Search NASA⌕ Search

SEARCH · Search NASA

Results for “Deployable Power Systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,063 records · Page 59

Southwest Wind Power R&D Test Site Development at the National Wind Technology Center (CRADA CRD-12-00472 Final Report)

Southwest Windpower, Inc. (SWWP) has been designing and distributing small wind turbines for more than 22 years and is the recognized global leader in the design, manufacturing and distribution of small wind systems (400-3000 watts). The company has been a pioneer in the development of wind technology and has built and shipped more than 170,000 wind turbines to over 120 countries worldwide. Headquartered in Flagstaff AZ, SWWP has sales representatives in over 88 countries. Applications for SWWP systems include residential homes, commercial properties, micro grids, remote cabins, telecom transmitters, offshore platforms, water pumping and sailboats. In addition, U.S. Department of Defense uses SWWP’s products in Forward Operating Bases (FOB’s), USGS uses them for remote monitoring of glacier movements and the CIA uses them to provide power seismic monitoring. Today, SWWP plans development of new technologies to address distributed energy market needs and become even more aggressive in international markets. This strategy includes extensive Research, Development, Demonstration & Deployment (RDD&D) activities to improve existing production line into more simple, reliable, and cost-effective wind turbine systems. Important part of such activities is the field testing of the new systems, which should provide: (i) validation of the reliable operation of hardware and software; (ii) validation of numerical models of the system and its components; (iii) field comparison of various control and optimization strategies; (iv) customized reliability testing; (v) customized monitoring and analysis testing; and (vi) IEC certification testing (vii) filed demonstration of system performance and reliability. Such field testing facility should encompass multiple towers and appropriate data acquisition systems. SWWP is exploring to move part of the engineering department to Colorado, and execute its RDD&D strategies in this new location. Partnership with NREL will provide great insights into SWWP’s RDD&D processes and more efficient commercialization by utilizing NWTC as the field testing site, and working close with NREL personnel. NWTC is ideally suited to strain the design. NREL is very experienced with customized and IEC testing. During this project, Southwest Windpower aims to improve the value proposition of distributed renewable energy, and make it a competitive choice in the energy markets. As of today, more then 170,000 small wind turbines, manufactured in the U.S., are installed in more then 180 countries. With the improved value proposition, Southwest Windpower wants to create and address new market needs, substantially increase its sales domestically and internationally, which should have positive impact on the creation of American jobs, competitiveness of U.S. economy, export or U.S. products, and the use of renewable energy.

17 WIND ENERGY↗

Comparing the Net Cost of CSP-TES to PV Deployed with Battery Storage

Concentrated solar power with thermal energy storage (CSP-TES) is a unique source of renewable energy in that its energy can be shifted over time and it can provide the electricity system with dependable generation capacity. In this study, we provide a framework to determine if the benefits of CSP-TES (shiftable energy and the ability to provide firm capacity) exceed the benefits of PV and firm capacity sources such as long-duration battery storage or conventional natural gas combustion turbines (CTs). The results of this study using current capital cost estimates indicate that a combination of PV and conventional gas CTs provides a lower net cost compared to CSP-TES and PV with batteries. Some configurations of CSP-TES have a lower net cost than PV with batteries for even the lowest battery cost estimate. Using projected capital cost targets, however, some configurations of CSP-TES have a lower net cost than PV with either option for even the lowest battery cost estimate. The net cost of CSP-TES varies with configuration, and lower solar multiples coupled with less storage are more attractive at current cost levels, due to high component costs. However, higher solar multiples show a lower net cost using projected future costs for heliostats and thermal storage materials.

14 SOLAR ENERGY↗

Fish-Friendly Hydropower Turbine Development & Deployment: Alden Turbine Preliminary Engineering and Model Testing

