Search NASA⌕ Search

SEARCH · Search NASA

Results for “replacement”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,045 records · Page 58

Rapid Patterning and Advanced Device Structures for Low Cost Manufacturable Crystalline Si IBC Cells

Recent record efficiency Si cells have had an interdigitated back contact (IBC) design where both positive and negative contacts are fabricated on the back side of the Si wafer. Many industry groups have investigated IBC cells but used photolithography to pattern the rear contacts although it is considered impractical for low cost, high volume manufacturing. Alternative patterning methods using lasers and mechanical masking have been utilized in fabrication of patterned regions in IBC Si solar cells to replace photolithography. Another exciting advance in Si solar cell technology has been replacing the high temperature diffusion of doped regions inside the crystalline Si wafer with low temperature deposition of very thin layers of doped amorphous hydrogenated Si (a-Si:H) on the Si wafer. This is called a Si heterojunction (HJ) device. The a-Si:H provides excellent passivation of surface defects and has produced the highest open circuit voltages (VOC) of any Si solar cell device structure. The Institute of Energy Conversion (IEC) demonstrated the first IBC-HJ solar cell combining these two strategies in 2007 and has fabricated IBC-HJ cells with 20% efficiency using three photolithography steps. Despite the demonstrated efficiency potential of this device by industry groups (>26%) there is no commercial production because of the challenges of patterning and processing the structure in an industrial environment. Our work sought to address that challenge. The objective of this 3 year project was to develop the processing for the IBC-HJ Si solar cell using lasers for patterning and contact formation instead of photolithography. Laser patterning enables rapid, contactless manufacturing of patterned regions. We intensively studied laser fired contacts, laser patterning of the a-Si multi-layer stacks and metal layers and the use of plasma shadow masks. After an exhaustive focus in the first year on the laser fired emitter (LFE) and contact (LFC), we were unable to achieve VOC greater than 660 mV, compared to the 720 mV required to meet our milestones. We discovered that an additional issue with our original IBC structure was the presence of an inversion layer at the back surface connecting the p and n regions which reduced the VOC and fill factor (FF). We developed innovative methods for characterizing the inversion layer. These two limitations in the original design lead to development of a new IBC-HJ process sequence and device structure which we called Plasma Masked Laser Processed (PMLP). It retained the original high efficiency features including manufacturability. The LFC was replaced with a standard n-type a-Si HJ contact. The inversion layer was eliminated by replacing the previous p-type stack in the gap with an n-type or SiN stack. The PMLP used laser ablation of a multi-layer a-Si stack followed by chemical etching to open the n-contact. It required deposition of a patterned stack through a mask in the plasma deposition chamber. This turned out to be a source of significant problems due to inevitable unwanted deposition ‘leakage’ under the mask. This formed a blocking contact on the emitter which significantly reduced Voc and FF. Several iterations in PMLP device structure and chemical etching steps resulted in a large improvements, e.g. the efficiency increasing from 3 to 15% and Voc from 450 to 660 mV but they were unable to completely eliminate it. The best IBC-HJ device we fabricated had only 15% efficiency. For perspective, our standard FHJ devices had 20% efficiency.

14 SOLAR ENERGY↗

NDE Technology Engineering Program for Hanford DST Non-Visual Volumetric Inspection Technology: Phase II RAVIS Radiation Tolerance Test Report

