Search NASA⌕ Search

SEARCH · Search NASA

Results for “Configuration planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,063 records · Page 59

Design of a Solar Sail Mission to Mars

A new area of interest in space vehicles is the solar sail. Various applications for which it has been considered are attitude control of satellites, focusing light on the jungles of Vietnam, and a Halley's comet rendezvous. Although for various reasons these projects were never completed, new interest in solar sails has arisen. The solar sail is an alternative to the rocket-propelled space vehicle as an interplanetary cargo vehicle, and manufacture of solar sails on the space station is a possibility. Solar sails have several advantages over rockets, including an unlimited power supply and low maintenance. The purpose of this project is to design a solar sail mission to Mars. The spacecraft will efficiently journey to Mars powered only by a solar sail. The vehicle weighs 487.16 kg and will be launchable on an expendable launch vehicle. The project includes an investigation of options to minimize cost, weight, and flight duration. The design of the sail and its deployment system are a major part of the project, as is the actual mission planning. Various topics researched include solar power, material, space environment, thermal control, trajectories, and orbit transfer. Various configurations are considered in order to determine the optimal structure. Another design consideration is the control system of the vehicle. This system includes the attitude control and the communication system of the sail. This project will aid in determining the feasibility of a solar sail and will raise public interest in space research.

Feaux, K.↗

Developing a Framework for Effective Network Capacity Planning

As Internet traffic continues to grow exponentially, developing a clearer understanding of, and appropriately measuring, network's performance is becoming ever more critical. An important challenge faced by the Information Resources Directorate (IRD) at the Johnson Space Center in this context remains not only monitoring and maintaining a secure network, but also better understanding the capacity and future growth potential boundaries of its network. This requires capacity planning which involves modeling and simulating different network alternatives, and incorporating changes in design as technologies, components, configurations, and applications change, to determine optimal solutions in light of IRD's goals, objectives and strategies. My primary task this summer was to address this need. I evaluated network-modeling tools from OPNET Technologies Inc. and Compuware Corporation. I generated a baseline model for Building 45 using both tools by importing "real" topology/traffic information using IRD's various network management tools. I compared each tool against the other in terms of the advantages and disadvantages of both tools to accomplish IRD's goals. I also prepared step-by-step "how to design a baseline model" tutorial for both OPNET and Compuware products.

Yaprak, Ece↗

Plan for compensation of self-gravity on ST-7/DRS

The Space Technology 7 (ST-7) payload, flying on the Laser Interferometer Space Antenna (LISA) Pathfinder (LPF) mission, will demonstrate drag-free control of a test mass with acceleration disturbances below 3x10-14 m/s2/(square root)Hz. Low frequency acceleration noise introduced by the electrostatic force needed to counter static mass distribution imbalance is expected to be a significant contributor to the acceleration noise budget. For this reason, the self-gravity (due to mass imbalance) is minimized by adding trim mass to bring the total differential acceleration between the two test masses due to self-gravity below 5x10-10 m/s2 in any axis and the DC acceleration gradient due to self-gravity below 4x10-8 m/s2/m in any axis of either test mass. A plan has been established to develop the distribution and placement of the compensation masses. Compensation for the self-gravity effects on the two test masses is handled in a two step process. A nominal compensation mass is defined and incorporated early and is located very near the test masses. The final trimming for self-gravity occurs after the integration on the spacecraft with small mass added externally to the test mass vacuum enclosures. The plan identifies three preliminary points in the hardware maturity where the trimming to the as-built configuration can take place: (1) during build-up of the sensor vacuum enclosure, (2) prior to delivery of the integrated ST-7 to Europe, and (3) prior to environmental testing of the integrated LPF system. The sensitivity of the self-gravity to knowledge errors in the actual mass distribution is taken into account in the determination of final trimming opportunities and mounting locations.

acceleration noise↗

Ascent/Descent Software

The Ascent/Descent Software Suite has been used to support a variety of NASA Shuttle Program mission planning and analysis activities, such as range safety, on the Integrated Planning System (IPS) platform. The Ascent/Descent Software Suite, containing Ascent Flight Design (ASC)/Descent Flight Design (DESC) Configuration items (Cis), lifecycle documents, and data files used for shuttle ascent and entry modeling analysis and mission design, resides on IPS/Linux workstations. A list of tools in Navigation (NAV)/Prop Software Suite represents tool versions established during or after the IPS Equipment Rehost-3 project.