The Alden turbine was developed through the U.S. Department of Energy's (DOE's) former Advanced Hydro Turbine Systems Program (1994-2006) and, more recently, through the Electric Power Research Institute (EPRI) and the DOE's Wind & Water Power Program. The primary goal of the engineering study described here was to provide a commercially competitive turbine design that would yield fish passage survival rates comparable to or better than the survival rates of bypassing or spilling flow. Although the turbine design was performed for site conditions corresponding to 92 ft (28 m) net head and a discharge of 1500 cfs (42.5 cms), the design can be modified for additional sites with differing operating conditions. During the turbine development, design modifications were identified for the spiral case, distributor (stay vanes and wicket gates), runner, and draft tube to improve turbine performance while maintaining features for high fish passage survival. Computational results for pressure change rates and shear within the runner passage were similar in the original and final turbine geometries, while predicted minimum pressures were higher for the final turbine. The final turbine geometry and resulting flow environments are expected to further enhance the fish passage characteristics of the turbine. Computational results for the final design were shown to improve turbine efficiencies by over 6% at the selected operating condition when compared to the original concept. Prior to the release of the hydraulic components for model fabrication, finite element analysis calculations were conducted for the stay vanes, wicket gates, and runner to verify that structural design criteria for stress and deflections were met. A physical model of the turbine was manufactured and tested with data collected for power and efficiency, cavitation limits, runaway speed, axial and radial thrust, pressure pulsations, and wicket gate torque. All parameters were observed to fall within ranges expected for conventional radial flow machines. Based on these measurements, the expected efficiency peak for prototype application is 93.64%. These data were used in the final sizing of the supporting mechanical and balance of plant equipment. The preliminary equipment cost for the design specification is $1450/kW with a total supply schedule of 28 months. This equipment supply includes turbine, generator, unit controls, limited balance of plant equipment, field installation, and commissioning. Based on the selected head and flow design conditions, fish passage survival through the final turbine is estimated to be approximately 98% for 7.9-inch (200-mm) fish, and the predicted survival reaches 100% for fish 3.9 inches (100 mm) and less in length. Note that fish up to 7.9- inches (200 mm) in length make up more than 90% of fish entrained at hydro projects in the United States. Completion of these efforts provides a mechanical and electrical design that can be readily adapted to site-specific conditions with additional engineering development comparable to costs associated with conventional turbine designs.

13 HYDRO ENERGY↗

Secure Control Systems for the Energy Sector

Schweitzer Engineering Laboratories (SEL) will conduct the Hallmark Project to address the need to reduce the risk of energy disruptions because of cyber incidents on control systems. The goals is to develop solutions that can be both applied to existing control systems and designed into new control systems to add the security measures needed to mitigate energy network vulnerabilities. The scope of the Hallmark Project contains four primary elements: 1. Technology transfer of the Secure Supervisory Control and Data Acquisition (SCADA) Communications Protocol (SSCP) from Pacific Northwest National Laboratories (PNNL) to Schweitzer Engineering Laboratories (SEL). The project shall use this technology to develop a Federal Information Processing Standard (FIPS) 140-2 compliant original equipment manufacturer (OEM) module to be called a Cryptographic Daughter Card (CDC) with the ability to directly connect to any PC enabling that computer to securely communicate across serial to field devices. Validate the OEM capabilities with another vendor. 2. Development of a Link Authenticator Module (LAM) using the FIPS 140-2 validated Secure SCADA Communications Protocol (SSCP) CDC module with a central management software kit. 3. Validation of the CDC and Link Authenticator modules via laboratory and field tests. 4. Creation of documents that record the impact of the Link Authenticator to the operators of control systems and on the control system itself. The information in the documents can assist others with technology deployment and maintenance.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Factors Affecting Route Selection and Survival of Steelhead Kelts at Snake River Dams in 2012 and 2013

In 2012 and 2013, Pacific Northwest National Laboratory conducted a study that summarized the passage proportions and route-specific survival rates of steelhead kelts that passed through Federal Columbia River Power System (FCRPS) dams. To accomplish this, a total of 811 steelhead kelts were tagged with Juvenile Salmon Acoustic Telemetry System (JSATS) transmitters. Acoustic receivers, both autonomous and cabled, were deployed throughout the FCRPS to monitor the downstream movements of tagged-kelts. Kelts were also tagged with Passive Integrated Transponder tags to monitor passage through juvenile bypass systems and detect returning fish. The current study evaluated data collected in 2012 and 2013 to identify individual, behavioral, environmental and dam operation variables that were related to passage and survival of steelhead kelts that passed through FCRPS dams. Bayesian model averaging of multivariable logistic regression models was used to identify the environmental, temporal, operational, individual, and behavioral variables that had the highest probability of influencing the route of passage and the route-specific survival probabilities for kelts that passed Lower Granite (LGR), Little Goose (LGS), and Lower Monumental (LMN) dams in 2012 and 2013. The posterior probabilities of the best models for predicting route of passage ranged from 0.106 for traditional spill at LMN to 0.720 for turbine passage at LGS. Generally, the behavior (depth and near-dam searching activity) of kelts in the forebay appeared to have the greatest influence on their route of passage. Shallower-migrating kelts had a higher probability of passing via the weir and deeper-migrating kelts had a higher probability of passing via the JBS and turbines than other routes. Kelts that displayed a higher level of near-dam searching activity had a higher probability of passing via the spillway weir and those that did less near-dam searching had a higher probability of passing via the JBS and turbines. The side of the river in which kelts approached the dam and dam operations also affected route of passage. Dam operations and the size and condition of kelts were found to have the greatest effect on route-specific survival probabilities for fish that passed via the spillway at LGS. That is, longer kelts and those in fair condition had a lower probability of survival for fish that passed via the spillway weir. The survival of spillway weir- and deep-spill passed kelts was positively correlated with the percent of the total discharge that passed through turbine unit 4. Too few kelts passed through the traditional spill, JBS, and turbine units to evaluate survival through these routes. The information gathered in this study describes Snake River steelhead kelt passage behavior, rates, and distributions through the FCRPS as well as provide information to biologists and engineers about the dam operations and abiotic conditions that are related to passage and survival of steelhead kelts.

