Low-Cost Illumination-Grade LEDs

Solid State Lighting is a cost-effective, energy-conserving technology serving a rapidly expand- ing multi-billion dollar market. This program was designed to accelerate this lighting revolution by reducing the manufacturing cost of Illumination-Grade LEDs. The technical strategy was to investigate growth substrate alternatives to standard planar sapphire, select the most effective and compatible option, and demonstrate a significant increase in Lumen/$ with a marketable LED. The most obvious alternate substrate, silicon, was extensively studied in the first two years of the program. The superior thermal and mechanical properties of Si were expected to improve wavelength uniformity and hence color yield in the manufacture of high-power illumination- grade LEDs. However, improvements in efficiency and epitaxy uniformity on standard c-plane sapphire diminished the advantages of switching to Si. Furthermore, the cost of sapphire decreased significantly and the cost of processing Si devices using our thin film process was higher than expected. We concluded that GaN on Si was a viable technology but not a practical option for Philips Lumileds. Therefore in 2012 and 2013, we sought and received amendments which broadened the scope to include other substrates and extended the time of execution. Proprietary engineered substrates, off-axis (non-c-plane) sapphire, and c-plane patterned sapphire substrates (PSS) were all investigated in the final 18 months of this program. Excellent epitaxy quality was achieved on all three candidates; however we eliminated engineered substrates and non-c-plane sapphire because of their higher combined cost of substrate, device fabrication and packaging. Ultimately, by fabricating a flip-chip (FC) LED based upon c-plane PSS we attained a 42% reduction in LED manufacturing cost relative to our LUXEON Rebel product (Q1-2012). Combined with a flux gain from 85 to 102 Lm, the LUXEON Q delivered a 210% increase in Lm/$ over this time period. The technology was commercialized in our LUXEON Q product in Sept., 2013. Also, the retention of the sapphire increased the robustness of the device, enabling sales of low-cost submount-free chips to lighting manufacturers. Thus, blue LED die sales were initiated in the form of a PSS-FC in February, 2013.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Beam Development_V6MP

This presentation includes slides on Conditions; Sternglass states; H+ beam interacts with a W sense wire – Sternglass theory for SE current; Observed H+ beam at 03WS001 location; Jan 23 data; H- beam at 03WS001 location, Jan 23 data, Sternglass theory for SE current; H- beam at 03WS001 location; Jan 23 data; H+ beam at 04WS001 location, Jan 23 data, Sternglass theory for SE current; H+ beam at 04WS001 location; Jan 23 data; H- beam at 10WS001 location, Nov 17, 2013 data, Sternglass theory for SE current; H- beam at 10WS001 location; Nov 17, 2013 data; H- beam at 11WS001 location, Nov 17, 2013 data, Sternglass theory for SE current; and lastly H- beam at 11WS001 location; Nov 17, 2013 data.

43 PARTICLE ACCELERATORS↗

A Status Report and a Comparison of H- Emittance at the Dome and ISTS

Why is the emittance in the H-Dome degrading? Can the H- source run reliably for 28 days at 120 Hz? Are the ISTS diagnostics and/or source good enough to proceed with meaningful experiments? For an entire year an effort to answer these questions was made by several teams across multiple groups. At the end of 2013, beginning of 2014, everything came together and for the most part we now have the answers. This talk concentrates on questions 1 and 3.

43 PARTICLE ACCELERATORS↗

Suppressing Parasitic Effects in a Long Dielectric Wakefield Accelerator

Dielectric wakefield acceleration is a promising concept for increasing the accelerating gradient above the limits of conventional accelerators. Although superior gradients are reported in short dielectric wakefield accelerator tubes, problems arise when it comes to efficiency and multi-meter long interaction lengths. Here we discuss possible issues and provide some solutions backed by simulations.

43 PARTICLE ACCELERATORS↗

On Maximum FODO Acceptance

This note illustrates maximum acceptance of FODO quadrupole focusing channel. Acceptance is the largest Floquet ellipse of a matched beam: A = $\frac{a^2}{β}$$_{max}$ where a is the aperture of the channel and β max is the largest value of beta-function in the channel. If aperture of the channel is restricted by a circle of radius a, the s-s acceptance is available for particles oscillating at median plane, y=0. Particles outside median plane will occupy smaller phase space area. In x-y plane, cross section of the accepted beam has a shape of ellipse with truncated boundaries.