Brown, Charles↗

James Webb Space Telescope Core 2 Test - Cryogenic Thermal Balance Test of the Observatorys Core Area Thermal Control Hardware

The James Webb Space Telescope (JWST), successor to the Hubble Space Telescope, will be the largest astronomical telescope ever sent into space. To observe the very first light of the early universe, JWST requires a large deployed 6.5-meter primary mirror cryogenically cooled to less than 50 Kelvin. Three scientific instruments are further cooled via a large radiator system to less than 40 Kelvin. A fourth scientific instrument is cooled to less than 7 Kelvin using a combination pulse-tube Joule-Thomson mechanical cooler. Passive cryogenic cooling enables the large scale of the telescope which must be highly folded for launch on an Ariane 5 launch vehicle and deployed once on orbit during its journey to the second Earth-Sun Lagrange point. Passive cooling of the observatory is enabled by the deployment of a large tennis court sized five layer Sunshield combined with the use of a network of high efficiency radiators. A high purity aluminum heat strap system connects the three instrument's detector systems to the radiator systems to dissipate less than a single watt of parasitic and instrument dissipated heat. JWST's large scale features, while enabling passive cooling, also prevent the typical flight configuration fully-deployed thermal balance test that is the keystone of most space missions' thermal verification plans. This paper describes the JWST Core 2 Test, which is a cryogenic thermal balance test of a full size, high fidelity engineering model of the Observatory's 'Core' area thermal control hardware. The 'Core' area is the key mechanical and cryogenic interface area between all Observatory elements. The 'Core' area thermal control hardware allows for temperature transition of 300K to approximately 50 K by attenuating heat from the room temperature IEC (instrument electronics) and the Spacecraft Bus. Since the flight hardware is not available for test, the Core 2 test uses high fidelity and flight-like reproductions.

JWST Thermal Core 2 Test↗

Parametric Study of an Ablative TPS and Hot Structure Heatshield for a Mars Entry Capsule Vehicle

The National Aeronautics and Space Administration is planning to send humans to Mars. As part of the Evolvable Mars Campaign, different en- try vehicle configurations are being designed and considered for delivering larger payloads than have been previously sent to the surface of Mars. Mass and packing volume are driving factors in the vehicle design, and the thermal protection for planetary entry is an area in which advances in technology can offer potential mass and volume savings. The feasibility and potential benefits of a carbon-carbon hot structure concept for a Mars entry vehicle is explored in this paper. The windward heat shield of a capsule design is assessed for the hot structure concept as well as an ablative thermal protection system (TPS) attached to a honeycomb sandwich structure. Independent thermal and structural analyses are performed to determine the minimum mass design. The analyses are repeated for a range of design parameters, which include the trajectory, vehicle size, and payload. Polynomial response functions are created from the analysis results to study the capsule mass with respect to the design parameters. Results from the polynomial response functions created from the thermal and structural analyses indicate that the mass of the capsule was higher for the hot structure concept as compared to the ablative TPS for the parameter space considered in this study.

Langston, Sarah L.↗

Power and Propulsion Element Steerable High Gain Antenna Lunar Transit Thermal Analysis Tracking Methodology

The Power and Propulsion Element (PPE) is an ion thruster propulsion spacecraft developed as an element of Space Reactor (SR-1) Freedom to provide propulsion, communications and power for the spacecraft. PPE was originally being developed for the use with the lunar orbiting space station Gateway as one of the first two planned elements. PPE was to be launched with the Habitation and Logistics Outpost (HALO) element in a configuration called the Co-Manifested Vehicle (CMV) that would arrive at a Near-Rectilinear Halo Orbit (NRHO) around the Moon via a lunar transit spiral trajectory phase. The PPE communication system is equipped with two Steerable High Gain Antennas (SHGA) each steered by a two-axis gimbal (TAG) mechanism. A thermal analysis was conducted during the near-Earth spiral phase of the mission using Thermal Desktop (TD). This analysis utilized multiple axis Earth tracking articulators in combination with SINDA system internal environmental heating symbols to produce accurate Earth ground station tracking communication system temperatures. This presentation provides an overview of the communication system thermal model and the analysis methodology.