13 HYDRO ENERGY↗

Factors Affecting Route Selection and Survival of Steelhead Kelts at Snake River Dams in 2012 and 2013

In 2012 and 2013, Pacific Northwest National Laboratory (PNNL) conducted a study that summarized the passage route proportions and route-specific survival rates of steelhead kelts that passed through Federal Columbia River Power System (FCRPS) dams. To accomplish this, a total of 811 steelhead kelts were tagged with Juvenile Salmon Acoustic Telemetry System (JSATS) transmitters. Acoustic receivers, both autonomous and cabled, were deployed throughout the FCRPS to monitor the downstream movements of tagged kelts. Kelts were also tagged with passive integrated transponder tags to monitor passage through juvenile bypass systems (JBS) and detect returning fish. The current study evaluated data collected in 2012 and 2013 to identify environmental, temporal, operational, individual, and behavioral variables that were related to forebay residence time, route of passage, and survival of steelhead kelts at FCRPS dams on the Snake River. Multiple approaches, including 3-D tracking, bivariate and multivariable regression modeling, and decision tree analyses were used to identify the environmental, temporal, operational, individual, and behavioral variables that had the greatest effect on forebay residence time, route of passage, and route-specific and overall dam passage survival probabilities for tagged kelts at Lower Granite (LGR), Little Goose (LGS), and Lower Monumental (LMN) dams. In general, kelt behavior and discharge appeared to work independently to affect forebay residence times. Kelt behavior, primarily approach location, migration depth, and “searching” activities in the forebay, was found to have the greatest influence on their route of passage. The condition of kelts was the single most important factor affecting their survival. The information gathered in this study may be used by dam operators and fisheries managers to identify potential management actions to improve in-river survival of kelts or collection methods for kelt reconditioning programs to aid the recovery of Snake River steelhead populations.

13 HYDRO ENERGY↗

Adaptive Solar Energy and Power Storage Platform for Multimetered Properties

Veritel Energy LLC has successfully demonstrated the feasibility of its innovative adaptive solar energy and power storage platform designed for multimetered properties in Phase I of its DOE SBIR grant. The project centered around the development and initial deployment of proprietary hardware and software system that manages and distributes site-generated renewable energy to multiple tenants efficiently. This system integrates seamlessly with existing building infrastructure and utility systems, making it a viable solution for aging multifamily properties often located in at-risk communities. The pilot system was installed in a multifamily building with a single master-meter, and functioned as a pilot to demonstrate a scalable model for renewable energy system adoption across similar properties. This installation not only showed potential for significant reductions in greenhouse gas emissions but also improved the economic viability of renewable installations by allowing property owners to recoup investments through increased energy savings and tenant billing. The Phase I project set the groundwork for further enhancements and testing in Phase II which will aim to apply the technology to projects with dozens of sub-meters, further contributing to the decarbonization of the built environment.

14 SOLAR ENERGY↗

Cybersecurity Technical Assistance Capabilities Overview [Slides]

Electric grids around the world are undergoing rapid structural and operational change, making it more important than ever to understand evolving risks and improve grid resilience and security against natural and human disruptions. Through tailored technical assistance, NREL is working with partners to support the secure and resilient deployment of energy systems and address grid integration challenges.

