feedback methods to optimize these goals, reacting to wind disturbances after they have already impacted the wind turbine. Lidar sensors offer a means to provide additional inputs to a wind turbine controller, enabling new techniques to improve control methods, allowing a controller to actuate a wind turbine in anticipation of an incoming wind disturbance. This paper will look at the development of lidar-enhanced controls and how they have been used for various turbine load reductions with pitch actuation, as well as increased energy production with improved yaw control. Ongoing work will also be discussed to show that combining pitch and torque control using feedforward nonlinear model predictive control can lead to both reduced loads and increased energy production. Future work is also proposed on extending individual wind turbine controls to the wind plant level and determining how lidars can be used for control methods to further lower the cost of wind energy by minimizing wake impacts in a wind farm.

17 WIND ENERGY↗

Role of distal reabsorption and peritubular environment in glomerulotubular balance.

Total kidney glomerulotubular balance was examined during aortic constriction and release in saline-loaded dogs and in dogs undergoing water diuresis. Aortic constriction lowered the glomerular filtration rate by 45% in both groups, and glomerulotubular balance, as judged by changes in absolute sodium reabsorption, was also comparable. During water diuresis, a linear relationship was observed between free water clearance and urine flow during all maneuvers, suggesting that distal sodium reabsorption is related primarily to distal delivery. The results suggest that if alterations in the peritubular environment are responsible for the changes in tubular sodium reabsorption during aortic constriction in the saline- or water-loaded dog, then a change in renal plasma flow, and presumably delivery rate of oncotic force, may be the most likely mediator.

Schrier, R. W.↗

Enhanced Hanford Low-Activity Waste Glass Property Data Development: Phase 2

The U.S. Department of Energy’s (DOE) Office of River Protection (ORP) requested Pacific Northwest National Laboratory (PNNL) to support the River Protection Project vitrification in an effort to support operations upon completion of startup activities (DOE 2012). This work was performed under the PNNL project titled “ORP Glass Support Work.” One task of this project—Enhanced Hanford Waste Glass Models—is the subject of this report. A previous task focused on generating property-composition data and models for the Hanford site low-activity waste (LAW) glasses with lower waste loadings, which are relevant to the commissioning of the LAW vitrification facility. The current task has the long-term objective of expanding the Hanford site LAW glass database and property composition models for the balance of the Hanford site tank waste treatment and immobilization mission. During the balance of the mission, LAW glasses with higher waste loadings will be produced. This report presents the glass compositions and glass property data developed in Phase 2 of the enhanced Hanford LAW glass property data development effort. When this effort is complete, enhanced LAW glass property models will be developed. Section 1.1 summarizes the status of the LAW glass composition regions and waste loading constraints prior to the data development effort documented in this report. Section 1.2 summarizes the LAW Phase 2 glass composition region and test matrix. Section 1.3 documents the quality assurance program used in performing the work discussed in this report.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Recent Results on Coupling Fast Waves to High Performance Plasmas on DIII-D

Fast Waves (FWs) at 60 MHz and 90 MHz are used in DIII-D for central electron heating and current drive. Coupling of FWs to high-performance discharges is limited by low antenna loading in these regimes. To extend the application of high-power FWs to such regimes, methods of increasing the antenna loading in these regimes are needed. A systematic study of loading enhancement techniques has been carried out in DIII-D, including reduction of the antenna/plasma distance, gas puffing into the far scrape-off layer (SOL), and control of other parameters that affect the particle balance in the far SOL. Quantitative understanding of the physics of the loading resistance and its dependence on edge density profiles is demonstrated. The core FW heating efficiency appeared to be {approx}100% in the Advanced Inductive regime, consistent with the high first-pass direct electron absorption of {approx}75% that is predicted by the ray-tracing code GENRAY in this high electron beta regime.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Pick-up ion pressure gradients modulating the solar wind dynamics

Neutral interstellar atoms penetrate deeply into the inner heliosphere before they become ionized by various processes. As ions they are picked-up by the frozen-in magnetic fields and are convected outwards with the solar wind plasma. Thereby the primary plasma flow is mass, momentum, and energy-loaded. The dynamics of the distant multi-constituent solar wind is, however, not solely determined by these loading processes, but is also affected by the wave-mediated pick-up ion pressure gradients derivable from the pick-up ion distribution function. The action of the radial components of these pressures essentially counter balances the decelerating effect of the solar wind momentum loading, diminishing strongly the deceleration of the distant solar wind. Furthermore the latitudinal components of the pick-up ion pressures induce latitudinal forces acting on the multiconstituent solar plasma outflow and inducing nonradial bulk flow components. The enforced nonradial outflow geometry on the upwind hemisphere may partly be responsible for the magnetic flux deficit which was claimed since several years in the PIONEER-10 magnetic flux data.