Thermal Analysis↗

AERoBOND Project Summary

Under NASA’s Convergent Aeronautics Solutions (CAS) project, the Adhesive-Free Bonding of Complex Composites (AERoBOND) project investigated off-stoichiometric epoxy polymers for fast, reliable assembly of epoxy matrix composite structures. The project goal was to demonstrate feasibility of the AERoBOND joining method by demonstrating mechanical properties greater than 80% of conventional co-cured materials while reducing structure weight by 1%. The project consisted of three convergent research areas: material and process development, systems analysis, and material and process modeling. Material and process development was the largest component of AERoBOND with approximately 6 FTE and 1WYE of support to formulate and characterize new resins, prepare carbon fiber prepregs, fabricate laminates, measure mechanical properties, analyze failure results, and select material and process improvements. The systems analysis activity estimated the potential reduction in part count and aircraft weight by comparing models of composite wing boxes with no fasteners (co-cured structure), fasteners in major joints (co-cured stringers), and fasteners in all joints. The materials and process modeling activity included a molecular model of the AERoBOND materials system to predict mechanical properties of resins with offset stoichiometry and a process model to predict the effect of resin formulation and processing conditions on the extent of mixing and degree of cure in a finished joint. As the number of airline passenger trips doubles in the next 20 years (IATA/Tourism Economics Air Passenger Forecasts, April 2019), the increased demand for new commercial aircraft is now the single greatest technical challenge to the airframe manufacturing industry. To meet efficiency requirements, new aircraft must be fabricated primarily from high performance structural composites, but manufacturing processes are inherently slow with the largest bottleneck attributed to assembly and installation of fasteners (NASA/TM–2019-220428). Manufactures of commercial transport aircraft are compelled to install more than 100,000 redundant fasteners into bonded joints to prevent failures due to unpredictable weak bonds. In structural adhesive bonds, the interface between adherend and adhesive is nearly two-dimensional making it susceptible to minute quantities of contamination, which can cause weak bonds. Currently, bond strength assessment is only possible through destructive testing (i.e., breaking the joint). For these reasons, regulatory organizations such as the Federal Aviation Administration (FAA) often require redundant load paths in secondary-bonded, primary-structures to alleviate concerns with bond performance. The AERoBOND process enables reflow of matrix resin during assembly to eliminate the material discontinuity at the interface, thereby eliminating the dependence of mechanical performance on interfacial adhesion. The AERoBOND joint is equivalent to the interlaminar region obtained during a co-cure process, so joint performance depends on the cohesive properties of the matrix resin. Conventional co-cured structures, although too costly and complex for large-scale manufacturing, are trusted by manufacturers and regulators, and are certified for flight with few or no redundant fasteners.Systems analysis performed on a composite wing model at the scale of a single-aisle commercial transport aircraft indicated that >20,000 redundant fasteners per wing could be eliminated by implementing the AERoBOND joining method. A total weight reduction of 15% was predicted in a wing box by eliminating fasteners and thinning components that must no longer support localized fastener loads and accommodate fastener dimensions. Interlaminar shear fracture toughness measured by the end-notched flexure test was greater than 1 kJ/m2 (nearly 140% of the co-cured benchmark property), which is greatly in excess of the project goals for mechanical properties. Testing was planned to measure interlaminar tensile fracture toughness as well as interlaminar tensile and shear strengths using the same AERoBOND configuration, but was delayed due to closure of LaRC facilities during the COVID-19 pandemic. The AERoBOND process model is partially validated and available for experimental use. It allows the user to input AERoBOND process parameters such as material composition, laminate configuration, and cure cycle to predict the final cure state of the AERoBOND joint. A preliminary, multi-scale material model was developed to predict AERoBOND joint mechanical properties (stiffness and strength) based on the cure state of the joint provided by the process model. The timing for transition of this technology within NASA is excellent as NASA initiates new enduring projects to address composites manufacturing rate challenges. AERoBOND technology is well suited to AAVP/AATT objectives for rapid manufacturing of a composite wing. A minimal effort (1 FTE/$15k procurement/0 WYE) is proposed in FY21 to continue a minor mechanical testing effort and maintain a SAA with ASX composites to develop commercial quality prepreg material. An RFI with the composites industry is suggested to quantify the technology gap between the current TRL and the TRL needed for transition to industry. A moderate effort [3-4 FTE/$150k/1 WYE (~$115k)] is proposed in FY22 for the “high rate composites manufacturing” project currently in planning. The partnership with ASX Composites will be expanded to produce material for sub-element/element-scale “panel-off” activities. Industry partnerships with airframe manufacturers is an expected component to explore damage tolerance and environmental stability. Further development of multi-scale modeling tools (process model, meso-scale model, and molecular model) is planned to enhance and deliver tools for rapid manufacturing infusion.