This test report provides the results of radiation tolerance robustness testing that was performed on samples of robotic components and an ultrasonic guided wave air-slot sensor that represent components/sub-systems of the Robotic Air-slot Volumetric Inspection System (RAVIS) that has been engineered for volumetric inspection of Hanford tank bottom plates via under-tank refractory pad air-slots. The specific components tested for 1) functionality during active irradiation and 2) tolerance to cumulative radiation dose (until failure or upon reaching a cumulative dose test limit) were: • four samples each of a printed circuit board (PCB) and direct current (DC) motor, which are robotic components, and • 26 ultrasonic piezoelectric elements (samples) inside an air-slot sensor. The robotic components are part of the RAVIS air-slot inspection crawler drive control system that is responsible for remote communication with and actuation of the air-slot inspection crawler. The failure of either of these components during under-tank deployment would require manual retrieval via the crawler’s tether, which risks damage to the robot/refractory/tank. Preemptive replacement of the components at appropriately conservative dose/time intervals informed by failure dose would reduce the likelihood of under-tank failure. The components were included in radiation tolerance testing to quantify their failure doses to inform replacement intervals. The air-slot sensor is responsible for collecting ultrasonic inspection data (scan images) for the tank bottom plates during under-tank deployment. Compromised signal quality due to elevated noise levels caused by gamma radiation would compromise inspection performance. The air-slot sensor was included in radiation tolerance testing to quantify the impact of active irradiation on sensor signal quality. The irradiation and in-situ functional tests of the PCBs, DC motors and air-slot sensor took place in June and July 2020 at the Pacific Northwest National Laboratory. Testing was performed at a gamma dose rate near 300 rad/hr., which, in the absence of under-tank dose rate data, has been conservatively estimated to be the upper-bound dose rate beneath the primary tanks at Hanford. Irradiation took place at elevated temperatures of 150-200°F to determine failure doses that reflect the compounding effects of gamma radiation and heat. The test results revealed: • The DC motors can tolerate being actively irradiated at the high dose rate at 200°F and can tolerate a cumulative dose of 300,000 rad, that which would be incurred after 5 years of service at the 300 rad/hr dose rate. The component therefore meets minimum and preferred radiation tolerance and lifecycle requirements for robotic components. • The air-slot sensor can tolerate being actively irradiated at the high dose rate at 150°F and can tolerate a cumulative dose of 60,000 rad, that which would be incurred after 1 year of service at the 300 rad/hr dose rate. The sensor therefore meets minimum radiation tolerance and lifecycle requirements. • The PCB can tolerate being actively irradiated at the high dose rate, but can only tolerate a cumulative dose of 19,000 rad at 150-200°F. The PCB does not meet minimum radiation tolerance and lifecycle requirements; however, because the component is considered replaceable, it can be replaced before a cumulative dose of 19,000 rad is reached, determined through either monitoring with a dosimeter or scheduled time intervals that are calculated based on conservative estimates of under-tank dose rates.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

NARAC Meteorological Monitoring Tower Maintenance Report: Submarine Base Group Two, Sub Base New London NEWLBASE2 Tower

Comments: The roof-based tower is located on Building 17 on Naval Submarine Base New London. Tower installation date is unknown. A second GFCI outlet in-line with the standard GFCI in the logger enclosure is mounted on conduit out of the tower base pedestal. The roof surface has been replaced and is now safe to walk on. The tower was not climbed during this maintenance visit. After the maintenance visit in 2018, the tower was deemed unsafe to climb due to age, corrosion, and deterioration of the tower components. The wind, air temperature, and relative humidity sensors located on the upper part of the tower require climbing of the tower for servicing and could not be accessed for inspection and maintenance. The tower is scheduled for replacement in FY2023. Tasks to be Completed: Tower system replacement / relocation. Consider replacement or bypassing of the suspect precipitation gauge signal connector.

99 GENERAL AND MISCELLANEOUS↗

Metallurgical Analysis of the High Flux Isotope Reactor (HFIR) Carrier Lifting Bails (Rev.1)

