Search NASA⌕ Search

SEARCH · Search NASA

Results for “COMMISSION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,063 records · Page 59

DCS - A high flux beamline for time resolved dynamic compression science – Design highlights

The Dynamic Compression Sector (DCS) beamline, a national user facility for time resolved dynamic compression science supported by the National Nuclear Security Administration (NNSA) of the Department of Energy (DOE), has recently completed construction and is being commissioned at Sector 35 of the Advanced Photon Source (APS) at Argonne National Laboratory (ANL). The beamline consists of a First Optics Enclosure (FOE) and four experimental enclosures. A Kirkpatrick–Baez focusing mirror system with 2.2 mrad incident angles in the FOE delivers pink beam to the experimental stations. A refocusing Kirkpatrick–Baez mirror system is situated in each of the two most downstream enclosures. Experiments can be conducted in either white, monochromatic, pink or monochromatic-reflected beam mode in any of the experimental stations by changing the position of two interlocked components in the FOE. The beamline Radiation Safety System (RSS) components have been designed to handle the continuous beam provided by two in-line revolver undulators with periods of 27 and 30 mm, at closed gap, 150 mA beam current, and passing through a power limiting aperture of 1.5 x 1.0 mm{sup 2}. A novel pink beam end station stop [1] is used to stop the continuous and focused pink beam which can achieve a peak heat flux of 105 kW/mm{sup 2}. A new millisecond shutter design [2] is used to deliver a quick pulse of beam to the sample, synchronized with the dynamic event, the microsecond shutter, and the storage ring clock.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Initial Results from the Majorana Demonstrator

Neutrinoless double-beta decay searches seek to determine the nature of neutrinos, the existence of a lepton violating process, and the eective Majorana neutrino mass. The Majorana Collaboration is assembling an array of high purity Ge detectors to search for neutrinoless double-beta decay in 76Ge. The Majorana Demonstrator is composed of 44.8 kg (29.7 kg enriched in 76Ge) of Ge detectors in total, split between two modules contained in a low background shield at the Sanford Underground Research Facility in Lead, South Dakota. The initial goals of the Demonstrator are to establish the required background and scalability of a Ge-based, next-generation, tonne-scale experiment. Following a commissioning run that began in 2015, the rst detector module started physics data production in early 2016. We will discuss initial results of the Module 1 commissioning and rst physics run, as well as the status and potential physics reach of the full Majorana Demonstrator experiment. The collaboration plans to complete the assembly of the second detector module by mid-2016 to begin full data production with the entire array.

Majorana Demonstrator↗

Status and perspectives of the ICARUS experiment at the Fermilab Short Baseline Neutrino program

In this study, the ICARUS collaboration has employed the 760 t T600 detector in a successful three-year physics run at the underground LNGS laboratory, performing a sensitive search for LSND-like anomalous ν e appearance in the CERN Neutrino to Gran Sasso beam, which contributed to the constraints on the allowed neutrino oscillation parameters to a narrow region around Δm 2 ~ 1 eV 2 . After a significant overhaul at CERN, the T600 detector has been installed at Fermilab. In 2020 the cryogenic commissioning began with detector cool down, liquid Argon filling and recirculation. ICARUS then started its operation collecting the first neutrino events from the Booster Neutrino Beam (BNB) and the Neutrinos at the Main Injector (NuMI) beam off-axis, which were used to test the ICARUS event selection, reconstruction and analysis algorithms. ICARUS successfully completed its commissioning phase in June 2022, moving then to data taking for neutrino oscillation physics, aiming at first to either confirm or refute the claim by Neutrino-4 short-baseline reactor. ICARUS will also jointly search for evidence of sterile neutrinos together with the Short-Baseline Near Detector, within the Fermilab Short-Baseline Neutrino program experiment, and will perform measurements of neutrino cross sections with both beams and several Beyond Standard Model searches with the NuMI beam. In this paper, the main technical achievements of the ICARUS detector subsystems (Time Projection Chambers, Light Detection System, Cosmic Ray Tagger, Trigger and Data Acquisition) obtained with both BNB and NuMI neutrino beams during the commissioning phase, will be presented in terms of the overall detector performance and capability to select and reconstruct neutrino events.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Specific Gamma-Ray Dose Constants with Current Emission Data