Frank Louis Palmieri↗

Adaptable Deployable Entry & Placement Technology (ADEPT) for Cubesat Delivery to Mars Surface

The Adaptable, Deployable Entry and Placement Technology (ADEPT), uses a mechanical skeleton to deploy a revolutionary carbon fabric system that serves as both heat shield and primary structure during atmospheric entry. The NASA ADEPT project, currently funded by the Game Changing Development Program in STMD is currently focused on 1m class hypersonic decelerators for the delivery of very small payloads ( 5 kg) to locations of interest in an effort to leverage low-cost platforms to rapidly mature the technology while simultaneously delivering high-value science. Preliminary mission design and aerothermal performance testing in arcjets have shown the ADEPT system is quite capable of safe delivery of cubesats to Mars surface. The ability of the ADEPT to transit to Mars in a stowed configuration (similar to an umbrella) provides options for integration with the Mars 2020 cruise stage, even to consider multiple ADEPTs. System-level test campaigns are underway for FY15 execution or planning for FY16. These include deployment testing, wind tunnel testing, system-level arc jet testing, and a sounding rocket flight test. The goal is system level maturation (TRL 6) at a 1m class Mars design reference mission configuration.

3D Woven↗

Space Launch System Development Status

Development of NASA's Space Launch System (SLS) heavy lift rocket is shifting from the formulation phase into the implementation phase in 2014, a little more than three years after formal program approval. Current development is focused on delivering a vehicle capable of launching 70 metric tons (t) into low Earth orbit. This "Block 1" configuration will launch the Orion Multi-Purpose Crew Vehicle (MPCV) on its first autonomous flight beyond the Moon and back in December 2017, followed by its first crewed flight in 2021. SLS can evolve to a130-t lift capability and serve as a baseline for numerous robotic and human missions ranging from a Mars sample return to delivering the first astronauts to explore another planet. Benefits associated with its unprecedented mass and volume include reduced trip times and simplified payload design. Every SLS element achieved significant, tangible progress over the past year. Among the Program's many accomplishments are: manufacture of Core Stage test panels; testing of Solid Rocket Booster development hardware including thrust vector controls and avionics; planning for testing the RS-25 Core Stage engine; and more than 4,000 wind tunnel runs to refine vehicle configuration, trajectory, and guidance. The Program shipped its first flight hardware - the Multi-Purpose Crew Vehicle Stage Adapter (MSA) - to the United Launch Alliance for integration with the Delta IV heavy rocket that will launch an Orion test article in 2014 from NASA's Kennedy Space Center. Objectives of this Earth-orbit flight include validating the performance of Orion's heat shield and the MSA design, which will be manufactured again for SLS missions to deep space. The Program successfully completed Preliminary Design Review in 2013 and Key Decision Point C in early 2014. NASA has authorized the Program to move forward to Critical Design Review, scheduled for 2015 and a December 2017 first launch. The Program's success to date is due to prudent use of proven technology, infrastructure, and workforce from the Saturn and Space Shuttle programs, a streamlined management approach, and judicious use of new technologies. The result is a safe, affordable, sustainable, and evolutionary path to development of an unprecedented capability for future missions across the solar system. In an environment of economic challenges, the nationwide SLS team continues to meet ambitious budget and schedule targets. This paper will discuss SLS program and technical accomplishments over the past year and provide a look at the milestones and challenges ahead.