24 POWER TRANSMISSION AND DISTRIBUTION↗

NREL Price Series Developed for the ARPA-E FLECCS Program

The price data for four regions (CAISO, ERCOT, MISO-W, and PJM-W) are developed using the ReEDS to PLEXOS conversion as described in (Gagnon et al. 2020). The reference ReEDS case chosen is based on the 2020 Standard Scenario Mid-case, which uses the 2020 ReEDS model version (Cole et al. 2020; Ho et al. 2021). All ReEDS model inputs use 2020 Standard Scenarios Mid-case assumptions except for CO2 prices, which are implemented as linearly increasing CO2 price trajectories beginning at $0/tCO2 in 2020 and ending at either $100/tCO2 or $150/tCO2 in 2035 to dive capacity expansion towards a low-carbon system that could support CCS deployment. However, these scenarios also prohibit CCS deployment in this time frame so that resulting price data are not influenced by the deployment and operation of CCS itself. Implementing the ReEDS to PLEXOS conversion tool, PLEXOS is then simulated using the 2035 ReEDS infrastructure for both CO2 price scenarios, with the following model version and setup: PLEXOS Version: 8.2 Solver: Xpress-MP 35.01.01 Mixed integer optimization relative gap 1% System configuration: • Total number of nodes: 134 (consistent with ReEDS balancing areas) • Line losses enforced using piecewise linear approximation • Energy dump was enabled Price data is aggregated to the ISO/RTO level using load-weighted averages. References: Cole, Wesley, Sean Corcoran, Nathaniel Gates, Daniel Mai, Trieu, and Paritosh Das. 2020. “2020 Standard Scenarios Report: A U.S. Electricity Sector Outlook.” NREL/TP-6A20-77442. Golden, CO: National Renewable Energy Laboratory. https://www.nrel.gov/docs/fy21osti/77442.pdf. Gagnon, Pieter, Will Frazier, Elaine Hale, and Wesley Cole. 2020. “Cambium Documentation: Version 2020.” NREL/TP-6A20-78239. National Renewable Energy Lab. (NREL), Golden, CO (United States). https://doi.org/10.2172/1734551. Ho, Jonathan, Jonathon Becker, Maxwell Brown, Patrick Brown, Ilya (ORCID:0000000284917814) Chernyakhovskiy, Stuart Cohen, Wesley (ORCID:000000029194065X) Cole, et al. 2021. “Regional Energy Deployment System (ReEDS) Model Documentation: Version 2020.” NREL/TP-6A20-78195. Golden, CO: National Renewable Energy Laboratory. https://doi.org/10.2172/1788425.

24 POWER TRANSMISSION AND DISTRIBUTION↗

MD PHEV/EV ARRA Project Data Collection and Reporting (Presentation)

This presentation describes a National Renewable Energy Laboratory project to collect and analyze commercial fleet deployment data from medium-duty plug-in hybrid electric and all-electric vehicles that were deployed using funds from the American Recovery and Reinvestment Act. This work supports the Department of Energy's Vehicle Technologies Program and its Advanced Vehicle Testing Activity.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Seasonal Cost-Benefit Analysis of Automated Distribution Feeder Upgrades with Advanced Mitigation Technologies

The increasing deployment of distributed solar photovoltaics (DPV) to meet clean energy goals can trigger adverse grid operation issues, such as voltage excursions and the violation of thermal loading constraints of the power delivery elements (e.g., lines and transformers) on the evolving electricity infrastructure. Such integration issues would require distribution upgrades with associated costs to mitigate them and to maintain reliable and resilient grid operating conditions. Traditional distribution network upgrade approaches use a specific single snapshot analysis that is overly conservative. This study considers a multi-time point analysis to capture both moderate (probable bounds) and extreme grid operating conditions using time points such as minimum load with minimum photovoltaics (PV), maximum load with maximum PV, maximum load with minimum PV, and minimum load with maximum PV. Further, this study investigates seasonal variation impacts and associated distribution upgrade costs for a spring season case (March, representing a low load and high PV scenario) and a summer case (July, representing a high load and high PV scenario). Such seasonal analysis will allow system operators to characterize upgrade requirements and associated costs across various periods. Because the spatial distribution of DPV can impact upgrade and associated costs, this study investigates three common DPV deployment scenarios - randomly deployed, close to the substation, and far from the substation - at different penetration levels. Apart from spatial distribution impacts, this project evaluates the techno-economic impacts of the nodal photovoltaic penetration factor (NPPF) for generating the various DPV deployment scenarios at increasing penetration levels. This project investigates the impact of varying nodal PV-to-load ratios using conservative and extreme NPPF values of 3 and 10, respectively. This study investigates the deployment of traditional infrastructure upgrade strategies, such as installing new voltage regulating equipment, transformers and lines replacements, and the activation of advanced inverter functionality (e.g., autonomous volt/VAR) in expanding PV hosting capacity. Existing DPV systems are assumed to operate with the legacy unity power factor, and we considered the possibility of retrofitting such systems with the activation of volt/VAR control as integration standards and regulations continue to evolve to allow such functions. The cost-benefit analysis metrics used in study include distribution upgrade costs, average cost per watt of the upgrade cost, average marginal cost per watt of the upgrade cost, and power losses.