The specific gamma-ray dose constant represents the gamma effective dose rate due to a point source of unit activity of a given nuclide at 1 m. New tabulations of specific gamma-ray dose constants have been made using current gamma emission data from the SCALE 6.2.3 software package and International Commission on Radiological Protection Publication 107, combined with the effective dose per fluence conversion coefficients (antero-posterior orientation) of International Commission on Radiological Protection Publication 116. SCALE data cover 1,264 nuclides, and International Commission on Radiological Protection Publication 107 data include 1,192 nuclides, with only 777 nuclides in common between the two sets.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

The LCLS variable-energy hard X-ray single-shot spectrometer

The engineering design, implementation, operation and performance of the new variable-energy hard X-ray single-shot spectrometer (HXSSS) for the LCLS free-electron laser (FEL) are reported. The HXSSS system is based on a cylindrically bent Si thin crystal for dispersing the incident polychromatic FEL beam. A spatially resolved detector system consisting of a Ce:YAG X-ray scintillator screen, an optical imaging system and a low-noise pixelated optical camera is used to record the spectrograph. The HXSSS provides single-shot spectrum measurements for users whose experiments depend critically on the knowledge of the self-amplified spontaneous emission FEL spectrum. It also helps accelerator physicists for the continuing studies and optimization of self-seeding, various improved mechanisms for lasing mechanisms, and FEL performance improvements. The designed operating energy range of the HXSSS is from 4 to 20 keV, with the spectral range of order larger than 2% and a spectral resolution of 2 × 10 -5 or better. Those performance goals have all been achieved during the commissioning of the HXSSS.

Rich, David↗

Commercial Building Planning and Retrofitting Strategy for Grid Services

The increasing integration of distributed energy resources (DERs) plays an important role in improving energy consumption efficiency. In September 2020, the Federal Energy Regulatory Commission (FERC) approved Order 2222 which opens wholesale electricity markets to small capacity DERs. The benefit of this new FERC Order 2222 is that DERs, such as rooftop solar panels and batteries, will be able to participate in regional electricity markets and provide grid services. Meanwhile, the planning and operation strategies of DERs are facing new challenges to account for the impact of the wholesale market with numerous uncertainty factors. Therefore, in this paper, we propose a new planning and retrofitting model for long-term commercial buildings that considers both DER investment and market participation. Specifically, we explore the capability of implementing DERs for grid services. The effectiveness of the proposed model is validated using real-world data. Simulation results also validate that participating in grid services can significantly increase revenues through appropriate building energy management and shorten the payback period of DER investments.

building energy management↗

Total skin electron therapy (TSET): A reimplementation using radiochromic films and IAEA TRS-398 code of practice

Purpose: The aim of this work is to present an updated implementation of total skin electron therapy (TSET) using IAEA TRS-398 code of practice for absolute dosimetry and taking advantage of the use of radiochromic films. The optimization of quality control tests is also included. Methods: A Varian 2100 C/D linear accelerator equipped with the special procedure HDTSe{sup -} (high dose rate total skin electron mode, E=6 MeV) was employed to perform TSET irradiations using the modified Stanford technique. The commissioning was performed following the AAPM report 23 recommendations. In particular, for dual-field beams irradiation, the optimal tilt angle was investigated and the dose distribution in the treatment plane was measured. For a complete six dual-field beams irradiation, the treatment skin dose on the surface of a cylindrical phantom was evaluated by radiochromic films and the B factor which relates the single dual-field skin dose to the six dual-field skin dose was assessed. Since the TRS-398 reference conditions do not meet the requirements of TSET absolute dosimetry, GafChromic EBT films were also employed to check and validate the application of the protocol. Simplified procedures were studied to verify beam constancy in PMMA phantoms without the more difficult setup of total skin irradiation. Results: The optimized geometrical setup for dual-field beams was: Tilt angle={+-}19 deg., SSD=353 cm, and the beam degrader (200x100x1 cm{sup 3}) placed at 320 cm from the source. As regards to dose homogeneity in the treatment plane, for dual-field beams irradiation, the mean relative dose value was 97%{+-}5% (normalizing to 100% at the calibration point level). For six dual-field beams irradiation, the multiplication factor B was 2.63. In addition, beam quality, dose rate, and bremsstrahlung contribution were also suitable for TSET treatments. The TRS-398 code of practice was used for TSET dosimetry, as dose measurements performed by ionization chamber and radiochromic film agreed within 2.5%. Simplified quality control tests and baseline values were presented in order to check flatness, symmetry, and field size with radiochromic films and output and beam quality constancy with ionization chamber. Short-term reproducibility and MU linearity tests were also included. Conclusions: Commissioning parameters met the requirements of TSET treatments and the matching of AAPM guidelines with the IAEA code of practice was successful. Frequent beam performance controls can be easily performed through the presented quality assurance tests. Radiochromic dosimetry facilitated the TSET commissioning and played a major role to validate the application of TRS-398.