The dissolution rates of the aluminum alloys in the High Flux Isotope Reactor (HFIR) element carriers and the Material Test Reactor (MTR) L-bundles in the H-Canyon facility have been identified as the possible cause of extended dissolutions that result in significant time and financial expenditures. A study, carried out by Savannah River National Laboratory (SRNL) to determine relationships between the dissolution rates and the metallurgical properties of the aluminum alloy materials of construction of the HFIR carriers and the L-bundles, considered the dissolution rates of aluminum alloy (AA) series 1100, 6061, and 6063. The study determined that the aluminum alloy compositions played a principal role in the dissolution rate of the carrier/bundle components. Higher dissolution rates were correlated with lower concentrations of the minor element additions in the alloys and with specific element concentrations. Aluminum alloys 1100 and 6063 were found to have similar dissolution rates that were approximately two orders of magnitude (100X) greater than those of AA6061. Based on the results of the dissolution behavior study, a Technical Assistance Request (TAR) was first issued to determine if the replacement of AA6061-T6 with AA6063-T6 is feasible for the HFIR carrier lifting bails. A Technical Task Request was then issued to consider AA6063-T5 as well as other alloys to improve possible supply chain issues. The metallurgical properties of the L-bundle (specifically the end caps) were not evaluated in this report because L-Bundle drawings already allow for the use of AA6063-T6 in all structural components. The HFIR carriers are composed of thin-walled components with significant surface areas that allow for relatively quick overall dissolution times. Conversely, the carrier lifting bails and the supporting constituents are composed of solid bars and thick plate regions with relatively small surface areas that experience longer overall dissolution times. While the MTR L-bundle design includes allowances for the materials of construction to be either AA6061-T6 or AA6063-T6, the HFIR carriers are specified to be constructed fully with AA6061-T6 alloy. This report analyzes the recommendations of the dissolution behavior study to replace the materials of construction of the HFIR carrier lifting bails. The analysis considers the operational requirements of the lifting bail and its supporting structures. To decrease dissolution times, the analysis considers direct replacement of the material as well as reductions in the thicknesses of the components to decrease the mass of the elements. Material reductions are considered on options for using either AA6061 and/or AA6063. The calculations are based on specifications from the American Society of Mechanical Engineer (ASME) and The Aluminum Association, Inc. design codes. The analysis finds that direct replacement of the lifting bail material of construction with AA6063-T6, and AA6063-T5 as well as reductions in the dimensions of the lifting bail components are acceptable. Note that this study considers the structural suitability of the alloys. It does not consider their dissolution rates in the dissolvers.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Salt Vessel-Sample Generator Interface

The goal of the salt sampling program at Argonne is to develop and deploy automated molten salt sampling approaches for interfacing relevant unit operations with salt analysis to improve the timeliness and accuracy of sampling-based accountancy measurements. One technology under development is a vacuum sampler loop module. In this system, molten salt is drawn from a process vessel through a heated sampling line and into a charge vessel. Next, one or more samples are split from the volume in the charge vessel and the remaining salt is returned to the process. The vacuum sampler loop module is being developed to interface with other sample processing and analysis modules to enable rapid at-line sample characterization. The main purpose of the vacuum sampling loop module is to enable the collection of samples that are more representative of the bulk salt by replacing traditional point samplers (i.e., dip probes) with a sampling approach that captures a larger cross section of salt. Additionally, the vacuum sampling approach eliminates the risk of dross contamination of samples and avoids the use of moving parts in the salt. Two methods of interfacing the vacuum sampling loop with a precision pneumatic sample generator were investigated in FY21. This report covers the testing of fluidic coupling between the two modules. Two iterations of the fluidically coupled modules were tested. The first iteration system coupled the two modules using a freeze valve to seal the vacuum sampler during filling and to control flow into the pneumatic sample generator. While this integrated system functioned as intended, some changes were implemented to make the system more robust and better suited to remote deployment. Specifically, the system was made to be more modular and active control of the vacuum filling operation was replaced with a passive control mechanism. For passive filling, the salt charge vessel was vented to a small gas tank that was at negative pressure, causing salt to be drawn into the vessel until the force of the fluid head was in equilibrium with the gas pressure. The passive control system performed well and will be used in future iterations. Another change in the second system was a newly configured pneumatic sample generator in which sample ejection occurred through a hole in the reservoir’s stainless-steel side wall instead of through a non-wetted sapphire orifice on the bottom. This alternate configuration may be better suited for near-process deployment because it enables on-line orifice maintenance and an orifice bypass drain back to the process. A third change in the second iteration system was the transition to a two-chamber charge vessel which split off a fraction of the sampled salt as a liquid aliquot. The goal was to create a buffer mechanism that would allow reproducible aliquoting of samples, independently of variability in the charge vessel fill height. While the two-chamber design was functional, the sample size reproducibility was below target values. To improve reproducibility and overcome many of the impediments to remote deployment of the vacuum sampling loop module, separate work was conducted to replace the two-chamber liquid aliquoting mechanism with aliquoting into single-use sample tubes. Solid salt transfer in the sample tubes will replace fluidic coupling for integrating the vacuum sampler with downstream modules. Because the proposed operations can all be executed with simple overhead actuation mechanisms or other existing hot-cell technology, there will be no need for large investments in novel hot cell sample handling technologies using this alternate approach. As such, near-term deployment of the vacuum sampling technology will be achievable. This new approach for automated coupling of sample tubes with down-stream modules is covered in a separate FY21 report, and a remotely operated version of the vacuum sampler loop module with the tube aliquoting feature is planned for FY22.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Pitch Bearing Rating and Service Life Analysis