Lyles, Garry↗

NASA’s Space Launch System: Enabling a New Generation of Lunar Exploration

Following two decades of operational experience in low-Earth orbit (LEO), NASA has turned its focus once again to deep space exploration. The Agency is building the Space Launch System (SLS) to take astronauts and cargo to the Moon and send robotic spacecraft deep into the solar system. Offering unmatched performance, departure energy and payload capacity, SLS is designed to evolve into progressively more powerful configurations, enabling a new generation of human exploration of the Moon in preparation for future missions to Mars. The first build of the Block 1 vehicle is nearly complete for Exploration Mission-1 (EM-1), the first integrated flight of SLS and the Orion crew vehicle. EM-1 will send an uncrewed Orion to a distant retrograde lunar orbit in order to test and verify new systems, and along the way will deploy 13 6U-class CubeSats in deep space along the upper stage disposal trajectory after separation from Orion. The Agency’s current plans call for the first three missions on the SLS manifest to utilize the Block 1 vehicle in crew and cargo configurations. A more powerful evolved vehicle, Block 1B, will provide additional mass and volume performance using a new Exploration Upper Stage (EUS). Block 1B will lift 34 to 40 metric tons (t) to trans-lunar injection (TLI), depending on crew or cargo configuration. The Block 1B crew configuration will offer as much payload volume as industry-standard 5 m-diameter fairings to co-manifested payloads in a Universal Stage Adapter (USA). The Block 1B cargo variant will accommodate 8.4 meter-diameter fairings in 62.7-foot (19.1 meter) or 90-foot (27.4 meter) lengths. Adding smallsat secondary payloads to ride along with primary and co-manifested payloads on future flights may be possible, depending on mass margins. Leveraging a flight-proven, well-understood propulsion system, SLS’s flexible architecture, unmatched performance and expansive payload accommodations will open exciting new mission possibilities in deep space. Launches of habitat modules for NASA’s new Gateway lunar outpost, the next generation of robotic spacecraft to the far reaches of the solar system, large-aperture deep space telescopes, probes to interstellar space and the return of astronauts to the Moon are all possible with SLS.

Creech, Stephen D.↗

Steady Surface Pressure Measurement via the Lifetime Method With High-Speed Cameras in NASA's Unitary Plan Wind Tunnel

High spatial resolution measurement of steady surface pressure via pressure-sensitive paint at NASA Ames has traditionally relied on specialized cameras equipped to accumulate charge over multiple exposures, whereas measurement of the fluctuating component of pressure uses an altogether separate set of high-speed cameras. To reduce complexity of installation, data acquisition, and processing, we have implemented methods to use a single set of commercial off-the-shelf cameras to produce both steady and unsteady pressure measurements. Both imaging systems were installed in the 11-by 11-foot NASA Ames Unitary Plan Wind Tunnel and acquired images of a scaled model of the Space Launch System Block 1B Crew and Cargo configurations over a variety of flow conditions. This work focuses on methods for data acquisition, processing, and calibration to produce steady-state pressure estimates on the surface of the wind tunnel model based on the lifetime method. It will then compare the steady solutions produced by the legacy and high-speed imaging systems.