60 APPLIED LIFE SCIENCES↗

Report of the Task Group 186 on model-based dose calculation methods in brachytherapy beyond the TG-43 formalism: Current status and recommendations for clinical implementation

The charge of Task Group 186 (TG-186) is to provide guidance for early adopters of model-based dose calculation algorithms (MBDCAs) for brachytherapy (BT) dose calculations to ensure practice uniformity. Contrary to external beam radiotherapy, heterogeneity correction algorithms have only recently been made available to the BT community. Yet, BT dose calculation accuracy is highly dependent on scatter conditions and photoelectric effect cross-sections relative to water. In specific situations, differences between the current water-based BT dose calculation formalism (TG-43) and MBDCAs can lead to differences in calculated doses exceeding a factor of 10. MBDCAs raise three major issues that are not addressed by current guidance documents: (1) MBDCA calculated doses are sensitive to the dose specification medium, resulting in energy-dependent differences between dose calculated to water in a homogeneous water geometry (TG-43), dose calculated to the local medium in the heterogeneous medium, and the intermediate scenario of dose calculated to a small volume of water in the heterogeneous medium. (2) MBDCA doses are sensitive to voxel-by-voxel interaction cross sections. Neither conventional single-energy CT nor ICRU/ICRP tissue composition compilations provide useful guidance for the task of assigning interaction cross sections to each voxel. (3) Since each patient-source-applicator combination is unique, having reference data for each possible combination to benchmark MBDCAs is an impractical strategy. Hence, a new commissioning process is required. TG-186 addresses in detail the above issues through the literature review and provides explicit recommendations based on the current state of knowledge. TG-43-based dose prescription and dose calculation remain in effect, with MBDCA dose reporting performed in parallel when available. In using MBDCAs, it is recommended that the radiation transport should be performed in the heterogeneous medium and, at minimum, the dose to the local medium be reported along with the TG-43 calculated doses. Assignments of voxel-by-voxel cross sections represent a particular challenge. Electron density information is readily extracted from CT imaging, but cannot be used to distinguish between different materials having the same density. Therefore, a recommendation is made to use a number of standardized materials to maintain uniformity across institutions. Sensitivity analysis shows that this recommendation offers increased accuracy over TG-43. MBDCA commissioning will share commonalities with current TG-43-based systems, but in addition there will be algorithm-specific tasks. Two levels of commissioning are recommended: reproducing TG-43 dose parameters and testing the advanced capabilities of MBDCAs. For validation of heterogeneity and scatter conditions, MBDCAs should mimic the 3D dose distributions from reference virtual geometries. Potential changes in BT dose prescriptions and MBDCA limitations are discussed. When data required for full MBDCA implementation are insufficient, interim recommendations are made and potential areas of research are identified. Application of TG-186 guidance should retain practice uniformity in transitioning from the TG-43 to the MBDCA approach.

61 RADIATION PROTECTION AND DOSIMETRY↗

Verification of dosimetric accuracy on the TrueBeam STx: Rounded leaf effect of the high definition MLC