Pitch bearings are an essential component in wind turbines used to connect the blade root to the hub. They support the resulting simultaneous radial, axial, and overturning moment loads while allowing relative rotation of the blade to the hub. The most recent evidence indicates the replacement rate for pitch bearings on 3+ MW turbines can be several percent per year, reaching 10% by year 5. This is a far higher replacement rate than both older 1.5 to 2 MW turbines and 2 to 3 MW turbines, which only reach a 10% replacement rate by 14 to 24 years compared to the expected design life of at least 20 years. Typical pitch bearing replacements require the use of a large, expensive crane and removal of the blade(s) or rotor, with a significant amount of downtime. Given the most recent developments in pitch bearing reliability and the publication of the updated NREL and Fraunhofer IWES pitch bearing design guide, the purpose of this report is to update the performance and rating analysis of the example 1.9-meter diameter pitch bearing representative of that installed on a 1.5 MW wind turbine, compare the rating life to the observed service life of similar pitch bearings, and validate the service life modification factor with this large population of bearings. The report will also summarize the pitch bearing contact conditions, thereby serving as a guide for planned bench-level fretting wear tests at Argonne National Laboratory.

17 WIND ENERGY↗

Audit Report, "Fire Protection Deficiencies at Los Alamos National Laboratory"

The Department of Energy's Los Alamos National Laboratory (Los Alamos) maintains some of the Nation's most important national security assets, including nuclear materials. Many of Los Alamos' facilities are located in close proximity to one another, are occupied by large numbers of contract and Federal employees, and support activities ranging from nuclear weapons design to science-related activities. Safeguarding against fires, regardless of origin, is essential to protecting employees, surrounding communities, and national security assets. On June 1, 2006, Los Alamos National Security, LLC (LANS), became the managing and operating contractor for Los Alamos, under contract with the Department's National Nuclear Security Administration (NNSA). In preparation for assuming its management responsibilities at Los Alamos, LANS conducted walk-downs of the Laboratory's facilities to identify pre-existing deficiencies that could give rise to liability, obligation, loss or damage. The walk-downs, which identified 812 pre-existing fire protection deficiencies, were conducted by subject matter professionals, including fire protection experts. While the Los Alamos Site Office has overall responsibility for the effectiveness of the fire protection program, LANS, as the Laboratory's operating contractor, has a major, day-to-day role in minimizing fire-related risks. The issue of fire protection at Los Alamos is more than theoretical. In May 2000, the 'Cerro Grande' fire burned about 43,000 acres, including 7,700 acres of Laboratory property. Due to the risk posed by fire to the Laboratory's facilities, workforce, and surrounding communities, we initiated this audit to determine whether pre-existing fire protection deficiencies had been addressed. Our review disclosed that LANS had not resolved many of the fire protection deficiencies that had been identified in early 2006: (1) Of the 296 pre-existing deficiencies we selected for audit, 174 (59 percent) had not been corrected; and, (2) A substantial portion of the uncorrected deficiencies, 86 (49 percent) were considered by the walk-down teams to be significant enough to warrant compensatory actions until the deficiency was corrected or was tracked to closure through implementation of corrective actions. Further, we found that 32 of the significant deficiencies had been closed by the previous Los Alamos contractor, prior to LANS assuming responsibility for operation of the Laboratory, even though the deficiencies had not been corrected. A fire protection expert provided technical support during the audit. As an example of uncorrected problems, LANS had not resolved, by performing periodic tests, a deficiency identified in 2006 regarding a kitchen hood fire suppression system in a facility located within the Los Alamos Neutron Science Center. Such systems are required to be tested twice a year by the National Fire Protection Association standard, a standard that had been adopted by Department of Energy under DOE Order 420.1B. Yet, in 2006, the LANS walk-down team recognized that this system had not been inspected since May 