Search NASA⌕ Search

SEARCH · Search NASA

Results for “Data Telemetry”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,063 records · Page 59

Advanced study of video signal processing in low signal to noise environments

A generalized mathematical and computer model of the revised Apollo television system was developed and used to determine spectral compatibility with the overall Apollo communication system. In particular the effects of the change to commercial television format from slow-scan black and white on the principal telemetering subcarriers was analyzed. Experimental data was obtained from MSC telemetry division confirming the analytical results.

Garden, F.↗

The Viking parachute qualification test technique.

The parachute system for NASA's Viking '75 Mars lander was flight qualified in four high-altitude flight tests at the White Sands Missile range (WSMR). A balloon system lifted a full-scale simulated Viking spacecraft to an altitude where a varying number of rocket motors were used to propel the high drag, lifting test vehicle to test conditions which would simulate the range of entry conditions expected at Mars. A ground-commanded cold gas pointing system located on the balloon system provided powered vehicle azimuth control to insure that the flight trajectory remained within the WSMR boundaries. A unique ground-based computer-radar system was employed to monitor inflight performance of the powered vehicle and insure that command ignition of the parachute mortar occurred at the required test conditions of Mach number and dynamic pressure. Performance data were obtained from cameras, telemetry, and radar.

Raper, J. L.↗

Requirements and capabilities for planetary missions. Volume 2: Mars polar orbiter penetrator 1981

The Mars Polar Orbiter/Penetrator 1981 mission, intended to investigate the manner in which Mars has evolved, and which surveys its geochemistry, performs climatological investigations, and attempts to determine the planet's gravitational field, was described. The spacecraft, modified from the Viking Orbiter design, carries a new remote-sensing payload and six penetrators. The penetrators are released from a 2.46-h, 1000-km sun synchronous circular orbit and interrogated daily throughout the 2-year orbital mission. X-band telemetry is used to increase data return.

Ball, G. G.↗

The SEASAT-A synthetic aperture radar design and implementation

The SEASAT-A synthetic aperture imaging radar system is the first imaging radar system intended to be used as a scientific instrument designed for orbital use. The requirement of the radar system is to generate continuous radar imagery with a 100 kilometer swath with 25 meter resolution from an orbital altitude of 800 kilometers. These requirements impose unique system design problems and a description of the implementation is given. The end-to-end system is described, including interactions of the spacecraft, antenna, sensor, telemetry link, recording subsystem, and data processor. Some of the factors leading to the selection of critical system parameters are listed. The expected error sources leading to degradation of image quality are reported as well as estimate given of the expected performance from data obtained during a ground testing of the completed subsystems.

Jordan, R. L.↗

Aerospace technology can be applied to exploration 'back on earth'

Applications of aerospace technology to petroleum exploration are described. Attention is given to seismic reflection techniques, sea-floor mapping, remote geochemical sensing, improved drilling methods and down-hole acoustic concepts, such as down-hole seismic tomography. The seismic reflection techniques include monitoring of swept-frequency explosive or solid-propellant seismic sources, as well as aerial seismic surveys. Telemetry and processing of seismic data may also be performed through use of aerospace technology. Sea-floor sonor imaging and a computer-aided system of geologic analogies for petroleum exploration are also considered.

Jaffe, L. D.↗

Optimal GSTDN/TDRSS bit error rate evaluation using limited sample sizes

Statistical studies of telemetry errors were made on data from the Solar Mesosphere Explorer (SME). Examination of frame sync words, as received at the ground station, indicated a wide spread of Bit Error Rates (BER) among stations. A study of the distribution of errors per station pass, however, showed that there was a tendency for the station software to add an even number of spurious errors to the count. A count of wild points in science data, rejecting drop-outs and other system errors, yielded an average random BER of 3.1 x 10 to the -6 with 99% confidence limits of 2.6 and 3.8 x 10 to the -6. The system errors are typically 5 to 100 times more frequent than the truly random errors.