Purpose: The dosimetric leaf gap (DLG) in the Varian Eclipse treatment planning system is determined during commissioning and is used to model the effect of the rounded leaf-end of the multileaf collimator (MLC). This parameter attempts to model the physical difference between the radiation and light field and account for inherent leakage between leaf tips. With the increased use of single fraction high dose treatments requiring larger monitor units comes an enhanced concern in the accuracy of leakage calculations, as it accounts for much of the patient dose. This study serves to verify the dosimetric accuracy of the algorithm used to model the rounded leaf effect for the TrueBeam STx, and describes a methodology for determining best-practice parameter values, given the novel capabilities of the linear accelerator such as flattening filter free (FFF) treatments and a high definition MLC (HDMLC). Methods: During commissioning, the nominal MLC position was verified and the DLG parameter was determined using MLC-defined field sizes and moving gap tests, as is common in clinical testing. Treatment plans were created, and the DLG was optimized to achieve less than 1% difference between measured and calculated dose. The DLG value found was tested on treatment plans for all energies (6 MV, 10 MV, 15 MV, 6 MV FFF, 10 MV FFF) and modalities (3D conventional, IMRT, conformal arc, VMAT) available on the TrueBeam STx. Results: The DLG parameter found during the initial MLC testing did not match the leaf gap modeling parameter that provided the most accurate dose delivery in clinical treatment plans. Using the physical leaf gap size as the DLG for the HDMLC can lead to 5% differences in measured and calculated doses. Conclusions: Separate optimization of the DLG parameter using end-to-end tests must be performed to ensure dosimetric accuracy in the modeling of the rounded leaf ends for the Eclipse treatment planning system. The difference in leaf gap modeling versus physical leaf gap dimensions is more pronounced in the more recent versions of Eclipse for both the HDMLC and the Millennium MLC. Once properly commissioned and tested using a methodology based on treatment plan verification, Eclipse is able to accurately model radiation dose delivered for SBRT treatments using the TrueBeam STx.

60 APPLIED LIFE SCIENCES↗

SU-F-T-48: Clinical Implementation of Brachytherapy Planning System for COMS Eye Plaques

Purpose: To commission the Brachytherapy Planning (BP) system (Varian, Palo Alto, CA) for the Collaborative Ocular Melanoma Study (COMS) eye plaques by evaluating dose differences against original plans from Nucletron Planning System (NPS). Methods: NPS system is the primary planning software for COMS-plaques at our facility; however, Brachytherapy Planning 11.0.47 (Varian Medical Systems) is used for secondary check and for seed placement configurations not originally commissioned. Dose comparisons of BP and NPS plans were performed for prescription of 8500 cGy at 5 mm depth and doses to normal structures: opposite retina, inner sclera, macula, optic disk and lens. Plans were calculated for Iodine-125 seeds (OncoSeeds, Model 6711) using COMS-plaques of 10, 12, 14, 16, 18 and 20 mm diameters. An in-house program based on inverse-square was utilized to calculate point doses for comparison as well. Results: The highest dose difference between BP and NPS was 3.7% for the prescription point for all plaques. Doses for BP were higher than doses reported by NPS for all points. The largest percent differences for apex, opposite retina, inner sclera, macula, optic disk, and lens were 3.2%, 0.9%, 13.5%, 20.5%, 15.7% and 2.2%, respectively. The dose calculated by the in-house program was 1.3% higher at the prescription point, and were as high as 42.1%, for points away from the plaque (i.e. opposite retina) when compared to NPS. Conclusion: Doses to the tumor, lens, retina, and optic nerve are paramount for a successful treatment and vision preservation. Both systems are based on TG-43 calculations and assume water medium tissue homogeneity (ρe=1, water medium). Variations seen may result from the different task group versions and/or mathematical algorithms of the software. BP was commissioned to serve as a backup system and it also enables dose calculation in cases where seeds don’t follow conventional placement configuration.