2004 and noted that deficient suppression systems could result in significantly high levels of property damage and loss. After we brought this issue to management's attention on February 6, 2009, LANS officials stated that the Laboratory would correct this deficiency. As with the problems involving the fire suppression system, we observed that LANS had not always corrected life safety deficiencies involving building exits at one of its primary facilities. This included providing a secondary emergency exit for a building with occupants on multiple floor levels. LANS had removed personnel from the third floor and improved the sprinkler system of the facility, but it had still not provided a secondary exit for personnel on the second floor by the time we completed our review. NNSA has since stated that this fire protection issue will be completely addressed by relocating personnel from the second floor. Perhaps most serious, our testing revealed that a number of deficiencies were formally closed even though actual corrective action had not been completed. Notably, we observed that action had not been taken to resolve a recommendation to replace a fire alarm panel found to be unreliable. After the walk-down was conducted but prior to contract transition, the former contractor closed the recommendation in its action tracking database even though the panel had not been replaced. The walk-down team had categorized the fire alarm system as requiring replacement since it had been modified many times, was old and obsolete, and had very limited available spare parts. In fact, the walk-down team concluded that the panel 'must be considered to be unreliable and should have a very high priority for replacement'.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Techno-Economic Analysis of BEV Service Providers Offering Battery Swapping Services: Preprint

Battery electric vehicles (BEVs) offer the potential to reduce both oil imports and greenhouse gas emissions, but high upfront costs, battery-limited vehicle range, and concern over high battery replacement costs may discourage potential buyers. A subscription model in which a service provider owns the battery and supplies access to battery swapping infrastructure could reduce upfront and replacement costs for batteries with a predictable monthly fee, while expanding BEV range. Assessing the costs and benefits of such a proposal are complicated by many factors, including customer drive patterns, the amount of required infrastructure, battery life, etc. The National Renewable Energy Laboratory has applied its Battery Ownership Model to compare the economics and utility of BEV battery swapping service plan options to more traditional direct ownership options. Our evaluation process followed four steps: (1) identifying drive patterns best suited to battery swapping service plans, (2) modeling service usage statistics for the selected drive patterns, (3) calculating the cost-of-service plan options, and (4) evaluating the economics of individual drivers under realistically priced service plans. A service plan option can be more cost-effective than direct ownership for drivers who wish to operate a BEV as their primary vehicle where alternative options for travel beyond the single-charge range are expensive, and a full-coverage-yet-cost-effective regional infrastructure network can be deployed. However, when assumed cost of gasoline, tax structure, and absence of purchase incentives are factored in, our calculations show the service plan BEV is rarely more cost-effective than direct ownership of a conventional vehicle.

25 ENERGY STORAGE↗

In-orbit servicing

A concept called the low-cost modular spacecraft, in which the subsystems would be contained in replaceable modules and which would be capable of various applications, is under engineering development. Studies have shown that servicing of such a spacecraft on orbit by the Space Shuttle over an extended lifetime is more economical than three other alternatives: launching replacement satellites on conventional boosters as existing satellites fail, launching replacements by Shuttle, or launching replacement satellites and retrieving malfunctioning satellites by Shuttle. For on-orbit servicing, the Shuttle would use its Remote Manipulator system (RMS) to bring the malfunctioning satellite into its cargo bay. The Flight Support System (FSS) on the Orbiter used for servicing the satellite would include an appendage storage frame, a retention cradle, a positioning platform, a Module Exchange Mechanism (MEM), and a storage magazine. Ground simulations are under way with the Orbiter mockup.