Pressure Sensitive Paint↗

Control effectiveness and tip-fin dihedral effects for the HL-20 lifting-body configuration at Mach numbers from 1.6 to 4.5

Wind tunnel tests were made with a scale model of the HL-20 in the Langley Unitary Plan Wind Tunnel. Pitch control was investigated by deflecting the elevon surfaces on the outboard fins and body flaps on the fuselage. Yaw control tests were made with the all movable center fin deflected 5 deg. Almost full negative body flap deflection (-30 deg) was required to trim the HL-20 (moment reference center at 0.54-percent body length from nose) to positive values of life in the Mach number range from 1.6 to 2.5. Elevons were twice as effective as body flaps as a longitudinal trim device. The elevons were effective as a roll control, but because of tip-fin dihedral angle, produced about as much adverse yawing moment as rolling moment. The body flaps were less effective in producing rolling moment, but produced little adverse yawing moment. The yaw effectiveness of the all movable center fin was essentially constant over the angle-of-attack range at each Mach number. The value of yawing moment, however, was small. Center-fin deflection produced almost no rolling moments. The model was directionally unstable over most of the Mach number range with tip-fin dihedral angles less than the baseline value of 50 deg.

Cruz, Christopher I.↗

Ten million and one penguins, or, lessons learned from booting millions of virtual machines on HPC systems.

In this paper we describe Megatux, a set of tools we are developing for rapid provisioning of millions of virtual machines and controlling and monitoring them, as well as what we've learned from booting one million Linux virtual machines on the Thunderbird (4660 nodes) and 550,000 Linux virtual machines on the Hyperion (1024 nodes) clusters. As might be expected, our tools use hierarchical structures. In contrast to existing HPC systems, our tools do not require perfect hardware; that all systems be booted at the same time; and static configuration files that define the role of each node. While we believe these tools will be useful for future HPC systems, we are using them today to construct botnets. Botnets have been in the news recently, as discoveries of their scale (millions of infected machines for even a single botnet) and their reach (global) and their impact on organizations (devastating in financial costs and time lost to recovery) have become more apparent. A distinguishing feature of botnets is their emergent behavior: fairly simple operational rule sets can result in behavior that cannot be predicted. In general, there is no reducible understanding of how a large network will behave ahead of 'running it'. 'Running it' means observing the actual network in operation or simulating/emulating it. Unfortunately, this behavior is only seen at scale, i.e. when at minimum 10s of thousands of machines are infected. To add to the problem, botnets typically change at least 11% of the machines they are using in any given week, and this changing population is an integral part of their behavior. The use of virtual machines to assist in the forensics of malware is not new to the cyber security world. Reverse engineering techniques often use virtual machines in combination with code debuggers. Nevertheless, this task largely remains a manual process to get past code obfuscation and is inherently slow. As part of our cyber security work at Sandia National Laboratories, we are striving to understand the global network behavior of botnets. We are planning to take existing botnets, as found in the wild, and run them on HPC systems. We have turned to HPC systems to support the creation and operation of millions of Linux virtual machines as a means of observing the interaction of the botnet and other noninfected hosts. We started out using traditional HPC tools, but these tools are designed for a much smaller scale, typically topping out at one to ten thousand machines. HPC programming libraries and tools also assume complete connectivity between all nodes, with the attendant configuration files and data structures to match; this assumption holds up very poorly on systems with millions of nodes.

99 GENERAL AND MISCELLANEOUS↗

Integrated Resource Planning Model (IRPM)

The Integrated Resource Planning Model (IRPM) is a decision-support software product for resource-and-capacity planning. Users can evaluate changing constraints on schedule performance, projected cost, and resource use. IRPM is a unique software tool that can analyze complex business situations from a basic supply chain to an integrated production facility to a distributed manufacturing complex. IRPM can be efficiently configured through a user-friendly graphical interface to rapidly provide charts, graphs, tables, and/or written results to summarize postulated business scenarios. There is not a similar integrated resource planning software package presently available. Many different businesses (from government to large corporations as well as medium-to-small manufacturing concerns) could save thousands of dollars and hundreds of labor hours in resource and schedule planning costs. Those businesses also could avoid millions of dollars of revenue lost from fear of overcommitting or from penalties and lost future business for failing to meet promised delivery by using IRPM to perform what-if business-case evaluations. Tough production planning questions that previously were left unanswered can now be answered with a high degree of certainty. Businesses can anticipate production problems and have solutions in hand to deal with those problems. IRPM allows companies to make better plans, decisions, and investments.