60 APPLIED LIFE SCIENCES↗

ICARUS at the Fermilab Short-Baseline Neutrino program: initial operation

The ICARUS collaboration employed the 760-ton T600 detector in a successful 3-year physics run at the underground LNGS laboratory, performing a sensitive search for LSND-like anomalous $\nu _e$ appearance in the CERN Neutrino to Gran Sasso beam, which contributed to the constraints on the allowed neutrino oscillation parameters to a narrow region around 1 eV$^2$. After a significant overhaul at CERN, the T600 detector has been installed at Fermilab. In 2020 the cryogenic commissioning began with detector cool down, liquid argon filling and recirculation. ICARUS then started its operations collecting the first neutrino events from the booster neutrino beam (BNB) and the Neutrinos at the Main Injector (NuMI) beam off-axis, which were used to test the ICARUS event selection, reconstruction and analysis algorithms. ICARUS successfully completed its commissioning phase in June 2022. The first goal of the ICARUS data taking will be a study to either confirm or refute the claim by Neutrino-4 short-baseline reactor experiment. ICARUS will also perform measurement of neutrino cross sections with the NuMI beam and several Beyond Standard Model searches. After the first year of operations, ICARUS will search for evidence of sterile neutrinos jointly with the Short-Baseline Near Detector, within the Short-Baseline Neutrino program. In this paper, the main activities carried out during the overhauling and installation phases are highlighted. Preliminary technical results from the ICARUS commissioning data with the BNB and NuMI beams are presented both in terms of performance of all ICARUS subsystems and of capability to select and reconstruct neutrino events.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

R&D ERL: 5 Cell 704 MHz SRF Cavity

One of the key components for the superconducting RF Energy Recovery Linac, (ERL) under development in the Collider Accelerator Department at Brookhaven National Laboratory, is the Linac cavity and cryomodule. The cavity is a 5 cell accelerating cavity designed to operate at 703.75 MHz, and to accelerate 2 MeV electrons from the photoinjector up to 15-20 MeV, allow them to make a single pass around the ERL loop and then decelerate them back down to 2 MeV prior to sending them to the beam dump. This cavity was designed by Rama Calaga and Ilan Ben-Zvi at BNL and fabricated by Advanced Energy Systems in Medford, NY. The cavity was then delivered to Thomas Jefferson Laboratory in VA for chemical processing, testing and assembly of the hermetic string assembly suitable for shipment back to BNL. Once at BNL it was built into a complete cryomodule, installed in the ERL test facility and commissioned. This paper will review the key components of the cavity and cryomodule and discuss the present status of the cryomodule commissioning. The BNL 5 cell accelerating cavity has been designed for use in our high average current Energy Recovery Linac, a proof of principle machine to demonstrate key components necessary for the future upgrades to RHIC as well as applications for future ampere class high current, high brightness ERL programs. The cavity has been tested at greater than 20 MV/m with a Q{sub 0} of 1e{sup 10}, meeting the design specifications for use at full energy in the ERL. This paper will review the cavity design and specifications as well as the RF measurements that have been made both in the VTA at Jefferson Lab as well as during the commissioning in the ERL test cave at BNL. Finally the future plan for cavity testing and measurements prior to its use in ERL operations will be reviewed. The general physics parameters for the cavity can be found in table 1, and the reader is referred to Rama Calaga's Thesis for a much more detailed review of the cavity geometry and design. There are several different parameters that make this cavity design very unique. The first is the 17 cm diameter cavity iris and 24 cm diameter beampipe. The geometry, along with the cavity design, results in a cavity with no trapped higher order modes, and a BBU threshold is > 2 amperes. Another feature of the geometry of this particular cavity is the fact that the lowest mechanical resonance is at {approx}200 Hz, thus making it much less susceptible to microphonics.

43 PARTICLE ACCELERATORS↗

Energy interlock in the Booster to Storage Ring transfer line

Under normal operational conditions in NSLS-II the energy of the beam extracted from the Booster and transferred to and injected into the Storage Ring (SR) is 3 GeV. It was determined that for the commissioning purposes energy range of the beam reaching the SR is allowed to be 2 GeV - 3.15 GeV. While the upper limit of the beam energy is defined by the maximum possible settings of Booster dipoles at the top of the ramp, the lower energy limit has to be provided by magnet interlocks. Dynamic interlocks of the Booster dipoles would be an ideal solution, yet the constraints of time and resources do not allow providing such interlocks for commissioning stage of NSLS-II. Therefore, the static interlock of magnets in the Booster to SR transfer line (BSR) shall be used to build a required “energy filter”. The goal of this exercise is to find a feasible solution for the BSR energy interlock that will be used at commissioning stage of NSLS-II accelerator.