Cepollina, F. J.↗

Investigations with methanobacteria and with evolution of the genetic code

Mycoplasma capricolum was found by Osawa et al. to use UGA as the code of tryptophan and to contain 75% A + T in its DNA. This change could have been from evolutionary pressure to replace C + G by A + T. Numerous studies have been reported of evolution of proteins as measured by amino acid replacements that are observed when homologus proteins, such as hemoglobins from various vertebrates, are compared. These replacements result from nucleotide substitutions in amino acid codons in the corresponding genes. Simultaneously, silent nucleotide substitutions take place that can be studied when sequences of the genes are compared. These silent evolutionary changes take place mostly in third positions of codons. Two types of nucleotide substitutions are recognized: pyrimidine-pyrimidine and purine-purine interchanges (transitions) and pyriidine-purine interchanges (transversions). Silent transitions are favored when a corresponding transversion would produce an amino acid replacement. Conversely, silent transversions are favored by probability when transitions and transversions will both be silent. Extensive examples of these situations have been found in protein genes, and it is evident that transversions in silent positions predominate in family boxes in most of the examples studied. In associated research a streptomycete from cow manure was found to produce an extracellular enzyme capable of lysing the pseudomurein-contining methanogen Methanobacterium formicicum.

Jukes, T. H.↗

In-orbit and laboratory exchange of ORUs designed/not designed for servicing

The practicality of employing a combination of automated and extravehicular activity forms of servicing in-orbit was demonstrated with the STS 41-C Solar Maximum Repair Mission. This shows that modular Orbital Replacement Units (ORUs) designed for servicing can be readily accommodated. Successful replacement of an experiment ORU, not designed for replacement, was performed following extensive preparations. In a laboratory, spacecraft ORUs were replaced using a completely preplanned automated approach. This was later done using a completely unstructured teleoperations mode including the complicated exchange of the instrument ORU. As a result of this effort and work on powered tools, an approach for combining these techniques is underway to produce a flight support system servicing aid to increase the STS astronauts' effective in-orbit servicing capability by several fold.

Davis, R.↗

Launch vehicle performance using metallized propellants

Metallized propellant propulsion systems are considered as replacements for the solid rocket boosters and liquid sustainer stages on the current launch vehicles: both the Space Transportation System (STS) and the Titan 4. Liquid rocket boosters for the STS were analyzed as replacements for current solid rocket boosters. These boosters can provide a liquid propulsion system within the volume constraints of a solid rocket booster. A replacement for the Space Shuttle Main Engines using metallized O2/H2/Al was studied. The liquid stages of the Titan 4 were also investigated; the Aerozine-50 (A-50) fuel was replaced with metallized storable A-50/Al. A metallized propellant is similar to a traditional liquid propellant. However, it has metal particles, such as aluminum, that are suspended in a gelled fuel, such as hydrogen, RP-1, A-50 or monomethyl hydrazine (MMH). The fuels then undergo combustion with liquid oxygen or nitrogen tetroxide (NTO). These propellants provide options for increasing the performance of existing launch vehicle chemical propulsion systems by increasing fuel density or specific impulse or both. These increases in density and specific impulse can significantly reduce the propulsion system liftoff weight and allow a liquid rocket booster to fit into the same volume as an existing solid rocket booster. Also, because gelled fuels are akin to liquid propellants, metallized systems can provide enhanced controllability over solid propulsion systems. Gelling of the propellant also reduces the sensitivity to impacts and consequently reduces the propellant explosion hazard.