Coffey, R. E.↗

A single-frequency multitransmitter telemetry technique

A telemetry technique for a special data collection system being developed for use on general aviation aircraft involved in aeronautical research programs is described. The system consists of a number of sensor-transmitter units at different locations on the aircraft, with individual signal conditioning and logic, which send sampled data signals to a single receiver in the airplane. The transmitters operate independently on the same frequency and are not synchronized to the receiver. The problem of reception of multiple samples simultaneously is treated by discarding such samples. An overlap detection technique for the frequency shift keyed modulation system is described. The amount of predicted data loss due to overlap is presented and compared with results obtained with a circuit implementation; the effects of discarded data on accuracy is discussed.

Carreno, V. A.↗

Concept definition for space station technology development experiments. Experiment definition, task 2

The second task of a study with the overall objective of providing a conceptual definition of the Technology Development Mission Experiments proposed by LaRC on space station is discussed. During this task, the information (goals, objectives, and experiment functional description) assembled on a previous task was translated into the actual experiment definition. Although still of a preliminary nature, aspects such as: environment, sensors, data acquisition, communications, handling, control telemetry requirements, crew activities, etc., were addressed. Sketches, diagrams, block diagrams, and timeline analyses of crew activities are included where appropriate.

Source record↗

Hitchhiker-G: A new carrier system for attached shuttle payloads

A new carrier system has been developed for economical and quick response flight of small attached payloads on the space shuttle. Hitchhiker-G can accommodate up to 750 lb. of customer payloads in canisters or mounted to an exposed plate. The carrier connects to the orbiter's electrical systems and provides up to six customers with standard electrical services including power, real time telemetry, and commands. A transparent data and command system concept is employed to allow the customer to easily use his own ground support equipment and personnel to control his payload during integration and flight operations. The first Hitchhiker-G was successfully flown in January 1986 on STS 61C.

Goldsmith, T. C.↗

An 8.4-GHz dual maser front end for Parkes reimplementation

An 8.4 GHz front-end system consisting of a feedhorn, a waveguide feed assembly, dual masers, and downconverters is being reimplemented at Parkes as part of the Parkes-Canberra Telemetry Array for the Voyager Neptune encounter. The front-end system was originally assembled by the European Space Agency on the Parkes antenna for the Giotto project. It was also used on a time-sharing basis by the DSN as part of the Parkes-Canberra Telemetry Array to enhance the data return from Voyager 2 at Uranus. At the conclusion of these projects in 1986, the front-end system was dismantled, packed, and shipped to Europe. Part of the system was then shipped to JPL on loan for reimplementation at Parkes for the Voyager Neptune encounter. The system is being redesigned and refurbished for operation at Parkes. Tasks include new microwave front-end control cabinets, a closed-cycle refrigeration data acquisition system, a new noise-adding radiometer system, a front-end controller assembly, and refurbishment of the dual 8.4 GHz traveling-wave masers (TWMs) and waveguide feed system.

Trowbridge, D. L.↗

Hitchhiker capabilities

A carrier system has been developed for economical and quick response flight of small attached payloads on the space shuttle. Hitchhiker can accommodate up to 750 lb of customer payloads in canisters or mounted to an exposed side-mount plate, or up to 1200 lb mounted on a cross-bay structure. The carrier connects to the orbiter's electrical systems and provides up to six customers with standard electrical services including power, real time telemetry and commands. A transparent data and command system concept is employed to allow the customer to easily use his own ground support equipment and personnel to control his payload during integration and flight operations. A general description of the Hitchhiker program and the Shuttle Payload of Opportunity Carrier (SPOC) is given and future enhancements are outlined.