99 GENERAL AND MISCELLANEOUS↗

Localization accuracy from automatic and semi-automatic rigid registration of locally-advanced lung cancer targets during image-guided radiation therapy

Purpose: To evaluate localization accuracy resulting from rigid registration of locally-advanced lung cancer targets using fully automatic and semi-automatic protocols for image-guided radiation therapy. Methods: Seventeen lung cancer patients, fourteen also presenting with involved lymph nodes, received computed tomography (CT) scans once per week throughout treatment under active breathing control. A physician contoured both lung and lymph node targets for all weekly scans. Various automatic and semi-automatic rigid registration techniques were then performed for both individual and simultaneous alignments of the primary gross tumor volume (GTV{sub P}) and involved lymph nodes (GTV{sub LN}) to simulate the localization process in image-guided radiation therapy. Techniques included ''standard'' (direct registration of weekly images to a planning CT), ''seeded'' (manual prealignment of targets to guide standard registration), ''transitive-based'' (alignment of pretreatment and planning CTs through one or more intermediate images), and ''rereferenced'' (designation of a new reference image for registration). Localization error (LE) was assessed as the residual centroid and border distances between targets from planning and weekly CTs after registration. Results: Initial bony alignment resulted in centroid LE of 7.3 {+-} 5.4 mm and 5.4 {+-} 3.4 mm for the GTV{sub P} and GTV{sub LN}, respectively. Compared to bony alignment, transitive-based and seeded registrations significantly reduced GTV{sub P} centroid LE to 4.7 {+-} 3.7 mm (p = 0.011) and 4.3 {+-} 2.5 mm (p < 1 x 10{sup -3}), respectively, but the smallest GTV{sub P} LE of 2.4 {+-} 2.1 mm was provided by rereferenced registration (p < 1 x 10{sup -6}). Standard registration significantly reduced GTV{sub LN} centroid LE to 3.2 {+-} 2.5 mm (p < 1 x 10{sup -3}) compared to bony alignment, with little additional gain offered by the other registration techniques. For simultaneous target alignment, centroid LE as low as 3.9 {+-} 2.7 mm and 3.8 {+-} 2.3 mm were achieved for the GTV{sub P} and GTV{sub LN}, respectively, using rereferenced registration. Conclusions: Target shape, volume, and configuration changes during radiation therapy limited the accuracy of standard rigid registration for image-guided localization in locally-advanced lung cancer. Significant error reductions were possible using other rigid registration techniques, with LE approaching the lower limit imposed by interfraction target variability throughout treatment.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

CPAS Preflight Drop Test Analysis Process

Throughout the Capsule Parachute Assembly System (CPAS) drop test program, the CPAS Analysis Team has developed a simulation and analysis process to support drop test planning and execution. This process includes multiple phases focused on developing test simulations and communicating results to all groups involved in the drop test. CPAS Engineering Development Unit (EDU) series drop test planning begins with the development of a basic operational concept for each test. Trajectory simulation tools include the Flight Analysis and Simulation Tool (FAST) for single bodies, and the Automatic Dynamic Analysis of Mechanical Systems (ADAMS) simulation for the mated vehicle. Results are communicated to the team at the Test Configuration Review (TCR) and Test Readiness Review (TRR), as well as at Analysis Integrated Product Team (IPT) meetings in earlier and intermediate phases of the pre-test planning. The ability to plan and communicate efficiently with rapidly changing objectives and tight schedule constraints is a necessity for safe and successful drop tests.

Englert, Megan E.↗

An Overview of Renewable Energy Desk Activities for Power Grid Operations and Planning

This document summarizes how grid operators can address gaps in their planning and operations to maintain reliability as they pursue clean energy goals. When transitioning to higher renewable energy levels, many system operators configure a dedicated renewable energy desk to manage variable renewable energy resource operation. Establishing such a desk in the control room can be a key step in the modernization effort. A renewable energy desk in a control room is a specialized hub focused solely on monitoring, predicting, and managing the influx of energy from renewable sources.

ENERGY PLANNING, POLICY, AND ECONOMY,POWER TRANSMI↗