14 SOLAR ENERGY↗

Techno-Economic Analysis and Optimization of a Compressed-Air Energy Storage System Integrated with a Natural Gas Combined-Cycle Plant

To address the rising electricity demand and greenhouse gas concentration in the environment, considerable effort is being carried out across the globe on installing and operating renewable energy sources. However, the renewable energy production is affected by diurnal and seasonal variability. To ensure that the electric grid remains reliable and resilient even for the high penetration of renewables into the grid, various types of energy storage systems are being investigated. In this paper, a compressed-air energy storage (CAES) system integrated with a natural gas combined-cycle (NGCC) power plant is investigated where air is extracted from the gas turbine compressor or injected back into the gas turbine combustor when it is optimal to do so. First-principles dynamic models of the NGCC plant and CAES are developed along with the development of an economic model. The dynamic optimization of the integrated system is undertaken in the Python/Pyomo platform for maximizing the net present value (NPV). NPV optimization is undertaken for 14 regions/cases considering year-long locational marginal price (LMP) data with a 1 h interval. Design variables such as the storage capacity and storage pressure, as well as the operating variables such as the power plant load, air injection rate, and air extraction rate, are optimized. Results show that the integrated CAES system has a higher NPV than the NGCC-only system for all 14 regions, thus indicating the potential deployment of the integrated system under the assumption of the availability of caverns in close proximity to the NGCC plant. The levelized cost of storage is found to be in the range of 136–145 $/MWh. Roundtrip efficiency is found to be between 74.6–82.5%. A sensitivity study with respect to LMP shows that the LMP profile has a significant impact on the extent of air injection/extraction while capital expenditure reduction has a negligible effect.

25 ENERGY STORAGE↗

Distributed Ledger Technology for Fault Tolerant Distribution Grid Operations

This paper explores the potential of distributed ledger technology (DLT) to improve fault-tolerant grid operations by leveraging its core features as an immutable, decentralized ledger, a distributed, consensus-based agreement process, and a distributed state-replication engine. Distribution power systems deliver electricity to millions of customers; however, they are susceptible to various threats that can result in customer interruptions. These include faults caused by adverse weather conditions, natural disasters, vegetation growth, equipment failure, and malicious attacks. To minimize the effects of these faults, fault-handling approaches rely on network knowledge to isolate affected areas and reconnect unaffected areas, reducing the number of affected customers while maintaining safety. Here, we present a trusted data-sharing architecture that enables independent, distributed actors to reconstruct the pre-fault system state by enabling distributed resources to make appropriate decisions with limited network/system information. Although the process requires some data sharing between switch-delimited areas, the approach limits the amount of private information shared, preserving customers' privacy and business-sensitive information. We include three use cases that form a foundation for third parties to develop functional solutions that can eventually be deployed in the field. The gross error detection method used within switch-delimited areas can identify sensor errors and accurately detect circuit breaker states. The evaluation of possible reconnection while preserving data ownership resulted in a voltage magnitude difference smaller than 0.001% from the OpenDSS power flow solution that has full system knowledge, which is below the expected power flow tolerance. The approach offers a promising opportunity for improving fault-tolerant distribution grid operations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The ATLAS Workflow Management System Evolution in the LHC Run3 and towards the High-Luminosity LHC era

The ATLAS experiment has 18+ years of experience using workload management systems to deploy and develop workflows to process and to simulate data on the distributed computing infrastructure. Simulation, processing and analysis of LHC experiment data require the coordinated work of heterogeneous computing resources. In particular, the ATLAS experiment utilizes the resources of 250 computing centers worldwide, the power of supercomputing centres, and national, academic and commercial cloud computing resources. In this contribution, we present new techniques for cost-effectively improving efficiency introduced in workflow management system software. The evolution from a mesh framework to new types of computing facilities such as cloud and HPCs is described, as well as new types of production and analysis workflows.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

RADIANCE Executive Summary

Microgrids are gaining attention from organizations and cities because of their potential reliability and resilience benefits, especially in remote geographic areas: Microgrids can provide local power during emergencies, and they can reduce the costs of imported fuel by reducing overall fuel use. But the complexities and novelties of microgrid technologies are often barriers to deployment that require testing and validation to overcome. This report describes the testing, validation, and deployment of microgrid technologies in Cordova, Alaska, completed through the U.S. Department of Energy (DOE) Grid Modernization Laboratory Consortium (GMLC) project Resilient Alaskan Distribution system Improvements using Automation, Network analysis, Control, and Energy storage (RADIANCE).

ARIES↗