Goldsmith, Theodore C.↗

An 8.4-GHz dual-maser front-end system for Parkes reimplementation

An 8.4-GHz front-end system consisting of a feedhorn, a waveguide feed assembly, dual masers, and downconverters was reimplemented at Parkes as part of the Parkes Canberra Telemetry Array for the Voyager Neptune encounter. The front-end system was originally assembled by the European Space Agency and installed on the Parkes antenna for the Giotto project. It was also used on a time-sharing basis by the Deep Space Network as part of the Parkes Canberra Telemetry Array to enhance the data return from the Voyager Uranus encounter. At the conclusion of these projects in 1986, part of the system was then shipped to JPL on loan for reimplementation at Parkes for the Voyager Neptune encounter. New design and implementation required to make the system operable at Parkes included new microwave front-end control cabinets, closed-cycle refrigeration monitor system, noise-adding radiometer system, front-end controller assembly, X81 local oscillator multiplier, and refurbishment of the original dual 8.4-GHz traveling-wave masers and waveguide feed system. The front-end system met all requirements during the encounter and was disassembled in October 1989 and returned to JPL.

Trowbridge, D. L.↗

Development of a calibration workstation for SIR-C

The paper describes the status of a comprehensive synthetic aperture radar (SAR) software package developed specifically to aid the calibration of a multifrequency and multipolarization radar like the Shuttle Imaging Radar, SIR-C. The primary data types processed are engineering telemetry, point targets (corner reflectors and polarimetric active radar calibrators), distributed targets (clutter), tone-generators, and ground receivers. The parameters derived to aid the calibration of the production processor include measurements of relative radiometric channel to channel imbalance, absolute calibration constants, antenna pattern corrections, noise levels, polarimetric cross-talk, and geometric offsets. The software reports standard performance measurements such as resolution, peak and integrated sidelobes, radiometric response accuracy, and geometrical distortions such as scale errors, position bias and standard deviation, and image skew. Furthermore, the inclusion of software to allow updates of the shuttle-state vector (position and velocity) is considered.

Madsen, S. N.↗

Pre-Flight Testing of Spaceborne GPS Receivers Using a GPS Constellation Simulator

The NASA Goddard Space Flight Center (GSFC) Global Positioning System (GPS) test facility has been established within the GSFC Guidance Navigation and Control Center. The GPS test facility is currently housing the STR2760 GPS satellite 40-channel attitude simulator and an STR4760 12-channel navigation simulator. The facility also contains a few other Goddard resources such as an atomic time standard test bed, a rooftop antenna platform and a radome. It provides a new capability of high dynamics GPS simulations for space flight that is unique within the aerospace community. The GPS facility gives a significant advantage in the development and support of GPS based technologies for position, attitude and precise time determination on-board a spacecraft, sounding rocket or balloon. The GPS simulator system is configured in a transportable rack and is available for GPS applications' component development as well as for spacecraft subsystem and system level testing at spacecraft integration and test sites. The GPS facility has been operational since early 1996 and has been already utilized by a few successful flight projects carrying GPS experiments, such as USA Seastar satellite and the first Argentine satellite SAC-A. The experience in the SAC-A pre-flight testing using the STR2760 simulator is summarized as well as the comparison with preliminary analysis of the GPS data from SAC-A telemetry.

Kizhner, Semion↗

Simulations of 6-DOF Motion with a Cartesian Method

Coupled 6-DOF/CFD trajectory predictions using an automated Cartesian method are demonstrated by simulating a GBU-32/JDAM store separating from an F-18C aircraft. Numerical simulations are performed at two Mach numbers near the sonic speed, and compared with flight-test telemetry and photographic-derived data. Simulation results obtained with a sequential-static series of flow solutions are contrasted with results using a time-dependent flow solver. Both numerical methods show good agreement with the flight-test data through the first half of the simulations. The sequential-static and time-dependent methods diverge over the last half of the trajectory prediction. after the store produces peak angular rates. A cost comparison for the Cartesian method is included, in terms of absolute cost and relative to computing uncoupled 6-DOF trajectories. A detailed description of the 6-DOF method, as well as a verification of its accuracy, is provided in an appendix.