Palaszewski, Bryan A.↗

Launch vehicle performance using metallized propellants

Metallized propellant propulsion systems are considered as replacements for the solid rocket boosters and liquid sustainer stages on the current launch vehicles: both the Space Transportation System (STS) and the Titan 4. Liquid rocket boosters for the STS were analyzed as replacements for current solid rocket boosters. These boosters can provide a liquid propulsion system within the volume constraints of a solid rocket booster. A replacement for the Space Shuttle Main Engines using metallized 02/H2/A1 was studied. The liquid stages of the Titan 4 were also investigated; the Aerozine-50 (A-50) fuel was replaced with metallized storable A-50/A1. A metallized propellant is similar to a traditional liquid propellant. However, it has metal particles, such as aluminum, that are suspended in a gelled fuel, such as hydrogen, RP-1, A-50 or monomethyl hydrazine (MMH). The fuels then undergo combustion with liquid oxygen or nitrogen tetroxide (NTO). These propellants provide options for increasing the performance of existing launch vehicle chemical propulsion systems by increasing fuel density or specific impulse or both. These increases in density and specific impulse can significantly reduce the propulsion system liftoff weight and allow a liquid rocket booster to fit into the same volume as an existing solid rocket booster. Also, because gelled fuels are akin to liquid propellants, metallized systems can provide enhanced controllability over solid propulsion systems. Gelling of the propellant also reduces the sensitivity to impacts and consequently reduces the propellant explosion hazard.

Palaszewski, Bryan↗

On-line upgrade of program modules

This paper presents a taxonomy of problems that must be solved in order to achieve on-line upgradability of long-lived programs, and presents a solution to the fundamental problems in the taxonomy. The solutions are based upon AdaPT, a set of language extensions designed to aid in the distribution of a single Ada program. AdaPT introduces three major units, the public, the partition, and the node. Publics are primarily used to share type information. Partitions are the basic units of distribution while nodes are used to control the configuration of the program. Nodes and partitions can be created dynamically via the allocator. A node-level routine controls the replacement process. The controlling node creates a new instance of the routine being replaced; the run-time system must ensure that the new instance is the updated one. Once access to the new version has been established, all further calls to the module are redirected to the new version and the caller is informed of the change so that it may make subsequent calls directly. When a module is being upgraded, there is a transition period during which both the old and new versions are present. We require that clients of a potentially replaceable module 'check in' with the controlling node. The controlling node keeps track of the number of clients that have been redirected to the replacement. When all have been redirected, the old version can be deallocated.

Waldrop, Raymond S.↗

STS-61 Space Shuttle mission report

The STS-61 Space Shuttle Program Mission Report summarizes the Hubble Space Telescope (HST) servicing mission as well as the Orbiter, External Tank (ET), Solid Rocket Booster (SRB), Redesigned Solid Rocket Motor (RSRM), and the Space Shuttle main engine (SSME) systems performance during the fifty-ninth flight of the Space Shuttle Program and fifth flight of the Orbiter vehicle Endeavour (OV-105). In addition to the Orbiter, the flight vehicle consisted of an ET designated as ET-60; three SSME's which were designated as serial numbers 2019, 2033, and 2017 in positions 1, 2, and 3, respectively; and two SRB's which were designated BI-063. The RSRM's that were installed in each SRB were designated as 360L023A (lightweight) for the left SRB, and 360L023B (lightweight) for the right SRB. This STS-61 Space Shuttle Program Mission Report fulfills the Space Shuttle Program requirement as documented in NSTS 07700, Volume 8, Appendix E. That document requires that each major organizational element supporting the Program report the results of its hardware evaluation and mission performance plus identify all related in-flight anomalies. The primary objective of the STS-61 mission was to perform the first on-orbit servicing of the Hubble Space Telescope. The servicing tasks included the installation of new solar arrays, replacement of the Wide Field/Planetary Camera I (WF/PC I) with WF/PC II, replacement of the High Speed Photometer (HSP) with the Corrective Optics Space Telescope Axial Replacement (COSTAR), replacement of rate sensing units (RSU's) and electronic control units (ECU's), installation of new magnetic sensing systems and fuse plugs, and the repair of the Goddard High Resolution Spectrometer (GHRS). Secondary objectives were to perform the requirements of the IMAX Cargo Bay Camera (ICBC), the IMAX Camera, and the Air Force Maui Optical Site (AMOS) Calibration Test.