43 PARTICLE ACCELERATORS↗

Exploring Alternative Non-contact temperature measurements for 99 Mo production facility NorthStar FY14 Activity 5, Deliverable 2

We have conducted an experiment to explore an alternative non-contact method of measuring the Inconel target window temperature. This experiment involves using a standard color camera to observe the visible light emitted from the Inconel target window at high heat in order to estimate the window temperature. The safety limit to prevent target window failure is 700 °C and therefore we need a reliable and accurate method of measuring temperature especially in the range of 600 °C to 700 °C if it is to replace the IR camera. In this temperature range the window will emit a significant amount of black body radiation within the visible range and hence the idea of using a color camera. The goal is to see if the shift in window color (determined by the RBG pixel values of the camera) as the target window is heated to 700 °C can be calibrated to the temperature.The reasons for exploring this as an alternative to an IR are camera are: significant cost reduction and potentially less complicated to calibrate.

42 ENGINEERING↗

Magnifying Lenses with Weak Achromatic Bends for High-Energy Electron Radiography

This memo briefly describes bremsstrahlung background effects in GeV-range electron radiography systems and the use of weak bending magnets to deflect the image to the side of the forward bremsstrahlung spot to reduce background. The image deflection introduces first-order chromatic image blur due to dispersion. Two approaches to eliminating the dispersion effect to first order by use of magnifying lens with achromatic bends are described. Also, higher-order image blur terms caused by weak bends are also discussed, and shown to be negligibly small in most cases of interest.

43 PARTICLE ACCELERATORS↗

An Electron Beam Test Facility (EBTF) for TA-53

A dedicated facility for electron-beam R&D would significantly increase the viability of the Accelerator and Electrodynamics capability at LANL. Such a facility would provide access to a high-quality source of nearly-relativistic electrons, sufficient experimental and data acquisition capabilities, and flexibility to enable a broad range of fundamental and applied accelerator and beam physics experiments. Such a facility would cost-effectively meet the needs of a broad set of projects and sponsors ranging from LANL LDRD, DOE Office of Science, NNSA Global Security, Threat Reduction, and others. Implementation of such a facility at TA-53 would allow technical resources for Accelerator and Electrodynamics capability development to remain within LANL while meeting many important mission needs that can only be met through such a facility, allowing technical capability and technical expertise to co-reside.

43 PARTICLE ACCELERATORS↗

Disk Mechanical Test Development

The target disks are held in a circular slot in a stainless steel holder. The holder is sized and toleranced so that the disks fit without constraint in the holder at the temperature of the parts under the irradiation condition. The target is a stack of 29 mm diameter disks 0.5 mm thick separated by 0.25 mm coolant gaps. The hottest disks reach a temperature of 1263 K at the center. Figure 1 shows the temperature contour plot of the hottest disk, Disk 14. Temperature increase causes thermal expansion through the thickness and radially. The radial thermal expansion in particular causes thermal stresses, aggravated by the fact that the center heats significantly more than the edge. Thus the center of the disk expands radially but the relatively cool outer edge constrains that motion. The resulting thermal stress is shown in Figure 2, showing a peak thermal stress of 281 MPa at the center. Stress/strain curves for molybdenum are shown in the plot in Figure 3. From the curve at 982°C, it is evident that plastic deformation will result, with a maximum deformation of 0.002 in (0.05 mm). Actual deformation is shown in Figures 4 and 5 in one radial plane and in the "Z" direction through the thickness.

36 MATERIALS SCIENCE↗

99 Mo Production Plant Layout

The NorthStar Medical Technologies 99 Mo production facility configuration is envisioned to be 8 accelerator pairs irradiating 7 100 Mo targets (one spare accelerator pair undergoing maintenance while the other 7 pairs are irradiating targets). The required shielding in every direction for the accelerators is initially estimated to be 10 feet of concrete. With the accelerator pairs on one (ground) level and spaced with the required shielding between adjacent pairs, the only practical path for target insertion and removal while minimizing floor space is vertical. The current scheme then requires a target vertical lift of nominally 10 feet through a shield stack. It is envisioned that the lift will be directly into a hot cell where an activated target can be removed from its holder and a new target attached and lowered. The hot cell is on a rail system so that a single hot cell can service all active target locations, as well as deliver the ready targets to the separations lab. On this rail system, coupled to the hot cell, will be a helium recovery and clean-up system. All helium coolant equipment is located on the upper level near to the target removal point.

42 ENGINEERING↗