Murman, Scott M.↗

Reusable Rack Interface Controller Common Software for Various Science Research Racks on the International Space Station

The purpose of the EXPRESS (Expedite the PRocessing of Experiments to Space Station) rack project is to provide a set of predefined interfaces for scientific payloads which allow rapid integration into a payload rack on International Space Station (ISS). VxWorks' was selected as the operating system for the rack and payload resource controller, primarily based on the proliferation of VME (Versa Module Eurocard) products. These products provide needed flexibility for future hardware upgrades to meet everchanging science research rack configuration requirements. On the International Space Station, there are multiple science research rack configurations, including: 1) Human Research Facility (HRF); 2) EXPRESS ARIS (Active Rack Isolation System); 3) WORF (Window Observational Research Facility); and 4) HHR (Habitat Holding Rack). The RIC (Rack Interface Controller) connects payloads to the ISS bus architecture for data transfer between the payload and ground control. The RIC is a general purpose embedded computer which supports multiple communication protocols, including fiber optic communication buses, Ethernet buses, EIA-422, Mil-Std-1553 buses, SMPTE (Society Motion Picture Television Engineers)-170M video, and audio interfaces to payloads and the ISS. As a cost saving and software reliability strategy, the Boeing Payload Software Organization developed reusable common software where appropriate. These reusable modules included a set of low-level driver software interfaces to 1553B. RS232, RS422, Ethernet buses, HRDL (High Rate Data Link), video switch functionality, telemetry processing, and executive software hosted on the FUC computer. These drivers formed the basis for software development of the HRF, EXPRESS, EXPRESS ARIS, WORF, and HHR RIC executable modules. The reusable RIC common software has provided extensive benefits, including: 1) Significant reduction in development flow time; 2) Minimal rework and maintenance; 3) Improved reliability; and 4) Overall reduction in software life cycle cost. Due to the limited number of crew hours available on ISS for science research, operational efficiency is a critical customer concern. The current method of upgrading RIC software is a time consuming process; thus, an improved methodology for uploading RIC software is currently under evaluation.

Lu, George C.↗

Radio Frequency Telemetry System for Sensors and Actuators

The present invention discloses and teaches apparatus for combining Radio Frequency (RF) technology with novel micro-inductor antennas and signal processing circuits for RF telemetry of real time, measured data, from microelectromechanical system (MEMS) sensors, through electromagnetic coupling with a remote poweringheceiving device. Such technology has many applications, but is especially useful in the biomedical area.

Rainee N Simons↗

Automating CapCom Using Mobile Agents and Robotic Assistants

We have developed and tested an advanced EVA communications and computing system to increase astronaut self-reliance and safety, reducing dependence on continuous monitoring and advising from mission control on Earth. This system, called Mobile Agents (MA), is voice controlled and provides information verbally to the astronauts through programs called personal agents. The system partly automates the role of CapCom in Apollo-including monitoring and managing EVA navigation, scheduling, equipment deployment, telemetry, health tracking, and scientific data collection. EVA data are stored automatically in a shared database in the habitat/vehicle and mirrored to a site accessible by a remote science team. The program has been developed iteratively in the context of use, including six years of ethnographic observation of field geology. Our approach is to develop automation that supports the human work practices, allowing people to do what they do well, and to work in ways they are most familiar. Field experiments in Utah have enabled empirically discovering requirements and testing alternative technologies and protocols. This paper reports on the 2004 system configuration, experiments, and results, in which an EVA robotic assistant (ERA) followed geologists approximately 150 m through a winding, narrow canyon. On voice command, the ERA took photographs and panoramas and was directed to move and wait in various locations to serve as a relay on the wireless network. The MA system is applicable to many space work situations that involve creating and navigating from maps (including configuring equipment for local topology), interacting with piloted and unpiloted rovers, adapting to environmental conditions, and remote team collaboration involving people and robots.

Clancey, William J.↗