Fahr, Hans J.↗

Development of a Rotor-Body Coupled Analysis for an Active Mount Aeroelastic Rotor Testbed

At the Langley Research Center an active mount rotorcraft testbed is being developed for use in the Langley Transonic Dynamics Tunnel. This testbed, the second generation version of the Aeroelastic Rotor Experimental System (ARES-II), can impose rotor hub motions and measure the response so that rotor-body coupling phenomena may be investigated. An analytical method for coupling an aeroelastically scaled model rotor system to the ARES-II is developed in the current study. Models of the testbed and the rotor system are developed in independent analyses, and an impedance-matching approach is used to couple the rotor system to the testbed. The development of the analytical models and the coupling method is examined, and individual and coupled results are presented for the testbed and rotor system. Coupled results are presented with and without applied hub motion, and system loads and displacements are examined. The results show that a closed-loop control system is necessary to achieve desired hub motions, that proper modeling requires including the loads at the rotor hub and rotor control system, and that the strain-gauge balance placed in the rotating system of the ARES-II provided the best loads results.

Wilbur, Matthew L.↗

Balancing Authority Cooperation Concepts to Reduce Variable Generation Integration Costs in the Western Interconnection: Consolidating Balancing Authorities and Sharing Balancing Reserves

The study described in this chapter demonstrates the benefits of BA consolidation with the help of a detailed WECC system model and advanced methodology, which is also described in this chapter. The study aims to determine the potential savings in production cost and reduction in balancing reserve requirements in the WECC system. The study has found that effective use of the diversity in load and variable generation over a wide area can indeed help to achieve significant savings. The implementation cost for the consolidation was beyond the scope of this study. The analysis was performed for two different scenarios of VG penetration: 11% (8% wind and 3% solar) and 33% (24% wind and 9% solar) of WECC projected energy demand in 2020. In analysis of balancing reserves, the objective was to determine the reduction in balancing reserve requirements due to BA consolidation, in terms of required capacity and ramp-rates. Hour-ahead and 10-minute ahead forecast errors for load, wind, and solar were simulated. In addition, 1-minute resolution load, wind and solar data were used to derive balancing reserve requirements i.e. load-following and regulation requirements for each individual BA and for the consolidated BA (CBA). The reduction in balancing reserves was determined by calculating the difference between total reserve requirements that need to be carried by different BAs if they operate individually, and reserve requirements that need to be carried by the CBA. The study results show that the consolidated WECC system would have about a 50% overall reduction in balancing reserves for the 11% penetration scenario and a 65% reduction for the 33% penetration scenario in comparison with total reserve requirements that need to be carried by different BAs if they operate individually.

balancing authorities consolidation↗

Comparison of MPC Formulations for Building Control under Commercial Time-of-Use Tariffs

© 2019 IEEE. Most medium and large commercial buildings in the U.S. are subject to complex electricity tariffs that combine both Time-of-Use (TOU) energy and demand charges. This study analyses the performances of different economic Model Predictive Control (MPC) formulations, from the standpoints of monthly bill reduction, load shifting, and peak demand reduction. Simulations are performed on many simplified commercial building models, with multiple TOU demand charges, and under various summer conditions. Results show that compared to energy-only MPC, the traditional method for dealing with demand charges significantly reduces peak demand and owner bill, however, highlight a lack of load shifting capability. A proposed incremental approach is presented, which better balances the bill components in the objective function. In the case study presented, this method can improve monthly bill savings and increase load shifting during demand response events, while keeping a similarly low peak demand, compared to traditional MPC methods taking into account demand charges.

Cutsem, Olivier Van↗

Photogrammetric Deflection Measurements for the Tiltrotor Test Rig (TTR) Multi-Component Rotor Balance Calibration

Calibrating the internal, multi-component balance mounted in the Tiltrotor Test Rig (TTR) required photogrammetric measurements to determine the location and orientation of forces applied to the balance. The TTR, with the balance and calibration hardware attached, was mounted in a custom calibration stand. Calibration loads were applied using eleven hydraulic actuators, operating in tension only, that were attached to the forward frame of the calibration stand and the TTR calibration hardware via linkages with in-line load cells. Before the linkages were installed, photogrammetry was used to determine the location of the linkage attachment points on the forward frame and on the TTR calibration hardware. Photogrammetric measurements were used to determine the displacement of the linkage attachment points on the TTR due to deflection of the hardware under applied loads. These measurements represent the first photogrammetric deflection measurements to be made to support 6-component rotor balance calibration. This paper describes the design of the TTR and the calibration hardware, and presents the development, set-up and use of the photogrammetry system, along with some selected measurement results.

Calibration↗

Photogrammetric Deflection Measurements for the Tiltrotor Test Rig (TTR) Multi-Component Rotor Balance Calibration

Calibrating the internal, multi-component balance mounted in the Tiltrotor Test Rig (TTR) required photogrammetric measurements to determine the location and orientation of forces applied to the balance. The TTR, with the balance and calibration hardware attached, was mounted in a custom calibration stand. Calibration loads were applied using eleven hydraulic actuators, operating in tension only, that were attached to the forward frame of the calibration stand and the TTR calibration hardware via linkages with in-line load cells. Before the linkages were installed, photogrammetry was used to determine the location of the linkage attachment points on the forward frame and on the TTR calibration hardware. Photogrammetric measurements were used to determine the displacement of the linkage attachment points on the TTR due to deflection of the hardware under applied loads. These measurements represent the first photogrammetric deflection measurements to be made to support 6-component rotor balance calibration. This paper describes the design of the TTR and the calibration hardware, and presents the development, set-up and use of the photogrammetry system, along with some selected measurement results.

Calibration↗