43 PARTICLE ACCELERATORS↗

Final Rulison Path Forward

The U.S. Department of Energy (DOE) Office of Legacy Management developed this report as a guide for discussions with the Colorado State regulators and other interested stakeholders in response to increased drilling for natural gas reserves near the underground nuclear explosion site at Rulison, Colorado. The Rulison site is located in the Piceance Basin of western Colorado, 40 miles northeast of Grand Junction. The Rulison test was the second natural gas reservoir stimulation experiment in the Plowshare Program, which was designed to develop peaceful uses for nuclear energy. On September 10, 1969, the U.S. Atomic Energy Commission, a predecessor agency of DOE, detonated a 40-kiloton nuclear device 8426 feet below the ground surface in an attempt to release commercially marketable quantities of natural gas. The blast vaporized surrounding rock and formed a cavity about 150 feet in diameter. Although the contaminated materials from drilling operations were subsequently removed from the surface of the blast site, no feasible technology exists to remove subsurface radioactive contamination in or around the test cavity. An increase in drilling for natural gas near the site has raised concern about the possibility of encountering residual radioactivity from the area of the detonation. DOE prohibits drilling in the 40-acre lot surrounding the blast site at a depth below 6000 feet. DOE has no evidence that indicates contamination from the Rulison site detonation has migrated or will ever migrate beyond the 40-acre institutional control boundary. The Colorado Oil and Gas Conservation Commission (COGCC) established two wider boundaries around the site. When a company applies for a permit to drill within a 3-mile radius of surface ground zero, COGCC notifies DOE and provides an opportunity to comment on the application. COGCC also established a half-mile radius around surface ground zero. An application to drill within one-half mile requires a full hearing before the commission. This report outlines DOE's recommendation that gas developers adopt a conservative, staged drilling approach allowing gas reserves near the Rulison site to be recovered in a manner that minimizes the likelihood of encountering contamination. This staged approach calls for collecting data from wells outside the half-mile zone before drilling closer, and then drilling within the half-mile zone in a sequential manner, first at low contamination probability locations and then moving inward. DOE's recommended approach for drilling in this area will protect public safety while allowing collection of additional data to confirm that contamination is contained within the 40-acre institutional control boundary.

54 ENVIRONMENTAL SCIENCES↗

Neutrino Interactions

The neutrino group of the University of Tennessee, Knoxville was involved from 05/01/2013 to 04/30/2015 in the neutrino physics research funded by DOE-HEP grant DE-SC0009861. Contributions were made to the Double Chooz nuclear reactor experiment in France where second detector was commissioned during this period and final series of measurements has been started. Although Double Chooz was smaller experimental effort than competitive Daya Bay and RENO experiments, its several advantages make it valuable for understanding of systematic errors in measurements of neutrino oscillations. Double Chooz was the first experiment among competing three that produced initial result for neutrino angle θ 13 measurement, giving other experiments the chance to improve measured value statistically. Graduate student Ben Rybolt defended his PhD thesis on the results of Double Chooz experiment in 2015. UT group has fulfilled all the construction and analysis commitments to Double Chooz experiment, and has withdrawn from the collaboration by the end of the mentioned period to start another experiment. Larger effort of UT neutrino group during this period was devoted to the participation in another DOE-HEP project - NOvA experiment. The 14,000-ton "FAR" neutrino detector was commissioned in northern Minnesota in 2014 together with 300-ton "NEAR" detector located at Fermilab. Following that, the physics measurement program has started when Fermilab accelerator complex produced the high-intensity neutrino beam propagating through Earth to detector in MInnessota. UT group contributed to NOvA detector construction and developments in several aspects. Our Research Associate Athanasios Hatzikoutelis was managing (Level 3 manager) the construction of the Detector Control System. This work was successfully accomplished in time with the commissioning of the detectors. Group was involved in the development of the on-line software and study of the signatures of the cosmic ray backgrounds. Flumerfelt and another graduate student Philip Mason were also studying the non-linearity properties of the NOvA liquid scintillator - information that will be essential at the final stages of NOvA data analysis. Philip Mason also studied the response of the FAR NOvA detector in correlation with solar flares. Flumerfelt and Mason successfully defended their PhD in 2015. Also, undergraduate student Cameron Blake Erickson has defended his undergraduate thesis on the NOvA liquid scintillator studies with Compton gamma spectrometer at UT.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Energy Efficiency Collaboratives