Fricke, Robert W., Jr.↗

Feasibility of flywheel energy storage systems for applications in future space missions

The objective of this study was to examine the overall feasibility of deploying electromechanical flywheel systems in space used for excess energy storage. Results of previous Rocketdyne studies have shown that the flywheel concept has a number of advantages over the NiH2 battery, including higher specific energy, longer life and high roundtrip efficiency. Based on this prior work, this current study was broken into four subtasks. The first subtask investigated the feasibility of replacing the NiH2 battery orbital replacement unit (ORU) on the international space station (ISSA) with a flywheel ORU. In addition, a conceptual design of a generic flywheel demonstrator experiment implemented on the ISSA was completed. An assessment of the life cycle cost benefits of replacing the station battery energy storage ORU's with flywheel ORU's was performed. A fourth task generated a top-level development plan for critical flywheel technologies, the flywheel demonstrator experiments and its evolution into the production unit flywheel replacement ORU.

Santo, G. Espiritu↗

Digital modulation schemes for high speed transmission through low bandwidth lowpass analog links

Existing NTSC (National Television System Committee) standard will be phased out and replaced with HDTV (High Definition Television) standard within the next 10 years. Accordingly, the existing video network system operated by NASA will become obsolete and requires either replacement or modification to accommodate digital transmission. Network replacement is extremely expensive, hence, several digital modulation schemes are investigated in this report to accomplish digital transmission over existing analog links saving NASA from the cost of network replacement. There are two competing transmission systems available for HDTV transmission over limited bandwidth channels. The cost and performance of the two competing schemes are remarkably similar. However, the input data rate in such a case is limited to 40 Mbit/s. Transmission of higher data rates is possible using simple signal processing techniques. On the other hand, a third transmission system, multilevel pulse amplitude modulation (M-PAM) is proposed. M-PAM is the first stage of the well known M-VSB. This M-PAM scheme is much simpler and uses the channel more efficiently. The three schemes are compared and preliminary conclusions were made. Despite of several similarities, each modulation scheme has it unique merits. To determine the suitability of each scheme, more investigations and laboratory tests for all schemes are needed.

Andrawis, Alfred S.↗

Design and implementation of scalable tape archiver

In order to reduce costs, computer manufacturers try to use commodity parts as much as possible. Mainframes using proprietary processors are being replaced by high performance RISC microprocessor-based workstations, which are further being replaced by the commodity microprocessor used in personal computers. Highly reliable disks for mainframes are also being replaced by disk arrays, which are complexes of disk drives. In this paper we try to clarify the feasibility of a large scale tertiary storage system composed of 8-mm tape archivers utilizing robotics. In the near future, the 8-mm tape archiver will be widely used and become a commodity part, since recent rapid growth of multimedia applications requires much larger storage than disk drives can provide. We designed a scalable tape archiver which connects as many 8-mm tape archivers (element archivers) as possible. In the scalable archiver, robotics can exchange a cassette tape between two adjacent element archivers mechanically. Thus, we can build a large scalable archiver inexpensively. In addition, a sophisticated migration mechanism distributes frequently accessed tapes (hot tapes) evenly among all of the element archivers, which improves the throughput considerably. Even with the failures of some tape drives, the system dynamically redistributes hot tapes to the other element archivers which have live tape drives. Several kinds of specially tailored huge archivers are on the market, however, the 8-mm tape scalable archiver could replace them. To maintain high performance in spite of high access locality when a large number of archivers are attached to the scalable archiver, it is necessary to scatter frequently accessed cassettes among the element archivers and to use the tape drives efficiently. For this purpose, we introduce two cassette migration algorithms, foreground migration and background migration. Background migration transfers cassettes between element archivers to redistribute frequently accessed cassettes, thus balancing the load of each archiver. Background migration occurs the robotics are idle. Both migration algorithms are based on access frequency and space utility of each element archiver. To normalize these parameters according to the number of drives in each element archiver, it is possible to maintain high performance even if some tape drives fail. We found that the foreground migration is efficient at reducing access response time. Beside the foreground migration, the background migration makes it possible to track the transition of spatial access locality quickly.

Nemoto, Toshihiro↗