Collaboratives for energy efficiency have a long and successful history and are currently used, in some form, in more than half of the states. Historically, many state utility commissions have used some form of collaborative group process to resolve complex issues that emerge during a rate proceeding. Rather than debate the issues through the formality of a commission proceeding, disagreeing parties are sent to discuss issues in a less-formal setting and bring back resolutions to the commission. Energy efficiency collaboratives take this concept and apply it specifically to energy efficiency programs—often in anticipation of future issues as opposed to reacting to a present disagreement. Energy efficiency collaboratives can operate long term and can address the full suite of issues associated with designing, implementing, and improving energy efficiency programs. Collaboratives can be useful to gather stakeholder input on changing program budgets and program changes in response to performance or market shifts, as well as to provide continuity while regulators come and go, identify additional energy efficiency opportunities and innovations, assess the role of energy efficiency in new regulatory contexts, and draw on lessons learned and best practices from a diverse group. Details about specific collaboratives in the United States are in the appendix to this guide. Collectively, they demonstrate the value of collaborative stakeholder processes in producing successful energy efficiency programs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Development of a project on North Unit Irrigation District’s Main Canal at the Monroe Drop, using a novel low-head hydropower technology called the SLH100

Natel Energy is a low­-head, distributed hydropower company based out of Alameda, CA. Natel manufactures and sells proprietary hydroelectric turbines called hydroEngines® that are suitable for low-­head, high-­flow settings, and range from 30kW to 1 MW of capacity per unit. Natel’s hydroEngine is a state­-of­the-­art two stage impulse turbine, using blades mounted symmetrically on two belts perpendicular to the axis of travel, and using linearly­-moving foils, rather than a rotor, to enable efficient conversion of kinetic energy of large volumes of water at low head with no risk of cavitation. In addition, the hydroEngine can be installed at or above tailwater level, reducing the excavation necessary to build the powerhouse and thus reducing total installed cost and project footprint. Thus, the hydroEngine technology enables a new generation of small hydro installations with low cost of project development, fish-­friendly operations, and small project footprint. In September of 2015, Natel Energy formally commissioned its first project installation in Madras, Oregon, installing 1 SLH100 turbine at an existing drop structure on the North Unit Irrigation District (NUID) Main Canal. The water falls between 13.5 feet to 16.5 feet at this structure, depending on flow. The plant has an installed capacity of 250 kW and an expected annual generation of approximately 873 MWh. The plant operates at an annual capacity factor of 40%, and a capacity factor over the irrigation season, or period of available flow, of 80%. Annual capacity factor is calculated as a percentage of plant operating hours relative to a total of 8,760 hours in a year; because the irrigation canal in which the Project is located only runs water from April to October, the available flow capacity factor is higher. Net greenhouse gas reductions from the Monroe Project are estimated to be 602 tCO2/year. The purpose of this report is to provide an overview of the specifications for Natel’s first commissioned project, the project development process, the plant’s performance, project costs, and the construction, installation, and commissioning process. We hope that this report will provide useful context for assessment of the hydroEngine as a viable technology choice for future distributed, low-­head hydropower projects, as well as assessment of the bankability, performance, reliability, and cost of the hydroEngine.

13 HYDRO ENERGY↗

Implementation of Energy Code Controls Requirements in New Commercial Buildings

Most state energy codes in the United States are based on one of two national model codes; ANSI/ASHRAE/IES 90.1 (Standard 90.1) or the International Code Council (ICC) International Energy Conservation Code (IECC). Since 2004, covering the last four cycles of Standard 90.1 updates, about 30% of all new requirements have been related to building controls. These requirements can be difficult to implement and verification is beyond the expertise of most building code officials, yet the assumption in studies that measure the savings from energy codes is that they are implemented and working correctly. The objective of the current research is to evaluate the degree to which high impact controls requirements included in commercial energy codes are properly designed, commissioned and implemented in new buildings. This study also evaluates the degree to which these control requirements are realizing their savings potential. This was done using a three-step process. The first step involved interviewing commissioning agents to get a better understanding of their activities as they relate to energy code required controls measures. The second involved field audits of a sample of commercial buildings to determine whether the code required control measures are being designed, commissioned and correctly implemented and functioning in new buildings. The third step includes compilation and analysis of the information gather during the first two steps. Information gathered during these activities could be valuable to code developers, energy planners, designers, building owners, and building officials.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